Loading...
HomeMy WebLinkAbout20180374 Ver 1_PLAN SET REVISED_20180618A N G F E C e LAS 7 NORTH SHEET INDEX DRAWING NO. SHEET TITLE EC000 COVER SHEET EC100 GENERAL NOTES EC101 GEOMORPHIC PARAMETERS EC200 SITE PLAN EC201 SITE PLAN — M1 & M2 EC202 SITE PLAN — UT1 EC203 EROSION CONTROL EC204 WETLANDS SHEET EC300 PROFILES — M1 EC301 PROFILES — Ml & M2 EC302 PROFILES — UT1 EC400 DETAILS EC401 DETAILS EC402 DETAILS EC403 DETAILS EC500 PLANTING PLAN EC600 BUFFER ZONES PROJECT STANDARDS THE FOLLOWING STANDARDS AS THEY APPEAR IN THE "NC EROSION CONTROL PLANNING AND DESIGN MANUAL" AND ARE APPLICABLE TO THIS PROJECT AND HEREBY ARE CONSIDERED PART OF THE PLANS. 6.06 TEMPORARY GRAVEL CONSTRUCTION ACCESS 6.60 TEMPORARY SEDIMENT TRAP 6.62 SILT FENCE 6.63 TEMPORARY ROCK DAM REFERENCE 0 5 4 3 DURHAM COUNTY, NORTH CAROLINA STREAM RESTORATION PLANS MAR R Y=JACKSON PROPERTY NEUSE RIVER BASIN- 030202010304 JUNE 2018 M2 UT3 UT2 UT4 M1 UT1 \ • UT5 © 2017 DigitalGlobe ©CNES (2017) Distribution Airbus DS © 2017 HERE © 2017 Microsoft Corporation STREAM RESTORATION PROJECT AREA PROJECT AREA LEGEND STREAM TYPE LEGEND PANTHER CREEEK TRIBUTARIES TO PANTHER CREEK BY REFERENCE 1. TOPOGRAPHIC INFORMATION BASED UPON SURVEY CONDUCTED BY WITHERSRAVENEL, IN OCTOBER 2016. 2. COORDINATE SYSTEM IS NAD 83 NORTH CAROLINA STATE PLANE FEET. 3. AERIAL IMAGERY SHOWN ON ALL PLAN SHEETS ARE FROM: USGS BING IMAGES 2017 7 SCALE IN FEET 0 1000 2000 VICINITY MAP SCALE IN FEET 0 5000 10000 PROJECT RESTORATION LENGTHS REACH EXISTING (LF) PROPOSED (LF) Ml (PANTHER CREEK) N 36.037967° 1,486 M2 (PANTHER CREEK) Roza 1,192 W-78.798614° 216 890 UT2 (SB) 132 200 UT3 (SA) 264 L ' 247 58 UT5 (SE) 111 192 TOTAL 4,082 4,083 *EXISTING STREAM LENGTH NUMBERS MAY DIFFER FROM PJD REPORT DUE TO DATA COLLECTED BY SURVEY GRADE EQUIPMENT DURING GEOMORPHIC SURVEY *(XX) — LETTERS INSIDE PARENTHESES CORRESPOND TO DESIGNATIONS IN ATTACHED PJD* o �W0C.) J aH 1# FALLS LAKE � U) = OZ r d h�'rl €� O I I AO i C ih*,I T W M Ry KnoTI r H tek �d `U 2017 HERE © 2017 Microsoft Corporation{� VICINITY MAP SCALE IN FEET 0 5000 10000 PROJECT RESTORATION LENGTHS REACH EXISTING (LF) PROPOSED (LF) Ml (PANTHER CREEK) 1,588 1,486 M2 (PANTHER CREEK) 1,524 1,192 UT1 (SD) 216 890 UT2 (SB) 132 200 UT3 (SA) 264 65 UT4 (SC) 247 58 UT5 (SE) 111 192 TOTAL 4,082 4,083 *EXISTING STREAM LENGTH NUMBERS MAY DIFFER FROM PJD REPORT DUE TO DATA COLLECTED BY SURVEY GRADE EQUIPMENT DURING GEOMORPHIC SURVEY *(XX) — LETTERS INSIDE PARENTHESES CORRESPOND TO DESIGNATIONS IN ATTACHED PJD* 5 4 3 2 ENGINEER CIVIL & ENVIRONMENTAL CONSULTANTS, INC. 250 OLD WILSON BRIDGE ROAD, SUITE 250 WORTHINGTON, OHIO 43085 PHONE: (614) 540-6633 CONTACT: JOSHUA WHITE EMAIL: jwhite@cecinc.com SURVEYOR WITHERSRAVENEL 115 MACKENAN DRIVE CARY, NC 27511 PHONE: (919) 469-3340 CONTACT: MARSHALL WIGHT, PLS PREPARED FOR PIEDMONT CONSERVATION COUNCIL, INC. 721 FOSTER STREET DURHAM, NC 27701 PHONE: (919) 525-3037 CONTACT: ELIZABETH ZANDER DURHAM SOIL & WATER CONSERVATION DISTRICT 721 FOSTER STREET DURHAM, NC 27701 PHONE: (919) 560-0558 CONTACT: EDDIE CULBERSON PIED ONT ON SER,VATION eo COUNCIL. INC. DURHAM SAIL &WATER FOR PERMITTING PURPOSES NOT FOR CONSTRUCTION 2 1 0 CE 0O O U w U) ICE w 0 Z O LU m w Q 0 0 z .LO co o M H 1:T rA �_ 0 o tm CO 1-1 O ^ W T, 0 0 P N 00 y 00 0U cn M M co � 0 00C0 0-3 O .k & r y (D i � m Wy •� o U LO N �1 G F E W H W 2 } m Z QW o Y U U W Q Z � No OZ LU W H�aO O U Z M J aWZa o �W0C.) J aH 0 W U) = OZ aZcn Lu W M H W } m W 2 } m Z QW o Y _= U co Z W No LU x O U Z M cn a 0 m hd do W Cn W o' 0 0 m Q DRAWING NO.: A ECOOO SHEET 1 OF 17 1 l II CONSTRUCTION SEQUENCE A CEC PROJECT MANAGER WILL PROVIDE CONSTRUCTION QUALITY ASSURANCE DURING THE H CONSTRUCTION PHASE OF THIS PROJECT. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE USED DURING IMPLEMENTATION OF THE PLAN. 1. PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES, NOTIFICATION AND APPROVAL MUST BE GRANTED FROM US ARMY CORP OF ENGINEERS AND NCDWR DIVISION OF WATER QUALITY. 2. THE CONTRACTOR SHALL CONTACT NORTH CAROLINA 811 CENTER (1.800.632.4949) AND LAND QUALITY (919.791.4200) BEFORE ANY EXCAVATION. 3. THE CONTRACTOR WILL MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE BY UTILIZING THE ACCESS ROAD OFF REDWOOD ROAD (SHOWN ON THE PLANS). 4. THE CONTRACTOR WILL UTILIZE THE ACCESS ROAD AND STREAM CROSSINGS AS SHOWN ON THE PLANS. CONSTRUCTION TRAFFIC SHALL BE RESTRICTED TO THE AREA DENOTED AS "LIMITS OF DISTURBANCE" ON THE CONSTRUCTION PLANS. G 5. THE CONTRACTOR SHALL INSTALL TEMPORARY SILT FENCE AROUND THE STAGING AREAS. THE CONTRACTOR WILL NOT PLACE EXCAVATED FILL INTO THE OLD CHANNEL UNTIL THE NEW CHANNEL IS COMPLETE AND WATER HAS BEEN DIVERTED INTO THE NEW CHANNEL. 6. THE CONTRACTOR SHALL INSTALL ALL TEMPORARY STREAM CROSSINGS AS SHOWN ON PLANS IN ACCORDANCE WITH THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. DITCHES AND STREAM REACHES ON SITE WILL BE LEFT OPEN DURING THE INITIAL STAGES OF CONSTRUCTION TO ALLOW FOR DRAINAGE AND TO KEEP SITE ACCESSIBLE. 7. CONTRACTOR SHALL BEGIN CONSTRUCTION ON EACH STREAM REACH AND COMPLETE THAT SPECIFIC STREAM REACH BEFORE MOVING TO THE NEXT REACH. THE NEW CHANNEL SECTIONS SHALL BE LEFT OPEN ON THE DOWNSTREAM END TO ALLOW FOR DRAINAGE DURING RAIN EVENTS. AT NO TIME WILL CLEARING AND GRUBBING PROGRESS BEYOND THE SECTION OF CHANNEL THAT IS BEING CUT UNLESS WORKING F WITH MORE THAN ONE CREW (I.E. CANNOT REMOVE TREES ON BETWEEN STATIONS 14+22 TO 16+00 WHEN YOU ARE WORKING BETWEEN STATIONS 10+00 TO 14+00 ALONG THE MAIN STEM). 8. MAJORITY OF THE PROJECT IS OFFLINE CONSTRUCTION, CONTRACTOR WILL INSTALL TYPICAL PUMP AROUND OPERATION WHEN SUFFICIENT FLOW IS PRESENT. MAINSTEM OF PANTHER CREEK (M1.M2) & TRIB (UT1) CONSTRUCTION 9. ONCE STAGING AND TEMPORARY CROSSINGS ARE COMPLETE, THE CONTRACTOR WILL START WITH M1. M1 IS A PERENNIAL CHANNEL AND TYPICALLY MAINTAINS FLOW. IF SUFFICIENT FLOW IS PRESENT, THEN A PUMP -AROUND IS NEEDED (SEE #22 AND #23 FOR PUMP -AROUND INSTRUCTIONS). 10. ONCE THE SECTIONS OF M1 HAVE BEEN EXCAVATED TO DESIGN GRADES, INSTALL E IN -STREAM STRUCTURES, SEED AND MAT, AND READY THE CHANNEL TO ACCEPT FLOW. ONE REACH SHOULD BE COMPLETE WITH ALL STRUCTURES, SEED, AND MATTING BEFORE MOVING ONTO THE NEXT REACH. 11. THE CONTRACTOR WILL MOVE TO M2 WHEN M1 IS COMPLETE. M2 IS A PERENNIAL CHANNEL AND TYPICALLY MAINTAINS FLOW. IF SUFFICIENT FLOW IS PRESENT, THEN A PUMP -AROUND IS NEEDED (SEE #22 AND #23 FOR PUMP -AROUND INSTRUCTIONS). 12. ONCE THE SECTIONS OF M2 HAVE BEEN EXCAVATED TO DESIGN GRADES, INSTALL IN -STREAM STRUCTURES, SEED AND MAT, AND READY THE CHANNEL TO ACCEPT FLOW. ONE REACH SHOULD BE COMPLETE WITH ALL STRUCTURES, SEED, AND MATTING BEFORE MOVING ONTO THE NEXT REACH. 13. THE CONTRACTOR WILL MOVE TO UT1 WHEN M2 IS COMPLETE. UT1 IS AN INTERMITTENT CHANNEL AND ONLY MAINTAINS FLOW SEASONALLY. IF SUFFICIENT FLOW IS PRESENT, THEN A PUMP -AROUND IS NEEDED (SEE #22 AND #23 FOR p PUMP -AROUND INSTRUCTIONS). 14. ONCE THE SECTIONS OF UT1 HAVE BEEN EXCAVATED TO DESIGN GRADES, INSTALL IN -STREAM STRUCTURES, SEED AND MAT, AND READY THE CHANNEL TO ACCEPT FLOW. ONE REACH SHOULD BE COMPLETE WITH ALL STRUCTURES, SEED, AND MATTING BEFORE MOVING ONTO THE NEXT REACH. 15. IMMEDIATELY UPON COMPLETION OF BANK GRADING, THE SLOPE WILL BE RESEEDED, MULCHED, AND MATTED WITH EROSION CONTROL FABRIC. THE CONTRACTOR SHALL ONLY WORK IN AREAS THAT CAN BE SEEDED, MULCHED, AND MATTED WITHIN THE SAME DAY. 16. THE SECTIONS ALONG M1 (10+00 TO 14+86), M2 (14+86 TO 36+85), AND UT1 (10+00 TO 19+19), ARE AREAS OF STRUCTURE INSTALLATION AND REQUIRE THE USE OF A TEMPORARY PUMP -AROUND OPERATION WHEN SUFFICIENT FLOW IS PRESENT. PUMP -AROUND OPERATIONS ARE TO BE USED IN ORDER TO DIVERT FLOW AROUND THE STREAM SECTION BEING CONSTRUCTED TO THE EXISTING CHANNEL DOWNSTREAM. THE CONTRACTOR SHALL INSTALL TEMPORARY ROCK DAMS AND PUMP -AROUND OPERATIONS WHENEVER FLOW IS SUFFICIENT. THE PORTION OF THE CHANNEL ISOLATED SHALL BE DEWATERED AND THE REMOVED WATER SHALL FLOW THROUGH A SPECIAL STILLING BASIN. THE CONTRACTOR WILL NOT PLACE EXCAVATED FILL INTO THE OLD CHANNEL UNTIL THE NEW CHANNEL IS COMPLETE AND WATER HAS BEEN DIVERTED INTO THE NEW CHANNEL. 