Loading...
HomeMy WebLinkAbout20180931 Ver 1_USACE Permit_20180731U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-01511 County: Guilford U.S.G.S. Quad: NC -Guilford GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Greensboro Attn: Johnnie Hill Address: 2602 South Elm Eugene Street Greensboro, NC 27406 Size (acres) --0.25 Nearest Town Greensboro Nearest Waterway Brush Creek River Basin Cape Fear USGS HUC 03030002 Coordinates 36.1235 N -79.9207 W Location description: The project area for the Western Trail Stream Restoration Improvements project is located between Western Trail and Firewood Trail, approximately 0.35 mile west of High View Road, in Greensboro, Guilford County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of dredged or fill material into a total of 150 linear feet of stream channel, including culvert removal and construction of a concrete toe wall for bank stabilization (33 linear feet), and restoration of stream channel using natural channel design techniques (117 linear feet), Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 27. Aquatic Habitat Restoration, Establishment and Enhancement Activities; NWP 18. Minor Discharges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 7/3/2018, and the enclosed plans "Western Trail Stream Restoration Improvements Project P-05831-03" Sheets 1-10. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at 919-554-4884 ext. 30 or David.E.Bailey2(a�usace.army.mil. Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=BAl LEY.DAVI D.E.1379283736 r Date: 2018.07.3112:29:50-0a�00� Date: 07/31/2018 Corps Regulatory Official: Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmgpu.usace.aM.mil/cm_apex/Vp=136:4:0. Copy furnished: David Hamilton, ARCADIS, 1 Centerview Drive, Suite 208, Greensboro, NC 27407 Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105 C�itr JI G�re�e���mb Jr, J J . tIth0 0a au rJcja a Daps, > ritm � � � ern � � tr Weg- terli g1 � r�ri =�,i1 sm t�r�el ���� tr Jr,aitl J�� 1mr r l per, r r lenr l t p rb J jeC�tr p=05831=03 1 e " PROJECT LOCATION�i , 1, d G R E E N S S 0 R 0 7\ - - 'I URO"'. _ _ d• �, � - ms's&'• _ Y r] .•y " I _ M _ _ _ `-"mac CITY OF GREENSBORO P ENGINEERING DIVISION ' - �_� „F,, �,, 100W, DESIGN SUBMITTAL 300 W. WASHINGTON ST. GREENSBORO,NC 'As F !I'LL _ __ 4 �'i F `• � � CITY OF GREENSBORO WATER RESOURCES DEPT. 2602 S. ELM -EUGENE ST. i. � °••-�•-��"%v, ''.p I{nnwwfra1511C11JW. m GREENSBORO,NC - Call Before yvu dig, VIrC�IIr ,,�IrTr y • AF ��.. J �JJ J J JJJJ JJ — - 1' EXISTING FEATURES PROPOSED FEATURES -RARI III SHOUK I. \\j o o X. CDWRACT SHEET IF - - - - - - - - - _t. - - ON E = ... ­RX11 ­­ C-A- I— I. SB STRIVE INFORMATION Notts be coplod or dMdxftd wthout tho -I IN IS LINE 111 1111 LIE TV P,UAE ONE "o -p- wdft- parnhdon oftho011yal'Gremminibm. 03 Am INLET 11 MUE1 Gi _ MEUUR -TE mm TP I REM -D AS - - OPS wa Ere -R­ CSI -Ul- - XX - ­ - -I.- S111. TEUDIN­ ONE SIRISU OUDIMS. INE -HEAD RSIBRS CA lt)G&,P A? PuR­ I.T .------ --I --T I I IH. ­ 1.1. SIU- 1­MR­ I.1E S11 - HASMAQ ­PA1 TRAISIDAN. oe NPIDES General Permit ­ Applies -MAHR. ISHT 41 SSN ­­ _E - LOCATION MAP DISTURBED AREA o -I- III E.ISNRNS IRw III IRSPERI LNE 1. 8W' 0.22 Acres -- - FAA - -1 2!00 RE -DI --Al. EA1­1 TAX M.L.I.- P,UAE -1 INE s I -SH INDEX TO CONTRACT DRAWINGS. SHEET NO. DESCRIPTION 11 4e EU I- IN. TRUI ONE mFF NADIETI) SHRUB (P - wars,I � _ gDMER INjSNEETRNG.HAR _ AMAUNI C`­I'� U=NG COMBINERS BEHO AND EIG IS NIS Cl .1=1 -ON DIIII UIBN _LS C I ED=ICTRI I_ , UIGON DI_IIN LS HE.- --T .1 S.DSE ABBREVIATIONS IAMEMBT AAS NIONED ABAND NUMBER SBESTOS CEMENT AD OUTSIDE DIAMETER ASP ALTI-- BACKUPORB SC NO I OF 11 ------------- -1 OF STUNE 1UNTLI OF I.AN.11 PPAGE BACKFLOW PREVENTER EF1 K EAS UNE EL -NAIL 6 P EROOK AS MENT ESMT - BP BEARING BIG I— CHLORIDE BEST MANAGEMENT PRACTICES BMP POUNDS PER SQUARE INCH BOTTOM BIT PRPSTESSEDCONCRETE P, PWS P PVC Pps PS CONC UUARU 1XL C.NT.UI E CENTER LINE CIL P IER_ LINE CENTER TO CENTER C/C PIEDMONT TRIAD AIRPORT AUTHORITY QUANTITY PL PTAA Q, U,1H1D AREA E -ARI CITY OF CLEANOUT CO (MENTI) TO GREENSBORO DID REINFORCE (D) (ING) REINFORCED CRETE REINIF RCONG A RU.