Loading...
HomeMy WebLinkAbout20180985 Ver 1_401 Application_20180718 (2)Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 7/25/2018 8:57:21 AM (Message Start Event) Accept by Montalvo, Sheri A 7/27/2018 9:09:01 AM (NON -DOT Project) The task was assigned to Montalvo, Sheri A. The due date is: July 30, 2018 5:00 PM 7/25/2018 8:57 AM Staff Review ID#* 20180985 Version* 1 Is this project a public transportation project?* r Yes r No Reviewer List:* Robb Mairs:eads\rlmairs2 Select Reviewing Office:* Wilmington Regional Office - (910) 796-7215 Submittal Type:* 401 Application Does this project require a request for payment to be sent?* r• Yes r No How much is r $240.00 owed?* r $570.00 Project Submittal Dated 7/25/2018 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: F New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Ronald Cullipher, PE Who is subrritting the information? Email Address: ron@tcgpa.com Project Information Project Name: Baker and Smith Properties. Lot 2B -Atlantic Beach NC Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yesr No r Unknown County (ies) Carteret Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent PCN Form 6.29.2018.pdf 7.85MB Only pdf or kvrz files are accepted. Describe the attachments: PCN Form pages 1 thru 10 Baker & Smith Properties, applicant Bachelors Delight Mitigation Bank - Credit Reservation Letter 0.1 ac riparian wetland credit Site plan- proposed wetland fill- 1879 sf V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: Submittal Date: v r Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form —Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification - Regular ❑ Non404 ❑ 401 Water Quality Certification - Express ❑ Riparian Jurisdictional General Permit Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or indieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. 0 Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Baker & Smith Properties, Lot 213 2b, County: Carteret 2c. Nearest municipality / town: Atlantic Beach 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Baker & Smith Properties, LLC 3b. Deed Book and Page No. DB1513 PG074 3c. Responsible Party (for LLC if applicable): Worth Baker 3d. Street address: 1588 NC Highway 102 3e. City, state, zip: Ayden, NC 28513 3f. Telephone no.: 252-714-8176 3g. Fax no.: 3h. Email address: wbaker@starfishnet.com Page 1 of 10 PCN Form —Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Ronald D. Cullipher, P.E. 5b. Business name (if applicable): The Cullipher Group, P.A. 5c. Street address: 151 A Hwy 24 5d. City, state, zip: Morehead City, NC 28557 5e. Telephone no.: 252-773-0090 ext 224 5f. Fax no.: 252-773-0243 5g. Email address: ron@tcgpa.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 636516729988000 1 b. Site coordinates (in decimal degrees): Latitude: 34.699583 Longitude: -76.7771 1 c. Property size: 0.45 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Bogue Sound 2b, Water Quality Classification of nearest receiving water: SA; HQW 2c. River basin: White Oak 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Previously undeveloped and wooded on this tract and undeveloped and wooded adjacent. This site now has a duplex residential unit, septic system and stormwater management system on this parcel 3b. List the total estimated acreage of all existing wetlands on the property: 0.1177 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: Provide enough area to construct the duplex, on-site septic, stormwater infiltration system and driveway. 