HomeMy WebLinkAboutWQ0040170_Application_20180726LATHAM-WAL TERS ENGINEERING, INC.
CIVIL ENGINEERING LAND PLANNING SITE DEVELOPMENT
L F 16507•A NORTHCROSS DRIVE
HUNTERSVILLE, NC 28078
February 12, 2018
RECEIVED/NCDENRIDWR
Attention
NCDEQ JUL 2 4 2018
610 E. Center Ave. woRos
Mooresville, Ne 2811$ MOORESVILLE REGIONAL OFFICE
Project Location: Harrisburg, NC
Project Name: Grantham Subdivision Phases 3-4
Subject: Fast Track Sewer System Application Summary
Phase 3-4 of Grantham Subdivision consist of 117 single-family lots with a typical layout
of 3 bedrooms. With a daily discharge of 360 GPD for each home, the calculated maximum flow
for Phases 3-4 of Grantham is approximately 42,120 GPD.
The entire subdivision is adjacent to Robinson Church Rd. (S.R. 1168) and Reedy Creek.
The sewer network from phase 3-4 will tie-in to a manhole that was constructed in phase 1-2.
The outfall of the existing sewer network ties -in to the Reedy Creek Interceptor near manhole
#019096.
Latham -Walters Engineering, Inc.
Carlos Ruano
PHONE: (704) 895-8484
CARLOS@LW ENG I N EER.COM
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: V 46 IqO (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Harrisburg Public Works (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Robert Donham per 15A NCAC 02T .0106(b)
Title: Town En ig neer RECEIVEDINCDENRIDWR
4. Applicant's mailing address: 4100 Main St JUL 2 41018
City: Harrisbure State: NC Zip: 28075-_
WQROS
5. Applicant's contact information: MOORESVILLE REGIONAL OFFICE
Phone number: (704) 455-0728 Email Address: rdonhamPa harrisbur ng c org
II. PROJECT INFORMATION:
1. Project name: Grantham Subdivision
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000_ and issued date:
If new construction but part of a master plan, provide the existing permit number: W000
3. County where project is located: Cabarrus County
4. Approximate Coordinates (Decimal Degrees): Latitude: 35_27° Longitude: -80_65°
5. Parcel ID (if applicable): 55056635150000
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Mitchell S. LathamLicense Number: 17646
Firm: Latham -Walters En ing eering Inc
Mailing address: 16507-A Northcross Drive
City: Huntersville State: NC Zip: 28078
Phone number: (704) 825-8484 Email Address: mitch@lwengineer.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
I. Facility Name: Rocky River Regional WWTP
Owner Name: Chad VonCannon
Permit Number: 04475
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 36" & 8" inch
System Wide Collection System Permit Number(s) (if applicable): WQCS_
Owner Name(s):
FORM: FTA 04-16 Page 1 of 5
VL GENERAL REQUIREMENTS
I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes [-]No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ®No ❑N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater : 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T.0103(20))
L---* Is there a Pretreatment Program in effect? ❑ Yes ® No
6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow a,b
No. of Units
Flow
Dwelling Units
360 gal/day
117
42,120 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
42,120 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(l) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 42 120 GPD (per 15A NCAC 02T.01 14)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers):
I. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
8,431
PVC
8
176
DIP
➢ Section 11 & UI of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) —.02T.0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - °
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the potable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-I6 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)):
I. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g)
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be orovided for sewer systems:
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS -I waters of Class I or
Class Il impounded reservoirs used as a source of drinking water
100 feet
"Waters classified WS (except WS -I or WS -V), B, SA, ORW, HOW, or SB from normal
high water or tide elevation and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
**Stream classifications can be identified using the Division's NC Surface Water Classifications weboage
➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0 105(c)(6) (additional permits/certifications)?
® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high-priority?"
Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location),
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version). and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
I, %Yl�at��..l� a��r^ attest that this application for
(Professional Engineer's name from Application Item 111. 1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC OST .0106(b):
✓�r�-w�� , o �.JA g.N�attest that this application for
Authority's name & title from A plication Item I.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: \ tti Date:
FORM: FTA 04-16 Page 5 of 5
DWR
State of North Carolina
Department of Environmental Quality
Division of Water Resources Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE —01/14)
(JURISDICTION USE ONLY)
Jurisdiction Requesting Flow Acceptance for Collection System:
❑City of Concord ❑City of Kamtapolis Q Town of Harrisburg ❑Town of Mt. Pleasant
❑Charlotte Mecklenburg Utilities
Project Title, Description, and Number of Lots/Unit: Grantham Subdivision, 117 Lots
Project Title: Grantham Subdivision
Description Grantham Subdivision engineering plans and specifications, as prepared and sealed by Mitchell S Latham NCPE
with Latham -Walters Engineering Inc.,for the wastewater collection system extension consisting of approximately 8,43 1 linear
feet of 8 -inch sanitary sewer with 37 manholes and other appurtenances to serve 117 lots located near Reedy Creek near
Meck/Cab Cc line, with a wastewater discharge of 42,120 GPD. (117 lots w/ 3 bedrooms x 360 GPD)
What is the quantity of flow that will be discharged? 42,120 GPD
Flow type:
Q Domestic 100 %n ❑ Commercial % ❑ Industrial %
Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC
Interceptor connection point.
Pump Station
(Name or Number)
Firm Capacity "
MGD
(A)
Design Average Daily Flaw •"
(Firm/pQ
MCD
(B)
Approx. Current
Average Daily Flow
MGD
(C)
Obligated, Not Yet
Tributary Daily Flow
MGD
(D) _ (B+C)
Total current Flow
Plus Obligated Flow
MGD
(E)—(A-D)
Available
Capacity'""
MGD
"The Firm Capacity of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken oul ofservice.
—Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5.
""A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the W WTP where Available Capacity is <0.
Section IL Jurisdiction's Certification Statement:
certify that, to the best of my knowledge, the addition of the volume of
wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor; and the flow
from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream
pump station in route to the receiving WSACC interceptor normal circumstances, given the implementation of the planned
improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with
local established policies and procedures using the best available data. This certification applies to those items listed above in
Section 1 plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the
downstream sewer ctapacity._,Sigtature of this form indicates acceptance of this wastewater flow.
l
Jurisdiction's Signing Official Signature
Revision Date: 08/09/13
Date
WSACC
(SO I=A 004 • NC Slarhblic Seclor • ONSGSIN61,27
Mr. Haynes Brigman
Town Manager
Town of Harrisburg
P.O. Box 100
Harrisburg, NC 28075
WATER & SEWER AUTHORITY
OF CABARRUS COUNTY
232 Davidson Hwy.
Concord, NC 28027
June 29, 2018 704.786.1783 ♦ 704.795.1564 Fax
w v.wsamorj
Subject: Flow Acceptance Request - Town of Harrisburg
Grantham Subdivision Phases 3-4
Dear Mr. Brigman:
This is an approval of the flow acceptance request received by the Water and Sewer Authority of Cabarrus
County (WSACC) from the Town of Harrisburg on June 27, 2018. WSACC has or will have capacity at the
Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the
domestic wastewater from the proposed project entitled Grantham Subdivision Phases 3-4, located near Robinson
Church Road in Harrisburg. The referenced project includes a subdivision expansion with 117 three-bedroom
single-family homes, with 42,120 gallons per day (gpd) wastewater flow projected.
The wastewater generated by this project will be conveyed through a proposed gravity system, through the
existing Town of Harrisburg gravity system, and then enter WSACC's system at the existing 36 -inch Reedy
Creek Interceptor. WSACC agrees to accept wastewater from the proposed development based on information
provided by Latham -Walters Engineering, Inc. (Civil Engineer for the project) using North Carolina Department
of Environmental Quality (NCDEQ) wastewater flow guidelines.
