Loading...
HomeMy WebLinkAbout20181013 Ver 1_Revised Wetland Impact Table_20180724Wetland Impact Impact Area Map Wetland ID Impact Duration Type of Impact Cowardian Class NCWAM Type Forested Riparian Type of Jurisdiction Area of Imapct (Acres) W1 W1 WG Temporary Land Clearing PFO Headwater Forest No Yes Corps 404 0.109 W2 W2 WF Temporary Land Clearing PFO Headwater Forest No Yes Corps 404 0.016 W3 W2 WF Temporary Land Clearing PFO Headwater Forest No Yes Corps 404 0.037 W4 W3 WE Temporary Land Clearing PEM Headwater Forest No Yes Corps 404 0.043 W5 W3 WE Temporary Land Clearing PFO Headwater Forest No Yes Corps 404 0.224 W6 W3 WE Permanent Land Clearing PFO Headwater Forest Yes Yes Corps 404 0.030 W7 W3 WE Permanent Land Clearing PFO Headwater Forest Yes Yes Corps 404 0.033 W8 W5 WX Permanent Land Clearing PFO Headwater Forest Yes No Corps 404 0.015 W9 W4 WB Temporary Land Clearing PFO Headwater Forest No No Corps 404 0.286 W10 W4 WB Temporary Land Clearing PFO Headwater Forest No No Corps 404 0.002 W11 W4 WB Temporary Land Clearing PFO Headwater Forest No No Corps 404 0.118 Temp Total 0.835 Perm Total 0.078 GRAND TOTAL 0.913 Table D2. Wetland Impacts Stream Impact Impact Map Area Stream ID Impact Duration Type of Impact Stream Name Flow Regime Type of Jurisdiction Average Stream Width Impact Length (Linear Feet) Impact Area (Acres) S1 S1 SC Permanent Bank Stabilization UT to Poplar Creek R3 Corps 404 6.12 14.7 0.002 S2*W3 DC Temporary Excavation N/A N/A Corps 404 3.67 48.03 0.004 Temp Total 48.0 0.004 Perm Total 14.7 0.002 TOTAL 62.7 0.006 Table D3. Stream Impacts * Potential Non-wetland W.O.U.S. Zone 1 Impact (Square Feet) Zone 2 Impact (Square Feet) B1 S1 SC UT to Poplar Creek Land Clearing Temporary Allowable No PER-50 -673.13 673.13 B2 S1 SC UT to Poplar Creek Land Clearing Temporary Allowable No PER-50 1299.297 -1299.297 B3 S1 SC UT to Poplar Creek Land Clearing Temporary Allowable No PER-50 -263.49 263.490 Temp Total 1299.297 936.616 2235.913 Perm Total 0.0 0.0 0.0 Total 1299.297 936.616 2235.913 Buffer Impact Table D6. Buffer Impacts Total (Square Feet) Stream ID Reason for ImpactStream Name Duration of Impact; Temporary or Permanent Buffer Mitigation Required Buffer Distance (Feet) Stream Buffer Impact Map Area Neuse River Buffer Rule Category Acres Streams (Linear Feet) Zone 1 (Square Feet X 3) Zone 2 (Square Feet X 1.5) Price per Unit (Approx.) Source Cost (Approx.) Mitigable Non-Riparian Wetland Impacts 0 $52,000.00 DEQ ILF Program $0.00 Mitigable Riparian Wetland Impacts 0 $69,500.00 RES $0.00 Mitigable Stream Impacts 0 $400.00 DEQ ILF Program $0.00 Mitigable Zone 1 Buffer Impacts 0 $1.15 RES $0.00 Mitigable Zone 2 Buffer Impacts 0 $1.15 RES $0.00 TOTAL $0.00 Mitigation Quantities