-GA1 ­­AIK CLEAR c UP CONCRETE CONCRETE C `NC REINFORCED PIPE CONTROL DENSITY PILL CIF R QUIRES RESTRAINED JOINT PIPE RIP REDD RIP CORRUGATED METAL PIPE CMP CROSS SECTION A SECT RIGHT OF R/W ,00 YR 1. - -D S.UNDAA1 CURB INIUET CI SAN- BOOK D.B. SERVER SAN SIR 100% DESIGN SUBMITTALDEED AIR -I UEMOLTION DEMO SOL BORINGS 'T" D' o I FORT I AMETER DIA SQUARE YARD -IN DR STANDARD DUCTILE IRON DI STAINLED STEEL .ENT ESMT STAND EACH EA STONE EDGE OF -ENT EP STORM TAX MAP NUMBER BORE So I SO YD STD SET STA STN STM TMLNE ELECTRIC (AL) -C ELEVATION ELTELEPHONETE ENGINEER ENGR TEMPORARY BENCH MARK EXISTING EX, EXIST TEMPORARY CONSTRUCTION EASEMENT FIBERGLASS REINFORCED TEMPORARY SEDIMENT TRAP POLYMER MORTAR FRPM TEST BEHIND -XX (E.G. TE -1) FORCE MIN FM THICKNESS FOUNDATION FN. TO BE ABANDONED TBM TCE - TF -XX THK T.I, GREENSBORO DEPT. OF TO BE REMOVED TRANSPORTATION G OT TREE BRAD (E) (ING) I TYPICAL UNDERGROUND TBR T UND GROUND I I H_HNDINQIESI=�IYNOTED T.RNS. HORIS UNNAMED I ENT - BOX INSIDE DIAMETER NV -TICAL NV _ PIPE IRON PIPE IF ­TREHED LIN UT VERT VC P 0 ol. Ro� g LIN"' LIN WA I LIN FOOT LF -R MEC`LAMATION FADIUTY MANHOLE M" -I SURFACE ELEVATION WM WRF ISE I -;I,, IN MAX "M MAX MECHANICAL JOINT M MINIMUM MIN MONUMENT MON HIS TYPE I CONTRACT ICONTRACTORI AS -BUILT I AUTH. OAT BENCH MARKS IN 777.'EE CITY OF GREENSBORO DIVISION G-2 SHEET N0. ROAN Y I ENI SI MIEY i mg -ENGINEERING WESTMN TRNIL STREAM RESTORATION TelOUA 2. AT CHECKED :y DAN III N. C-1IN DRAINING INDEX/SHEET INDEX MAP DF sIMALK SCALE, AS NOTED NARRATIVE CONTRACT SHEET PROJECT OESC - OF - THE PURPOSE OF THE EROSION CONTROL MEASURES SHOWN ON THESE PLANS SHALL BE TO PRECLUDE THE TRANSPORT OF ALL WATERBORNE SEDIMENTS RESULTING FROM CONSTRUCTION ACTIVITIES FROM ENTERING ONTO ADJACENT PROPERTIES OR STATE WATERS. IF SENSITIVE INFORMATION PROJECT NOTES FIELDINSPECTION REVEALS THE INADEQUACY OF THE PLAN TO CONFINE SEDIMENT TO THE PROJECT SIZE, ALL APPROPRIATE MODIFICATIONS Not To be Copied or WILL BE MADE TO CORRECT ANY PLAN DEFICIENCIES. INADDITION TO THESE NOTES, ALL PROVISIONS OF THE NORTH CAROUNA EROSION AND SEDIMENT CONTROL REGULATIONS SHALL APPLY TO THIS PROJECT, THE TOTAL AREA OF LAND DISTURBANCE FOR THIS PROJECT IS APPROXIMATELY 0.22 ACRES. N11hoLITi11B I. INSTREAM STRUCTURE SYMBOLS SUCH AS BOULDER CROSS VANE, ROOT WADS, BRUSH E, TO ETC. ARE NOT TO SCALE AND ARE REPRESENTATIVE OF THE PROPOSED STRUCTURE EXISTING SIZE CO -#Ten p��1 a ofG�Ym��1�V LOCA TIONS.REFER TO THE DETAIL SHEETS ON C-4 THROUGH C-7 FOR ACTUAL STRUCTURE SIZING AND DIMENSIONS, THE ENTIRE PROJECT SIZE IS FORESTED, SURROUNDING AND DOWNSTREAM OF THE PIPE OUTLET IS EXTREMELY INCISED AND IN NEED OF 2. ONLY TREES THAT ARE MARKED FOR REMOVAL MAY BE CUT. THE REMAINING TREES WITHIN REPAIR. OFF-SITE AREAS THE LIMITS OF DISTURBANCE SHALL BE PROTECTED DURING CONSTRUCTION. NO OFF-SITE LAND DISTURBING ACTIVITIES ARE CURRENTLY PLANNED IN CONNECTION WITH THIS PROJECT. IF THE NEED FOR OFF -SIZE LAND DISTURBING ACTIVITIES ARISES DURING CONSTRUCTION THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTAL E&S PLAN COVERING THIS , ACTIVITY FOR APPROVAL BY THE PLAN APPROVING AUTHORITY. ANY SOIL MATERIAL HAULED TO OR FROM THE SITE MUST BE TO A PERMITTED G­ L$. RDING TO THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) WEB SOIL SURVEY, TWO SOILS OCCUR W MIN TIE PROJECT AREA. THESE SOILS CONSIST OF POPLAR FOREST SANDY LOAM, AND POPLAR FOREST CLAY LOAM. THESE UNITS ARE WELL DRAINED SOILS ON AREAS WITH SLOPES CATEGORIZED FROM 6-35 PERCENT. ■yAI�IOYY. CRITICAL AR THE AREAS WITHIN OR ADJACENT TO WATERWAYS ARE CONSIDERED CRITICAL. DISTURBANCE SHALL BE MINIMIZED TO THE EXTENT POSSIBLE AND M TRA CARE SHALL BE TAKEN IN INSTALLING AND MAINTAINING THE SPECIFIED EROSION &SEDIMENT CONTROLS. THE EXISTING STREAM BANKS ALONG THE DOWNSTREAM PORTION ARE NEARLY VERTICAL SLOPES W1TH POTENTIAL FOR SIGNIFICANT EROSION. AND N AND ROL MEA ORES SED T THE CITY SHALL ORGANIZE AN ON811E PRE-CONSTRUCTIONN MEETING FOR ISSUANCE OF THE LAND DISTURBING PERMIT 48 HOURS PRIOR TO TIE START OF ANY LAND DISTURBING ACTIVITY. THE CERTRED RESPONSIBLE LAND DISTURBER (CROL) MUST ATTEND THE Iom�Iw �nfJI111o11aII i�WN� -- -- 13 5e5 PRE-CONSTRUCTION MEETING. THE LIMITS OF DISTURBANCE MUST BE FLAGGED IN THE FIELD WITH CHAD ORANGE SAFETY FENCE AND SUPER SILT FENCE WITH ORANGE FABRIC PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT. FLAG ALL TREES LOCATED WITHIN THE LIMITS OF DISTURBANCE WHICH WILL REMAIN, AXT ­wage------ 313-1 NPDES PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT THE LIMITS OF DISTURBANCE MUST BE CLEARLY FLAGGED. 