23. ONCE CONSTRUCTION IN A PUMP -AROUND AREA HAS BEEN COMPLETED, REMOVE ALL PUMP -AROUND MATERIALS AND TURN THE WATER INTO THE NEW CHANNEL. 24. UPON COMPLETION OF THE NEW CHANNEL, ALL DISTURBED FLOODPLAIN AREAS INCLUDING STAGING AREAS AND HAUL ROADS, SHALL BE SEEDED AND COVERED WITH MULCH. TREES SHALL BE PLANTED IN ACCORDANCE WITH THE PLANTING PLAN. PERMANENT SEEDING MIXTURES SHALL BE APPLIED AS SHOWN ON THE VEGETATION PLAN. TEMPORARY SEEDING SHALL BE APPLIED IN ALL AREAS SUSCEPTIBLE TO EROSION (I.E. DISTURBED DITCH BANKS, STEEP SLOPES, AND SPOIL AREAS) SUCH B THAT GROUND COVER IS ESTABLISHED WITHIN 21 WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUND COVER SHALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. 25. ALL AREAS SHOULD BE SEEDED AND MULCHED BEFORE LEAVING THE PROJECT REACH. REMOVE TEMPORARY STREAM CROSSINGS. ALL WASTE MATERIAL MUST BE REMOVED FROM THE PROJECT REACH. LAS I 26. THE CONTRACTOR SHALL ENSURE THAT THE REACH IS FREE OF TRASH AND LEFTOVER MATERIALS PRIOR TO MOBILIZATION OF EQUIPMENT FROM THE REACH. 7 6 1 5 SPECIAL NOTES FOR NATURAL STREAM DESIGN A. AS -BUILT DRAWINGS - DURING CONSTRUCTION, THE CONTRACTOR AND THE ENGINEER SHALL WORK TOGETHER TO MAINTAIN A SET OF PRINTS SHOWING ANY CHANGES OR CORRECTIONS IN RED. THESE PRINTS SHALL BE SUBMITTED TO THE ENGINEER AT THE COMPLETION OF THE WORK. B. STREAM RESTORATION DEFINITIONS 1. BANKFULL ELEVATION - BANKFULL ELEVATION IS THE POINT OF INCIPIENT FLOODING IN AN ALLUVIAL CHANNEL. 2. FLOODPLAIN SILL - A FLOODPLAIN SILL IS THE BURIED EXTENSION OF THE STRUCTURE AND IS PERPENDICULAR TO THE FLOW DIRECTION OF THE BANKFULL CHANNEL ACROSS THE BANKFULL BENCH OR FLOODPLAIN 3. FOOTER BOULDERS - FOOTER BOULDERS ARE PLACED TO PROVIDE A FOUNDATION FOR THE SURFACE BOULDERS IN EACH HYDRAULIC STRUCTURE. THE LOWEST COURSE OF FOOTER BOULDERS ARE BURIED IN THE CHANNEL TO A DEPTH BELOW THE CALCULATED OR MEASURED SCOUR DEPTH. FOOTER BOULDERS SHALL BE DURABLE LIMESTONE WITH DIMENSIONS SHOWN IN THE DETAILS. TYPICALLY, FOOTER BOULDERS ARE BURIED IN THE CHANNEL BOTTOM AND NOT SEEN WHEN THE STRUCTURE IS COMPLETED. ALL SURFACE BOULDERS FOR ALL STRUCTURES REQUIRE FOOTER BOULDERS UNLESS BEDROCK IS ENCOUNTERED AT THE PROPOSED ELEVATION OF FOOTER BOULDERS. 4. SURFACE BOULDERS - SURFACE BOULDERS ARE THE TOP -MOST COURSE OF BOULDERS USED IN EACH CROSS -VANE OR OTHER ROCK STRUCTURE. ALL SURFACE BOULDERS CAN BE SEEN PROTRUDING FROM THE WATER SURFACE DURING EXTREMELY LOW FLOWS. SURFACE BOULDERS SHALL BE DURABLE LIMESTONE WITH DIMENSIONS SHOWN IN THE DETAILS. 5. THALWEG - THE THALWEG IS THE LOWEST POINT OF THE BANKFULL CHANNEL DESCRIBED BY THE STREAM PROFILE. THIS ELEVATION IS THE REFERENCE FOR ALL ELEVATIONS ON OR ALONG THE CHANNEL AND HYDRAULIC STRUCTURES DESCRIBED IN THIS SECTION AND IN THE PROJECT DRAWINGS. 6. VANE ANGLE - THE VANE ANGLE IS THE SMALLEST ANGLE MEASURED BETWEEN A VANE AND A LINE TANGENT TO THE BANKFULL ELEVATION AT THE POINT WHERE THE VANE INTERSECTS THE BANK. THE VANE ANGLE SHALL BE BETWEEN TWENTY PERCENT (20%) AND THIRTY PERCENT (30%), OR AS SPECIFIED IN THE STREAM RESTORATION DATA TABLE. 7. VANE LENGTH - THE VANE LENGTH IS THE DISTANCE BETWEEN THE UPSTREAM LIMIT OF THE VANE ARM AT THE CHANNEL BED TO THE DOWNSTREAM INSERTION POINT OF THE VANE ARM INTO THE STREAM BANK. 8. VANE SLOPE - THE VANE SLOPE IS THE SLOPE OF THE VANE ARM FROM THE UPSTREAM LIMIT AT THE CHANNEL BED TO THE DOWNSTREAM INSERTION POINT OF THE VANE ARM INTO THE STREAM BANK. THE VANE SLOPE SHALL BE BETWEEN TWO PERCENT (2%) AND SEVEN PERCENT (7%) OR AS SPECIFIED IN THE STREAM RESTORATION DATA TABLE AND THE VANE ARMS SHALL TIE INTO THE BANKS AT HALF TO THREE QUARTERS OF THE BANKFULL ELEVATION. 9. SUBSTRATE RESTORATION - SUBSTRATE RESTORATION IS DESIGNED TO REPLACE AND RESTORE COARSE SUBSTRATE (GRAVEL, COBBLE, AND BOULDER) TO THE STREAM CHANNEL IN CASES WHERE COARSE SUBSTRATES OR BEDROCK ARE ABSENT FOLLOWING CHANNEL EXCAVATION. THE PURPOSE OF SUBSTRATE RESTORATION IS TO PROVIDE NATURAL SUBSTRATE AND EROSION AND SCOUR PROTECTION IN THE CHANNEL. 10. BASE FLOW - FOR THE PURPOSE OF THESE STREAM DESIGN SPECIFICATIONS, A FLOW EQUAL TO ONE CUBIC FOOT PER SECOND PER SQUARE MILE OF DRAINAGE AREA. C. FLOODPLAIN AND CHANNEL CONSTRUCTION 1. THE CONTRACTOR SHALL STAKE OUT THE PROPOSED STREAM CENTERLINE AND STRUCTURE LOCATIONS FOR APPROVAL BY THE ENGINEER BEFORE INITIATING EXCAVATION. DEPENDING ON THE SITE CONDITIONS, SOME SHIFTING OF THE STREAM CHANNEL AND VANE STRUCTURES MAY BE NECESSARY. ANY COST ASSOCIATED WITH CHANGING CHANNEL ALIGNMENT AND STRUCTURE LOCATIONS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 2. THE PROPOSED STREAM CHANNEL SHALL BE CONSTRUCTED BY FIRST EXCAVATING THE FLOODPLAIN TO THE ELEVATIONS AND DIMENSIONS SPECIFIED ON THE STREAM MITIGATION GRADING PLAN. THE PROPOSED STREAM CHANNEL SHALL THEN BE EXCAVATED TO THE PROPER DEPTHS INDICATED ON THE PROFILE AND CROSS-SECTIONS. THIS SHALL BE DONE AS UNCLASSIFIED EXCAVATION AND IS TYPICALLY ACCOMPLISHED WITH A TRACK EXCAVATOR WITH HYDRAULIC THUMB. ANY STOCKPILING OR DOUBLE -HANDLING OF MATERIALS NECESSARY TO BUILD THE CHANNEL SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. D. FILTER FABRIC 1. NON -WOVEN FILTER FABRIC SHALL ONLY BE USED WHEN COVERING THE ROCK SECTION OF A STRUCTURE. CONTRACTOR SHALL USE US FABRICS US205NW FABRIC OR EQUIVALENT. 2. WOVEN FILTER FABRIC SHALL ONLY BE USED WHEN COVERING THE WOODY SECTION OF A STRUCTURE. CONTRACTOR SHALL USE US FABRICS US315 FABRIC OR EQUIVALENT. *** ALL DEFINITIONS MAY NOT BE USED ON THIS PROJECT 6 � 5 4 GENERAL NOTES 3 2 STRUCTURES LEGEND WORK THIS PLAN SET WITH THE EROSION AND SEDIMENT CONTROL PLANS. CONTRACTOR SHALL REVIEW ALL APPLICABLE PERMITS FOR THIS PROJECT AND ALL WORK SHALL BE IN STRICT CONFORMANCE WITH THE CONDITIONS OF EACH PERMIT. GOVERNING SPECIFICATIONS THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, DATED MAY 2013, SHALL BE THE GOVERNING PROVISIONS FOR STORMWATER POLLUTION PREVENTION ASSOCIATED WITH CONSTRUCTION ACTIVITIES. BENCH MARKS THE CONTRACTOR SHALL BE RESPONSIBLE FOR HOLDING BENCH MARK LOCATIONS THROUGHOUT THE LIFE OF THE PROJECT. IN THE EVENT THAT A BENCH MARK IS DISTURBED, THE CONTRACTOR, AS DIRECTED BY THE ENGINEER, WILL RELOCATE OR REESTABLISH THE BENCH MARK. NO ADDITIONAL PAYMENT OR COMPENSATION WILL BE MADE FOR THIS WORK. ELEVATIONS ALL ELEVATIONS SHOWN REFER TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1988 (NGVD 88) COORDINATES THE PROJECT DATUM ON THESE PLANS ARE BASED UPON THE SOUTH ZONE OF THE NORTH CAROLINA STATE PLANE SYSTEM. THE HORIZONTAL DATUM IS BASED ON THE NORTH AMERICAN DATUM OF 1983 (NAD 83). GRID FACTORS ARE NOT REQUIRED WHEN MAKING FIELD MEASUREMENTS. VERIFICATIONS OF DIMENSIONS THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL PLAN AND ELEVATION DIMENSIONS PRIOR TO ORDERING MATERIALS FOR THE CONSTRUCTION OF THE VARIOUS BID ITEMS IN THIS CONTRACT. WASTE MATERIAL ALL MATERIAL EXCAVATED AND NOT REUSED IN THE CONSTRUCTION OF THIS PROJECT SHALL BE REMOVED FROM THE PROJECT AND DISPOSED OF BY THE CONTRACTOR. FILTER FABRIC FILTER FABRIC SHALL BE PLACED BELOW ALL DUMP ROCK GUTTERS AND SCOUR BASINS AND AT ALL LOCATIONS INDICATED ON THE TYPICALS. UTILITIES THE CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION, AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THESE PLANS OR NOT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN THE STATUS AND LOCATION OF EACH UTILITY WHEN PERFORMING WORK WHICH MAY AFFECT THESE FACILITIES, INCLUDING PROBING, EXCAVATION, OR ANY OTHER PRECAUTION REQUIRED TO CONFIRM LOCATION. THE CONTRACTOR SHALL EXPOSE ALL UTILITIES OR STRUCTURES PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL CALL, TOLL FREE, NORTH CAROLINA 811 (1-800-632-4949) TWO DAYS PRIOR TO CONSTRUCTION AND SHALL NOTIFY ALL UTILITY COMPANIES AT LEAST 48 HOURS PRIOR TO WORK IN THE VICINITY OF THEIR UNDERGROUND LINES. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE OR DISRUPTION TO UTILITY LINES WHICH ARE KNOWN ACTIVE AND ARE TO REMAIN IN OPERATION. EROSION AND SEDIMENT CONTROL DETAILS NOT SHOWN IN THE PLANS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, DATED MAY 2013. IN THE EVENT THAT THE TEMPORARY EROSION AND POLLUTION CONTROL MEASURES ARE ORDERED BY THE ENGINEER DUE TO THE CONTRACTOR'S NEGLIGENCE, CARELESSNESS, OR FAILURE TO INSTALL PERMANENT CONTROLS AS PART OF THE WORK AS SCHEDULED. SUCH WORK SHALL BE PERFORMED BY THE CONTRACTOR AT HIS OWN EXPENSE. THE FIRST ORDER OF WORK FOR THE CONTRACTOR IS TO INSTALL SEDIMENT CONTROL STRUCTURES, SILT FENCE, ETC. TO ESTABLISH EROSION CONTROL AT THE EARLIEST POSSIBLE DATE. INITIAL CLEARING AND GRUBBING IS TO ONLY BE WHAT IS NECESSARY IN ORDER TO ACCOMPLISH THESE OPERATIONS. IN ADDITION, THE CONTRACTOR IS TO NAME AN INDIVIDUAL TO REVIEW THE EROSION CONTROL FEATURES AT A MINIMUM OF ONCE A WEEK DURING PERIODS OF HEAVY PRECIPITATION AND/OR ACTIVE CONSTRUCTION TO ASSESS THE SUCCESS OF THE EROSION CONTROL STRUCTURES, REVEGETATION EFFORTS, AND SEE THAT REPLACEMENT, CLEANING, AND/OR INSTALLATION OF ADDITIONAL FEATURES IF NECESSARY ARE CARRIED OUT. MAINTENANCE SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, DATED MAY 2013. FEDERAL, STATE, AND LOCAL LAWS AND SAFETY REGULATIONS THE CONTRACTOR AND ANY SUB -CONTRACTORS SHALL CONFORM TO APPLICABLE OSHA SAFETY REGULATIONS. THE CONTRACTOR AND ANY SUB -CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS TOGETHER WITH EXERCISING PRECAUTIONS AT ALL TIMES FOR THE PROTECTION OF PERSONS INCLUDING EMPLOYEES AND PROPERTY. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SUB -CONTRACTOR TO INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTION WITH THE WORK. CLEARING & GRUBBING LIMITS CLEARING LIMITS SHALL BE EXTENDED TO A MAXIMUM LIMIT NECESSARY FOR CONSTRUCTION MATERIALS AND SHALL NOT EXTEND BEYOND CONSTRUCTION BOUNDARIES WHERE EARTHWORK ACTIVITIES ARE TO BE PERFORMED. GRUBBING SHALL ONLY TAKE PLACE WITHIN THE AREA AS NECESSARY. ALL COSTS ASSOCIATED WITH CLEARING & GRUBBING SHALL BE CONSIDERED INCIDENTAL TO BID ITEM CLEARING AND GRUBBING. ADDITIONAL NOTES 1. THE CONTRACTOR IS REQUIRED TO INSTALL INSTREAM STRUCTURES USING A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE (3' X 2' X 1') BOULDERS, LOGS, AND ROOTWADS. 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL RESTORATION PLAN. THE CONTRACTOR SHOULD MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. 3. CONSTRUCTION IS SCHEDULED TO BEGIN SUMMER 2018. 4. CONTRACTOR SHOULD CALL NORTH CAROLINA 811 BEFORE EXCAVATION STARTS. (1-800-632-4949) 5. CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF ACCESS AREA AND LIABLE FOR DAMAGES TO EXISTING UTILITIES IN ACCESS AREA. 6. CONTRACTOR WILL INSPECT THE DEPTH OF THE UTILITIES AND IS RESPONSIBLE FOR MAKING SURE THE LINES ARE PROTECTED DURING CONSTRUCTION. 7. CONTRACTOR IS RESPONSIBLE FOR INSTALLING SAFETY / WARNING SIGN ADJACENT TO ALL CONSTRUCTION ENTRANCES. 4 � 3 1 MAP SYMBOL STRUCTURE NAME I 11 I I I I I I I I IH TOE WOOD W/BRUSH LAYERING ROCK CONSTRUCTED RIFFLE 1k:p. LOG VANE, ROCK J -HOOK AND ROOT ROCK J -HOOK BOULDER CASCADE ROOT WAD FOR PERMITTING PURPOSES NOT FOR CONSTRUCTION 2 Q z cr o_ O ~ U E Lu U) c w p Z O cn w cc w Q p 0 z G F E . co W o M U } m H 1:T p Y W Wa cc p � O W H a J O aWZa � W w D o 0 M a 0 tm V J a� _ O W 1 � o 00 O Z aZLu vu o 0 Lo To cm 0 U I1 ) � 1 Lu V) M v .U M 1 1 (D 0 0 cn O `n ) , cm i m W o � O Lo N G F E a � o � w 0) RT Lo Lo T U) W H U } m O Z } m Z Q p Y W Wa cc p OZ a W H a J O aWZa � W w D �WOC.) M a 0 V J a� _ O W cn = O Z aZLu vu Lu M 0 1=o F_ cn a � o � w 0) RT Lo Lo T U) W H } m O Z } m Z Q p Y W J p U a Z 0 N W w = Z W M a 0 a 0 m J Z p Q w Q W 00 0 0 0rrQ DRAWING NO.: A EC1 00 SHEET 2 OF 17 1 101111111111 ©m 114111111111111 om mm [am ram 0 0 0 Panther Creek & Unnamed Tributary M1 Panther Creek M2 Panther Creek UT1 To Panther Creek Reference Stream/Past projects Parameter Existing Stream Design Stream Existing Stream Design Stream Existing Stream Design Stream Min Median Max Min Median Max Min Median Max Min Median Max Min Median Max Min Median Max Min Median Max Min Median Max Flow regime Perennial Perennial Perennial Perennial Intermittant Intermittant Mitigation action Restoration Restoration Restoration Restoration Enhancement Enhancement Stream type (Rosgen) C5b C4 C5b C4 C5b C4b C4 B4 Drainage area, DA (sq mi) 3.52 3.52 4.01 4.01 0.07 0.07 Mean riffle depth, dbkf (ft) 2.4 1.9 2.2 2.0 0.8 0.5 Riffle width, Wbkf (ft) 19.1 23.2 22.8 24.5 4.2 6.5 Width -to -depth ratio, [Wbkf/dbkfl 8.1 12.0 10.4 12.0 5.1 12.0 8.0 12.0 8.0 12.0 Riffle cross-section area, Abkf (sq ft) 45.0 45.0 49.9 50.0 3.5 3.5 Max riffle depth, dmbkf (ft) 3.5 2.5 3.6 2.7 1.9 0.6 Max riffle depth ratio, [dmbkf/dbkf] 1.5 1.3 1.6 1.3 2.2 1.2 1.2 1.4 1.2 1.4 Mean pool depth, dbkfp (ft) 3.5 3.4 3.2 3.6 0.9 1.1 Mean pool depth ratio, [dbkfp/dbkf] 1.5 1.8 1.4 1.8 1.0 2.0 1.5 2.0 1.5 2.0 Pool width, Wbkf p (ft) 24.0 34.9 29.7 36.7 4.5 9.7 Pool width ratio, [Wbkfp/Wbkf] 1.3 1.5 1.3 1.5 1.1 1.5 1.3 1.7 1.3 1.7 Pool cross-section area, Abkf p (sq ft) 84.1 90.0 94.5 100.0 3.9 7.0 Pool area ratio, [Abkfp/Abkfl 1.9 2.0 1.9 2.0 1.1 2.0 1.5 2.5 1.5 2.5 Max pool depth, dmbkfp (ft) 5.3 5.8 7.1 6.1 1.9 1.6 Max pool depth ratio, [dmbkfp/dbkf] 2.3 3.0 3.2 3.0 2.3 3.0 2.0 3.5 2.0 3.5 Low bank height, LBH (ft) 6.4 2.5 6.5 2.7 2.4 0.6 Low bank height ratio, [LBH/dmbkfl 1.8 1.0 1.8 1.0 1.3 1.0 1.0 1.1 1.0 1.1 Width flood -prone area, Wfpa (ft) 39 57 86 33 42 51 27 57 112 34 44 54 12 53 75 9 12 14 Entrenchment ratio, ER [Wfpa/Wbkf] 2.0 3.0 4.5 1.4 1.8 2.2 1.2 2.5 4.9 1.4 1.8 2.2 2.9 12.6 17.8 1.4 1.8 2.2 2.2 6.0 1.4 2.2 Meander length, Lm (ft) 173 311 449 162.7 104.6 278.9 159 314 468 171.5 110.2 293.9 44.8 68.6 92.3 13.0 29.2 45.4 Meander length ratio [Lm/Wbkf] 9.1 16.3 23.5 7.0 4.5 12.0 7.0 13.8 20.5 7.0 4.5 12.0 10.6 16.2 21.8 2.0 4.5 7.0 7.0 12.0 2.0 7.0 Radius of curvature, Rc (ft) 14.6 38.0 61.5 58.1 87.1 116.2 16.3 43.2 70.0 61.2 91.9 122.5 11.0 17.5 24.0 16.2 24.3 32.4 Radius of curvature ratio [Rc/Wbkfl 0.8 2.0 3.2 2.5 3.8 5.0 0.7 1.9 3.1 2.5 3.8 5.0 2.6 4.1 5.7 2.5 3.8 5.0 2.5 5.0 2.5 5.0 Belt width, Wbif (ft) 143.4 267.0 390.5 81.3 133.6 185.9 288.9 344.7 400.6 85.7 140.8 196.0 6.9 18.4 29.9 13.0 32.4 51.8 Meander width ratio [Wbif/Wbkf] 7.5 14.0 20.4 3.5 5.8 8.0 12.7 15.1 17.6 3.5 5.8 8.0 1.6 4.3 7.1 2.0 5.0 8.0 3.5 8.0 2.0 5.0 Pool length, LP (ft) 18.8 98.2 177.6 46.5 69.7 93.0 24.6 101.1 177.6 49.0 73.5 98.0 7.0 11.5 16.0 13.0 19.4 25.9 Pool length ratio [Lp/Wbkf] 1.0 5.1 9.3 2.0 3.0 4.0 1.1 4.4 7.8 2.0 3.0 4.0 1.7 2.7 3.8 2.0 3.0 4.0 2.0 4.0 1.0 3.0 Pool -to -pool spacing, p -p (ft) 45.5 129.8 214.1 93.0 127.8 162.7 54.8 130.1 205.3 98.0 134.7 171.5 36.0 54.0 72.0 25.9 35.6 45.4 Pool -to -pool spacing ratio, [p-p/Wbkf] 2.4 6.8 11.2 4.0 5.5 7.0 2.4 5.7 9.0 4.0 5.5 7.0 8.5 12.8 17.0 4.0 5.5 7.0 4.0 7.0 1.5 5.0 Riffle length, Lrif (ft) 26.7 74.8 122.8 46.5 69.7 93.0 30.2 80.3 130.4 49.0 73.5 98.0 14.2 34.8 55.4 13.0 19.4 25.9 Riffle length ratio, [Lrif/Wbkfl 1.4 3.9 6.4 2.0 3.0 4.0 1.3 3.5 5.7 2.0 3.0 4.0 3.4 8.2 13.1 2.0 3.0 4.0 2.0 4.0 1.0 3.0 Valley length, VL (ft) 1235 1235 1033 1033 203 838 Stream length, SL (ft) 1588 1480 1524 1240 216 975 Valley Elevation Change, VE (ft) 5.1 5.1 2.5 2.5 2.3 0.9 Stream Elevation Change, SE (ft) 4.3 4.3 2.3 2.3 4.8 4.1 Valley slope, VS (ft/ft) 0.0041 0.0041 0.0024 0.0024 0.0111 0.0011 Average water surface slope, S (ft/ft) 0.0027 0.0029 0.0015 0.0019 0.0221 0.0042 Sinuosity, k = SL/VL (ft/ft) 1.29 1.20 1.48 1.20 1.06 1.16 1.00 1.20 1.00 1.20 Riffle slope, Srif (ft/ft) 0.002 0.007 0.013 0.004 0.005 0.006 0.002 0.007 0.011 0.003 0.003 0.004 0.014 0.025 0.036 0.006 0.007 0.008 Riffle slope ratio, [Srif/S] 0.7 2.7 4.7 1.5 1.8 2.0 1.3 4.4 7.6 1.5 1.8 2.0 0.6 1.1 1.6 1.5 1.8 2.0 1.0 2.0 1.0 2.5 Pool slope, Sp (ft/ft) 0.000 0.001 0.007 0.000 0.001 0.001 0.000 0.001 0.002 0.000 0.000 0.001 0.000 0.001 0.005 0.000 0.001 0.002 Pool slope ratio, [S p/S] 0.0 0.4 2.4 0.0 0.3 0.5 0.0 0.7 1.3 0.0 0.3 0.5 0.0 0.0 0.2 0.0 0.3 0.5 0.0 0.5 0.0 0.4 Bankfull discharge, Qbkf (cfs) 198 127 216 233 20 5 Bankfull mean velocity, Ubkf = Q/A (ft/s) 4.4 4.4 4.4 2.8 2.8 2.8 4.3 4.3 4.3 4.7 4.7 4.7 5.7 5.7 5.7 1.4 1.4 