Loading...
HomeMy WebLinkAbout20180992 Ver 1_Roadway Improvements_2018071715" RCP345 350 355 34034548" CMPWTLDWTLDWTLDWTLDWTLDWTLDWTLDWTLDWTLD37 38 32 + 0 0 33+00 34+00 35+00 36+00 37+00 38+00 39+00 W W W W W W W W W W W W W W CB#201 RIM = 347.87 INV IN = 339.71 29 LF 30" RCP @ 1.00% CB#202 RIM = 347.80 INV IN = 342.13 INV IN = 340.49 INV OUT = 340.00 395 LF 18" RCP @ 3.00%CB#203 RIM = 359.35 INV IN = 354.07 INV OUT = 353.97 51 LF 30" RCP @ 1.00% FHA TEE STA = 33+58.14 12" GATE VALVE FHA TEE STA = 38+58.41 12" GATE VALVE PROPOSED 12" C900 PVC WATER MAIN K E N N E B E C R O A D 60' PUBLIC RIGHT OF WAY YI#210 RIM = 344.24 INV IN = 341.10 INV OUT = 341.00 HDWL#500 RIM = 344.92 INV OUT = 340.00 12 LF 48" RCP @ 2.89% CONNECT NEW RCP TO EXISTING CMP WITH CONCRETE COLLAR 360355350 360 41 1 2 4 3WW40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 W W W W W W W W W W W W W W W10+0011+00248 LF 18" RCP @ 1.20% CB#204 RIM = 361.00 INV IN = 357.14 INV IN = 357.15 INV OUT = 357.04 34 LF 18" RCP @ 3.17% YI#207 RIM = 361.95 INV IN = 358.33 INV OUT = 358.23 142 LF 18" RCP @ 1.25% CB#205 RIM = 362.26 INV IN = 359.02 INV OUT = 358.9239 LF 15" RCP @ 2.50% DI#206 RIM = 364.50 INV OUT = 360.00 57 LF 18" RCP @ 1.85% CB#208 RIM = 362.99 INV IN = 359.49 INV OUT = 359.39 26 LF 18" RCP @ 1.00% CB#209 RIM = 362.99 INV OUT = 359.75 FHA TEE STA = 43+58.25 12" GATE VALVE PROPOSED 12" C900 PVC WATER MAIN K E N N E B E C R O A D60' PUBLIC RIGHT O F W A Y 12"x8" TEE (2) 12" GV (1) 8" GV FHA 360 362 362 363 364 361 363 364 365 366 3 4 5 350 330 335 34 0 35 5 6 7 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 54+47 W W W W W W W W W W W W W CB#101 RIM = 341.38 INV IN = 338.68 INV OUT = 338.58 49 LF 18" RCP @ 0.77% FES#100 INV IN = 338.20 FHA TEE STA = 48+58.88 12" GATE VALVE FHA TEE STA = 53+58.80 12" GATE VALVE 2" BOA STA = 54+09.62 12" GATE VALVE PROPOSED 12" C900 PVC WATER MAIN K E N N E B E C R O A D 60' PUBLIC RIGHT OF WAY DI#102 RIM = 347.17 INV OUT = 342.50 51 LF 15" RCP @ 7.50% 360 355 350 345 340 MAJOR CONTOUR MINOR CONTOUR INTERMEDIATE CONTOUR RIP-RAP OUTLET PROTECTION STORM DRAIN LINE FLARED END SECTION RISER STRUCTURE CATCH BASIN YARD INLET 400 CBU WCR ROADWAY CENTER LINE RIGHT OF WAY LINE LOT LINE SETBACK LINE EASEMENT LINE VALLEY CURB & GUTTER STANDARD CURB & GUTTER WHEELCHAIR RAMP SIGN STREET LIGHT SPILL CURB & GUTTER CLUSTER MAILBOX UNIT LOTS WITH FLOOD HAZARD KENNEBEC MEADOWS SUBDIVISIONKENNEBEC ROADWAY IMPROVEMENTS IIC-102/3/20162016-072212/08/2017RELEASED FOR CONSTRUCTION| || || || || || || || || || || || |DATE:FILE NO.HORZ. SCALE:ORIG. SHEET SIZE:REVISIONSCurryCURRY ENGINEE R S N O RTH CAROLINAEST.10NC LIC. NO. P-0799Z:\PROJECTS FOLDER-ZEBULON\2016\2016-072 BALL - KENNEBEC SUBDIVISION\PLANS\CONSTRUCTION DRAWINGS - RE-DESIGN\SHEET FILES\C-10 KENNEBEC ROADWAYIMPROVEMENTS II.DWGPLOTTED: 3/22/2018 2:11 PMENGINEERING205 S. Fuquay AvenueFuquay-Varina, NC 27526T (919) 552-0849F (919) 552-2043SEAL 24 x 36PRELIMINARY DO NOT USE FOR CONSTRUCTION NOT FOR CONSTRUCTION OR SIMILAR 40'80' SCALE IN FEET 20'40' SCALE: 1 IN = 40 FT SCALE IN FEET HORIZONTAL 0 1"=40'NSCALE: 1 C-10 STATION 32+50-39+50 1" = 40' KENNEBEC GRADING & DRAINAGE LAYOUT NN SCALE: 2 C-10 STATION 39+50-47+50 1" = 40' KENNEBEC GRADING & DRAINAGE LAYOUT SCALE: 3 C-10 STATION 47+50-54+47 1" = 40' KENNEBEC ROADWAY LAYOUT LEGEND: INSTALL NEW CB ON EXISTING 48" CMP 110/13/2017TOFV AND WAKE COUNTY COMMENTS #1NOT FOR CONSTRUCTION OR SIMILAR 8' PUBLIC UTILITY EASEMENT 20' TYPE 'C' LANDSCAPE BUFFER 8' PUBLIC UTILITY EASEMENT 20' TYPE 'C' LANDSCAPE BUFFER 20' PUBLIC STORM DRAIN EASEMENT 20' PUBLIC STORM DRAIN EASEMENT 20' PUBLIC STORM DRAIN EASEMENT 20' TYPE 'C' LANDSCAPE BUFFER PROPOSED STREAM IMPACT: * PERMANENT IMPACT = 16 LF * TEMPORARY IMPACT = 10 LF PROPOSED NRB BUFFER IMPACTS: * PERMANENT ZONE 1 IMPACT = 978 SF * PERMANENT ZONE 2 IMPACT = 680 SF