Loading...
HomeMy WebLinkAbout20170730 Ver 2_July inspection_20180723Wetland Inspection Report Project Num: 19980260 Version: 2 Project Name: NC DOT - Winston-Salem Northern Beltway Phase 2 County: Forsyth�R-2247/U-2579) Location: NC DOT - Winston-Salem Northern Beltway Phase 2(R-2247/U-2579) Latitude: SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 7/18/2018 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: Phone: Phone: 336-776-9703 We reviewed several permit sites from the original permit and one site from Phase II. All sites reveiwed were in compliance and built to plans. page: 1 Site Number: 19980260 Inspection Date: 7/18/2018 Owner: Thorpe, Gregory Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ Comment: DOT, Corps, Contractors and mvself reviewed sites 6, 7A, 9, 11, 12, 13, 14 and 3A (Phase II). All sites were built to the plans. With the followinp exceptions. The riffle at the inlet at Site 11 was constructed of bedrock to ensure stabilitv and avoid headcuttinq into the wetland. This site would continue to be monitored. Site 3 was a lonq culvert that was still under construction. We reviewed the temporarv diversion at inlet and outlet. Sites 12 and 13 were related to a bridqe that had not been constructed, but we reveiwed pendinq impacts. page: 2