2. AN ONSITE PRE-CONSTRUCTION MEETING SHALL BE HELD PRIOR TO CONSTRUCTION. CITY OFFICIALS. THE ENGINEER, AND CERTIFIED General Permit RESPONSIBLE LAND DISTURBER (CHILD) MUST ATTEND. APPROPRIATE OFFICIALS MUST RECEIVE 48 HOUR NOTICE PRIOR TO SCHEDULING, 3, INSTALL CONSTRUCTION ENTRANCES, AT THE TIME OF THE PRE-CONSTRUCTION MEETING. TWO STANDARD SIGNS MUST BE INSTALLED ON EACH 510E OF THE CONSTRUCTION ACCESS. THOSE SIGNS SHOULD STATE EITHER "CONSTRUCTION ENTRANCE AHEAD" OR "TRUCKS Applies ENTERING HIGHWAY'. . INSTALL INLET PROTECTION ON THE CURB INLETS AND CULVERTS NEAR THE CONSTRUCTION ENTRANCES. DISTURBED AREA 5. INSTALL SILT FENCE AROUND THE TEMPORARY CONSTRUCTION STAGING AREAS AS SHOWN ON PLANS. 6. CLEARING OF EXISTING TREES SHALL BE LIMNED TO THE MINIMUM EXTENT NECESSARY TO PERFORM THE PROPOSED WORK. ALL TREES 0.22 Acres WITHIN THE UNITS OF GRADING MAY BE REMOVED, 00 NOT REMOVE TREES OUTSIDE OF THE LIMITS OF GRADING UNLESS SHOWN ON TIE PLANS OR APPROVED BY TIE ENGINEER. PROVIDE TREE PROTECTION MEASURES FOR TREES MICH ARE TO REMAIN, 7. INSTALL ROOT PROTECTON MATTING FOR STAGING/STOCKPILE AREAS AS WELL AS CONSTRUCTION ACCESS AND HAUL ROADS. 8, INSTALL TEMPORARY VEHICULAR STREAM CROSSINGS WHERE NEEDED IN ACCORDANCE WITH DETAILS ON PLANS.. STREAM CO 1. BEGIN WORK AT THE UPSTREAM SECTION AND PROCEED DOWNSTREAM. ONLY BEGIN WORK IN AN AREA WHICH CAN BE COMPLETED BY TIE END OF THE DAY INCLUDING GRADING ADJACENT TO TIE CHANNEL. WORK SHALL NOT BE CONDUCTED IN THE CHANNEL DURING gRAIN EVENTS, THE STREAM BYPASS DETAILS IPNNTHENO DIAIERING TO DIVERT FLOW AROUND INSIREAM CONSTRUCTION SITES IN ACCORDANCE VAIN $ 3. PROCEED 11 STREAM BANK GRADING AND INSTALLATION OF INSTREAM STRUCTURES, 4 AS GRADING IS COMPLETED, FINISHED SURFACES SHALL BE STABILIZED WTH BLANKET AND MATTING, SEEDING, PLANTINGS, AND UVE STAKES AS SHOWN ON PLANS, AREAS TO RECEIVE SEEDING SHALL BE SURFACE ROUGHENED PRIOR TO SEEDING. g m 5. ALL CONSTRUCTION STAGING AREAS SHALL BE RETURNED TO NATURAL GROUND AND RESTORED AT THE COMPLETION OF THE PROJECT. x S k§ - ALL DISTURBEDAAREAS WITHIN THE PROJECT AREA AND STREAM SHALL BE PLANTED AND RESTORED IN ACCORDANCE WUH THE PLANS AND DETAILS. EROSION CONTROL BLANKETS SHALL BE INSTALLED ON SLOPES 3:1 OR STEEPER TO PROTECT THE SLOPES FROM EROSION AND ALLOW THE SEED TO GERMINATE PROPERLY BLANKETS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND THE MANUFACTURER'S INSTRUCTONS. S SEEDED AREAS WHICH DO NOT GERMINATE OR WHICH DIE SHALL BE RESEEDED AFTER DETERMINING TUE CAUSE OF THE PROBLEM AND KING THE NECESSARY CORRECTIVE ACTION, AFTER ADEQUATE STABIUZATION HAS BEEN ACHIEVED, ALL TEMPORARY E&5 MEASURES SHALL BE REMOVED. MAINTENANCE HETH RESPONSIBLE LAND DISTURBER SHALL BE RESPONSIBLE FOR E MAINTENANCE AND REPAIR OF ALL EROSION AND SEDIMENT CONTROL STRUCTURES. IN GENERAL. ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH SIGNIFICANT RAINFALL ANY NECESSARYCLEANUPMAINTAIN EFFECTVENESS OF THE EROSION CONTROL DEVICES SHALL REPAIRMS FOLLOWING WLL RE CHECKED CO RE 1. BE TEMPORARY VEADE HICULAR STREAMLY. ME CROSSINGE SHALL BE CHECKED FOR STRUCTURAL INTEGRITY, FOR ANY UNDERMINING AT THE BASE OF THE CROSSING, OR EROSION AT THE TOP OF BANK. 2. TREE PROTECTION AND ROOT PROTECTION MATTING SHALL BE CHECKED FOR EROSION, UNDERMINING, OR OTHER DEFICIENCIES WHICH COULD RESULT IN DAMAGE TO PROTECTED TREES AND ROOT SYSTEMS FROM CONSTRUCTION ACTIVITY 8 3. SILT FENCE SHALL BE CHECKED FOR UNDERMINING, "END RUNS' AND FABRIC INTEGRITY. REMOVE SEDIMENT WHEN THE LEVEL OF DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER, 4. CHECK SEEDED PLANTED AREAS TO ENSURE THAT A GOOD STAND IS MAINTAINED, RESEED AND FERTILIZE AS NEEDED. jppx DESIGN SUBMITTAL E d£ Zt,, ..�",�. 3 �►n �"�I� =1 Ci FL�ny REVISIONS TYPE CONTRACT CONTRACTOR AS-BUILT AUTH. OAT BENCH MARKS JOB NO. GR91GDo Pb5B3f-O3 CITY OF GREENSBORO C'-3 RDADWAr oESIBNEo Br M. ���� ENGINEERING DMSIONAAR SEWER CONST. SURVEY BY COB � N TRAM S1n8AM RBSTOBAnON SIEET N0. RcnnlBceMNNo�Wca�ma,l Tal, ss,e AOre WATER CIECKEO BY DAH k CeMwlawHVNJL'Bnc JMU NOTES 1fW -3-11L SIDEWALK SCALE: AS NOTED k v� REMOVE 50 LF �1 - A30" 10RM8\PIZnEN9INV=879 � v2;v sen I 3 - FIREWOOD TRAIL - TEMPORARY SILT CHECK DAM POTENTIAL TREE DEMO NOflhing Easling 865125.78 1728079.58 865116.08 1728113.50 •8' 865124.81 1728576.39 865120.39 1728106.38 ^12" 865151.15 1728002.25 665168.07 1728011.32 •12" 865156.27 1728035.74 I�LISMITS OF SURVEY DO NOT EXTEND TO THE ^14" 1 865157.99 1728018.61 RIGHT OF WAY. ADDITIONAL TREE DEMOLITION MAY BE NECESSARY FOR CONSTRUCTION ^IB" 865161.10 1728034.32 ACCESS. 