Loading...
HomeMy WebLinkAbout20180552 Ver 1_More Info Received_20180717Strickland, Bev From: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Sent: Tuesday, July 17, 2018 12:28 PM To: Kirk West Cc: Homewood, Sue; tammy@hycolake.org Subject: [External] RE: [Non-DoD Source] Fwd: Sedimentation Inspection Report - Cottages at Hyco Lake; SAW -2018-01417 Attachments: RGP30-2016-12-23.pdf rt Mr. West, Thank you for the information you submitted regarding shoreline stabilization on Hyco Lake at the above referenced property, included photos submitted via email on 7/11/2018 that show active erosion on the shoreline. Your activity, described as rip rap stabilization of approximately 200 linear feet of shoreline, fits the description of Department of Army, Wilmington District, Corps of Engineers General Permit 198200030 (GP 30) as long as the work is done in compliance with GP 30 Special Conditions and General Conditions (attached). Note, however, that you must also receive approval from the NC Division of Water Resources (NCDWR). Please see the Shoreline Stabilization Form and Help Document (updated September 2013) at the following NCDWR website: http://deq.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401-wetlands-buffer- permits/401-application-forms-help-documents Sue Homewood (cc'd above) is currently the appropriate NCDWR contact for those requirements in Caswell County. Her phone number is 919-791-4200. If you have any questions related to Corps of Engineers requirements please let me know. Thank you for your time and coordination. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Kirk West [mailto:kirk@westandwoodall.com] Sent: Wednesday, July 11, 2018 10:53 AM To: Bailey, David E CIV USARMY CESAW (US)<David.E.Bailey2@usace.army.mil> Subject: [Non-DoD Source] Fwd: Sedimentation Inspection Report - Cottages at Hyco Lake David, Please see below photos of erosion and email from the Zac about erosion. We have a 6 new homes coming in, there is erosion and will be more. We are trying to prevent more erosion. We would prefer not to spend this money but fill like we need to. Also do do this now while construction is taking place will be much easier than after all the homes are done and landscaping in. Please let me know you did get this and what other questions you have. Fil i � « . yr f � � . , ■�� � � ��� , � -4t� ■ � ho . . J . ■ # _ - - . \,-/ , . m k _ - ®I Ab » '• ` - q..' '&&:. ■AL I u , . -. ■ ■% ■�� �� � �'�\ � I- . • ' ,. 4& .. #NNW 10 ' AL I . = ■� ��, � #d- ` K• dr�� �� ■� - a ow �� . ■ .� � � �� AL a 2 2 10 � + JL •, . 4lb - 5 %M I . OF 092"Cl* low rt qp 4 ft �jo0oqp A4%p y / 40 40 the J dr 4p A +.� At it 1 WP r 4 SP a N6 4w l 'ap Kirk West West & Woodall W; 336-322-5800 Q 919-524-5138 ki rk(a�westandwoodall.com Begin forwarded message: From: "Lentz, Zachary" <zac.lentzgncdenr.gov> Subject: Sedimentation Inspection Report - Cottages at Hyco Lake Date: July 10, 2018 at 11:29:02 AM EDT To: "kirkgwestandwoodall.com" <kirkgwestandwoodall.com> Cc: "Berry, Tom" <tom.berrygberico.com> Mr. West, Attached you will find a Sedimentation Inspection Report for your project "Cottages at Hyco Lake." Several corrective actions have been suggested in order for your site to be in compliance with the approved plan; please make these changes within the next two weeks. Please don't hesitate to reach out with any questions or concerns. Thank you, Zac Lentz