HomeMy WebLinkAboutU-6081 PROJECT DATA SHEET_mod.pdfPROJECT DATA SHEET
TIP No.: U-5736 County: ONSLOW
Federal-aid No.: N/A WBS No.: 47466.1.1
NCDOT Division: 3
Proiect Description:
• Length: 3.6 miles
• Termini (US Hwy / SR): NC 53 (Western Boulevard) from SR 1308 (Gum Branch Rd.) to US
17 (Marine Blvd.)
• MPO / RPO: Jacksonville Urban Area MPO
• NEPA / 404 Merger Candidate? ❑ Yes � No ❑ Unknown
• General Description of Project:
Replace existing with a 23' raised median and add an additional through lanes in each
direction with modified superstreet design.
Desiqn Data (Existinq Conditions�
• Functional Classification: Minor Arterial
• Type of Access Control: Non Controlled
• Typical Section: Four lane shoulder with variable width median
• Right of Way: 200'
• Posted Speed: 55 mph (from Gum Branch Rd. to Henderson Rd.) / 45 mph (from
Henderson Rd. to Marine Boulevard)
• Structure Inventory (bridges, RCBC, Walls, etc):
N/A
• Other TIP Pro'ects in the Area
U-4007E — Intersection Improvements at US 17 Marine Blvd. and NC 53 Western Blvd.
U-5736 —NC 53 Western Blvd from US 17 (Marine Blvd.) to NC 24 (Lejeune Blvd.)
U-5791A — Jacksonville Pkwy Ext from NC 53 (Western Blvd.) to SR 1324 (Ramsey Rd.)
U-5789 — NC 53 Western Blvd. at SR 2714 (Jacksonville Pkwy)
U-5787 — SR 2715 (Trade St.) from NC 53 (Western Blvd.) to McDaniel Dr.
• Railroad Involvement:
n/a
Long Range Plan History:
Traffic Data (AADT�
Current Year 18,000 — 40,000
Design Year
Source of Traffic Data: NCDOT GIS
Cost Estimates:
Construction Right-of-Way/Utilities Total
TIP Estimate $16,400,000 $3,800,000 $20,200,000
Current Estimate (20XX)
Project Schedule:
Environmental Document OCT 2020
Right-of-Way 2025
Let 2027
Initial Scopinq Comments:
Figure 1: Vicinity Map
(Insert here)
Figure 2: Environmental Features Map with
Study Area - as Recommended by NCDOT
(Insert here)