2, IONIRACTUR TO HELD ADJUST THE 665150.52 1727999.66 PROPOSED CONSTRUCTION ACCESS/HAUL ROAD TO MINIMIZE LAND DISTURBANCE ANG •20" 865148.32 1728039.50RVE EXISTNG VEGETATION T THE MAX SMUM EXTENT PRACTICABLE. ^24"1 865112.57 1728105.47 3, FOR STREAM CROSSING, SEE SHEET C-4. ^TO BE PRESERVED IF POSSIBLE. HORZ.: SCALE 1" = 10' 100% DESIGN SUBMITTAL LEGEND CONTRACT SHEET = OF O-s- SILT FENCE SENSITIVE INFORMATION Not to be coplad or �L d tftdodwNhaRlhe c 0 (ONLYRAS NEEDED) r 043115 lheor d riiiarceoro. TREE DEMO )f ee Size ng Easling 4" 865110511 9.56 1728071.92 4" 865121.55 1728074.53 4" 865106.78 1728108.72 865105.60 1728105.80 665098.53 1728095.67 , ellb.�Gdg G. 865110.30 1728073.37 8" 865102.85 1728113.95 10' 865086. 72 1728096.15 865128.10 1728053.89 24' 865106.50 1728061.15 2e 24' 865139.09 1727991.45 cNv a IXaansbwo utgwpouna loCal'4°1nNMMXa17RMwsls - ---- �3-ses __-_ ------ NPDES 24" 865141.76 1728004.16 General Permit 665143.66 1727999.70 24' 865107.36 1728097.80 Applies DISTURBED AREA = 24' 865096.97 1:28099.69 30' 865121.74 1728065,77 0.22 Acres POTENTIAL TREE DEMO NOflhing Easling 865125.78 1728079.58 865116.08 1728113.50 •8' 865124.81 1728576.39 865120.39 1728106.38 ^12" 865151.15 1728002.25 665168.07 1728011.32 •12" 865156.27 1728035.74 I�LISMITS OF SURVEY DO NOT EXTEND TO THE ^14" 1 865157.99 1728018.61 RIGHT OF WAY. ADDITIONAL TREE DEMOLITION MAY BE NECESSARY FOR CONSTRUCTION ^IB" 865161.10 1728034.32 ACCESS. 2, IONIRACTUR TO HELD ADJUST THE 665150.52 1727999.66 PROPOSED CONSTRUCTION ACCESS/HAUL ROAD TO MINIMIZE LAND DISTURBANCE ANG •20" 865148.32 1728039.50RVE EXISTNG VEGETATION T THE MAX SMUM EXTENT PRACTICABLE. ^24"1 865112.57 1728105.47 3, FOR STREAM CROSSING, SEE SHEET C-4. ^TO BE PRESERVED IF POSSIBLE. HORZ.: SCALE 1" = 10' 100% DESIGN SUBMITTAL LEGEND O-s- SILT FENCE a-'-- TREE PROTECTION LIMITS OF DISTURBANCE OCONSTRUCTION ENTRANCE ® HAUL ROAD X.°PtN TREEREMOVAL � Qp{ESSgpq-Y '4� e 0 (ONLYRAS NEEDED) r 043115 ® REMOVE PIPE _ 6/20/2018 F4C1pEC4 CITY OF GREENSBORO C ENGINEERING DFVII ViESTEtNTRAELSiRBAMRSSToRATI�i SHEET N0. EXISTING CONDITIONS DEMO AND ESS 1fA J LOG ROLLERS STA 0.33 STA0+42 SEE DETAIL SHEET C - ROOT WADS S""0" - SEE DETAIL SHEET C-5 C A� .a / LOG J -HOOK VANE SEE DETAIL SSTA 1+42 HEET C-6 SS TA ROOT WADS TO STAP0.86 �S SST' A SHEET 1 STA 11+1,5 .SEE DETAIL SHEET C-5 Loo SEE DETAIL SHEET C-4 L `OO\_ LOO�EoIIP ND SEE EITI I a PRGPDSED \ °ST�REAMBE Vim—LaoLOD—� !/fir STA 1+0401 VANE SEE DETAIL SHEET C-6 FRARC4LD151 ME` AFOMIGBmMNWt MWOe�m�Ine�,Inc Tel. -8 0+00.00 0+25.00 -2D-'°rD 2D -20 -10O+75.00 ,D 2G 0+50.O -20 -10 o 10 20 -20 -10 0 10 20 1 +00.00 1 +25.00 320 820 820 E2 820 820 821 BI5 815 815 815 \ 1 / BIS 815 815 \ 815 -20 -10 o 10 20 -20 -10 0 10 20 1 +00.00 1 +25.00 CONTRACT SHEET OF - SENSITIVE INFORMATION Not to be copied or dehbuted MAlhoutthe of the Oly of Gmwmbm. i eww�betow. tleto.laudg NPDES General Permit Applies DISTURBED AREA = 0.22 Acres LEGEND GRADING LIMITS LIMITS OF DISTURBANCE HAUL ROAD 100% DESIGN SUBMITTAL pofESSp_ -Y 0� HORZ: SCALE 1" = 10' 4 0 J115 - 6/20/2018 ® pE P 810 VERTICAL: SCALE 1' 5 CITY OF GREENSBORO C— 2 ENGINEERING DIVISION VII TRAEL snulAM REMRAnON SHEET N0. PLAN AND PROFILES C EP 1fA 320 820 820 E2 BI5 815 815 815 \ 1 / CONTRACT SHEET OF - SENSITIVE INFORMATION Not to be copied or dehbuted MAlhoutthe of the Oly of Gmwmbm. i eww�betow. tleto.laudg NPDES General Permit Applies DISTURBED AREA = 0.22 Acres LEGEND GRADING LIMITS LIMITS OF DISTURBANCE HAUL ROAD 100% DESIGN SUBMITTAL pofESSp_ -Y 0� HORZ: SCALE 1" = 10' 4 0 J115 - 6/20/2018 ® pE P 810 VERTICAL: SCALE 1' 5 CITY OF GREENSBORO C— 2 ENGINEERING DIVISION VII TRAEL snulAM REMRAnON SHEET N0. PLAN AND PROFILES C EP 1fA APPROX. SNeMIfN Name Common Name DIAMETER LfNGTN SPACING QUANITT C...PlPnch.. ocnLen[alis B.T.—sh 0.S-2" CIA 30-3fi" S'O.C. OG _ Comus Pmonum Silky GD—E! 0.5-2" CIA SNIv nipm Black Willow 0A 30-36" 5'O.C. W fo ' paIy bFlt— NATIVE PERMANENT SEED MIX' OIxG OAIEs rtxIN inmw NAME COMMOR4 NAME AssOGT Ox WMT PERMANENTSEED LES/ACRE ANDROPOGON VIRGINICUS BROOMSEDGE e LBS/ACRE CAPER UNIBA RIDSEOGE8 les/ACRE WUPINOIDEA FOXSEDGE 20 aUES/ACRECAREER UE.RE 1. PERMANENT SEED MIX CONSIST OF THE ABOVE -REFERENCED IS SPECIES AND THE SEASONAL NURSE CROPS OIxG OAIEs rtxIN inmw NAME COMMOR4 NAME AssOGT Ox WMT PERMANENTSEED UPS/ACRE MAR. 15 -SEPT. 30ID SORGHUM WOOLOR IUDANGRASS 101es/ACR[ 185/A11E CONTRACT SHEET OF - SENSITIVE INFORMATION Not to be copied of dRiftdod NABloutthe expre s-11ten pwff*don of the City of Gmereboro. i eFlw�below. 1Lub.�Bdg I�oca°rlwinromlonon/U � O1wn NPDES General Permit Applies DISTURBED AREA = 0.22 Acres 100% DESIGN SUBMITTAL pofESSp_ -Y 0� e � r Danis _ 6/20/2018 FaCIpECR CST/ OF GREENSBOROC —3 ENGINEERING DMSION VVHRMTRAM snu AMREMIllAnON —Ti N0. PLANTING PLAN � � 1fL 4 T T I . 