1.4 2.0 6.0 3.0 10.0 Bankfull wetted perimeter, WP (ft) 23.8 27.1 27.2 28.6 5.9 7.6 Bankfull hydraulic radius, R (ft) 1.9 1.7 1.8 1.7 0.6 0.5 Mannings bankfull discharge, Qbkf (cfs) 198 127 216 233 20 5 Mannings bkf velocity, Ubkf = Q/A (ft/s) 4.4 2.8 4.3 4.7 0.4 1.4 Bankfull stream power, w (Ib/ft/s) 1.4 0.8 0.7 0.9 0.1 0.2 Bankfull shear stress, t (Ib/ft2) 0.32 0.30 0.17 0.20 0.82 0.12 Leopold et al. - diameter mobilized (mm) 24 22 13 15 64 9 Rosgen (CO) - diameter mobilized (mm) 85 79 46 54 210 33 1 0 1 0 1 0 1 0 1 0 1 p Z CE o O ~ U � W U) ICE W 0 Z O Cn W W Q 0 0 Z 0 m111.1 M . LO V °0 o M H � �_ O o ) F 0 00 � � o o 0 11 F-4 N °° 0000 co .U con C; 1M� (O 1 0 0 cc 0 `9 O .,.., m i m E W o N � o LO N H U W Q � OZ W J H�aO o aWZa �Lu0U U�_ J aH O W a(n= O Z ZvJ LLJn W = c rr n F_ a � b � w W LO cc WT W Qm m a Z Y B Q W a =_ U V Z o � N O W2 a Z cn � � a O 2 W di 0 JZ p v Q H W C/) W O 0 0 FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC1 01 SHEET 3 OF 17 2 1 7 6 5 OQUINN WILLIAM V OQUINN WILLIAM V OQUINN WILLIAM V VEAZEY LENORE M OQUINN CAROLYN A OQUINN CAROLYN A OQUINN CAROLYN A 0853-04-84-1359 0853-04-63-9646 0853-04-74-5088 � 0853-04-74-7241 � - _ SEABOARD AIRLINE RAILWAY EX/ST/NG STREAM _ UT4 EX/ST/NG STREAM UT2 - - + O ol 20+50 21+00-21+50 220 � � O xS 2+00 2k } �0 3� / o - O 16+50 BEGIN CONSTRUCTION x0 00 �°j ix0, 97+00 mi X12+50-- 3 �`O 7j p c STA = 10+00 x o 15foo ELEV = 265.23 ` ��x�0 x-0o�, x0 S0 �8x ^max o� , �, is+oo `s0 24+00 2��0 x -00 18X50+0 yl I S 1 max. � 00 C, 7�'A _ XOO o0 14+50 0 10+00-10+501911 , - �O 200\ I n ' tX/J//NV J/KCHM M1 PROPOSED BANKFULL STREAM CHANNEL M1 0� % O'y, O o�oa 141 +1 8 I 0 �, sxoo� xp ` M1 EXISTING TOP OF BANK EX/ST/NG STREAM / "ofoo UT5 EQUITY TRUST COMPANY JAMES E STOVALL IRA 0853-04-71-5646 LEGEND PROPOSED LIMITS OF DISTURBANCE - - EXISTING PROPERTY LINE D - APPROXIMATE LIMIT OF DISTURBANCE 0 +0 0 0+45 PROPOSED RELOCATED STREAM CENTERLINE PROPOSED BANKFULL PROPOSED STREAM CHANNEL -267- EXISTING INDEX CONTOUR -----266--- EXISTING INTERMEDIATE CONTOUR *LIMITS OF DISTURBANCE = 18.85 ACRES* NOTES MARBREY JASON K 0853-03-92-5108 1. TOPOGRAPHIC INFORMATION BASED UPON SURVEY CONDUCTED BY WITHERSRAVENEL, IN OCTOBER 2016. A 2. COORDINATE SYSTEM IS NAD 83 NORTH CAROLINA STATE PLANE FEET. 3. AERIAL IMAGERY SHOWN ON ALL PLAN SHEETS ARE FROM: USGS BING IMAGES 2017 7 6 EX/ST/NG PROPERTY BOUNDARY Dmax=2. 0 1 1 1 BRANDON DAVID G VEERAINDAR GOLI 0853-04-94-1771 VEERAINDAR JEAN C 0853-02-96-3120 NORTH EX/ST/NG STREAM UT3 O 0 CC 0 0 O U � W cUn c w 0 Z cn �26XOUcr +pp 27+50 2 - - �� W 8x-00` _ �X O klixs ,32X00 3 SO - O' TRANSITION FROM \ M1 TO M2 STA = 24+86 ELEV = 262.06 EX/ST/NG STREAM UT1 PROPOSED LIMITS OF DISTURBANCE 1+00 BEGIN CONSTRUCTION O UT1 50 l� STA = 10+00 Ok 1 0 0 EX/ST/NG STREAM M2 ELEV = 268.3 10+001 / SITE PLAN BUFFER SLOPE VARIES WIDTH VARIES WIDTH VARIES SLOPE VARIES 0 EX. GROUND i0.50% SLOPE 0.50% SLOPE TO EX. GROUNI Wbkf = 23.24' 5.33' 2.66' F 0 P 4*5 Dbkf 1.26'1 TYPICAL RIFFLE SECTION BUFFER SLOPE VARIES WIDTH VARIES WIDTH VARIES SLOPE VARIES 0 EX. GROUND 0.50% SLOPE 0.50% SLOPE TO EX. GROUNI Dmax=2.65 Wbkf = 24.49 5.61' 2.81' P 4.53.3 0 DP IN 3' Dbkf=1.33' TYPICAL RIFFLE SECTION BUFFER SLOPE VARIES WIDTH VARIES WIDTH VARIES SLOPE VARIES 0 EX. GROUND 0.25% SLOPE 0.25% SLOPE TO EX. GROUNI Wbkf = 6.48' 1.62' F 1 2.5 Dmax--0.651- TYPICAL max=0.65'TYPICAL RIFFLE SECTION 1 0 Six - xop S s0 I 0 30+00 30 ;ZOO 34+SO_ 35+p,xp0 8 g3o�pX5 5� 36 +00X36+50i+7 Q, ti°' oo �ofoo X W PROPOSED BANKFULL ^� + C. STREAM CHANNEL M2 }1X50' END CONSTRUCTION 0 28 UT1 XR ^_ STA = 18+90 S ELEV = 259.42 CJD 16XpO2i16X '7 i 15X0026115+50 END CONSTRUCTION _ / M2 -0214+50- � STA = 36+78 / ELEV = 257.81 JACKSON BETTY JAMES 0863-03-03-1220 Abkf = BANKFULL AREA Wbkf = BANKFULL WIDTH Dmax=MAXIMUM BANKFULL DEPTH Dbkf =MEAN BANKFULL DEPTH TYPICAL STREAM SECTIONS M1 N.T.S. Abkf = BANKFULL AREA Wbkf = BANKFULL WIDTH Dmax=MAXIMUM BANKFULL DEPTH Dbkf =MEAN BANKFULL DEPTH TYPICAL STREAM SECTIONS M2 N.T.S. Abkf = BANKFULL AREA Wbkf = BANKFULL WIDTH Dmax=MAXIMUM BANKFULL DEPTH Dbkf =MEAN BANKFULL DEPTH TYPICAL STREAM SECTIONS UT1 1 0 N.T.S. PROPOSED BANKFULL STREAM CHANNEL UT1 RAMIREZ MARTIN RAMIREZ CLAUDIA 0863-03-03-9368 EX/ST/NG PROPERTY BOUNDARY BUFFER WIDTH VARIES WIDTH VARIES 0.50% SLOPEI 0.50% SLOPE Wbkfp = 34.86' EXISTING GROUND5.40' 3.86EXISTING GROUND ' FLOODPLAIN SLOPE VARIES 10 1 SLOPE VARIES TO EX. GROUND l.b 0.7 TO EX. GROUND Dmax = 5.79' TYPICAL POOL SECTION BUFFER WIDTH VARIES WIDTH VARIES 0.50% SLOPEI 0.50% SLOPE Wbkfp = 36.74' EXISTING GROUNDEXISTING GROUND 5.70' 4.07' FLOODPIP 1 SLOPE VARIES 10 1 1 SLOPE VARIES TO EX. GROUND 1.50 .7 TO EX. GROUND Dmax = 6.10' TYPICAL POOL SECTION BUFFER WIDTH VARIES WIDTH VARIES 0.25% SLOPE 0.25% SLOPE Wbkfp = 9.72' EXISTINGGROUND EXISTING GROUND 1.00' 1.62' I 1 SLOPE VARIES 7 1 1 SLOPE VARIES TO EX. GROUND 2 1 TO EX. GROUND Dmax = 1.62' TYPICAL POOL SECTION 0 I 1�© 1. ANY HARDWOOD TREES GREATER THAN 12" C MUST BE INCORPORATED WITHIN THE STREAM z5-: a m Z PROJECT, PER DIRECTION OF ENGINEER. H 2. TOEWOOD MAY BE INSTALLED IN LIEU OF J < ROOTWADS, PER DIRECTION OF ENGINEER. 3. CONTRACTOR WILL REMOVE ANY INVASIVE OR � EXOTIC SPECIES WITHIN THE PROJECT AREA. LAND QUALITY NOTES It �V� 1. ALL IN -STREAM WORK WILL HAVE A Lu F PUMP -AROUND SET UP BEFORE ANY WORK BEGINS AND MUST PUMP 24 HOURS A DAY m UNTIL THE WORK IN THAT SECTION IS 100% cn COMPLETE AND STABILIZED WITH SEED, MULCH, 0 O AND MATTING. 2. ALL STREAMS THAT MUST BE CROSSED, EXISTING 1 OR NEW, WILL REQUIRE THE WOOD MAT B 00 TEMPORARY CROSSING, IF THAT SECTION OF STREAM IS ACTIVELY FLOWING. 3. DO NOT CLEAR AND GRUB MORE THAN 300 FEET o OF THE OFF-LINE STREAM WORK AT ONE TIME. 1 ALL WORK MUST BE COMPLETED IN THAT N co 00 SECTION BEFORE CLEARING THE NEXT 300 FEET. 4. DO NOT CLEAR MORE IN THE LIVE STREAM WORK +� AREA, BANKS INCLUDED, THAN CAN BE FINISHED v AND STABILIZED BY THE END OF THE DAY. 5. THE OLD CHANNEL CANNOT BE BACKFILLED UNTIL M co c0 co THE NEW CHANNEL FOR THAT SECTION HAS BEEN COMPLETED AND STABILIZED. REFERENCE MARBREY JASON K 0853-03-92-5108 1. TOPOGRAPHIC INFORMATION BASED UPON SURVEY CONDUCTED BY WITHERSRAVENEL, IN OCTOBER 2016. A 2. COORDINATE SYSTEM IS NAD 83 NORTH CAROLINA STATE PLANE FEET. 3. AERIAL IMAGERY SHOWN ON ALL PLAN SHEETS ARE FROM: USGS BING IMAGES 2017 7 6 EX/ST/NG PROPERTY BOUNDARY Dmax=2. 0 1 1 1 BRANDON DAVID G VEERAINDAR GOLI 0853-04-94-1771 VEERAINDAR JEAN C 0853-02-96-3120 NORTH EX/ST/NG STREAM UT3 O 0 CC 0 0 O U � W cUn c w 0 Z cn �26XOUcr +pp 27+50 2 - - �� W 8x-00` _ �X O klixs ,32X00 3 SO - O' TRANSITION FROM \ M1 TO M2 STA = 24+86 ELEV = 262.06 EX/ST/NG STREAM UT1 PROPOSED LIMITS OF DISTURBANCE 1+00 BEGIN CONSTRUCTION O UT1 50 l� STA = 10+00 Ok 1 0 0 EX/ST/NG STREAM M2 ELEV = 268.3 10+001 / SITE PLAN BUFFER SLOPE VARIES WIDTH VARIES WIDTH VARIES SLOPE VARIES 0 EX. GROUND i0.50% SLOPE 0.50% SLOPE TO EX. GROUNI Wbkf = 23.24' 5.33' 2.66' F 0 P 4*5 Dbkf 1.26'1 TYPICAL RIFFLE SECTION BUFFER SLOPE VARIES WIDTH VARIES WIDTH VARIES SLOPE VARIES 0 EX. GROUND 0.50% SLOPE 0.50% SLOPE TO EX. GROUNI Dmax=2.65 Wbkf = 24.49 5.61' 2.81' P 4.53.3 0 DP IN 3' Dbkf=1.33' TYPICAL RIFFLE SECTION BUFFER SLOPE VARIES WIDTH VARIES WIDTH VARIES SLOPE VARIES 0 EX. GROUND 0.25% SLOPE 0.25% SLOPE TO EX. GROUNI Wbkf = 6.48' 1.62' F 1 2.5 Dmax--0.651- TYPICAL max=0.65'TYPICAL RIFFLE SECTION 1 0 Six - xop S s0 I 0 30+00 30 ;ZOO 34+SO_ 35+p,xp0 8 g3o�pX5 5� 36 +00X36+50i+7 Q, ti°' oo �ofoo X W PROPOSED BANKFULL ^� + C. STREAM CHANNEL M2 }1X50' END CONSTRUCTION 0 28 UT1 XR ^_ STA = 18+90 S ELEV = 259.42 CJD 16XpO2i16X '7 i 15X0026115+50 END CONSTRUCTION _ / M2 -0214+50- � STA = 36+78 / ELEV = 257.81 JACKSON BETTY JAMES 0863-03-03-1220 Abkf = BANKFULL AREA Wbkf = BANKFULL WIDTH Dmax=MAXIMUM BANKFULL DEPTH Dbkf =MEAN BANKFULL DEPTH TYPICAL STREAM SECTIONS M1 N.T.S. Abkf = BANKFULL AREA Wbkf = BANKFULL WIDTH Dmax=MAXIMUM BANKFULL DEPTH Dbkf =MEAN BANKFULL DEPTH TYPICAL STREAM SECTIONS M2 N.T.S. Abkf = BANKFULL AREA Wbkf = BANKFULL WIDTH Dmax=MAXIMUM BANKFULL DEPTH Dbkf =MEAN BANKFULL DEPTH TYPICAL STREAM SECTIONS UT1 1 0 