Loading...
HomeMy WebLinkAboutNC0081621_Report_20180723 w Ull !HIS ENGINEERS July 23, 2018 1968.019(34) Ms.Julie Grzyb NC DEQ/Division of Water Resources NPDES Complex Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 RECEIVED/DENRIDWR Subject: Justification for 1.0 MGD Flow Request JUL 26 2018 NPDES Application NC0081621 Water Resources Water and Sewer Authority of Cabarrus County Permitting Section Muddy Creek WWTP Dear Ms. Grzyb: As you know, the Water and Sewer Authority of Cabarrus County (WSACC) has recently submitted a request for additional flow at its Muddy Creek Wastewater Treatment Plant. The Plant is currently permitted at 0.3 million gallons per day (MGD) and the WSACC Application requests an increase to 1.0 MGD. This request is supported by the WSACC Master Plan,excerpts of which were submitted with the NPDES Application. We received a Request for Additional Information dated June 4, 2018 from Mr. Qais Banihani, requesting that the flow projections be supported using the methodology outlined in the Engineering Alternative Analysis (EAA) Guidance Documents. On July 16 we replied to that Request utilizing population data for the Town of Midland but indicated in our calculation . narrative that the past 10 years of growth within the Midland area would not be a good representation of future growth.The population statistical area is too small and growth trends over the past decade do not reflect the anticipated growth demand resulting from Midland's proximity to the Charlotte Metropolitan Area. On July 18 I had an opportunity to meet briefly with Mr. Banihani at which time he advised our response was not sufficient. He suggested I contact you and provide further justification. In 2014, WSACC commissioned a Master Plan which contained an extensive analysis of the growth and flow projections expected in the service area through 2040. In short, this area is expected to grow more rapidly in the coming years than in the past decade. The anticipated flow is approximately 1.12 MGD in 2040. WSACC therefore decided to make a request for an NPDES Permit of 1.0 MGD and to design facilities appropriate for future expansion based on these projections. 10700 Sikes Place,Suite 115 Charlotte, North Carolina 28277 704.377.9844/NC License F-0114 WIIIISENGINEERS Ms.Julie Grzyb July 23, 2018 Page 2 of 2 On behalf of the Water and Sewer Authority of Cabarrus County, we are requesting your acceptance of the WSACC Master Plan flow projection in lieu of the population-based linear extrapolation methodology suggested in the EAA Guidance Document. For your reference, I have attached the first two chapters of the WSACC Master Plan which document the growth model and flow projection calculations. Upon review, I am sure you will agree this methodology is far more accurate than a linear extrapolation of census populations. Please let me know if this is acceptable or if you have additional questions. Thank you for your consideration. Yours very truly, WILLIS ENGINEERS Charles A. Willis,Jr., P.E., BCEE Attachments cc: Water and Sewer Authority of Cabarrus County