The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006,
funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the
future. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local
governing bodies, regulatory approval, and funding availability. It should be noted that the list and schedule of
CIP projects are tentative and are revised periodically to reflect changing conditions and needs.
If construction of this project is not started within two (2) years of the date of this approval, the approval is
rescinded and a second request and approval will be required. Please notify WSACC, in writing, when
construction of this project is initiated.
If you have any questions, please call me at (704) 786-1783, extension 228.
Sincerely,
J. Thomas Hahn, PE
Utility Systems Engineer
cc: Tom Polito/Harrisburg
Mitchell S. Latham, PE/Latham-Walters Engineering, Inc.
Michael Wilson/WSACC
Tim Kiser, PE/WSACC
Chad VonCannon, PE/WSACC
Mark Lomax/WSACC
Divlslon of Water Rasoureft
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE —04/16)
(WSACC USE ONLY) Grantham Subdivision Phases 3-4
Section I. Name of wastewater treatment facility (W WTF) receiving wastewater:
® Rocky River Wastewater Treatment Facility — Permit 4NCO036269
Muddy Creek Wastewater Treatment Facility — Permit #NC0081621
WWTP facility's permitted flow, MGD 26.500
Estimated obligated flow not yet tributary to the WWTP, MGD 2.335
WWTP facility's actual avg. daily flow, MGD 17.040 (64.30% of permit)
Total flow for this specific request, MGD 0.042
Total actual and obligated flows to the facility, MGD 19.417
Percent of permitted flow used 73.27%
Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP.
Section III. WSACC Certification Statement:
I, J. Thomas Hahn. PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted
in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary
sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal
circumstances, given the implementation of the planned improvements identified in the planning assessment where
applicable. This analysis has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Section i and Section II plus all attached planning
assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this
wastewater flow.
's Signing Official Signature
(A)
(B)
(C)
(D) — (B+C)
(E)—(A-D)
Pump Station
Firm Capacity *
Design Average Daily Flow *"
Approx. Current
Obligated, Not Yet
Total Current Flow
Available
(N )
(Name or Number
MGD
(Finn/pt)
Average Daily Flow
Tributary Daily Flow
Plus Obligated Flow
Capacity"**
MCD
MGD
MGD
MGD
MGD
Reedy Creek PS
16.500
6.600
1.506
0.404
1.910
4.690
Lower Rocky River PS
37.000
14.800
8.290
1.772
10.062
4.738
* The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of serves.
**Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5.
***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capacity is <0.
Section III. WSACC Certification Statement:
I, J. Thomas Hahn. PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted
in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary
sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal
circumstances, given the implementation of the planned improvements identified in the planning assessment where
applicable. This analysis has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Section i and Section II plus all attached planning
assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this
wastewater flow.
's Signing Official Signature
DWR
State of North Carolina
Department of Environmental Quality
Division of Water Resources Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE —01/14)
FTSE PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a Planning Assessment Addendum for each pump station located between the project
connection point and the WWTP listed in section 1 or 2 where Available Capacity is < 0.:
Given that:
a.
The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
and MGD of the Available Capacity (E) in
Pump Station name and that;
Pump Station Name (Number):
N s n �-
c.
A funded Capital Project that will provide the required planned capacity, through CIP
project (name)
is in design or under construction with a planned completion date of ; and/or
Pump Station Address:
N 0 n 2
Given that:
a.
The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
and MGD of the Available Capacity (E) in
Pump Station name and that;
b.
The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c.
A funded Capital Project that will provide the required planned capacity, through CIP
project (name)
is in design or under construction with a planned completion date of ; and/or
d.
I The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification
to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in
the system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S.
143-215.67(a), which prohibits the introduction of any waste in excess of the capacity of the
waste disposal systtem.
J ` LP � T � a �J `r\ ti �
Si ning Official Sig e
Date
5-12 / / if
Revision Date: 08/09/13