N.T.S. PROPOSED BANKFULL STREAM CHANNEL UT1 RAMIREZ MARTIN RAMIREZ CLAUDIA 0863-03-03-9368 EX/ST/NG PROPERTY BOUNDARY BUFFER WIDTH VARIES WIDTH VARIES 0.50% SLOPEI 0.50% SLOPE Wbkfp = 34.86' EXISTING GROUND5.40' 3.86EXISTING GROUND ' FLOODPLAIN SLOPE VARIES 10 1 SLOPE VARIES TO EX. GROUND l.b 0.7 TO EX. GROUND Dmax = 5.79' TYPICAL POOL SECTION BUFFER WIDTH VARIES WIDTH VARIES 0.50% SLOPEI 0.50% SLOPE Wbkfp = 36.74' EXISTING GROUNDEXISTING GROUND 5.70' 4.07' FLOODPIP 1 SLOPE VARIES 10 1 1 SLOPE VARIES TO EX. GROUND 1.50 .7 TO EX. GROUND Dmax = 6.10' TYPICAL POOL SECTION BUFFER WIDTH VARIES WIDTH VARIES 0.25% SLOPE 0.25% SLOPE Wbkfp = 9.72' EXISTINGGROUND EXISTING GROUND 1.00' 1.62' I 1 SLOPE VARIES 7 1 1 SLOPE VARIES TO EX. GROUND 2 1 TO EX. GROUND Dmax = 1.62' TYPICAL POOL SECTION 0 I 1�© w o m J Z p Q w cn w O U 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A EC200 NOT FOR CONSTRUCTION SHEET 4 OF 17 3 2 1 Lo O z5-: a m Z m o Y H M � B J < W U2 +, = O � U It �V� O vs Z O Lu F 4- m cn 0 O 000 M 1 00 O Lo O L9 o 1 rl N co 00 U c 1 1 +� 000 v 1 1 .U N 00RT� M co c0 co O Lo •k � tm � , T m m E W o N > O Lo N U wa cc 0 z WJ a O aWza� D Lu J a� 0 Lu cn = 0 0 aZLucn Lu C <' as <' w a; RT Lo Lo T w o m J Z p Q w cn w O U 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A EC200 NOT FOR CONSTRUCTION SHEET 4 OF 17 3 2 1 z5-: a m Z m o Y B J < W � U N Z O Lu W m cn M a w o m J Z p Q w cn w O U 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A EC200 NOT FOR CONSTRUCTION SHEET 4 OF 17 3 2 1 m 0 ro m a m N h I ti I G F E 0 3 0 °o ZS a A h 7 6 5 4 VEAZEY LENORE M 1 \ 4 1 I,\ \ I 1 I� ,�, \ ; // _ / v�1 0853-04-84-1359 �\ i 1 \ l\ ` , \ \ \\ • �� �J / OQUINN WILLIAM V 0 UINN \ ` Q COOQUIN L IAS �-c \ �\ I \/ r✓�J OQUINN CAROLYN A 0853-04,--74-7 41 SEABOARD AIRLINE RAILWAY C5-Z�J,,�l OQUINN WILLIAM V - �/ 0853-04-74-5088 \\; `` \ _i/ 1 1'rte ` >� i-'� -- INTO PROPOSED CHANNEL OQUINN CAROLYN A /� TIE EXISTING UT4 ✓ \ \� \ TIE EXISTING UT2 0853-04-63-9646 -� - =� _= / I \ / `� \ INTO PROPOSED CHANNEL �� �Z�__--- ���/ �� \� r��) \ (NO RESTORATION TO OCCUR) J �_ `---_ /\ (NO RESTORATION TO OCCUR) 21+00 21+50 ??r,� `� I \ \� `j . 26+50 27+00 201+ 50 / \ o° 1 27+. zro 16+50 BEGIN CONSTRUCTION+o / x A 12150 15+00 3 2 1 BRANDON DAVID G S/\\\ ��� 0853-04-94-1771 , �I \ \l 4 /( I VEERAINDAR GOLI VEERAINDAR JEAN C 0853-02-96-3120 ,1171 NORTH \\ \ J L� \// n TIE EXISTING UT3 CE o INTO PROPOSED CHANNEL O (NO RESTORATION TO OCCUR)�I\ /� (_ \�- U W w I`J\— r ��� Z Wr 77 NQ PROPOSED BANKFULL _ 11 ` \��--- — \�� ?e STREAM CHANNEL M2 – az p0 s2+so \i�V—/ I c\ ��1 ������//�� \\ �_ N LLI Ir ELEV - 265.23 \ I \\ v ti� .hX�AW 24+00 L\ / << - _ JS - _PROPOSED TEMPORARY ' c / J '(J1 L� o / 7100 14+50 P%x —_r°STREAM CROSSING ,9 1 + 3�5�g,0..�► /+'\32\+ 00\ \I \ I3� xo0 \ Zj O \ss+so a+sROPOSED BANKFULL PROPOSED TEMPORARY L\ �� \ / ✓ STREAM CHANNEL M1 x`' iI 1 //� \ STREAM CROSSING IN TRANSITION FROM /�TOM2 u<\ °° / / / / ��� \ �\ \ STA = 24+86 PROPOSED STAGING y'<op�2 7 %� x ,✓ � A \ ELEV = 262.06 � `` VI �� AND STOCKPILE AREA END CONSTRUCTION / EX/ST/NG STREAM \� ���;,. `� / 09 -. UTl ) ��� I\ /, 1 `• \ STA = 09+19 / +. M2 i `� / END CONSTRUCTION �r �/ / / ^ J \� \ \ \ \ I \ 1. +so ELEV = 258.7 � ► I� \� \ �_ —✓ s Ooh- 1 �x10 p //� / / �� \ \ \ \ 1 ( Za+oo ��s ,5 p0 2s+off \ fC �� .� �-� M2 TIE EXISTING UT5 ` o p3+50 O / �� A\� 1 \ \ I v \ �� – I� STA = 36+78 INTO PROPOSED CHANNEL%��- ` ° — PROPOSED ROCK DAM \ J Z \ V A v 1 003��+so ELEV = 257.81 ✓ + (NO RESTORATION TO OCCUR) ^ I -FENCE ,1+50EX/ST/NG STREAM PROPOSED LIMITS \I\/ � V _/ (I (J J \ \\ \ OF DISTURBANCE ✓\\\v �i \\\ o Ji,�;;�_1' _ ! —1` _ �. PROPOSED TEMPORARY , PROPOSED TEMPORARY — �� �/ / ///=��/ II SILT FENCE / \ STREAM CROSSING \ ( � 1 EQUITY TRUST COMPANY JAMES E STOVALL IRA 0853-04-71-5646 • /� // // �/ %' �\���- .����\��� _ -- ����=_r--��////%ii.mo� �./,/�/��^� /\�A\\— ' --'Ir / �///� / �' // �A \ \\\ �\\ A \\I\\ \\\\ \\\� %\ \ A�1\\\I� �\ ,\ <�< ��ii��,�\�(II "/ % �/j/%'%/// /%�����—%�� =�-�-������_—����_�/,��//% �/�:-:��'�J_—_���— �OSE�PROPOSED STAGING BANKFULL LT1S!iEgM CHANNELAND STOCKPILE AREA \ moi l — \\ � 11 --� EX/ST/NG PROPERTY BOUNDARY \ I � / /-,��'�—--�.�-�-=� %� �-:✓i� --- �,�=.—_ � \ \\\ BEGIN CONSTRUCTION UT1 – \\ \ �\ \\\ STA 10+00 1 ELEV = 268.3 EX/ST/NG STREAM �\ \ \ — i' \ \ \\ \\ \� \ \ \�/ UT1 ``i 1l\ < �\ \\\ — \ \ 1 / ✓� /�' i1 ���� - - \ �� \ \\\V \ \\�\ ,�\\\\� /////o \ \i�l//%1/lllll IIII ll�l/// /) S \ �\ �, \ \\� �� �i 1.✓� �((I //�����J-/�f--\\��✓ �. \�\\� \ I \ \ EX/ST/NG PROPERTY BOUNDARY \\ I \ \\\ PROPOSED TEMPORARY \ �/ /// // // I/r ( I I I J I J — r� STREAM CROSSING C IV/)) I1 / \ \ = RAMIREZ MARTIN \ - \ ��\\\\ \ \ \ \ \ \ \ \\ \ _ RAMIREZ CLAUDIA EX/ST/NG ACCESS ROAD �—\—/ \\\\ �� �- \ \ \ ii'� TO BE UT/L/ZED-�\ \` \ �\ < -r/ / \ / 1 >) \ 11 I / 11 1 / l/ Il�\\\ll\I - / ((I // (11 11( < <\\1 l I I �h \ \\ \ ) \/�� - \ \ 1 \\��\ \ \ I I `\ \ \ \� 0863-03-03-9368 11o 1 J////lIIII I III 11�I\ \\ \ \-�\ / /1 \ ��\�� �� ��-•` \ \ \ \ \� \\ \ \ \�- / II moi/ �J�ii/i// I\�\\\ I \ \ \ // \ / \ \ JACKSJI B JA \ I \ \ \ \\ \I I I -0 j 10r/I 0863 I3 /01 tll j \1 III \ \ \ \ �\l�- ��-, // L-_-=%—\\\\\\�\�\I \��\ \\\ll/ii \\ / 1 / //// )_=rte--� \\\ \ / / // -� J / \\��— \��I\\\\\ \�\\ ��\\\\\1 I/l(�i/i /��/�,,�1� l 1 I I I I I 1 1� j \l\ l\\\\ \III//l /� //��� /� I ► I I / // � \ 1 \ 1 II \ 1\`\\\ 1 I III I I \ \ -� �IIIIII\\l/ MARBREY JASON K / l ( r-,� \ \IIII// I /(\ \`--'�- \\ \ 1\1`111 I II IIII )� \ (/- vl 1111/1111 IIII / \ \ , I I // I t // ✓r_\�,\\\\\ 11 111 Ij ` I I 0853-03-92-5108(/ II( II I�I \� �/ ///�_s �111III((///Illt�I I Itill I I I I II�I1((IIIII r \\\\ l 1111111Jl�ll(� (/ �` I I I � ✓ � ///�//�/ )1 I I I I I I \ \ \ I / J \�llllllllll(� \\�\\��\1\\� � f/y/ \1111 \I\\=�\111tj11\Ilj�\\\\�/I���\��\�\\\\\\\\\\\\\�\\-7 -171 (`l /`\\J� '1 � 1�/�_�ll 1 \ \ 1�\ \ \ 1 I\\ \ 1 I\ � \ \ 1 I J \ I �\ I 1 ti l �\t (\ \��\-J/7/ E & S PLAN \�\III \Ji �II \\ 1 I�\\\I�I 11 \ \ 1 \\� \ \ \�\ \\� \ A II / 11 I \ \ \I\�_\✓�\� Ji SCALE IN FEET \1 J/1 1 I ) J I i / / / I� 1\ \Ir/ J / I 1 1 � llll/Il//l/ll 0 50 100 %�/i%'iiii�I'�I� � Ij �1�1 ilii• \V<alll lVA\ \\\VA i(/�_v��� /� III 1�\AvvA I / / I ( A ( I I � \ ( l /-v 1 A \ � �_ LAND QUALITY E&S GROUND COVER STABILIZATION NEW STABILIZATION TIMEFRAMES Site Area Description Stabilization Timeframe Exceptions ❑) Perimeter dikes, swales. ditches and slopes 7 days None 1 High Quality Water (HOW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not Steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. GROUNDCOVER SHALL BE IN ACCORDANCE WITH NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCGO10000 AND PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 7 M NOTIFICATION OF LAND RESOURCES SEDIMENT & EROSION CONTROL SELF -INSPECTION PROGRAM THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE SELF -INSPECTION REPORT FORM WILL ALSO BE AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND QUALITY WEB SITE, HTTP://PORTAL.NCDENR.0RG/WEB/LR/EROSION. IF YOU HAVE QUESTIONS, PLEASE CONTACT THE LAND QUALITY SECTION AT A DEQ REGIONAL OFFICE AT 919.791.4200. 5 1 4 'LIMITS OF DISTURBANCE = 18.85 ACRES' SEDIMENT & EROSION CONTROL LEGEND SF - SILT FENCE - APPROXIMATE LIMIT OF DISTURBANCE EXISTING PROPERTY LINE - TEMPORARY CONSTRUCTION ENTRANCE ® - ROCK DAM - TEMPORARY STREAM CROSSING a DITCH PLUG - PROPOSED HAUL ROAD ■� - EXISTING ACCESS ROAD 3 w Q 0 O Z co O Cl) H � U2 = +, O O 0) 0o O 000 ?