Loading...
HomeMy WebLinkAboutThe Allan Lindsey Center - 7/23/2018 3:29:56 PMWater Resources ENVIRONMENTAL QUALITY Staff Review: Updated ID#: Updated Version: Who needs a copy?* SW3180603 1 17 Central Office r Regional Office Select Reviewing Office* Mooresville Regional Office — 704-663-1699 Central Office Reviewer: Corey Anen - eads\scanen Select RO Reviewer:* zahid.kahn@ncdenr.gov SUBMITTED PROJECT INFORMATION Existing Project Information: I D# SW3180603 Version: 1 Facility Name: The Allan Lindsey Center County: Union Name: OAK Engineering Vft is subrritting the inforrraticn? Email Address: eleanor@oak.engineering Describe the attachments: Construction Drawings for the Allan Lindsey Center revised per comments received. Full submittal in the mail. Please upload all files that need to be submitted. Lindsey Center Plans 2018.07.17.pdf 36.57MB Only pdf files are accepted. fJ By checking the box and signing box below, certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the Supplemental Information form. Full Name: Eleanor R Thomas Signature: Date Submitted: