Loading...
HomeMy WebLinkAboutNCG140060 - NODEnergy, Mineral and Land Resources ENVIRONMENTAL QUALITY July 13, 2018 CERTIFIED MAIL 7017 0190 0000 9526 RETURN RECEIPT REQUESTED Whiteville Ready Mixed Concrete, LLC Grady L. Simmons Jr., Registered Agent PO Box 944 Lumberton, NC 28359 PAT MCCRORY Governor MICHAEL REGAN Secretary TOBY VINSON Interim Director RECEIVED JUL 25 2018 DENR-LAND QUALITY STORMWATER PERMITTING Subject: Compliance Evaluation Inspection & Resulting Notice of Deficiency NPDES General Stormwater Permit NCG140000 Certificate of Coverage N)n e67-1 i� DO rp () Whiteville Ready Mixed Concrete Duplin County Dear Mr Simmons: On July 10, 2018, staff from the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the tract/project known as Whiteville Ready Mixed Concrete located in Duplin County, North Carolina. The site drains to Pine Log Branch, which is currently classified as Class C Sw Waters in the Lumber River Basin. The following observations were noted during the DEMLR inspection (please see the attached addendum for additional information about your permit): 1. A stormwater pollution prevention plan has not been developed and implemented and is a violation of Permit Condition Part III. 2. Analytical sampling has not occurred for the site and is a violation of Permit Condition Part IV Section A and Section D which requires semi-annual sampling for 5 parameters. 3. Qualitative sampling has not occurred for the site and is a violation of Permit Condition Part IV Section C which requires semi-annual observations for 10 parameters. 4. The site needs general housekeeping and implementation of best management practices to keep potential pollution sources from entering stormwater and wastewater discharges. 5. Spill prevention and response procedures need to be implemented. Petroleum products found on site were spilled on the ground. Wilmington Regional Office 127 Cardinal Drive Ext, Wllmington, NC28405 . Phone: 910-796-7215 Whiteville Ready Mix NCG 140060 July 13, 2018 Page 2 of 2 6. Wastewater treatment has not been in accordance with permit requirements Part II section B.2. Required Response 1. You are directed to respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address and include a schedule for compliance with the permit. 2. Develop and implement a Stormwater Pollution Prevention Plan (SPPP). Submit copy of the SPPP to this office for review with 30 calendar days of receipt of this Notice. Include all required minimum elements. 3. Implement the required sampling protocol as outlined in the permit. Thank you for your attention to this matter. This office requires that the violations as described above be properly resolved. unresolved violations may lead to the issuance of a Notice of Violation and/or assessments of civil penalties. Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the NPDES Stormwater General Permit may be subject to a civil penalty assessment of up to $25,000.00 per day for each violation. If you have any questions, comments, or need assistance with understanding any aspect of your permit, please do not hesitate to contact Brian Lambe or me at (910) 796-7215. Sincerely, Z ) I Daniel Sams, PE Regional Engineer Land Quality Section Attachments: BIMS Inspection Checklist cc: Central Files — DEMLR WiRO Files — Land Quality t Permit: NCG140060 SOC: County: Columbus Region: Wilmington Compliance Inspection Report Effective: 08/01/17 Expiration: 06/30/22 Owner : Whiteville Ready -Mixed Concrete LLC Effective: Expiration: Facility: Whiteville - Ready -Mixed Concrete Facility 110 Legion Dr Ext Contact Person: Sammy Jacobs Title: Directions to Facility: System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative(s): Related Permits: Whiteville NC 28472 Phone: 910-642-0426 Phone: Inspection Date: 07/10/2018 Entry Time: 11:30AM Exit Time: 12:30PM Primary Inspector: Brian P Lambe Phone: Secondary Inspector(s): Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/ Wastewater Discharge COC Facility Status: Compliant Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG140060 Owner - Facility: Whiteville Ready -Mixed Concrete LLC Inspection Date: 07/10/2018 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Complaint recieved regarding the Whiteville Readi-Mix facility. The inspector met with the site operator. He was fairly new at the facility, having transfered from the Ocean Isle Beach plant. He was unaware of the permit or the requirements; including the SPPP and sampling. The site has three sources of wastewater discharge. The drum cleanout pit, southeast corner of facility, is breached on the west side and appears to overtop frequently. The berm of the pit is covered with dried concrete residue. A ditch is to the south of the pit. The ditch does have evidence of concrete material in it. A secondary basin is to the west. The inspector is unsure of the definition of this basin, whether it is constructed or natural low spot: due to vegetation. Outlet of this basin is unknown. The pit breach drains to this basin. The truck washddown is on the south of the facility. No measures are installed to retain process wastewater from running into the woods. The stockpile spraydown is on the west side of the facility. No measures are in place to retain wastewater onsite. The wastewater flows into the woods. A truck maintenance facility is onsite. The used oil is deposited into a container inside, then pumped to a container outside. A recent spill is evident around the outside container. Used oil container does not have secondary containment. The employees had thrown sand on the spill, but did not clean it up. Secondary containment around the desiel fuel is in need of repair. Some other containers are stored outside, generally used containers of various sources. The facility generally sheet flows offsite. There is no containment to reduce suspended solids and sediment for the site. The waste concrete area to the west of the facility is in the process of being crushed. The concrete did include offsite concrete as there was rebar present. The conveyor belt spraydown was not contained on site. Page: 2 Permit: NCG140060 Owner - Facility: Whitevitle Ready -Mixed Concrete LLC Inspection Date: 07/10/2018 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ M ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ E ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 1:1N 1:1 1:1e # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: A stormwater pollution prevention plan was not available for inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: No records of sampling was available during inspection. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: No records of sampling was available during inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: No observance to permit conditions has been conducted at this facility. Page: 3