� ca O 00 LO N 00 0 00 000 c U cn v) co (O -Ma o O °C LO .P (D i Wy •� o LO N ■ G F Is 0 m Lij0 J Z p Q W Cn W o' 0 0 Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC203 2 SHEET 7 OF 17 1 H - � a LU Wa 0i � O Z W a J 4 aWZa� D Lu LO F_ 0 C.)V J a� _ O wo� oC Cn = O Z aZvJ CE= O0 oa 0 ZN LLJ Z 0 O Z U) Fn O Z a W_ = C IIx F_ I 0 m Lij0 J Z p Q W Cn W o' 0 0 Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC203 2 SHEET 7 OF 17 1 �: - � a LU 0i RT LO LO F_ T Z W Z 0 J Wa m QW o W (n J CE= O0 oa 0 ZN U Z 0 O Z U) Fn O Z a OV IIx W 0 m Lij0 J Z p Q W Cn W o' 0 0 Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC203 2 SHEET 7 OF 17 1 z G F E MX 'A 7 6 5 4 3 2 v OQUINN WILLIAM V \ OQUINN WILLIAM V OQUINN WILLIAM V VEAZEY LENORE M \\ \ 1 I \\ I I l \f �\ l �% fI\\ BRANDON DAVID G \I (\ /�\\ II �� �� VEERAINDAR GOLI OQUINN CAROLYN A \, OQUINN CAROLYN A OQUINN CAROLYN A 0853-04-84-135\ / /\\- �- 9 �I\\�eJ�0853-04-94-1771 \\\VEERAINDAR JEAN C \,\`� 0853-04-63-9646 0853-04-74-5088 0853-04-74-7241 ✓>s 1\�\ d 0853-02-96-3120 10�- - v 1 NORTH SEABOARD AIRLIN`t RAILWAY , A C� r / - / l /� I� �I �� o / EX/ST/NG STREAM \`- J/ \- �// ^\ I / ��\�� / / ��� r---�\ / I a — �^ - \ \ I - �� - - EX/ST/NG STREAM EX/ST/NG STREAM \ - // UT2 =�� �� PROPOSED STREAM �// \�� v �� �l UT3 �\� �✓ �I�I//,\\\ \ > �� �� \ `-\ \ 1 s / w �cc ]°� I �(� PROPOSED STREAM o o UT2 PROPOSED STREAM - 'LL-/ =�-, \� /// V/ \J l� \ I ��J 1-�� cam `/I� \��1 , 1/ Z \��� L EX/ST/NG WETLAND UT3 --� ��� A`- /�� AV IV p -� TO BE IMPACTED f `�-i\�-�� /\\ / \ \� � -21+00-21+50 2Zr11 i26+50 �` ��- I \ \T -\ ✓` \ I W Y 7fOo 1 : o ko0 +100-27+50-.. �' / 20+50 0 _h X27 n6 o \ \ \`�1/ � I ( \�� Lu x1l" 00 16+507 6`° h0 °�� y o-`x``�O `fid k00-3 5 �� _ -rte 0 �x ti X s '�.o 32 0 �. �� BEGIN CONSTRUCTION �� �, / J / oxo 00 ��^o i 00` 17+00 00 `L�� 'Ix SO` L x�0� �o \X / `\ \\ \\ - /� M1 t 12+507 >> o `� 19foo 5` ee -o o \ a STA = 10+00 00 XOO ^ o S0 x -26g x O I x O ELEV = 265.23 \ Ox 00 X j �, 6-0-00 ; S 24+00 2� `�Q ° � 'N 0 _J �x �� \ -AM w `�`�xs —100 A^� 8x0018+5�� �akoo ,yl — �� ° I j �' 29x / �o �x. ' �6) ; s°�� , a� /\ \/J r j\ �� Q 5. .`x' x00 0 -- � s° 30+0 �Ox ) Rx \4 1 1 }o `L�g 1' �0 // % 00 14+50 _ , i '00 _ - EX/ST/NG STREAM 4+50_ 00 \\\� I / o 0 10+00-10+50 y / �-� _ _ L \ �� -�� \ . �Ox _ M2 00 k50 35+0� x35 �� fns_ 00 4 1J 1X0 2xo // 6'j �� J 1 \\� \\ \�\ +0 1\9x 1a 50 36+00-36+50i+78 38 LEGEND 1 �OfOp �� • lA EX/ST/NG STREAM - / J \ \\ \\ \ - - o =� �- \ \ 1 \ C�/ V 00 \\ TRANSITION FROM o PROPOSED BANK, } 50 / o M� 271 // o STREAM CHANNEL M2 k x / \ N 265 V / II o\\w 272 J / \� O 2 rn�' END CONSTRUCTION \ / �V �l� _ \ � PROPOSED BANKFULL �l �"� 8�' I 0 \ STA = 24+86 UT1 \ ,� J ul STREAM CHANNEL M1 0 % / / / �� \ EX/ST/NG STR / o �� \ '\ \ I Is + O x / / \ \ ELEV = 262 06 / x � � STA = 18+90 \�� / h PROPOSED STREAM UT5 EX/ST/NG WER TO RE) EX/ST/NG I EQUITY TRUST COMPANY JAMES E STOVALL IRA 0853-04-71-5646 0+00 0+45 r urs N / � j 4 - vi C3 cd i - 716k�'0 / �s ELEV = 259.42 / \y ��\Il/� \\ \ �/ O /\/ ( �i r 1 / 0! 15+50 00 ! \2 ) ^I END CONSTRUCTION x00 // / / I L\\ / n� JQ 5k0 26rw-� �. 68 �I v �/ M2 +� 00 ,Z /// ///�/ , PROPOSED LIMITS \ -� �k00 2e1'3+50. xp\e , ..,��6p \ l- STA_ O OF DISTURBANCE �+00 foo� _ 01,4+50e _ �� J - \ I \l ELEV =36+78 0 257 81 ?� 00 OFV(JT %_ 12+OOirr _�- -��� - _ \ � i /f - BEGIN CONSTRUCTION 11+50 0, ter- ������___ _�� 0 O OOH \����-�_ �•� / \ ✓ \ (% �� 5 -- \ o t STA - 10+00 ELEV �\11 // N 00 – 268.3 \ V oo V _- = / 00 %% ✓ \ \ \ / C� \�\ 10+ \ \\\ \ m \�� \ \_ �� / /� / / t 111 00 \ `� \ \ _�(�j l N ai urs - m C/ \ / -` - PROPOSED BANKFULL \ � \\ -1�i ///�--s— \ M Yom.. \ \ ��----.i- _�—_-- �-' _� � i- \ � \ � \ \ - /iii �� \ l / / �� I \ \ \ j i/ I / / ' ///--\� ��% /�--�_ \� \ \\ j/1 _///1� i / \\\� �_ — /�/ii "/\_ \\ \ \\\\ \ \ \ I I I \ V \//1 \\ / / /�� - ��"� _ \' I� c ( / /� \ \ \\ \ \ /\ / - //- STREAM CHANNEL UT1 \ JACKSON BETTY JAM 0 0 -_J RAMIREZ MARTIN �-+ oC - \ MARBREY JASON K =Z /// / vvvV\ \A\v\\�� v A v �" �� L �I�\till 11 / /// 0863-03-03-1220\��= //� - ��� �AV\Avv\ vv vwv�_= v 7� l LO _SEX/ST/NG PROPERTY BOUNDARY =�� / �\ \\\\ \\\\ \\\ \ \\ \ �� \\ \ 111 ///j // ,��� \ fes-/--\� \\\\\���-\�\\\_� / /�. RAMIREZ CLAUDIA 0 a� / PROPOSED LIMITS-- 0853-03-92-5108 �� \\\�\ \ I =\� hl �=.yam i� '� / i i�.^ \ \ \ \ \ \ 1 \ \\ \ III ll/ r// r OF DISTURBANCE -<-�--- tip- --// 1 \��\\.\�\\�\\\,\ � \\\ \\ \\ 0863-03-03-9368 .,� _ - \\\\ I IY//\\\�11IIfJJ//// 11 l ///�� i���\\\\ �\ \- ��)1`\\ \SITE PLAN �\ 111 �//�/ / ///,\�� J \\ \ \ � \\\ \11( /'--'�� -- �%�i �� ��/;-�� � � L \\ \`'�.� �/ � -� /\ \• � -�i� \ I o I II IIS(/�////J 11 \ J / / \\ \ \ \ / \ ) _`� / ✓/�- i1 i%�J/ \\� \ -_� i �� /-/v SCALE IN FEET vo) \ _ •�I\ I ) �/ ��/\ i �� /J - - \ \��✓�\ l\ '//�///�TING PROPERTY BOUNDARY Moog 0 100 20o/ll/�J1 �) O V LO \\_ tJ //i-���i��ijii✓ /��/���\� \ \ 1� \ 1J�1 4 / / l l IIII / \ 1 �� \�\ \ \ �\ �\\\ ✓/\ \\ \ \ \\_ •r+ �� \� \_�� \�\II J I \�dj, (�/ll� l f (/IIIIII`(I l l 1 \ \ I \ > - \ \\ \���\� \\\J/ \ \ \ _ �� �\\` \ \� l-1— r// \ / /1 >1 \1\ / //lJ J11llU�l�\\\l \1 -/ 1 I III //II 1111 IIII \<<I\\\III �\ \ \ \ G 1 \��\ \ \ \ t\ \�\��\\\� I I `\ \\ \ \ N EXISTING PROPERTY LINE APPROXIMATE LIMIT OF DISTURBANCE PROPOSED RELOCATED STREAM CENTERLINE PROPOSED BANKFULL PROPOSED STREAM CHANNEL EXISTING WETLAND TO REMAIN EXISTING WETLAND TO BE IMPACTED EXISTING INDEX CONTOUR EXISTING INTERMEDIATE CONTOUR *LIMITS OF DISTURBANCE = 18.85 ACRES* EXISTING WETLAND INSIDE A01 = 0.403Ac IMPACTED WETLAND INSIDE A01 = 0.242Ac PROPOSED VERNAL POOL AREA INSIDE A01 = 2.164 7 FOR PERMITTING PURPOSES NOT FOR CONSTRUCTION 11 VERNAL POOL 4- re- 1 VERNAL POOL 1 1-1� --Iww VERNAL POOL 3 — VERNAL POOL PLAN SCALE IN FEET 0 150 300 5 1 4 VERNAL POOL 5 Vernal Pool Area (Acres) 1 0.190 2 0.152 3 0.193 4 0.415 5 0.170 6 0.488 7 0.255 8 0.191 9 0.110 r ---TOTAL 2.164 3 VERNAL POOL 7 7� VERNAL POOL 8 2 VERNAL POOL 9 I / / / F - LU W W H = ' ^ V♦ rm mo Z Y wa W Q 0 � 0 oz 00 o� W H�aO a N J a z v= i W �WOC.) W Z Q O J a� 0 W o a c1) =OZ DRAWING NO.: A aZw SHEET 8 OF 17 = a p� = a � W rr n H F - LU W W r = ' ^ V♦ rm mo Z Y W Q 0 z 0 U 00 o� Z a N O J z v= i W �a z G F C Ic c 0 m wo J Z p 0 0 > cn w O O 0 o a DRAWING NO.: A EC204 SHEET 8 OF 17 1 I ti I ti 1� ■ o. 0 1 POINT OF CURVATURE ON-SITE STREAM ALLUVIUM (IF AVAILABLE), OTHERWISE USE A WELL GRADED MIX OF CLASS A, CLASS B, AND #57 STONE. A MIXTURE OF ALLUVIUM AND WELL A GRADED MIX MAY ALSO BE USED FOR BACKFILL. HEADER LOG 20'-30' NON -WOVEN GEOTEXTILE FABRIC (TYPE II) ROOTWAD SHALL EXTEND INTO BANK A MIN. OF 10 FT. ROOTWAD INSTALLED UNDER LOG VANE ANCHOR BOULDER (THIS SHEET) POINT OF TANGENCY /FN, whk c ?qN F3 U<G aq�3 B FUC( eqA z3 �0 USC / a - FOOTER LOG MIDPOINT OF CURVE PLAN 0 1 LOGS BURIED 5 -FT. MIN. UNDER STREAMBED TOP OF BOULDER AT INVERT ELEV. 1 TOP OF BOULDER 5 FT. SILL AT INVERT ELEV. PAST HEADER BANKFULL ON-SITE STREAM ALLUVIUM (IF SILL AVAILABLE), OTHERWISE USE A BOULDERS BOULDER WELL GRADED MIX OF CLASS A, BANKFULL CLASS B, AND #57 STONE. A MIXTURE OF ALLUVIUM AND WELL / GRADED MIX MAY ALSO BE USED FOR BACKFILL. HEADER BOULDERS NON WOVEN GEOTEXTILE FABRIC (TYPE II) A (THIS DETAIL) FOOTER LOG \ SECTION A -A 5 FT. SILL EXISTING GROUND PAST BANKFULL ANKFULL - FOOTER BOULDERS HEADER AND FOOTER LOGS SHALL BE PLACED INTO THE EXISTING SUBSTRATE SECTION B -B FOOTER BOULDERS STREAMBED NOTES: 6. NON -WOVEN GEOTEXTILE FABRIC (TYPE II) SHALL BE INSTALLED ON THE UPSTREAM SIDE OF 1. A HYDRAULIC EXCAVATOR, WITH A HYDRAULIC THUMB, SHALL BE USED TO PLACE BOULDERS THE ROCK J -HOOK 1/4 -INCH FROM THE TOP OF THE ROCK. THE NON -WOVEN GEOTEXTILE AND LOGS. FABRIC SHALL BE BURIED IN THE BOTTOM OF THE CHANNEL AND SHALL BE PLACED THE ENTIRE LENGTH OF STRUCTURE. 2. LOGS SHALL BE RELATIVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED AND EXTENDED INTO THE BANK 6 -FT. 7. ROOT WAD SHALL BE PLACED BENEATH THE HEADER LOG AND PLACED SO THAT IT LOCKS THE HEADER LOG INTO THE BANK. 3. LOG VANE SHALL EXTEND FROM THE BOTTOM OF THE BED ELEVATION TO THE HEAD OF THE VANE AT A MIN. DEPTH OF 1/2 BANKFULL ELEVATION THE LOG VANE ARM HAS A SLOPE OF 8. BACKFILL STRUCTURE WITH EXCAVATED ON-SITE STREAM ALLUVIUM (IF AVAILABLE), OTHERWISE 2%-4%. HEADER AND FOOTER LOGS SHALL BE TIED SECURELY INTO THE BANK IN SUCH A USE A WELL GRADED MIX OF CLASS A, CLASS B, AND #57 STONE. A MIXTURE OF ALLUVIUM WAY THAT ELIMINATES THE POSSIBILITY OF STREAM FLOW DIVERTING AROUND THEM. AND WELL GRADED MIX MAY ALSO BE USED FOR BACKFILL. 4. NON -WOVEN GEOTEXTILE FABRIC (TYPE II) SHALL BE INSTALLED ON THE UPSTREAM SIDE OF 9• SOIL SHALL BE COMPACTED WELL AROUND BURIED PORTIONS OF LOG WHILE CREATING A THE STRUCTURE 1/4 DIAMETER LENGTH FROM THE TOP OF THE LOG. THE NAILS SHALL BE SMALL POCKET BETWEEN THE HEADER LOG AND THE OUTSIDE BANK. NO GREATER THAN 12 INCHES ON CENTER. THE WOVEN GEOTEXTILE FABRIC SHALL BE BURIED IN THE BOTTOM OF THE CHANNEL AND SHALL BE PLACED THE ENTIRE LENGTH OF 10. ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ON-SITE CONSTRUCTION STRUCTURE. OBSERVER. 5. BOULDERS SHALL BE PLACED ON TOP OF HEADER LOG FOR ANCHORING. 1/3 OF THE WAY 11. ITEMS IN THIS DETAIL ARE A GRAPHICAL ILLUSTRATION AND DO NOT SPECIFY THE ACTUAL ACROSS THE CHANNEL FROM THE OUTSIDE BANK, THE HEADER ROCK SHALL BE PLACED AT QUANTITY OF MATERIALS (I.E. LOGS, BOULDERS, STONE, ETC.) TO BE USED FOR THE CHANNEL INVERT ELEVATION. HEADER BOULDERS TO BE PLACED 0.10 -FT. TO 0.25 -FT. CONSTRUCTION. APART WITH MINIMUM DIAMETER OF 1.5 FT. DETAIL NO. 1 LOG J -HOOK 0 1 PAP POINT OF CURVATURE NON -WOVEN GEOTEXTILE FABRIC (TYPE II) HEADER BOULDERS T \ ON-SITE STREAM ALLUVIUM (IF AVAILABLE), OTHERWISE USE A WELL GRADED MIX OF CLASS A, 20' TO 30' / CLASS B, AND #57 )` STONE. A MIXTURE OF l ALLUVIUM AND WELL GRADED MIX MAY ALSO Sz 6 � BACKFILL.BE D FOR egNkF��p4s;?. _ r / QO& B SILL BOULDERS MID POINT OF CURVE POINT OF TANGENCY PLAN VIEW 1 2 FOR PERMITTING PURPOSES NOT FOR CONSTRUCTION B (THIS DETAIL) ON-SITE STREAM ALLUVIUM (IF UE A 1�` GRADEDLMIX OOF CLASS AS CLA SELL B, BOUDLDERS AND #57 STONE. A MIXTURE OF ALLUVIUM AND WELL GRADED MIX MAY ALSO BE USED FOR BACKFILL. TOP I OF BOEL D R A STREAMBED- AT `\/\ /\/ - �- \ FOOTER A (THIS DETAIL) BOULDERS NON -WOVEN FOOTER BOULDERS GEOTEXTILE SECTION A -A FABRIC (TYPE II) 6 FT. SILL PAST BANKFULL MIN. 5 FT. SILL PAST BANKFULL MIN BANKFULL SILL HEADER BOULDERS BOULDERS 7 /f BANKFULL SLOPE \% � FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBSTRATE A MINIMUM OF THE BOULDER DIAMETER NOTES: SECTION B -B 1. ALL BOULDERS SHALL BE A MINIMUM DIAMETER OF 3 FT. 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER, AND PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL AND LINED WITH FILTER FABRIC. THE CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 3. DIMENSIONS AND SLOPES MAYBE ADJUSTED TO FIT BY THE ENGINEER. 4. A DOUBLE FOOTER BOULDER SHALL BE UTILIZED IN SAND BED MATERIAL. 5. VANE ARM SHALL TIE INTO THE BANK HALFWAY BETWEEN THE CHANNEL INVERT AND BANKFULL ELEVATIONS. THE ARM SHALL RISE AT 2%-4% FROM THE CHANNEL INVERT AT AN ANGLE OF 20-30 DEG FROM THE ADJACENT TANGENT LINE. 6. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE VANE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 7. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER OR THE ENGINEER'S ON-SITE CONSTRUCTION OBSERVER. DETAIL NO. 2 ROCK J -HOOK N.T.S. N.T.S. NOTES: 1. CONSTRUCTED ALLUVIAL RIFFLES ARE GRADE CONTROL AND HABITAT ENHANCEMENT MEASURES ANKFULL WIDTH (Wbkf DETAIL NO. 4 THAT ARE USED TO MAINTAIN GRADE OF UPSTREAM POOLS, OXYGENATE WATER, AND PROVIDE HABITAT FOR EPIFAUNA AND FISH. THESE STRUCTURES ARE TYPICALLY USED IN LOWER GRADIENT STREAMS WITH OVERALL SLOPES LESS THAN 2% THIS DETAIL CAN BE USED FOR LOW FLOW CHANNEL BOULDER CASCADE CONSTRUCTING RIFFLES USING NATURAL ALLUVIUM CONSISTING OF BOULDERS, COBBLES, AND \ GRAVEL OR SPECIFIED SELECT MATERIAL. 1/3 1/3 �11/3 1 ,000 { 2. CONSTRUCTED ALLUVIAL RIFFLES SHOULD BE PLACED AT THE STATIONS, OFFSETS, ELEVATIONS, ON-SITE STREAM ALLUVIUM (IF AVAILABLE) goo ?0000 I AND GEOMORPHIC POSITIONS INDICATED ON THE STREAM MITIGATION DATA TABLE, STREAM OTHERWISE USE A WELL GRADED MIX OF CLASS A MITIGATION PLAN, AND THIS DETAIL, OR AS DIRECTED BY THE ENGINEER. AT A MINIMUM, THE po 0o A, CLASS B, AND #57 STONE. A MIXTURE OF 000 000 BANKFULL, INNER BERM, AND LOW -FLOW CHANNEL WIDTHS; INVERT ELEVATIONS AT HEAD AND ALLUVIUM AND WELL GRADED MIX MAY ALSO BE Foo - BOTTOM OF RIFFLE; ESTIMATED ROCK THRESHOLD SIZE; AND ALLUVIUM OR SELECT MATERIAL 0o CLASSIFICATION AND DEPTH SHOULD BE SPECIFIED IN THE STREAM MITIGATION DATA TABLE. USED FOR BACKFILL. 1 �1 Oo o LOG, ?000 3. REFER TO "SPECIAL NOTES FOR STREAM DESIGN". B Pc I 00 I BOULDER ON-SITE STREAM ALLUVIUM (IF AVAILABLE), 4. CONSTRUCTED ALLUVIAL RIFFLES ARE PLACED IN THE STRAIGHT SECTIONS OF THE CHANNEL I ro 4z I - (TYP.) 'oo�� I OTHERWISE USE A WELL GRADED MIX OF CLASS BETWEEN MEANDER BENDS (I.E., BETWEEN UPSTREAM POINT OF TANGENCY AND DOWNSTREAM � A, CLASS B, AND #57 STONE. A MIXTURE OF POINT OF CURVATURE), AS INDICATED ON THE STREAM MITIGATION PLANS. °o° 00 - -j B (THIS SHEET' C of 0 00 ALLUVIUM AND WELL GRADED MIX MAY ALSO BE BOULDERS TO BE PLACED AT - - 00 ' ao 0 000 I 5. ALLUVIUM OR SELECT MATERIAL FOR CONSTRUCTED RIFFLES SHALL CONSIST OF COARSE wr P A USED FOR BACKFILL. SUBSTRATE (GRAVEL, COBBLE, AND BOULDER). A MIXTURE OF SIZES OF ALLUVIUM OR SELECT 45' TO 55' ANGLE TO Wbkf _ MATERIALS, AS SPECIFIED ON THE STREAM RESTORATION PLAN SHEETS, SHOULD BE USED FOR 00 SUBSTRATE IN RIFFLE AND RUN HABITATS. COARSE ALLUVIUM EXCAVATED FROM THE EXISTING STREAM BED, WHICH MEETS THE SPECIFIED SIZE CLASSIFICATION, IS THE PREFERRED MATERIAL J CONTROL POINT .� 0 4 �� ' SURFACE BOULDER POINT OF TANGENCY \ \O� TO USE FOR SUBSTRATE RESTORATION. REFER TO SUBSTRATE RESTORATION INFORMATION. 00 (PT) 6. CONSTRUCT ALLUVIAL RIFFLES BY: 6.1. SHAPE THE CHANNEL AND FLOODPLAIN TO THE SPECIFIED GRADES AND DIMENSIONS. V 6.2. EXCAVATE ENOUGH BED MATERIAL TO PLACE SUBGRADE MATERIAL, IF SPECIFIED, AND I PLAN COARSE ALLUVIAM OR SELECT MATERIAL FOR THE RIFFLE TO ACHIEVE THE SPECIFIED INVERT ELEVATIONS. IF THE CHANNEL IS DESIGNED WITH AN INNER BERM, KEY THE COARSE ALLUVIUM OR SELECT MATERIAL INTO THE BANKS EXTENDING ENTIRELY UNDER THE INNER BANKFULL WIDTH -I - - - L J,-- BERM. IF THE CHANNEL LACKS AN INNER BERM, KEY THE COARSE ALLUVIUM OR SELECT COIR FIBER EROSION (Wbkf) COIR FIBER EROSION MATERIAL INTO THE BANKS EXTENDING ALONG THE TOE. \ 00 I I_ FOOTER CONTROL BLANKET CONTROL BLANKET 6.3. PLACE THE COARSE ALLUVIUM OR SELECT MATERIAL IN SIX-INCH LIFTS AND COMPACT EACH Wbkf LOW LIFT WITH THE BUCKET OF THE EXCAVATOR. I BOULDER FLOW �J 6.4. INSTALL THE ALLUVIAL RIFFLE AT THE INVERTS SPECIFIED IN THE PLANS AND THEN CHECK \� CHANNEL THE ELEVATIONS OF THE INVERTS WITH SURVEY EQUIPMENT. �\ 6.5. PLACE SOIL OVER THE TOP OF THE COARSE ALLUVIUM OR SELECT MATERIAL KEYED INTO Loo - THE INNER BERM OR STREAM BANK AND GRADE THE INNER BERM/BANKS TO THE A SPECIFIED ELEVATIONS. B (THIS SHEET) 7. THE CONSTRUCTED ALLUVIAL RIFFLE MATERIAL SHALL BE FINISHED TO CREATE A SMOOTH ON-SITE STREAM ALLUVIUM (IF AVAILABLE), SECTION B -B ON-SITE STREAM ALLUVIUM (IF AVAILABLE), PROFILE, WITHOUT AN ABRUPT JUMP/TRANSITION BETWEEN THE UPSTREAM POOL -GLIDE AND OTHERWISE USE A WELL GRADED MIX OF CLASS PLAN VIEW OTHERWISE USE A WELL GRADED MIX OF CLASS THE RIFFLE, OR AN ABRUPT DROP/TRANSITION BETWEEN THE RIFFLE AND THE DOWNSTREAM A, CLASS B, AND #57 STONE. A MIXTURE OF HEAD OF RIFFLE A, CLASS B, AND #57 STONE. A MIXTURE OF RUN -POOL. THE FINISHED CROSS-SECTION OF THE RIFFLE MATERIAL SHALL GENERALLY MATCH ALLUVIUM AND WELL GRADED MIX MAY ALSO BE ALLUVIUM AND WELL GRADED MIX MAY ALSO BE THE SHAPE AND DIMENSIONS SHOWN ON THE RIFFLE TYPICAL SECTION WITH SOME VARIABILITY USED FOR BACKFILL. BANKFULL USED FOR BACKFILL. OF THE THALWEG LOCATION AS A RESULT OF PLACEMENT OF LARGER SUBSTRATE, SUCH AS BOULDERS. STREAM BED GL RIFF 8. THE END OF RIFFLE CONTROL POINT MAY TIE IN TO A DRAINAGE STRUCTURE OR OTHER - SURFACE BOULDER Oo �O�o 16" MIN DEPTH SECTION A -A IN -STREAM STRUCTURE (E.G. - J -HOOK VANE, LOG OR BOULDER SILL, ETC.). AT A MINIMUM _ (NP ) COIR FIBER ROLLS SHOULD BE CONSIDERED TO PROTECT THE OUTER BEND DOWNSTREAM OF THE CONSTRUCTED ALLUVIAL RIFFLE. ����o o°• FLOW 9. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED - FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL °�� 70_ POOL TO CONSTRUCTION. °08 0 0�3� o� 04 0 00 0 0 00 0o OooOoo°a,000. . � 10. COIR FIBER EROSION CONTROL BLANKET SHALL BE INSTALLED ABOVE THE LOW -FLOW CHANNEL NON -WOVEN `" o°° �00� o� '+o0l��nonnoOp?Op0 GEOTEXTILE FABRIC0o. o�oo�oo�oo� opo 0000° OF THE RIFFLE. o 00 00°0 o 0000°0° (TYPE II) FOOTER BOULDER ^ ^na000�a DETAIL N O. 3 11 • ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ON-SITE CONSTRUCTION (TYP) SELECT MATERIAL ^000 °0 OBSERVER. ROCK CONSTRUCTED RIFFLE SECTION A -A 12. CONSTRUCTED ALLUVIAL RIFFLES PAYMENT SHALL INCLUDE ALL MATERIALS, EQUIPMENT, AND LABOR TO CONSTRUCT THE ALLUVIAL RIFFLE. N.T.S. 7 6 5 4 3 N.T.S. BANKFULL WIDTH (Wbkf) LOW FLOW CHANNEL " 00°0°0°00°0o' SURFACE BOULDER o0"000°opO1, ��� •� f�q o�0000� oo° , --'a �% 0 0°o rc ..,o o • 04.