1 .ern co±4r.ary mrcx° ,+r �". .s�n,e s"�rZrc f'c e�,.r R.cracra ,s wnrrr .r w.orwm.r CITY OF GREENSBOROr sm.An. Acv. SILT FENCE DETAIL 430 A M r�Yptl ttil�r A� N4 w iorlrc w .u+Arl4L !i rO IXW+ � m erc °dx rxr,w w r i ll/KW lel NTtlr4 als� � ra Y,N of IXIWLE 5I51, M(MaYACM IX ARDOL STANDAM TREE PRDTECTION DETAIL WIXI" IIIA ill 8E EF—ThTNETF BTPW 1YSW1 �n Yfoo F oa��,r«i n-w�i as ��0�0400 1r� fi ia�oo r" Lit � I RW .!C .5 Gf4C,i0 9Y /fF rm'6 n,�exV A x1srM wFr SILT FENCE DETAIL I ._�17liilS� 1k, rs •ar su+w�.o�. ��r tria.:ae�€�e�`Ra�wrxu! w.raaau ww,er..aw.r \ g m RAW • Sra.[ �' r,IEszaENrru catsnstcrfar fxraAna€�rw� C I T Y O F O R E E N S B a R a TENPORAAY DONSTRUCTION ENTRANCE DETAIL {RESIDENTIAL SITMI d3fi-B �■ - maga r "KIP—1— v1— xc*11114 CONTRACT SHEET OF - SENSITIVE INFORMATION Not to be copled or d td:AdedwNhoutthe .M.l nl4,bolow. 1rto. Taudq 11 11, .. °�9 NPDES General Permit Applies DISTURBED AREA = 0.22 Acres Tn.ru.ar:o. 1J rw en Tcamr amen I•a ab Iran, II n1A moor. rr� �I! naE m sms r Urr. rA/Iic � sena. sr,A ad a„d n ��. on s°1 10-�1Oir.a�Q lima re i� rK s Wfrl»•>tlWr Yar. � � Gum orRll mn 4F ao« IN vucr. c x[.s ro 100%DESIGN SUBMITTAL CONCRETE TOE WALL CHANNEL BANK EROSION CONTROL DEVICE USING CONCRETE EROSION CONTROL STONES pofESSp_ -Y 0� e � r 04J115 _ 6/20/2018 �ipECr CITY OF GREENSBORO C-4 ENGINEERING DMSION VM NTRAEI. snulAM REMRAnON SHEET N0. CDNSTRUCTION DETAILS tfi PIAN rea � hr A�i SiNu �ruw wF. SW10V A—A [Mfnr[N ��rTlniy�Id [a_. � .an ..seflcl mea. � �rfar.ar.r olar ilra earar[W •u �yy lanffra mafa[ d Ctry OF ORRENSOOR O srmww Pvkuevr 4wzt srARry mTrgv sm. A70-1'L'Y. NI AMiffm4TACE o?aa YAe 214 "KIP—1— v1— xc*11114 CONTRACT SHEET OF - SENSITIVE INFORMATION Not to be copled or d td:AdedwNhoutthe .M.l nl4,bolow. 1rto. Taudq 11 11, .. °�9 NPDES General Permit Applies DISTURBED AREA = 0.22 Acres Tn.ru.ar:o. 1J rw en Tcamr amen I•a ab Iran, II n1A moor. rr� �I! naE m sms r Urr. rA/Iic � sena. sr,A ad a„d n ��. on s°1 10-�1Oir.a�Q lima re i� rK s Wfrl»•>tlWr Yar. � � Gum orRll mn 4F ao« IN vucr. c x[.s ro 100%DESIGN SUBMITTAL CONCRETE TOE WALL CHANNEL BANK EROSION CONTROL DEVICE USING CONCRETE EROSION CONTROL STONES pofESSp_ -Y 0� e � r 04J115 _ 6/20/2018 �ipECr CITY OF GREENSBORO C-4 ENGINEERING DMSION VM NTRAEI. snulAM REMRAnON SHEET N0. CDNSTRUCTION DETAILS tfi CONTRACT SHEET ACCESS ROAD DECK MAT - OF WIW NOT TO SCALE SENSITIVE INFORMATION P.R. Not to be copled or T Te. . - d fdxdedwNhotdthe en-Iften pannbdon -- --- - otthe O1yof Gmwvb=. ' 2Ker tm[AI �nw rl �_ - — .• ' = — 'r. Torp. iFNKleEneowro¢xWrTED i c..rRnaiEueoM.. - II MA1s pIw W OFl autl .�'� � � r A• syuTTHAi IxE smbF MFM �eF4alsbeIOYY. _ `/ .. iKLYTgWx� —1WM.—sMAT FF / 4R1 Ad+aT EAp PTx1G� e. L�a�ela dg qlY of araw�sbwoUMwPa+rw locolw IMom�aXm/MgwolF `YlY'MW� - -133 soT, ,torn xater-- � _ L77 ORANGE SILT FENCE ORANGE SILTFENCE NPDES TE FABRIC TO SF (GRADUAL) TIE FABRIC TO EF (OPTIONAL) General Permit 2"%8" SURFACE UMBER FABRIC O eoLTE2"X8" Applies SECTIPV A-A RUNNER AMBER l• I DISTURBED AREA = 0.22 Acres `#,T"'::SS.:a�°.;.....>�.ftrK,�Wrn�.,a wr m/er Po x rnenram .m x ne nwn w LwER L.>r� - --- -- - 6EGTloNbe .pr,vM•"• e HAUL ROAD DECK MAT CI T Y QF AR EEII SB DRO NTS. STAM7AR7 iEiFG4AAY SILT Ste•• STREAM LiIECK DA% Tygc A 433 CHANNEL RCOTWADS SHALL BE ORIENTED 20' - dQ' UPSTREAM TOWARDS THE STREAM FLOW a EXISTING STREAMBED MATERIAL OR STREAMEED MATERIAL MIX WATER SURFACE A THALWEG IN THE PROPOSED CHANNEL TO REDUCE ACTUAL NUMBER AND PLACEMENT OF IMPAC TO NAIVE VEGETATION AND PROVIDE ROOTWADS AT EACH LOCATION TO BE BANK STABILITY. DETERMINED BY THE DESIGNER ON SITE. 5 FLOW__ - BANKFULL E SR BED A' HEADER LOG 3' F ROOTWAGE CANNOT BE DRIVEN, EXCAVATE TRENCH AT LEAST 1FOOT BELOW THE ELEVATION OF THE OLD STREAM 2O BED FOR ROOT ADS. BACKFILL OVER, AROUND, AND BELOW BOTTOM FOOTER LOGS, ROOT WAD LOGS, AND ANCHOR LOGS. PACK BOULDERS AND LOGS IN BETWEEN ALL WADS TO FIRMLY S B� L TIE INTO STONE SREAMBEO (TYP) CLASS AI AN (50% EACH) �G4' FOOTER LOG SECURE ALL CONNECTIONS AND GAPS, ROOTWADS SHOULD OVERLAP. PLACE NAIVE BOULDERS BETWEEN ROOMADS, V NON-WOVEN FILTER FABRIC 4' % 3' % 2' BOULDER ON RI LE DTH ONALLUVUM FOOTER LOG (12- DIA. MINIMUM) ENDS OF ROD— S SHALL BE S r DOWNSTREAM SIDE OF LOG TO SECURE IN PLACE (T19) P, TOAFACI�TDATE DRIVNGWITH A HAINSAW C D PRO ECT BANK WITH D BRUSH MATTRESS SECTION A - A' ANCHOR BOULDER M° E �4V TE % 0 B' 1 TOE OF SLOPE (TYP) CUT-OFF LOGS ROOTWAD LOGS (12' DIA. MINIMUM) (12" DIA. MINIMUM) TOP OF BANK (TYP) BURY INTO BANK 12" E M R L OR MIN 5' (TYP) GREATER (ttP) OC ROLLER ELEVATION AS BOULDER BANKFULL SHOWN IN PROFILE POINT I ONI'X3TOP ELEVATION ON TOP IN LOG TO SECURE IN PLACE (TYP) PLAN VIEW EXCAVATE STREAM BANK N AB SLOPE, OR AS SPECIFIED ON THE PLANS ABOVE BANKFULL ELEVATION. SEED AND INSTALL MATTING AS SPECIFIED IMMEDIATELY AFTER GRADING. 