3e. Describe the overall project in detail, including the type of equipment to be used: Construct a duplex structure, on-site septic, infiltration system and bulkhead at wetland fill line 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? ❑X Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary FX Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Thomas Charles Agency/Consultant Company: USACOE Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Date unknown 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form —Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were ❑X Wetlands completed below for your ❑ Streams — tributaries project (check all that ❑ Buffers apply): ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b, Type of impact 2c. Type of wetland 2d, Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Unknown Yes Corps 0.043 W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.043 2h. Comments: This is for DWQ 401 as well 3. Stream Impacts If there are perennial or intermittent stream question for all stream sites impacted. impacts (including temporary impacts) proposed on the site, then complete this 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d, Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f, Average stream width (feet) 3g. Impact length (linear feet) S1 Choose one - S2 - Choose one - - S3 - Choose one - - S4 Choose one - S5 Choose one - S6 Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b, Name of waterbody (if applicable) 4c. Type of impact 4d, Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b, Proposed use or purpose of pond 5c, Wetland Impacts (acres) 5d, Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d, Stream name 6e, Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g, Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 _ Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Page 6 of 10 PCN Form —Version 1.4 January Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The onsite septic and stormwater management systems have determined the remaining portions of the lot available for the construction of the planned duplex residential unit. The wetland fill request is based on the minimum amount needed to provide safe ingress and egress to the unit and to access equipment necessary for the structure. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. While a nationwide permit could cover 0.1 acres of wetland fill, we have proposed the installation of a retaining wall the would reduce impacts due to fill slope requirements, thus eliminating an additional 6 to 8 feet of fill. The proposed fill is reduced to 1879 sf or 0.0431 acres 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑X Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑X Corps 2c. If yes, which mitigation option will be used for this project? F Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Batchelor's Delight 3b. Credits Purchased (attach receipt and letter) Type: Riparian buffer Type: Choose one Type: Choose one Quantity: 0.1 acre Quantity: Quantity: 3c. Request conditional approval prior to cre d purc ase Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 0.1 acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes OX No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d, 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 10.8% 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The Town of Atlantic Beach requires a system to collect and infiltrate the first 2" of runoff. That system is installed 2e. Who will be responsible for the review of the Stormwater Management Plan? Town of Atlantic Beach 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Town of Atlantic Beach ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed Q Other: Atlantic Beach 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): F1 Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes 0 No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page8of10 PCN Form —Version 1.4 January 2009 A " I �uNN�ementary Information ����vnmentai uocumentationDW ( Q Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? ❑Yes ❑X No ❑Yes ❑ Yes ❑Yes 2b. Is this an after -the -fact permit application? [01 Yes 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): ❑ No ❑ No Q No Q No 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? I ❑ Yes ❑X No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. On site waste treatment Page 9 of 10 PCN Form —Version 1.4 January 2009 So Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or 0 Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑X Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife Service, IPaC Information for Planning and Conservation, Regulatory Documents (http://crithab.fws.gov/ipac/gettingStarted/ index), the document from the website states there are no critical habitats -Contact via web only 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Contacted Ken Riley, Fishery Biologist, National Marine Fisheries Services Southeast Region and the site is outside of CAMA jurisdiction therefore no essential fish habitat. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Verified that no historic or archaeological resources were listed for the property on the interactive NCSHPO HPOWEB GIS Services. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Finished floor of the structure to be above the AE EL 7 requirement, including any electrical components for the house and/or on site septic. 8c. What source(s) did you use to make the floodplain determination? NC Firm Map F.I.R.M. 3720636500J, Community Number 370044, Town of Atlantic Beach, map effective date of 7/16/03. vo Y;1�6 App Icant/Agent's Signature Applicant/Agent's Printed Name ate (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 BACHELORS DELIGHT MITIGATION BANK CREDIT RESERVATION LETTER July 5, 2018 TO: The Cullipher Group, PA Attn. Ron Cullipher 151A Highway 24 Morehead City, NC 28557 Project: Baker and Smith Properties, Lot 2B Dear Mr. Cullipher: FROM: Bachelors Delight Mitigation Bank c/o Land Management Group, Inc. 3805 Wrightsville Avenue, Suite 15 Wilmington, NC 28403 Pursuant to your recent credit request, Bachelors Delight Mitigation Bank (BDMB) is providing confirmation of acceptance to supply riparian wetland mitigation credits for impacts associated with the "Baker and Smith Properties" (Lot 2B) project located on Atlantic Beach, North Carolina (Cataloging Unit 03030001). This acceptance is conditional upon receipt of payment as outlined below. Please refer to the table below depicting the type and quantity of credits requested and reserved for your project. Note that the BDMB provides wetland credits in 0.1 -acre increments. Based upon receipt of the project credit request transmitted on July 2, 2018, BDMB has reserved 0.1 riparian wetland credits fora period of up to 90 days from the date of this letter. Note that requests to reserve credits beyond 90 days will require a deposit. Please contact us if you need a reservation to extend beyond the 90 -day period. Upon request for receipt of credit transfer, BDMB will issue an invoice in the amount of $6,018.75. Upon receipt of payment, BDMB will provide an executed Transfer of Credit Certificate. Note that all payments must be made with certified funds. It is the applicant's responsibility to ensure that the credit types and amounts requested are consistent with the compensatory mitigation requirements of the permit(s) issued. BDMB and/or its agents are not responsible for determining the applicant's mitigation requirements. If you have any questions or need additional information, please contact me by phone at (910) 452-0001 or by email at cpreziosi@Imgroup.net. Sincerely, Bachelors Delight Mitigation Bank Digitally signed by Christian Preziosi Christian DN: cn=Christian Preziosi, o=Land Management Group, Inc., ou, Preziosi email=cpreziosi@Imgroup.net,c=US Date: 2018.07.05 17:33:39 -04'00' Christian Preziosi Land Management Group, Inc. (Agent) Mitigation Type Credits Requested Fee Per Unit Fee Stream 0 $508.00 $0.00 � Non- Riparian Wetland 0.0 $601187.50 $0.00 Riparian Wetland 0.1 1 $60,187.50 F�$6101&75 Total Fee [�'$6,018.75 Note that the BDMB provides wetland credits in 0.1 -acre increments. Based upon receipt of the project credit request transmitted on July 2, 2018, BDMB has reserved 0.1 riparian wetland credits fora period of up to 90 days from the date of this letter. Note that requests to reserve credits beyond 90 days will require a deposit. Please contact us if you need a reservation to extend beyond the 90 -day period. Upon request for receipt of credit transfer, BDMB will issue an invoice in the