Loading...
HomeMy WebLinkAbout20180660 Ver 1_More Info Requested_20180719ROY COOPER Governor MICHAEL S. REGAN seeret�. Water Resources S. JAY ZIMMERMAN ENVIRONMENTAL QUALITY Director July 19, 2018 DWR # 18-0660 Wake County LGI Homes NC LLC ATTN: David Hansley 3037 Sherman Drive Lancaster. SC 29720 Subject: REQUEST FOR ADDITIONAL INFORMATION Autumn Lakes Subdivision — Phase 2 and 3 Dear Mr. Hansley: On May 14, the Division of Water Resources (Division) received your application dated May 10, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. Additional information including a modified PCN was received on July 11, 2018. This modification expanded the scope of the project to include Phase 3 which had additional impacts. The Division has determined that additional information is required to process your application, therefore this application is on -hold until all of the following information is received: 1. Regarding the sewer crossing, the permanent maintenance corridor through the buffer was stated to be ten feet in width. Please update the plans to reflect this. Specifically sheet 4 of 8 (Impact Area A-2) shows a fifteen foot wide corridor through Zone 1 and 2 of the buffer and this is listed as "Conversion Impacts'. It's the Division's understanding that this is permeant impacts for the establishment of a permeant maintenance corridor in the buffer and should be ten feet in width based on your response to the July 10, 2018 letter requesting more information. Please clarify that this is the corridor that will be maintained and its width. Also, please confirm that the areas in the buffer that are shown as Temporary Impact Areas on the plan sheets will be allowed to re-establish vegetation. Will this area be marked to show the difference between the permanently maintained (mowed) corridor and the wider thirty foot utility easement? State of North Carolina I Environmental Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 Autumn Lakes Phase 2 and 3 DWR# 18-0060 Request for Additional Info Page 2 of 3 2. The updated plans show impacts to buffers and streams for a greenway crossing of two stream tributaries in Phase 3. a. Please provide aside view drawing of the culverts showing their location in relationship to the stream bed and bank, so that hydrological connection and aquatic life passage during low flow can be assured. Please include the size of the culverts. b. Is the sewer shown on the northside the proposed greenway new or proposed? If the sewer is in place, is there an existing maintenance corridor associated with it? c. On Impact Area C (sheet 7 of 8) no impacts area shown immediately adjacent to the culvert. Please clarify what is happening in this area and why no impacts are shown. d. Please note the Division limits greenways to ten feet wide (as you've proposed) with a two foot wide grassed maintenance corridor on either side. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deg.nc.gov/Forms/Supplemental-Information-Form (please note that the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Autumn Lakes Phase 2 and 3 D W R# 18-0060 Request for Additional Info Page 3 of 3 Please contact Paul Wojoski at (919) 807-6364 or Paul.Woioski(@ncdenr.gov if you have any questions or concerns. Sincerely, `K`n'"" ' Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Phil May, Carolina Ecosystems (via email) James Lastinger, USACE Raleigh Regulatory Field Office DWR 401 & Buffer Permitting Branch file File Name: 180660AutumnLakesPhase2(Wake)_401_Addlnfo2