10094 DESIGN SUBMITTAL i P INET A ELEVATION SiREAMBED G I EROSION CONTROL EROSION CONTROL MATTING C-43 Kms' YaJ LOG ROLLER LOCATION, SEE PROFILE ' L J B 5 MIN. URY MATRNG PLAN VIEW _ _ E CUT-OFF LOG BANKFULL ELEVATION 11 LOG ROLLER STRUCNRE NOTES: 1. LOGS WITHOUT ROOT MASS MAY BE USED IF APPROVED BY PROJECT FOOTER LOG BURY 5' MIN. _ _ -1I—III—ll— INVERT O ANCHOR BOULDERS TO REST ON ELEVATION OP OF ROI-AD AND BEHIND III— AND ON TOP OF CUT-OFF LOG N IS ENGINEER,LEAST12' IN DIAMETERDIAMETER 2. LOG IAMETER WITH A MAXIMUM S SHOULD BE AT LE SECTION B - B' - ANCHOR BOULDERS TO BE PLACED ON d OF 35', RELATIVELY SIR RECENTLY AIi HARDWOOD, AND MAY OF 24 STEL. SINGLE LOG WITH A MINIMUM DIAMETER IN PLACE 3 USED E III— �1- O ME SIDE OF THE FROM THE CHANNEL AS SHOWN AWAY 0 OF TWO LOGS. 4. SE FILTER FABRIC TO SEAL GAPS BETWEEN LOGS. 5. NAIL OIL R FABRIC TO TOP OF HEADER LOG USING 3" 10d GALVANIZED COMMON NAL ON V SPACING ALONG LOG.ONSTRUCAGN 6LENGOFLOG VARIES PER TYPICAL SECTION. POINT A LL IM N N DIMENSIONS A + 1 ONLY CLEAN, SEDIMENT REE BOULDERS SHALL BE USED EOR FOOTER LOG Z 1NOP OF FOOTER LOG TO BE STALLEDAT SAME ELEVATION).STRUCTURE �.pe aVWP(N CAR[Z"'t" IS USED IN STRAIGHT SECTIONS OF CHANNEL TO CREATE F DEGREES 35 ASSTREAMINVERTSTEP POOL CHANNEL. BOULDERS MUST BE AT LEAST 4' r 3' x 2'.SECTION LOG ROLLER DETAIL (LR) G R8. LR O A-A DETAIL — ROOTWAD (RTWD) •�`�^%N":`'"" 3 NOT To SCALE NOT TO SCALE AARI�►n �"�I�[LIwMYy ����71 REVISIONS TYPE CONTRACT CONTRACTOR AS-BUILT AUTH. OAT BENCH MARKS JOB ND. GR9IGDD Pb5B3f-B3 CIT/ OF GREENSBORO ENGINEERING DMBION C-5 ROA Y DESIGNER Br TRD SEWER CONST. SURVEY BY CDG WHS mN TRAz snmm REsTmAnoN SLEET N0. RcnnlBceMMNo�Wca�m.,I IDI, FIR ss,e Ao WATER CHECKS BY DAH k GMer'.PHw.`wN2<Bs492 NPO_ CONSTRUCTION DETAILS � OR 1fW 11L SIDENALK SCALE: AS NOTED CLASS Al AND EXISTING STREAMBED STONE (50% EACH) MATERIAL OR STREAMBED INVERT STONE LOCATION, MATERIAL MIX FLOW SEE PROFILE STREAMBED J1 EAGER BOULDER ON-SITE ALLUVIUM HEADER LOG TOE OF BANK T t 4 6 FOOTER LOG NON -WOVEN mTER FABRIC SECTION A - A' 'DOTER BOULDER INVERT STONE SCOUR ELEVATION, POOL . ,N SEE PROFILE KNLL HEADER LOG SCOUR POOL EXCAVATED HEADER BOULDER PER PROF. FLOWr —y PLAN VIEW STREAMBED ELEVATION BACKFILL (ON-SITE ALLUNUM)J }II $C FOOTER `LOG CLASS Al. I. AND R5) STONE L FOOTER BOULDER l�OUANAIEO) B, / SECTION B - B' ) \\ LOG J -HOOK MANE DIMENSION TABLE L F STA12+10 ITA 1 III w Fr FDEGREES 20 22 LOC J -HOOK VA 1. LOGS SHOULD BE INCHES IN DIAMETER WITH A MAXIMUM DIAMETER OF 30 INCHES. RELAnVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED. 2. A SINGLE LOG WITH A MINIMUM DIAMETER OF 24 INCHES MAY BE USED IN PLACE OF TWO 12 IN LOGS. 3, BOULDERS MUST BE AT LEAST 4 x 3' x 2. ANCHOR BOULDERS MAY BE SMALLER BUT MAY NOT WEIGHT LESS THAN 1.0 TON. 4. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER LOG AND EXTEND DOWNWARD TO THE DEPTH OFTHE BOTTOM FOOTER LOG. AND THEN UPSTREAM FOR A MINIMUM OF TEN FEET. 5. NAIL FILTER FABRIC TO TOP OF HEADER LOG USING 3" 10B GALVANIZED COMMON NAIL ON 1' SPACING ALONG LOG. 6. DIG A TRENCH BELOW THE BED FOR FOOTER LOGS AND PLACE FILL ON UPSTREAM S1DE OF VANE ARM. BETWEEN THE ARM AND SEES MOANK. 7. START AT'AN'AN'PLACE F"" LO LOGS. IS CONTINUE WITH STRUCTURE. FOLLOWING ANGLE AND SLOPE SPECCAT IFIIONS. 9. LOGS SHALL BE ANCHORED IN THE STREAMBANK BY TWO BOULDERS EACH WEIGHING NO LESS THAN ONE TON. ANCHOR BOULDERS MUST BE COVER BY NO LESS THAN 1.0' OF SOIL. 10. ____END OF LOG IN CHANNEL NEEDS TO BE ANCHORED BY BOULDERS ^^^^^^^^^^^ 11. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 12. USE WELLGRADED MIX OF CLASS Al, I. AND 057 STONE (EQUAL PARTS) ON UPSTREAM SIDE OF STRUCTURE. 13, PLACE EXISTING STREAMBED MATERIAL OR STREAMBED MATERIAL MIX UPSTREAM OF THE MEET STONE, IN ADDITION. PLACE EXISTING STREAMBED MATERIAL OR STREAMBED MATERIAL TO A DEPTH OF 1.0' ON TOP OF VDOT STONE. 