amount of $6,018.75. Upon receipt of payment, BDMB will provide an executed Transfer of Credit Certificate. Note that all payments must be made with certified funds. It is the applicant's responsibility to ensure that the credit types and amounts requested are consistent with the compensatory mitigation requirements of the permit(s) issued. BDMB and/or its agents are not responsible for determining the applicant's mitigation requirements. If you have any questions or need additional information, please contact me by phone at (910) 452-0001 or by email at cpreziosi@Imgroup.net. Sincerely, Bachelors Delight Mitigation Bank Digitally signed by Christian Preziosi Christian DN: cn=Christian Preziosi, o=Land Management Group, Inc., ou, Preziosi email=cpreziosi@Imgroup.net,c=US Date: 2018.07.05 17:33:39 -04'00' Christian Preziosi Land Management Group, Inc. (Agent) LEGEND BEt�CHWD®D DRIVE 60' PUBLIC RIGHT OF WAY Post © +a snuas P(i0PO5ED 11ETLAlpS FILL I i BEt�CHWD®D DRIVE 60' PUBLIC RIGHT OF WAY Post © +a snuas P(i0PO5ED 11ETLAlpS FILL SREET tt t OF 1 PROJECT tt: PM2245-005 DESIGN FILE ttt PM2245-005 LOi 2B WETLANDS FILL REQUEST.DGN B NCGS MON04ENT "SHERATON" E I I I I N/F LEE DRIVE MASTER ASSOC. INC. D.B. 1538 PG. 403 NCPIN 636516830108000 N82'5z IN I40 144.51 WETLANDS �G PROPOSED RETAI ING WALL 53.5 �• o HVAC/ 9i i THIS SET OF STAIR ' g NOISINSTALLED AT x. TEMPORARY a iOTBENREMOVELL I o o d a N/F LEE Is EX. TEMPORARY s RETAINING WALLO ri 03 I LOT 2B SCO EX. STEPS i LIIIIIIIIIIIII EX.LANDING I APPROVED SEPTIC I I DRAIN FIELD LOCATION L__—_____—__— -----5' MBL--------'-'----- 189.89 TOTAL 151R S88.10'030W 51.71 I 50.67 I I 1 I I I� I°° W IO Qy Q a IN LOT 2A of oI I I I I I I I 1 ----------------------- ------ 189.73 �EIP 588°10'03"W I I I N/F ITAC 350. LLC D.B. 1529 PG. 37 M.B. 33 PG. 237 NCPIN 636516729698000 ADDRESS: 2410 FORT MACON ROAD i I DRIVE MASTER ASSOC. INC. D.B. 1538 PG. 403 636516835221000 NCPIN N/F ISLAND BEACH HOME OWNERS ASSOG. PG. 41 NCPIN 636516822756000 zv SEAL * : 13343 Ivo 1141 REFERENCES: OWNER: N/F BAKER 8 SMITH PROPERTIES. LLC D.B. 1513 PG. 74 M.B. 33 PG. 237 NCPIN 636516729961000 NCPIN 636516729994000 VICINITY MAP N.T.S. ISlUNS: BY DATE OESCENPT/GV NATIONWIDE 18 PERMIT APPLICATION 116 LEE DRIVE. ATLANTIC BEAGH. NC 28512 BOK ER & SMITH I�R�PERTIES LOT 2B MOREHEAD TOWNSHIP. CARTERET COUNTY, NORTH CAROLINA CLIENT: BAKER 8 SMITH ESIGNED: RDC ADDRESS: 1588 NC HIGHWAY 102 EAST AYDEN. NC 28513 PHONE: 252-714-8176 P.A. 151-A NC HIGHWAY 24 MOREHEAD CITY, N.C. 28557 P.E. N: RDC 7VED: RDC 5/24/18 II i i i I I I I I I SREET tt t OF 1 PROJECT tt: PM2245-005 DESIGN FILE ttt PM2245-005 LOi 2B WETLANDS FILL REQUEST.DGN B NCGS MON04ENT "SHERATON" E I I I I N/F LEE DRIVE MASTER ASSOC. INC. D.B. 1538 PG. 403 NCPIN 636516830108000 N82'5z IN I40 144.51 WETLANDS �G PROPOSED RETAI ING WALL 53.5 �• o HVAC/ 9i i THIS SET OF STAIR ' g NOISINSTALLED AT x. TEMPORARY a iOTBENREMOVELL I o o d a N/F LEE Is EX. TEMPORARY s RETAINING WALLO ri 03 I LOT 2B SCO EX. STEPS i LIIIIIIIIIIIII EX.LANDING I APPROVED SEPTIC I I DRAIN FIELD LOCATION L__—_____—__— -----5' MBL--------'-'----- 189.89 TOTAL 151R S88.10'030W 51.71 I 50.67 I I 1 I I I� I°° W IO Qy Q a IN LOT 2A of oI I I I I I I I 1 ----------------------- ------ 189.73 �EIP 588°10'03"W I I I N/F ITAC 350. LLC D.B. 1529 PG. 37 M.B. 33 PG. 237 NCPIN 636516729698000 ADDRESS: 2410 FORT MACON ROAD i I DRIVE MASTER ASSOC. INC. D.B. 1538 PG. 403 636516835221000 NCPIN N/F ISLAND BEACH HOME OWNERS ASSOG. PG. 41 NCPIN 636516822756000 zv SEAL * : 13343 Ivo 1141 REFERENCES: OWNER: N/F BAKER 8 SMITH PROPERTIES. LLC D.B. 1513 PG. 74 M.B. 33 PG. 237 NCPIN 636516729961000 NCPIN 636516729994000 VICINITY MAP N.T.S. ISlUNS: BY DATE OESCENPT/GV NATIONWIDE 18 PERMIT APPLICATION 116 LEE DRIVE. ATLANTIC BEAGH. NC 28512 BOK ER & SMITH I�R�PERTIES LOT 2B MOREHEAD TOWNSHIP. CARTERET COUNTY, NORTH CAROLINA CLIENT: BAKER 8 SMITH ESIGNED: RDC ADDRESS: 1588 NC HIGHWAY 102 EAST AYDEN. NC 28513 PHONE: 252-714-8176 P.A. 151-A NC HIGHWAY 24 MOREHEAD CITY, N.C. 28557 P.E. N: RDC 7VED: RDC 5/24/18