HomeMy WebLinkAbout20140090 Ver 4_Re Sediment losses Sites 1, 24,27_20180727Wanucha, Dave
From:
Sent:
To:
Cc:
Subject:
Suggs, Phillip H
Friday, July 27, 2018 12:59 PM
Wanucha, Dave
Euliss, Amy
Re: Sediment losses after recent rains.
Just a follow up on the U-2579B Beltway project sites as reported by Amy earlier.
Site 1: crews cleaned it up and removed approx 20 - 5 gal buckets. Not quite a cu yd of material. This site had received about 6-
7 inches of rain over a two day period.
Site 24: approx 8-5gal buckets removed. A drop inlet was overwhelmed and most came thru the pipe.
Site 27: approx 5- 5 gal buckets removed. Several drop inlets were involved and rock inlet protection overwhelmed.
If you need anything else please let me know.
Get Outlook for iOS
From: Wanucha, Dave
Sent: Thursday, July 26, 2018 3:56:17 PM
To: Suggs, Phillip H
Cc: Euliss, Amy; Braquet, Stephanie
Subject: RE: Sediment losses after recent rains.
Thanks for the info.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.
From: Suggs, Phillip H
Sent: Thursday, July 26, 2018 3:53 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Braquet, Stephanie <scbraquet@ncdot.gov>
Subject: Sediment losses after recent rains.
Dave, some additional sites where we have had some losses:
-Stokes Co, Bolejack Rd bridge site. They had approx 3 inches of rain over the past two days and the creek levels were up over
the banks. They recovered about 1 1/2 5 gal buckets of sediment (approx 8 gals)
- 85 Rowan Co - they had several rain events of 2-2.5 inches since the weekend and one event of approx 3 inches.
First site is off of Loop C at I-3804 (OLd Beatty Ford Rd), there was a loss into the wetland. The basin overtopped and they
recovered about 4- 5 gal buckets of mixed sediment and erosion control stone. There is additional accumulation but I
recommend it be left to avoid damaging think herbaceous vegetation in that area. Most pockets are approx 1 inch max depth
with most much less.
In addition, there was a loss down a driveway pipe offsite on Hwy 152. This is not listed on our project but I think it is an
intermittent JS. It did not reach Cold Water Creek.
They have removed approx 7 cu yds of material from this site and will remove approximately one more cu yd. There is some I
recommended leaving due to possibility of damaging the heavy vegetation.
If you need any additional info please let me know.
Get Outlook for iOS
I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,