14. FILTER FABRIC SHALLBE TRIMMED DOES T ALONG THE TRVERLAP THE ANSITION BETWEEN THE STONE BACKFILL AND THE HEADER BOULDERS SO THAT THE FILTER FAR RI IEADER BOULDERS. LOG J -HOOK VANE DETAIL (LJV) LJV NOT TO SCALE TREE AND SHRUB PLANTING DETAIL NOT TO SCALE sen LOW, NA G1M EXISTING CHANNEL/ DITCH/PIPE FLOW OFFSET STACKED SO 3'-6" HTTP.) STREAMBED MATERIAL MIX PERCENT SIZE %) (Dm) CONTRACT SHEET = OF - ROUND RIVER ROCK/GRAVEL 5% - 10% 5/e .1 RWND RIVER ROCK/GRAVEL 3= - % 1-1/4' ON SHEET C -T FOR RWND RIVER ROCK/GRAVEL 60% - 65% 2-1/2' STEP POOL DIMENSIONS STATION I STEP SPACING STEP HEIGHTMBER PSTREAM WNSTREA S1EP WIDTH STEP$ IrvvERT t IN. t FINAL STEP SHALL BE OF 0' HEIGHT TO PROVIDE SMOOTH TRANSITION INTO STREAM CHANNEL OR ADJACENT INSTREAM STRUCTURE. STEP POOL DETAIL SP TERIAL TRANSITION INTO STREAM \ \ CHANNEL OR INSTREAM STRUCTURE STREAM INVERT NQIESL 1, FIELD ADJUST ROCK PLACEMENT TO ENSURE STABLE FLOW PATH AND TRANSITION INTO ADJACENT BANKS. 2. SUBSTRATE SHALL BE A MIX OF "7 (10-20%). #1 (20-42 AND CLASS AI (40-60%). MINIMUM THICKNESS SHALL BE 12'. \ 3. 2%2X3 BLOCKS TO HAVE NO TOP KEY UNLESS SPECIFIED IN DETAIL, 4, CONCRETE BOULDER BLOCKS SHALL BE 212X3 BLOCKS MANUFACTURED BY LOFLIN CONCRETE OR APPROVED OTHER. .L SMOOTH TRANSITION INTO STREAM CHANNEL OR STREAM STRUCTURE PLAN VIEW - STEP POOL 100% DESIGN SUBMITTAL ,r 6/20/2018 CITY OF GREENSBOROC —6 ENGINEERING DMSION VVHRMTRAM Snu"RBS9'OMnON SHEET N0. CDNETRUCTION DETAILS 1fA CONTRACT SHEET = OF - REFER TO DETAILS SENSITIVE INFORMATION ON SHEET C -T FOR Not to be Copled or BANK TREATMENT TAiTII011 a*--Itten pwff edon Otho GIy Or Gmwvb=. NOTES: 1. IN FILLIL sECnONs. BACKFlWIN - - EXISTING STREAMBED MATERIAL OR WITH STREAMBED MATERIAL MIX AS DIRECTED MFMML allb.�Bdg 12' (MIN.) STREAM BYENGINEER. BED MATERIAL 2. IN CUT SECTIONS. EXISTING MATERIAL (SEE NOTE 1) SHALL REMAIN IN PLACE IF IT MEETS THE REDUIREMENTS OF STREAMBED MATERIAL X. OTHERWISE OVER EXCAVATE AND REPLACE WITH STREAMBED MATERIAL MIX AS DIRECTED BY ENGINEER, gryot OrawlLbwoUMwpourq Locolw lMolmaXm/Mgwob - -_ ----_ T3-ses TYPICAL BED LINING DETAIL (BED1 NPDES NOT TO SCALE General Permit Applies DISTURBED AREA = 0.22 Acres STEP POOL DIMENSIONS STATION I STEP SPACING STEP HEIGHTMBER PSTREAM WNSTREA S1EP WIDTH STEP$ IrvvERT t IN. t FINAL STEP SHALL BE OF 0' HEIGHT TO PROVIDE SMOOTH TRANSITION INTO STREAM CHANNEL OR ADJACENT INSTREAM STRUCTURE. STEP POOL DETAIL SP TERIAL TRANSITION INTO STREAM \ \ CHANNEL OR INSTREAM STRUCTURE STREAM INVERT NQIESL 1, FIELD ADJUST ROCK PLACEMENT TO ENSURE STABLE FLOW PATH AND TRANSITION INTO ADJACENT BANKS. 2. SUBSTRATE SHALL BE A MIX OF "7 (10-20%). #1 (20-42 AND CLASS AI (40-60%). MINIMUM THICKNESS SHALL BE 12'. \ 3. 2%2X3 BLOCKS TO HAVE NO TOP KEY UNLESS SPECIFIED IN DETAIL, 4, CONCRETE BOULDER BLOCKS SHALL BE 212X3 BLOCKS MANUFACTURED BY LOFLIN CONCRETE OR APPROVED OTHER. .L SMOOTH TRANSITION INTO STREAM CHANNEL OR STREAM STRUCTURE PLAN VIEW - STEP POOL 100% DESIGN SUBMITTAL ,r 6/20/2018 CITY OF GREENSBOROC —6 ENGINEERING DMSION VVHRMTRAM Snu"RBS9'OMnON SHEET N0. CDNETRUCTION DETAILS 1fA 12' ECM BACKFILL O AND 11ASTREAMBANK/NATIYE SCLARE CUT SOIL CUT 3' OPENING IN \ ANCHOR STAKE ���� ECM PRIOR TO MAKING I \\\ S SHEET) \�\\/�\������\ PLANTING HOLE THIS \v PE IN MATTING 1 1/2' COMPOST AND SEED UNDER (12' MIN.) NOTE5: 1. ANCHOR ECM IN A 12' DEEP ANCHOR TRENCH AT HE TOP OF THE SLOPE OR TOP LIMIT OF ECM PLACEMENT. BACKFILL TRENCH AND TAMP EARTH FIRMLY. 2. UNROLL ECM DOWNSLOPE FROM ANCHOR, OVERLAP DOWNSTREAM FABRIC SHEET WITH 6" UPSTREAM FABRIC SHEET, 3, ANCHOR SEAMS AT 12" CENTERS AT EDGE OF OVERLAPPED SHINGLE. A WHEN ECM MUST BE SPLICED VERTICALLY, PLACE END OVER END (SHINGLED IN UPSLOPE DIRECTION) AND OVERLAP UPHILL EDGE WMA DOWNHILL EDGE NIH 12" OVERLAP AND ANCHOR USING TWO STAGGERED ROWS OF STAKES AT6' CENTERS AT SPLICE. ADDHIGNAL FASTENING MAY BE REQUIRED WHERE MATING IS CUT TO INSTALL PLANTINGS. 5. LAYECM MAT LOOSELY AND ANCHOR SUFFICIENTLY TO MAINTAIN DIRECT CONTACT WITH HE SOIL. DO NOT STRETCH ECM. 6. FOR SLOPES 2:1 AND STEEPER, USE 3 ANCHOR STAKES PER SQUARE YARD. FOR SLOPES FLATTER MAN 2:1, USE 2 ANCHOR STAKES PER SQUARE YARD. Z. ANGLE STAKES SUCH THAT EXPOSED PORTION FACES UPSTREAM. 8. ANCHOR, FILL, AND HAND COMPACT END OF ECM UNDER FOOTER ROCKS WHERE APPU CABLE, 9. REDUCE ANCHORING DIMENSIONS IN AREAS OF NATURAL RESOURCES TO BE PROTECTED. EROSION CONTROL MATTING DETAIL (ECM) NOT TO SCALE DIRTY WATER FILTER BAG (SEE DETAIL ON THIS SHEET) LEAN DISCHARGE HOSES WATER PUMP DAMETER UVE CUTTING BUDS (FACING UPWARD) U4 I. SOAK LIVE STAKES FOR 24 HOURS AND RECUT BURIED ENDS AT 45' ANGLE IMMEDIATELY PRIOR TO INETALLADON. MAIKE/DRIVE PILOT HOLES PRIOR TO PILOT HOLES SLIGHTLY SMALLER R THAN LIVE STAKE IVING UVE F DIAMETER.S INTO OUND. 3, INSTALL TWO (2) ROWS OF LIVE STAKES AT 45' ANGLES IN STREAM BANK BEGINNING 12" ABOVE NORMAL WATER SURFACE AND EXTENDING TO TOP OF BANK. 4. RECUT ANY LIVE STAKE TIPS DAMAGED BY INSTALLATION. 