Loading...
HomeMy WebLinkAboutU-6081_Start of Study Letter.pdfROY COOPER GOVERNOR From: Project No. STATE OF NORTH CAROLINA DEPARTN�NT OF TRANSPORTATION July 9, 2018 Trace R. Howell, PE .�'�� Design Engineer —DDC NCDOT — Division 3 U-6081 JAMES H. TROGDON, III SECRETARY Subject: NC 53 (Western Boulevard) from SR 1308 (Gum Branch Road) to US 17 (Marine Boulevard) Onslow County The North Carolina Department of Transportation Division 3 has begun studying the proposed improvements to NC 53 (Western Boulevard) in Onslow County. The project is included in the 2018-2027 North Carolina State Transportation Improvement Program (STIP). Right of way acquisition is scheduled for Fiscal Year 2025. The proposed project involves replacing the existing median with a raised median and adding and additional through lane in each direction. The project will require acquisition of additional right of way. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals which may be required by your agency. Your comments will be used in the preparation of a Minimum Criteria Determination Checklist. This document will be prepared in accordance with the State Environmental Policy Act. It is desirable that your agency respond by September 1, 2018 so that your comments can be used in the preparation of this document. If you have any questions conceming the project, please contact Greg S. Purvis, PE, Project .Manager Wetherill Engineering, at (919) 851-8077 or by email at �urvis(�a,wetherillen .c�om. Please forward all comments on the project to him. Please include the TIP Project Number in all correspondence and comments. Marling Address: NC DEPARTMENT OF TRANSPORTATION DNISION 3 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429 Telephone: (910) 341-2000 Fax: (910) 675-0143 Custorner Service: 1-877-368-4968 Website: www.ncdot.eov tocarion: 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429