Loading...
HomeMy WebLinkAboutNC0038377_Application_20180719 �' DUKE Duke Energy EC13K � 526 South Church Street ENERGY® Charlotte, NC 28202 July 19, 2018 Mailing Address: PO Box 1006 Mr.John Hennessy Charlotte, NC 28201-1006 NC Division of Water Resources Surface Water Protection Section 1617 Mail Service Center Raleigh, NC 27699-1617 FtEC E1V En I D F�FZ` Subject: Application for Certification of Pollution Control Facility AUL 2 0 201$ Mayo Steam Plant Roxboro,North Carolina; Person County ResourJces DW water NPDES Permit No.NC0038377 permitting Section Dear Mr. Hennessy, Pursuant to North Carolina General Statute(NCGS) §105-275(8), Duke Energy Progress, LLC. is requesting tax exemption certification for qualifying water pollution control equipment currently being installed at the referenced plant. The qualifying water pollution control equipment and appurtenances,operating in accordance with the terms and conditions of the referenced NPDES permit,are detailed in the attached North Carolina Department of Environment and Natural Resources, Division of Water Resources Application for Tax Certification and Exemption Form TC-WQ. In accordance with NCGS §105-275(8), form TC-WQ details the facility's water cleaning devices and appurtenances, which are"[R]eal and personal property that is used...exclusively for ... waste disposal or to abate, reduce or prevent the pollution of...water..." Submission of this application is required as a process step in the State of North Carolina Department of Revenue's pollution control certification process for real and personal property tax exemption of certain assets used in pollution control capacities within the facility. The equipment's primary function is the waste disposal, reduction,or prevention of water pollution. Please send one copy of the completed tax exemption certification to the following address: Ms. Anne Pifer Manager EHS-CCP Permitting and Compliance Duke Energy 526 S.Church Street,EC13K Charlotte,North Carolina 28202 If you have any questions regarding this request for tax exemption certification, please contact me at (980)373-1609. Sincerely, Anne Pifer Manager,EHS-CCP Permitting and Compliance Enclosure c: Ms. Cindy Mobberley, Duke Energy www.duke-energy.com DIVISION OF WATER RESOURCES TCN: APPLICATION FOR TAX CERTIFICATION This application is to be used only for waste treatment systems and equipment Rev. & EXEMPTION FORM TC-WQ under the authority of the NC Division of Water Resources (DWR) 01/29/2016 DIRECTIONS: Complete and mail signed copies of the application form and all supporting information to both: 1)the County Tax Administrator for the County in which the facility is located(one copy) AND 2)to the NC Division of Water Resources,Surface Water Protection Section, 1617 Mail Service Center, Raleigh,NC 27699-1617(two copies). Type or print in blue or black ink. A separate application package is required for each facility where property proposed for tax certification is located. THIS APPLICATION WILL NOT BE PROCESSED WITHOUT COMPLETE AND ACCURATE INFORMATION. If you have any questions regarding this application,please call the local tax office or the NC Division of Water Resources at 919/807-6300 or their web site at https://ox.deq.prod.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/npdes-wastewater/tax- certification for more specific contact information. Please Note: a)Tax Certifications will only be processed for facilities under the authority of the DWR and only if the DWR has found that the described property: 1.Has been or will be constructed or installed; 2.Complies with or that plans therefore which have been submitted to the DWR indicate that it will comply with the requirements of the Environmental Management Commission; 3. Is being effectively operated or will,when completed,be required to operate in accordance with the terms and conditions of the permit,certificate of approval,or other document of approval issued by the DWR;and 4.Has or,when completed,will have as its PRIMARY rather than incidental purpose the reduction of water pollution; 5.Is being used exclusively(100%)for waste treatment. b)If approved,the Tax Certification issued will incorporate all requested assets at the facility that meet the criteria for Tax Certification by DWR. Therefore this application must include any new assets for which Tax Certification is being requested,as well as any assets previously receiving Tax Certification from DWR for which Tax Certification is still needed. A.Applicant(Applicant is the owner of,and taxpayer for,the property described in this application for tax certification.) Name of Applicant: Name of Facility: Progress Energy Carolinas,Inc. Mayo Steam Plant Address of Applicant,if different from facility where property located: Physical Address of Facility where property located(no P.O.Box): I0660 Boston Road 10660 Boston Road Roxboro,NC 27574 Roxboro,NC 27574 (address) (city) (zip) (street address) (city)Y (Z1P) Business Relationship of Applicant to facility where property located: County where property located: Person Name of Contact Person at Facility where property located: Lori Tollie Does the Applicant hold any NC Division of Water Resources Permits? ®Yes / 0 No Title: Sr.Environmental Specialist Phone Number: 336-854-4916 If yes,please list Permit No.NC0038377 Permit No(s): If approved,will this be the first Tax Certification issued for this Facility? If no,attach any previously issued 0 Yes / ® No tax certifications B.Complete this Section only if the Operator/User of the facility and equipment is different from the Owner of the facility. Name of Operator/User: Operator/User Address: (address) (city) (zip) Operator/User Contact Name: Relationship between Operator/User of facility and equipment and applicant: ***ATTACH