5, INSTALL WHILE DORMANT (LATE FALL TO EARLY SPRING). DO NOT ALLOW STAKES TO DRY OUT BEFORE PLANTED. 6, ENSURE EXPOSED PORTION OF LIVE STAKE CONTAINS AT LEAST 3 BUDS. LIVE STAKE (LSTAKEZ NOT TO SCALE 8 OZ. NON- FILTER FABRIC WOVEN VELOCITY DISSIPATOR SANDBAG (T W.) µIRTY BANK PUMPR INTAKE C J. JE f / B B INOTE `/SSI FLOW J/H HSE LEAN WATER OUTLET J\ ' CLEAN WATER (SEE DETAIL THIS SHEET) SANDBAG DIKE SUMP HOLE OR POOL , WORK AREA. SDBAG DIKE OF PLAN VIEW BANK IMPERVIOUS SHEETING WORK AREA WORK AREA FLOW SEDIMENT CLEAN WATER SANDBAG DIKE STREAM BED SANDBAG DIKE LAY IMPERVIOUS H CROSS SECTION B -B" CROSS SECTION A -A' SSAEETING UNDER NDBAGS STREAM BYPASS SCHEMATIC (SB) SB NOT TO SCALE FRARC4LD151 ME="" po� '.:: r ,` aMa CLEAN WATER --/ FLOW S DISCHARGE HOSE ANDBAG ts9SE O O 1. PLACE IN HOSE AND ANCHOR IN CENTER OF VELOCITY DISSIPATOR 10' MINMIN. PLAN VIEW CLEAN WATER DISCHARGE HOSE GAADRAG FILTER FABRIC J 17y, STR qM BED CROSS SECTION C -C' CLEAN WATER OUTLET DETAIL (CWO) �W NOT TO SCALE LRmr 1{P VIEW Algd 11CISIC IIRj{fi11[ IQ ;T>afy lW�%AhFjl11 FILTER BAG DETAIL NOT TO SCALE STREAM B INSTALL BYPASS PUMPS AND SUPPORTING MEASURES TO DIVERT ROW AROUND INSTREAM CONSTRUCTION SITES COMPLETE IMPLEMENTATION OF SEDIMENT CONTROL MEASURES, BYPASS PRACTICES, AND ASSOCIATED CHANNEL AND BANK CONSTRUCTION IN HE FOLLOWING SEQUENCE: 1, BEGIN WORK AT THE UPSTREAM SECTION AND PROCEED DOWNSTREAM, IN SOME CASES, WORK MAY BEGIN DOWNSTREAM IF APPROPRIATE. HE SEQUENCE OF CONSTRUCTION MUST BE FOLLOWED UNLESS WRITTEN APPROVAL FOR DEVIATIONS FROM ENGINEER IS OBTAINED. ONLY BEGIN WORK IN AN AREA WHICH CAN BE COMPLETED BY THE END OF THE DAY INCLUDING GRADING ADJACENT TO THE CHANNEL. AT THE END OF EACH WORK DAY, THE WORK AREA MUST BE STABILIZED AND HE STREAM BYPASS PUMPS AND SUCTION PIPES REMOVED FROM HE CHANNEL. SANDBAG DIKES MAY BE LEFT IN PLACE UNTIL NO LONGER REQUIRED. WORK SHALL NOT BE CONDUCTED IN THE CHANNEL DURING RAIN EVENTS. 2, SITUATE SANDBAG DIKES AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, PUMP STREAM FLOW (CLEAN WATER) AROUND THE WORK AREA. DISCHARGE (CLEAN WATER) ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS. 3. PUMP WATER FROM THE WORK AREA TO A SEDIMENT FILTERING MEASURE SUCH AS A DEWATERING BASIN, SEDIMENT BAG. OR OTHER APPROVED SOURCE, LOCATE HE MEASURE SUCH THAT THE WATER DRAINS RACE INTO THE CHANNEL BELOW THE SEDIMENT SANDBAG DIKE. 4, AVOID TRAVERSING A CHANNEL REACH WITH EQUIPMENT WHERE NO WORK IS PROPOSED. IF EQUIPMENT HAS TO TRAVERSE SUCH A REACH FOR ACCESS TO ANOTHER AREA, USE TIMBER MATS OR SIMILAR MEASURES TO MINIMIZE DISTURBANCE TO THE CHANNEL. USE TEMPORARY STREAM CROSSINGS ONLY MEN NECESSARY ONLY WHERE NOTED ON HE PLANS OR SPECIFIED, 5. INSTALL ALL STREAM RESTORATION MEASURES AS INDICATED BY THE PLANS. GRADE ALL BANKS IN ACCORDANCE WITH THE GRADING PLANS AND TYPICAL CROSS-SECTIONS. STABILIZE ALL DISTURBED STREAM BANKS AT THE END OF EACH WORK DAY WITH SEED AND MULCH OR SEED AND MATTING AS SHOWN ON THE PLANS. 6. REMOVE CLEAN WATER DIKE AFTER ALL INSTREAM WORK IS COMPLETED AND STABILIZED, ESTABLISH A NEW CLEAN WATER DIKE UPSTREAM FROM THE OLD SEDIMENT DIKE AFTER THE FIRST SEDIMENT FLUSH, REMOVE 11. IF CHANNEL BED EROSION IS OCCURRING, INCREASE THE MATERIAL OR PLACEMENT SIZE OF THE OUTFALL PROTECTION. 12. REMOVE AND REPLACE DAMAGED OR LEAKING SANDBAGS. 14, CHESTERFIELD WILL WITHHOLD PAYMENT EQUIVALENT TO ALL FINES RESULTING FROM NONCOMPLIANCE WILF APPLICABLE REGULATIONS. 15, STAY NITHIN THE UNITS OF HE DISTURBANCE AS SHOWN ON THE PLANS AND MINIMIZE DISTURBANCE WITHIN HE WORK AREA WHENEVER POSSIBLE. CONTRACT SHEET OF - SENSITIVE INFORMATION Not to be copled or dbtftdodwlBroLRthe after wMMen pwff*don or MIB City of Gmwmbm. 1 BMwN�4lbBlBw- trtr.)audg I�oco�lw lnfamollon/U Meq Wwol� NPDES General Permit Applies DISTURBED AREA = 0.22 Acres 100% DESIGN SUBMITTAL pofESSp_ -Y'4� � r e 043113 6/20/2018 F4C1g C-7 WHSTffitP1lR S1R8AMRBS1'ORA Ilw CONSTRUCTION OETAILB 1/A � 1fA Action ID Number: SAW -2018-01511 County: Guilford Permittee: City of Greensboro, Attn: Johnnie Hill Project Name: Western Trail Stream Restoration / City of Greensboro / Guilford County / municipal Date Verification Issued: 07/31/2018 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date