Loading...
HomeMy WebLinkAbout20181013 Ver 1_401 Application_20180724Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 7/24/2018 11:19:35 AM (Start Event) Accept by Montalvo, Sheri A 7/24/2018 1:46:08 PM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: July 27, 2018 5:00 PM 7/24/2018 11:21 AM DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Johnston Is this project a public transportation project?* f Yes f• No This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project. 1a. Type (s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* IJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Number Other: List all IWV nurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply IJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express F Non -404 Jurisdictional General Permit IJ Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: O Yes O No For the record only for Corps Permit: O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program f Yes C No 1f. Is the project located in anyof NC's twentycoastal counties?* r Yes C No 1h. Is the project located in a designated trout watershed?* t' Yes f• No Link to trout information: http://vmw.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Tyson Kurtz 1b. Primary Contact Email:* tkurtz@eee-consulting.com 1c. Primary Contact Phone:* (XXX)XXX-XXXX (919)650-2463 1d. Who is applying for the permit? ❑ Owner r Applicant (other than owner) rJ Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: See attached landowner list 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) Rick Hester, Johnston Co District Manager 2d. Address Street Address 309 E. Market Street Address Line 2 City Smithfield Fbstal / Zip Code 27577 2e. Telephone Number: (XXX)XXX-XXXX (919)898-5100 2f. Fax Number: (XXX)XXX-)O= 2g. Email Address:* rick.hester@johnstonnc.com 4. Agent/Consultant (if applicable) 4a. Name: State/ Province/ Fbgion NC Country Tyson Kurtz 4b. Business Name: (if applicable) EEE Consulting, Inc. 4c. Address Street Address 601 Cascade Pointe Lane Address Line 2 Suite 101 City State / Province / Fbgion Cary NC Postal / Zip Code Country 27513 USA 4d. Telephone Number: (919)650-2463 (XXX)XXX-XXXX 4e. Fax Number: (xxx)xxx-xxxx 4f. Email Address:* tkurtz@eee-consulting.com Agent Authorization Letter* Rease provide the Agent Authorization Letter if you are submtting this docunent. Agent Auth 2.pdf 40.35KB RLE TYPE M.15T BE RDF C. Project Information and Prior Project History 1. Project Information ................................................................................................................................................................................................. 1a. Name of project:* Project No. 00358-0140; Wilson's Mills WD-WTP Service Line 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: * Wilson's Mills 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From US 40 take 70 E for ten miles. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) See attached landowner list 2b. Property size: (in acres) 40.5 2c. Project Address Street Address Alignment corridor from Wilson's Mills WTP to Wilson's Mills Road Address Line 2 City State/ Province/ Region Postal / Zip Code Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.576741 -78.345320 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Neuse River 3b. Water Resources Classification of nearest receiving water:* WS-IV:NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project alignment is located primarily along the edge of, and within, previously disturbed NCDOT and local ROW. The western extent of the alignment will connect to a proposed Booster Pump Station located next to the Wilson's Mills Elementary school. The alignment will connect the new pump station to the edge of the Wilson's Mills Water Treatment Plant (WTP) property. The waterline will run along disturbed grass lawns and occasionally cross through areas of Mixed Pine/Hardwood Forest. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) nick the upload button or drag and drop files here to attach document P2 updated topo.pdf 965.67KB File type mast be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent project 2 Soils map.pdf 862.92KB File type mast be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 8.29 4e. List the total estimated linear feet of all existing streams on the property: (intern ittent and perennial) 488.1 4f. Explain the purpose of the proposed project:* The Town of Wilson's Mills and Johnston County propose to install an underground waterline to run from a proposed Booster Pump Station at the town's water tower, to the edge of the Wilson's Mills WTP, in Johnston County. Installation of the 24" diameter waterline will offer improved hydraulic capacity of flow between the new Booster Pump and the WTP. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The proposed alignment runs east to west from a proposed Booster Pump Station, west of the Wilson's Mills Elementary School, to the western edge of the Wilson's Mills WTP. The preferred route of the waterline from the WTP is to run along previously cleared ROW which parallel local roads. The alignment will follow Wilson's Mils road SE for approximately one mile until it zig-zags north to run just south of Main Street. The alignment will mark a left turn to run behind the Johnston Farms subdivision until reaching the WTP. The project will involve installation of a 24 -inch underground waterline with associated valves and access points. The project alignment is approximately 2.6 miles long. Ground disturbing activities will include clearing and grubbing as needed within the 20 -foot wide LOD, although that will be minimal as most of the area has been cleared for other easements. Installation of the waterline will require trenching, and backfilling for the pipeline. Proposed trench widths will range from four to six feet, and average depth will be approximately three feet below existing ground elevation. The alignment will cross under the railroad tracks via jack and bore with thick steel casing. Jack and bore drilling will be used to cross under the occasional NCDOT intersections along the alignment. The alignment will cross tributaries to the Neuse River and Poplar Creek via open cuts. Cofferdams will be used while the installation occurs; water upstream will be pumped below the work area through a filter bag. Impacted areas will be restored to original grade and stabilized. All impacted buffers will be vegetated with native vegetation. No historic properties were identified along or adjacent to the alignment using the NCHPO database search, and no buildings were found within or adjacent to the project area during field investigations. No impacts to historic properties are proposed as part of this project. 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach docurrent 2018.07.23 -0358 -0140 -WILSON MILLS PROJECT 2.pdf 19.59MB File type mist be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No f Unknown Comments: 3e conducted delineations between March 9 -15, 2018 and also June 25, 2018 5b. If the Corps made a jurisdictional determination, what type of determination was made? r•' Preliminary r Approved r Unknown r N/A Corps AID Number: Exarrple: SAW -2017-99999 Preliminary determination is pending site visit. PJD request was submitted to USACE on 4/30/2018 and field verification is scheduled for 7/11/2018 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Ray Bode, PWS; Jason Steele, PWS; and Tyson Ku rtz EEE Consulting, Inc. 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Preliminary determination is pending site visit. PJD request was submitted to USACE on 4/30/2018 and field verification is scheduled for 7/11/2018 5dl. Jurisdictional determination upload Crick the upload button or drag and drop files here to attach document File type mast be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? f Yes f• No f Unknown 7. Future Project Plans 7a. Is this a phased project?* f Yes C No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands V Streams -tributaries V Buffers r- Open Waters r- Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact* 2b. Impact type * 2c. Type of wetland* 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* W1 - Land clearing T Headwater Forest WG No Corps 0.109 Ivbp label (e.g. Fbad Crossing 1 - Calvert, Fern -anent (Fj or (404, 10) or DAR (401, (acres) dewatering, etc) Terrporary (T) other) W2 - Land clearing T Headwater Forest WF No Corps 0.016 Nbp label (e.g. Road Crossing 1 - Calvert, Permanent (P) or (404, 10) or DAR (401, (acres) dewatering, etc) Temporary (T) other) W3 - Land clearing T Headwater Forest WF No Corps 0.037 Nbp label (e.g. Fbad Crossing 1 - Calvert, Ferrranent (F) or (404, 10) or DAR (401, (acres) dewatering, etc) Temporary (T) other) W4 - Land clearing T Headwater Forest WE No Corps 0.043 Nbp label (e.g. Fbad Crossing 1 - Culvert, Permanent (F� or (404, 10) or DAR (401, (acres) dewatering, etc) Terrporary (T) other) W5 - Land clearing T Headwater Forest WE No Corps 0.224 Nbp label (e.g. Fbad Crossing 1 - Calvert, Permanent (F') or (404, 10) or D✓tR(401, (acres) dewatering, etc) Terrporary (T) other) W6 - Land clearing P Headwater Forest WE Yes Corps 0.030 Nbp label (e.g. Fuad Crossing 1 - Calvert, Permanent (P) or (404, 10) or DhR (401, (acres) dewatering, etc) Temporary (1) other) W7 - Land clearing P Headwater Forest WE Yes Corps 0.033 Ivbp label (e.g. Fbad Crossing 1 - Calvert, Permanent (P) or (404, 10) or DAR (401, (acres) dewatering, etc) Temporary (T) other) W8 - Land clearing P Headwater Forest WX Yes Corps 0.015 Ivbp label (e.g. Fbad Crossing 1 - Calvert, Fermanent (Fj or (404, 10) or DAR (401, (acres) dewatering, etc) Temporary (T) other) W9 - Land clearing T Headwater Forest WB No Corps 0.286 Nbp label (e.g. Fbad Crossing 1 - Culvert, Ferrranerd (F) or (404, 10) or DAR (401, (acres) dewatering, etc) Temporary (T) other) W10 - Land clearing T Headwater Forest WB No Corps 0.002 Nbp label (e.g. Fbad Crossing 1 - Culvert, Permanent (F) or (404, 10) or DAR (401, (acres) dewatering, etc) Temporary (1) other) W11 - Land clearing T Headwater Forest WB No Corps 0.118 K/hp label (e.g. Fbad Crossing 1 - Culvert, Pernenent (F' or (404, 10) or DAR (401, (acres) dewatering, etc) Terrporary (T) other) 2g. Total Temporary Wetland Impact 0.835 2g. Total Permanent Wetland Impact 0.078 2g. Total Wetland Impact 0.913 2h. Comments: A wetland impact table with additional details is attached in the supporting documents section. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream ..... .... 3f. Type of ....... ........ 3g. Stream 3h. Impact s type* Type* Jurisdiction* width* length* S1 Waterline crossing P Bank SC Perennial Corps 6 15 9 Nbp label (e.g. Fbad Crossing Pernenert (F) or Stabilization Perennial (F$� or Average (linear feet) 0 1) Temporary (T) intermittent (INT) (feet) S2 Waterline crossing T Excavation DC Jurisdictiona Corps 4 48 1 Nbp label (e.g. Fbad Crossing Farnrenent (F' or I Ditch Average (linear feet) 9 1) Temporary (T) Perennial (1`13:� or (feet) 2 intermittent (INT) '* All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 192 3i. Total permanent stream impacts: 15 3i. Total temporary stream impacts: 48 3i. Total stream and tributary impacts: 63 3j. Comments: A stream impact table with additional details is attached in the supporting documentation section. S2 is an impact to a Potential Non -Wetland W.O.U.S.. DC was not classified as a jurisdictional ditch. DC was titled a Potential Non - wetland W.O.U.S.. Only a PJD was conducted. DC did not qualify as a intermittent or perennial stream or a wetland, but still could potentially be a waters of the United States. Impacts to DC must still be considered and this is the most applicable category to shows impacts. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that appy. Q Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Goose Creek ❑ Jordan Lake ❑ Other 6b. Impact Type * 6c. Per or 6d. Stream name * 6e. Buffer mitigation 6f. Zone 1 6g. Zone 2 Temp* required?* impact* impact* B1 -Allowable T SC No 0 673 Location and Exenpt, Allowable, allowable w/ Permanent (Pf or (square feet) (square feet) ration Temporary (T) B2 -Allowable T SC No 1,299 0 Location and Exempt, Allowable, allowable w/ Permanent (P/ or (square feet) (square feet) mitigation Temporary (T) B3 - Allowable T SC No 0 263 Location and Bxempt, Allowable, allowable w/ Permanent (P/ or (square feet) (square feet) nftation Temporary (T) 6h. Total buffer impacts: Zone 1 Zone 2 Temporary impacts: 1,299.00 936.00 Zone 1 Zone 2 Permanent impacts: 0.00 0.00 Zone 1 Zone 2 Total buffer impacts: 1,299.00 936.00 6i. Comments: A buffer impact table with additional details is attached in the supporting documents section. Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. click the upload button or drag and drop files here to attach document 2018.0719_00358-0140_Impact Maps_Sealed.pdf 1.42MB Revised P2 Wilsons Mills Impacts.pdf 85.89KB File must be PDF E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Multiple alignments were evaluated based on environmental impacts, availability of public right-of-way or private easement requirements, and ease of construction. The alignment route selected utilized eAsting Town owned land and public ROW as much as possible, minimizing the disturbance to forested and residential land. The waterline will run through the front of several residential front yards to stay within ROW rather than clearing forested land. Water valves will be located in uplands and situated such that maintenance access will not need to cross jurisdictional waters. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Proper erosion and sedimentation control measures will be implemented as proposed and approved by the NC Division of Energy, Mineral, and Land Resources (NCDEMLR). Proposed measures include super silt fence along stream banks and wetland perimeters, stone relief outlets, and compost socks adjacent to wetlands and/or streams. Streams will be crossed via open cut. Impacts at open cut crossing locations will be minimized by use of appropriate erosion control and flow diversion measures during construction. Direct impacts from construction of the waterline to these features will be temporary, and any impacted areas will be restored to original grade and stabilized following construction. Prior to excavating in jurisdictional streams, coffer dams will be installed upstream and downstream of the excavation area to isolate the disturbed area and contain sediment. Stream flow on the upstream side of the excavation will be pooled above the coffer dam and pumped around the excavation area. The pumped water will be discharged on the downstream side of the excavation below the lower coffer dam through sediment bags to filter the discharge water of sediment before allowing the water to be returned to the stream channel. Impacted stream banks will be stabilized with ripirap as required to provide proper stabilization and protection against erosion. Riplrap will be keyed into the stream banks such that the original crossisection of the stream is maintained. Wetland areas that must be excavated for installation of the pipe will be returned to their original (prelconstruction) contours and revegetated. Installation will be by low pressure rubber tired excavation equipment where possible. In all forested wetlands, clearing will be done by hand and grubbing will only occur as needed to excavate trenching for installation. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes C No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Permanent impacts to streams and wetlands are below the thresholds requiring mitigation under the NWP 12. All impacts to protected buffers are considered allowable and do no require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r- Level Spreader R Vegetated Conveyance (lower SFM/T) F' Wetland Swale (higher SHWT) W Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diffus Flow Documentation Click the upload button or drag and drop files here to attach docurrent File type mist be RDF 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? ryes F No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* f• Yes f No To look up low density requirement click here 15A NCAC 02H.1003(2). G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* f• Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval letter.)* r Yes r No NEPA or SEPA Final Approval Letter dick the upload button or drag and drop files here to attach docurrent 2017.08.01_NCDEQ-DWI_Ltr of Intent to Fund—Wilsons Mills Proj2.pdf 208.09KB FILE TYPE M- ST BE FDF 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* f Yes r No 2b. Is this an after -the -fact permit application?* t' Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The proposed project will upgrade the current water transmission lines for the Town of Wilson's Mills, NC. This project will not facilitate additional development that will effect downstream water quality. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* f Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pctf 5h. Does this project involve the construction/installation of a wind turbine(s)?* f Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPAC Project Review (March 30 2018). USFWS Official Species List was updated (June 19, 2018) and contained no changes since the original submission so project review was not re -submitted. NCNHP Project Review (June 20, 2018). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential Fish Habitat Mapper (used: April 12, 2018) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC DNCR SHPO Letter Date: May 4, 2018 7c. Historic or Prehistoric Information Upload nick the upload button or drag and drop files here to attach docurrent SHPO Response Letter ER 18-0685.pdf 98.41 KB File mist be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* f Yes r No 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM Panels: 3720168600J (eff. 12/2/2005) & 372016900J (eff. 12/2/2005) Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent USFWS Online Project Review Project No 00358-0140 Wilson's Mills WD_WTP Service 1.16MB Line.pdf Updated Official Species List Project 2.pdf 235.99KB Updated NHP project report project_ 2_wilsons_mills_and_l 1232_11232.pdf 825.36KB Landowners.pdf 75.07KB 140-138 DWR Buffer determination. pdf 579.22KB File mist be FDF or KNE Signature V By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Tyson Jeffrey Kurtz Signature Date Submitted: 7/24/2018 Initial Review Is this project a public transportation project?*(? a Yes F No Change only 9 needed. Has this project met the requirements for acceptance in to the review process?* f• Yes f No BIMS # Assigned * 20181013 Version#* 1 Reviewing Office* Central Office - (919) 707-9000 Select Project Reviewer* Paul Wojoski:EADS\pawojoski Is a payment required for this project?* f No payment required f Fee received F Fee needed - send electronic notification What amout is owed?* * $240.00 f $570.00