A PROCESS SCHEMATIC TO YOUR APPLICATION The number of each item for which Tax Certification is being requested must be shown on the schematic*** Application continues on Next page DIVISION OF WATER RESOURCES TAX CERTIFICATION & EXEMPTION APPLICATION PAGE 2 Waste Treatment Systems & Equipment: Waste treatment systems&equipment must be used exclusively for the abatement of water pollution Rev.09/01/2013 For DWR Uee Was asset listed in Asset Number, %of time item is Is this asset For County orry•A• Year of VIN Original Historical Description of Waste Treatment Systems or Equipment the permit(Yes/No) Vehicle Identification How is this equipment used for pollution abatement? used for pollution U.o+y Approved p replacing a prior Disapproved ' Number( ) abatement Acquisition Cost*' asset? Included in updated Under Lined Retention Basins NPDES permit application N/A Lined retention basin to replace ash basin per CCR requirements 100%construction 2018 532,803,564 Yes Included in updated Piping installed to reroute plant water away from Ash basin and to new Lined Under 2 Plant water reroute NPDES permit application WA Retention Basin 100%construction 2018 826,054,703 No Settling basin is used to remove the suspended solids from and provide storage Included in updated for FGD blowdown prior to being processed by the partial thermal evaporator Under 3 EGO Settling Basin NPDES permit application N/A (ZLD ) 100%construction 2018 $10.680,000 No 4 6 7 9 10 11 12 13 r4 15 Attach additional pages if necessary •If the asset is listed in the DWO permit,the description must be identical as listed on the current permit. If the asset is not specifically listed in the DWO permit,the applicant must attach detailed information as to why the asset should qualify for Tax Certification. When certifying systema or equipment,DENR is not certifying the cost of the equipment or the year of acquisition. Facilities: To qualify for tax certification,the building or section of building being applied for,must be used exclusively for water pollution prevention. A sketch of the building,square footage along with details as to how the building is used for water pollution prevention,is required. Land: To qualify for tax certification,the land must be used exclusively for water pollution prevention. A schematic diagram of the facility detailing the land being applied for is required. The amount of land (acreage)is required and how this land is being used to prevent water pollution. For wastewater treatment and irrigation system list separately the acreage used for actual treatment from the acreage required by the facility's water quality permit for buffers and setbacks. SIGNATURE: I hereby certify that the above equipment,facilities and/or land are used for the purpose stated,and that the information presented in this application is accurate. Furthermore,I certify that any portable or mobile equipment listed on this application will be used exclusively in the state of North Carolina. Applicant Signature: Dave Renner Title:VP CCP Engineering Date: 7`1/� (print name also) NOTICE: The penalty for fa ement,representation or certification Of: Duke Energy Progress LLC herein includes imprisonm- and/or the assessment of civil penalties. (Name of Applicant Business Entity) TC-WO Attachment A Lined Retention Basins At Mayo Plant, low volume and process flow streams are routed to the ash basin prior to discharging through Outfall 002.As a result of CAMA and the CCR Rule, Mayo's ash basin will not be allowed to receive these flows after April 17, 2019.This project will design and construct a new retention basin to replace the current ash basin as the treatment unit for process and low volume waste streams.The Lined Retention Basins project will include the following water pollution control facilities: • two lined basin primary cells • one secondary polishing olishingP and • chemical addition equipment at the inlet and outlet • one holding basin to provide retention and treatment for high-volume flows See attached diagram for more information on placement of these water pollution control facilities. (LRB MY010189) Plant water reroute At Mayo Plant, low volume and process flow streams are routed to the ash basin prior to discharging through Outfall 002.As a result of CAMA and the CCR Rule, Mayo's ash basin will not be allowed to receive these flows after April 17, 2019.This project will redirect all of the process and storm water flow streams,that currently go to the ash basin,to either the new lined retention basin for treatment or to Outfall 002 for discharge.The Plant Water Reroute project will include the following water pollution control facilities: • sumps, pumps, and piping • chemical feed systems at both the coal pile holding basin and the new lined retention basin See attached diagram for more information on placement of these water pollution control facilities. (SW/PW M Y010188) FGD Settling Basin At Mayo Plant, a settling basin is used to remove the suspended solids from and provide storage for FGD blowdown prior to being processed by the partial thermal evaporator(ZLD).As a result of CAMA and the CCR Rule, the existing basin,which is built on top of Mayo's ash basin,will be removed from service.The FGD Settling Basin project will include the following water pollution control facilities: • new FGD settling basin to replace the current basin upstream of the thermal evaporator.The new basin will be CCR compliant and provide at least 13 MM gallons of storage for FGD blowdown. See attached diagram for more information on placement of this water pollution control facility(WWT MY010141). _ Overall ,„r.! lo .,o' WONT(MY010141) J 1\ .,.. F ` i_ - iv t ' , _, , ‘1 LRB(MY010189) lirL d I" ' ' ' . ti 1:. '''\ -4 5 I r NSW/P' MY01018 )] DUKE �C' ENERGY.