HomeMy WebLinkAboutNC0082821_Compliance Evaluation Inspection_20180727Water R esources ENVIRONMENTAL QUALITY ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPPER Interim Director July 27, 2018 Ms. Jennifer Bunting (via email) Manager, Environmental Programs Southern States Fertilizer P.O. Box 26234 Richmond, VA 23260-6234 Subject: Southern States Fertilizer Plant Compliance Inspection Report NPDES Permit NCO082821 Statesville, Iredell County Dear Ms. Bunting, The Mooresville Regional Office (MRO) of the Division of Water Resources (DWR) would like to thank you, Mr. John Madden, and Bruce Gray, for taking time to meet with us regarding the Southern States Fertilizer manufacturing facility in Statesville. The MRO also extends its thanks to Tom Dunham and Jason Kilcoyne of Duncklee and Dunham for their assistance and input during the July 16, 2018, site visit. A Notice of Regulatory Requirements letter addressing the groundwater incident is currently being drafted and will be sent separately from this compliance inspection report. The current NPDES permit will expire on March 31, 2019. Your permit renewal application should be submitted 180 days prior to the permit expiration date and this is also a good time to update contact information. Since January 2016, three Notice of Violations (NOVs) and two Notice of Deficiencies (NODS) have been issued for limit violations associated with low pH and elevated TSS. A system operations review performed by the MRO and Duncklee and Dunham has revealed that since 2014, the system has operated around 64% of the time. The MRO acknowledges that during a portion of this time period, the system was only scheduled to operate a portion of the year. Operation efficiency has increased in 2018 largely due to a treatment system overhaul. Flows from the various recovery wells have also been optimized. The MRO has concerns regarding the notification of system failures as specified under Section E of the permit, which requires notification within 24 hours of occurrence. On multiple occasions in 2017, system failures were not reported to the MRO within the 24-hour notification period. In 2018, there are conflicting dates associated with separate reports of cracked piping at RW -2. The permittee is reminded that notification of system failures should follow this permit condition. The MRO would also like to impress upon Southern States that coordinated activity between on-site maintenance and Duncklee and Dunham will aid with proper reporting of system failure issues. State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Officel 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 All of this being said, the MRO would like to acknowledge that significant steps have been taken at the site to overhaul the treatment system and, in particular, that site housekeeping has dramatically improved since the last inspection. Plant operations moving away from loading/unloading and storage of liquid fertilizer are also anticipated to improve site conditions. Should you have questions regarding this letter, or the attached inspection report, you may contact Edward Watson by phone at (704) 235-2198 or email (edward.watson@ncdenr.gov). Sincerely, DocuSigned by: A"uw H P44.,e4 F161FB69A2D84A3... Andrew H. Pitner, P.G. Assistant Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources Attachment: Compliance Inspection Report cc: Tom Dunham & Jayson Kilcoyne, Duncklee and Dunham (via email) John Madden, Southern States United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NCO082821 111 12 I 18/07/16 I17 18 I S J 19 LG] 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- 67 1.0 70 I, I 71 [L] JI 72 I I 73I I I74 751 I I I 1 1 1 I80 I—I I I i Section B: FacilityDataI� Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 10:OOAM 18/07/16 14/05/01 Southern States Fertilizer Plant 2582 Salisbury Hwy Exit Time/Date Permit Expiration Date Statesville NC 28677 12:30PM 18/07/16 19/03/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Danny Dillon,6606 W Broad St Richmond VA 232606234NP Crops/804-281-1000/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenance Records/Reports Self-Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Edward Watson MRO GW/// / 107/27/2018 CA4CEBF8F85F415... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Docusigned by: Date Andrew Pitner MRO WQ//704-663-1699 Ext.21 �'y'. n H Nuft 7/27/18 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type (Cont.) NCO082821 111 121 18/07/16 1 17 18 ICI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On July 16, 2018, MRO staff conducted a compliance inspection of the Sourthern States Fertilizer Manufacturing facility operating under NPDES permit NC0082821. Edward Watson and Andrew Pitner,of MRO, Tom Dunham and Jason Kilcoyne, of Duncklee and Dunham, Jennifer Bunting, John Madden and Bruce Gray from Southern States,were present at the meeting. The recovery wells have been pumping year-round since 2016. RW -5r was observed to be operating during the site visit. The area around RW -5r needs to be maintained so the well is easily accessible to be able to perform routine work and sampling. Recovery well sampling will be performed in the months of May and December of each year. The system has received considerable repairs since 2015 and appears to be operating more efficiently. Wet toxicity sampling results have reported to be passing for 2016, 2017,and thus far in 2018. Southern States is reporting Discharge Monitoring Reports (DMRs)electronically as required by the Permit. The eDMR's for 2016, 2017 and 2018 were reviewed prior to the site visit and the records were complete. pH and TSS violations were noted in 2016 and 2017 resulting in the issuance of two NOD's and three NOV's for Limt Violations from this office. Most recently, RW -2 was shut down due to a cracked pipe at the well head. A January 11, 2018, email from Adam Daniel appeared to indicate that the cracked pipe was scheduled to be repaired within 7 to 10 days of discovery. However, according to the email attachment dated July, 9, 2018, and received by the MRO on July 11, 2018, states the RW -2 cracked pipe repair occurred on May 7, 2018. Apparent conflicts with email notification regarding system failure is not in compliance with permit requirements to notify the MRO. The Permit condition that stipulates reporting requirements for Noncompliance Notification is found in, Part II Standards and Conditions, Section E, Reporting Requirements, 9)Noncompliance Notification(a). The MRO would like to impress upon Southern States that coordinated activity between on-site maintenance and Duncklee and Dunham personnel will aid with the proper reporting of system failuire issues. As this is a permit requirement,on-site maintenance will need to play an active role in the 24 hr. notification process. Future violations may result in an enforcement action. Page# Permit: NCO082821 Owner - Facility: Southern States Fertilizer Plant Inspection Date: 07/16/2018 Inspection Type: Compliance Evaluation ❑ ❑ ❑ Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? ■ ❑ ❑ ❑ Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The Permittee was informed that this permit will exDire on March 31. 2019. and that a new application will need to be submitted with updated contact information. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ 0 ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The housekeeaina at the facilitv has improved sianificantly since the 2015 site visit. A request was made by MRO to record repair activities and to record routine system inspections performed by maintenance staff. This requirment is stipulated as a permit requirement in Part II Standard Conditions for NPDES Permits, Section C. Operation and Maintenance of Pollution Controls(2) Proper Operations and Maintenance: "Properly and offically designated operators are fully responsible for all proper operations and maintenance of the facilty and the documentation thereof, whether acting as a contractor operator (subcontractor) or a member of the Permittee's staff." Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CDCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? Yes No NA NE Page# 3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ El El ❑ ❑ ❑ ❑ ❑ ❑ Page# 3 Permit: NCO082821 Owner - Facility: Southern States Fertilizer Plant Inspection Date: 07/16/2018 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ 0 ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ 0 Is the ORC certified at grade equal to or higher than the facility classification? 0 ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ 0 Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? 0 ❑ ❑ ❑ Comment: There have been multiple Limit Violations (LV) reported for this facilitiv. Since 1-2016, there effluent discharge. have been 3 NOV'S and 2 NOD's. The LV's have primarily been for pH below minimum limits and elevated TSS. On 02/24//17. there was a system failure which was not reported to the MRO. From 6/20/17 through 7/26/17, the system was down again. MRO did not receive notification for several days after the shut down occurred and not within the 24 hr notification period. Also, between the dates of 08/11 throuah 08/28/17. another system failure occurred. Aaain. the MRO was not notified within the 24hr window. ee additional comments in the summa Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ ❑ 0 Are the receiving water free of foam other than trace amounts and other debris? M ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: Access to the outfall is challenging. Due the location of the outfall; the outfall had to be observed from across the stream. No foam, solids or coloration was observed in the effluent discharge. Page# 4