HomeMy WebLinkAboutNC0081621_Compliance Evaluation Inspection_20180720United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3 I NCO081621 111 12 I 18/07/12 I17 18 I S i 19 LG] i 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 70 I g 71 I tyI 72 I r l 73 I I 174 751 I I I 1 1 1 I80
uI I I i
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:05AM 18/07/12
14/10/01
Muddy Creek WWTP
14655 Hopewell Church Rd
Exit Time/Date
Permit Expiration Date
Midland NC 28107
11:38PM 18/07/12
18/10/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Kimberly Dawn Holt/ORC/704-788-4164/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Coleman M Keeter,PO Box 428 Concord NC 280260428/Executive
Director/704-786-1783/7047951564 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
- - SQL MRO WQ//252-946-6481/ 7/19/2018
Roberto SchellerCj91C2A007838943E-
Qais Banihani NPDES WW Permitting UnitH919-807-6£
Signature of Management Q A Reviewer Agency/Office/Phone and Fax NumbersDocuSigned by: Date
't" H NU." 7/20/18
EF1611`1369AMUAI.
W. Corey Basinger MRO WQ//704-235-2194/
.
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO081621 111 121 18/07/12 1 17 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO081621 Owner - Facility: Muddy Creek WWTP
Inspection Date: 07/12/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
0
❑
❑
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The current Dermit became effective on October 1. 2014 and expires on October 21. 2018
Permit is for the continued operation of an existing 0.15 MGD wastewater treatment plant.
Future expansion to 300,000 GPD has been approved. At time of inspection construction
was on-going under Authorization to Construct (ATC) 081621A01. Mr. Qais Banihani from
Complex Permitting Unit was present during inspection.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported CDCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Page# 3
Permit: NCO081621 Owner - Facility: Muddy Creek WWTP
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
Inspection Date: 07/12/2018 Inspection Type: Compliance Evaluation
❑
Is the wet well free of excessive grease?
❑
❑
Record Keeping
Yes No NA NE
Is the backup operator certified at one grade less or greater than the facility classification?
0
❑
❑
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment:
Pump Station - Influent
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
❑
❑
❑
0
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
0
❑
❑
❑
Is audible and visual alarm available and operational?
0
❑
❑
❑
Comment:
Bar Screens
Yes No NA NE
Type of bar screen
0
❑
❑
❑
a.Manual
❑
0
❑
❑
b.Mechanical
0
❑
❑
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment: Facility is equipted with mechanical bar screen and manual bypass.
Influent Sampling
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected above side streams?
❑
0
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is sampling performed according to the permit?
0
❑
❑
❑
Page# 4
Permit: NCO081621
Inspection Date: 07/12/2018
Influent Sampling
Owner - Facility: Muddy Creek WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: At time of insDection influent samDler was recorded at 4 dearees Celsius. It was noted in the
previous inspection, conducted on August 8, 2017, that influent sampler is not located above
all side streams of wastewater such as filter backwash water and sludge dewatering
supernatant. Such sidestreams can skew influent analytical values and missrepresent
treatment plant loading and removal rates.
Equalization Basins
Yes No NA NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
M
❑
❑
❑
Are audible and visual alarms operable?
0
❑
❑
❑
# Is basin size/volume adequate?
0
❑
❑
❑
Comment:
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
0 ❑
❑
❑
Are the diffusers operational?
0 ❑
❑
❑
Is the foam the proper color for the treatment process?
❑ ❑
0
❑
Does the foam cover less than 25% of the basin's surface?
0 ❑
❑
❑
Is the DO level acceptable?
❑ ❑
❑
0
Is the DO level acceptable?(1.0 to 3.0 mg/1)
0 ❑
❑
❑
Comment: It was noted that MLSS in aeration basin has chanaed in color from last insDection. from a
brownish color to a light black color. It was also noted that effluent had a light tint. Operator
indicated that color was from industry discharging ink. It is recommended that the MSDS
Sheet for the subject ink be obtained to ensure that this product will not have a cumulative
toxic effect on treatment process.
Aerobic Digester Yes No NA NE
Is the capacity adequate? 0 ❑ ❑ ❑
Is the mixing adequate? 0 ❑ ❑ ❑
Page# 5
Permit: NC0081621
Inspection Date: 07/12/2018
Owner - Facility: Muddy Creek WWTP
Inspection Type: Compliance Evaluation
Is the clarifier free of black and odorous wastewater?
0
❑
Aerobic Digester
Yes No NA NE
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment:
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
0
❑
❑
❑
Comment: At time of inspection effluent from secondary calrifiers was clear with few suspended solids.
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Comment: Caustic is being added to treatment process for alkalinity.
Filtration (High Rate Tertiary)
Type of operation:
Is the filter media present?
Is the filter surface free of clogging?
Is the filter free of growth?
Is the air scour operational?
Is the scouring acceptable?
❑ ❑ ❑ ■
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
Cross flow
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
❑
❑
■
❑
Page# 6
Permit: NCO081621 Owner - Facility: Muddy Creek WWTP
Inspection Date: 07/12/2018 Inspection Type: Compliance Evaluation
Filtration (High Rate Tertiary) Yes No NA NE
Is the clear well free of excessive solids and filter media? ❑ ❑ 0 ❑
Comment: Third filter is to be put online as per ATC.
Disinfection - UV
Yes No NA NE
Are extra UV bulbs available on site?
0
❑
❑
❑
Are UV bulbs clean?
0
❑
❑
❑
Is UV intensity adequate?
❑
❑
❑
0
Is transmittance at or above designed level?
0
❑
❑
❑
Is there a backup system on site?
0
❑
❑
❑
Is effluent clear and free of solids?
0
❑
❑
❑
Comment: Another bank of UV lamps are to be installed during construction per ATC.
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0 ❑
❑
❑
Is flow meter calibrated annually?
0 ❑
❑
❑
Is the flow meter operational?
0 ❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
0 ❑
❑
❑
Comment: V -notch weir has been replaced with sharper angle V -notch weir plate. The replacement
❑
❑
weir is constructed of traffic sign material. V -notch weir sould be inspected during
annual
0
❑
meter calibration for pitting and corrosion.
❑
Celsius)?
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
❑
❑
❑
representative)?
Comment: Effluent sampler was recorded at 5 degrees Celsius at time of inspection.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑
Page# 7
Permit: NC0081621
Inspection Date: 07/12/2018
Effluent Pipe
If effluent (diffuser pipes are required) are they operating properly?
Owner - Facility: Muddy Creek WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
❑ ❑ ■ ❑
Comment: At time of inspection effluent was clear with no visible foam or suspended solids at point of
discharge.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Comment:
Yes No NA NE
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
❑
❑
❑
❑
❑
❑
Page# 8