HomeMy WebLinkAboutNCG140462_Staff Review Form_4/6/2018Action History (UTC -05:00) Eastern Time (US & Canada)
by Workflow 4/6/2018 3:12:32 PM (Workflow Start Event)
Approved by Georgoulias, Bethany 7/20/2018 1:40:47 PM (CO Staff Review form)
In Discussed treatment system with H. Gupton (consultant), 336-985-6519 on 7/20/2018. Runoff and
rinse out water directed into basin #1 and routed through basins #245 prior to discharge. Basins #245
have ramps for clean-out, but curb prevents runoff from entering later in the treatment train. Most water
W11 be pumped back into trucks on-site and re -used on concrete; WW discharges through outfall #2 will
not be frequent. Emergency spillway only for large event overflows. EAA addressed.
• Georgoulias, Bethany reassigned the task to Georgoulias, Bethany 7/9/2018 2:25 PM
• The task was assigned to Patterson, Robert D 4/6/2018 3:12 PM
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Submission Type
ID #
NCG 140462
Project Name: Redi Mix Concrete
Contact Email(s):
County(ies)
Guilford
Web Access Link to Project File
Click here to log in to see the project information submitted.