°0° I • o Ov0 G /O �✓0 JO c oo' FOOTER BOULDER-/ NON -WOVEN SECTION B -B GEOTEXTILE FABRIC (TYPE II) STREAMBED NOTES: 1. THIS DETAIL CAN BE USED FOR CONSTRUCTING LOG AND BOULDER CASCADES FOR HYDRAULIC SLOPES GREATER THAN 4%. 2. CASCADE STEPS SHALL BE CONSTRUCTED WITH 1 ROW OF FOOTER BOULDERS OR LOGS AND 1 ROW OF HEADER BOULDERS OR LOGS. 3. PLACE HEADER BOULDERS OR LOGS SLIGHTLY UPSTREAM ON TOP OF THE FOOTER BOULDERS OR LOGS. 4. PLACE BOULDERS AND BACKFILL WITH ON-SITE STREAM ALLUVIUM (IF AVAILABLE) OTHERWISE USE A WELL GRADED MIX OF CLASS A, CLASS B, AND #57 STONE. A MIXTURE OF ALLUVIUM AND WELL GRADED MIX MAY ALSO BE USED AS BACKFILL. 5. THE GEOTEXTILE FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 6. CASCADES SHALL BE CONSTRUCTED SO THAT LOW FLOW IS CENTERED WITHIN THE CENTER 1/3 OF THE BANKFULL CHANNEL. 7. CASCADE STEPS SHALL SLOPE 2-4% WITH THE HIGHEST PORTION OF THE STEP ON THE DOWNSTREAM LEADING EDGE. 4. REFER TO THE THALWEG PROFILE(S) FOR DROP HEIGHT BETWEEN CASCADE STEPS. 5. ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ONSITE CONSTRUCTION OBSERVER. 0 ■ Cl } MIN. LOG MIN. DIA. (IN.) BOULDER c DIA. (FT.) 18 3.00 BANKFULL WIDTH (Wbkf) LOW FLOW CHANNEL " 00°0°0°00°0o' SURFACE BOULDER o0"000°opO1, ��� •� f�q o�0000� oo° , --'a �% 0 0°o rc ..,o o • 04.°0° I • o Ov0 G /O �✓0 JO c oo' FOOTER BOULDER-/ NON -WOVEN SECTION B -B GEOTEXTILE FABRIC (TYPE II) STREAMBED NOTES: 1. THIS DETAIL CAN BE USED FOR CONSTRUCTING LOG AND BOULDER CASCADES FOR HYDRAULIC SLOPES GREATER THAN 4%. 2. CASCADE STEPS SHALL BE CONSTRUCTED WITH 1 ROW OF FOOTER BOULDERS OR LOGS AND 1 ROW OF HEADER BOULDERS OR LOGS. 3. PLACE HEADER BOULDERS OR LOGS SLIGHTLY UPSTREAM ON TOP OF THE FOOTER BOULDERS OR LOGS. 4. PLACE BOULDERS AND BACKFILL WITH ON-SITE STREAM ALLUVIUM (IF AVAILABLE) OTHERWISE USE A WELL GRADED MIX OF CLASS A, CLASS B, AND #57 STONE. A MIXTURE OF ALLUVIUM AND WELL GRADED MIX MAY ALSO BE USED AS BACKFILL. 5. THE GEOTEXTILE FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 6. CASCADES SHALL BE CONSTRUCTED SO THAT LOW FLOW IS CENTERED WITHIN THE CENTER 1/3 OF THE BANKFULL CHANNEL. 7. CASCADE STEPS SHALL SLOPE 2-4% WITH THE HIGHEST PORTION OF THE STEP ON THE DOWNSTREAM LEADING EDGE. 4. REFER TO THE THALWEG PROFILE(S) FOR DROP HEIGHT BETWEEN CASCADE STEPS. 5. ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ONSITE CONSTRUCTION OBSERVER. 0 ■ Cl ■ 0 } Lo O m p c �•1 H M � J 3 W 0_ O Z p Q p O C1 W F W w N O 1 �O° 2 Z cn 0 o IL Q a DRAWING NO.: N EC400 SHEET 12 OF 17 111 1 pp y v 1 . o� M M� CD :4j O °C 's' T cm m E W O � O Lo N U Wa � OZ W H a J O aWZa� � o Lu V J a� O W cn =OZ aZLucn LuC I cn a Lu RT Lo Lo T ■ 0 } m p c w J 3 W 0_ J Z p Q p U W Z W w N O o w 2 Z cn 0 o IL Q a ■ 0 m 0 J Z p Q cn W w O 0 0 o IL Q DRAWING NO.: A EC400 SHEET 12 OF 17 1 0 1 1� ■ o■ 0 ■ 0 ■ ra ■ z= g; n I POINT OF CURVATURE (PC) EDGE OF WATER AT NORMAL FLOW I 0 1 CUT TOP OF STAKE SQUARE ` 2 BUDS / SCARS (MIN.) AND 4 IN (MIN.) EXPOSED I 3/4-2 IN. DIAMETER MAKE ANGLED (45') CUT AT BUTT -END, PLANT BUTT -END DOWN SPACING AS SPECIFIED FOOTER LOGS (12"-18" DIA. MIN.) 0 FLOW DETAIL NO. 5 LIVE STAKING N.T.S. ROOT WAD LOGS (6" -10 - DIA. & 6'-8' LONG) SPACED EVERY 4'-6' --- POINT POINT OF TANGENCY (PT) 1 LIVE STAKES NOTES 1. LIVE STAKES ARE USED FOR VEGETATIVE STREAM BANK STABILIZATION AND RIPARIAN HABITAT RESTORATION. 2. LIVE STAKES SHOULD BE PLACED AT THE STATIONS, OFFSETS, AND ELEVATIONS INDICATED ON THE STREAM MITIGATION DATA TABLE, STREAM MITIGATION PLAN, AND THIS DETAIL, OR AS DIRECTED BY THE ENGINEER. AT A MINIMUM, THE TYPE (SPECIES), SIZE, SPACING, AND QUANTITY OF LIVE STAKES SHOULD BE SPECIFIED IN THE STREAM MITIGATION DATA TABLE. 3. LIVE STAKES SHALL CONSIST OF WOODY LIVE CUTTINGS OF FAST-GROWING SHRUBS AND TREES (SUCH AS WILLOWS, DOGWOODS, BUTTONBUSH, ETC.), WHICH ARE CAPABLE OF GENERATING ROOTS FROM CUTTINGS WHEN PLACED IN WET OR MOIST SOIL. 4. LIVE STAKES SHALL BE AT LEAST ONE YEAR OLD, 0.75 INCH TO 2 INCHES IN DIAMETER, AND A MINIMUM OF 2 FEET LONG, WITH MOIST, GREEN, AND HEALTHY CAMBIUM AND GROWING LEAF BUDS LESS THAN 0.25 INCH. THE MAXIMUM LENGTH OF LIVE STAKES DEPENDS ON THE APPLICATION, AND SHALL BE AS SPECIFIED. WHEN LIVE STAKES ARE INSERTED IN RIP RAP OR STONE FILL, THEY SHALL BE LONG ENOUGH TO EXTEND THROUGH THE SURFACE OF THE RIP RAP OR STONE FILL AND AT LEAST HALF THE LENGTH SHALL BE INSERTED INTO THE SOIL, BELOW THE RIP RAP OR STONE FILL. 5. INSTALLING LIVE STAKES: 5.1. LIVE STAKES HARVESTED DURING DORMANCY SHALL BE MAINTAINED IN COLD STORAGE UNDER MOIST CONDITONS. SOAK THE BASE OF DORMANT -HARVESTED LIVE STAKES IN WATER AT LEAST 24 HOURS BEFORE PLANTING. 5.2. LIVE STAKES HARVESTED ON SITE SHOULD BE INSTALLED THE SAME DAY THEY ARE PREPARED. 5.3. PRIOR TO PLANTING, LIVE STAKES SHALL BE MAINTAINED IN A CONTINUOUSLY COOL, COVERED, AND MOIST STATE, WITH THE BASES SOAKING IN WATER. 5.4. CARE SHALL BE TAKEN NOT TO DAMAGE LIVE STAKES DURING INSTALLATION. THOSE DAMAGED SHALL BE LEFT IN PLACE AND SUPPLEMENTED WITH AN INTACT LIVE CUTTING/LIVE STAKE. 5.5. USE A DIGGING BAR, DIBBLE, OR SIMILAR TOOL TO MAKE A PILOT HOLE IN THE BANK 15 TO 18 INCHES DEEP. 5.6. PLACE THE LIVE STAKE IN THE PILOT HOLE, SO THAT A MINIMUM OF 4 INCHES AND TWO LIVE BUDS OF THE LIVE STAKE ARE EXPOSED. 5.7. TAMP THE SOIL AROUND LIVE STAKES. 6. ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ONSITE CONSTRUCTION OBSERVER. 7. LIVE STAKES SHALL BE PAID FOR PER EACH. 8. PAYMENT SHALL INCLUDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO INSTALL THE LIVE STAKES. PLACE MULCH INSI['E' FABRIC WRAP BANKFULL FOOD STAKES rOR ANCHORING REINFORCED EARTH 4 3 2 1 2"x4"x18" WOODEN STAKE NOTE: STAKES MAY BE MADE BY SAWING A 2x4 DIAGONALLY IN HALF. WOOD STAKE RESTORE DISTURBED AREA WITH TOPSOIL, SEEDING, MULCHING AND PLANTING POOL NORMAL FLOW WATER BRANCH CUTTINGS 1 a'- SURFACE (EL. OF LIVE STAKES \ 18" MIN.�, DOWNSTREAM RIFFLE _ I EXISTING REINFORCED EARTH � \ `) GROUND BANKFULL_ _ I<< ? ANCHOR ROCK I I I ROOT � _ WAD zu)2 EXCAVATION \ \ LIMITS TOE WOOD \ (SEE NOTE 2)WOVEN GEOTEXTILE 18" MIN. 12 ABOVE WATER ANCHOR ROCK (TYP) FOOTER LOGS OVERHANG SURFACE PROVIDE ROCK SILL AT UPSTREAM A TOE WOOD AND DOWNSTREAM END OF TOE WOOD (SEE NOTE 2) EXTENDING UP TO BANK FULL. USE 24" TO 36" BOULDERS STACKED. PLAN SECTION A -A RIPARIAN PLANTINGS AND LIVE STAKES NOTES: 1. IF AN APPROVED ON-SITE SOURCE IS AVAILABLE, SOD MATS LAYERS MAY BE USED INSTEAD OF REINFORCED EARTH. SOD MATS MAY ALSO BE OBTAINED FROM CLEARING AND EXCAVATION WORK ASSOCIATED WITH THE PROJECT. THE NUMBER OF LAYERS OF REINFORCED EARTH OR SOD MATS MAY VARY WITH THE BANK HEIGHT. 2. TOE WOOD CONSISTS OF A MIX OF LOGS, BRANCHES, BRUSH, AND OTHER WOODY VEGETATION INSTALLED AT VARIOUS ANGLE, BUT NOT PARALLEL TO THE FLOW. LAYER THE WOOD WITH LARGER MATERIAL ON THE BOTTOM AND A MAT OF BRANCHES AS THE TOP LAYER. ANGLE ROOT WADS SLIGHTLY UPSTREAM INTO THE FLOW. 3. THE TOP LAYER OF TOE WOOD SHALL BE AT THE ESTABLISHED NORMAL FLOW ELEVATION. 4. FILL BETWEEN ROOT WADS WITH A MIX OF WOODY DEBRIS PER NOTE 2. 5. LAYER REINFORCED EARTH AND CUTTINGS TO BANKFULL. 1 1 DETAIL NO. 7 TOE WOOD WITH GEOLIFT AND LIVE BRUSH LAYERING N.T.S. 5 MIX IN TOPSOIL AND TILL AT LEAST 4" DEEP 4:1 SLOPE EXISTING GROUND 5 FT. MIN COIR FIBER MATTING BANKFULL STAGE IMPERVIOUS L1 FT. MIN. DEPTH BELOW SELECT MATERIAL EXISTING CHANNEL GRADE 2' WIDER SOIL/ALLUVIAL FILL IN THAN EXISTING ABANDONED STREAM CHANNEL IMPERVIOUS CHANNEL SELECT MATERIAL TOP OF BANK i EXISTING STREAM / — CHANNEL 2WIDER THAN EXISTING WAW --W CHANNEL Fk-OW NOTES: PLAN 1. BEFORE WRAPPING PLUG WITH COIR FIBER MATTING, MIX IN TOPSOIL AND TILL INTO AT LEAST THE UPPER 4" TO HELP VEGETATION TO ESTABLISH. 2. RAKE SOIL LEVEL AND ADD TEMPORARY AND PERMANENT SEED AND MULCH BEFORE INSTALLING COIR FIBER MATTING. DETAIL NO. 6 IMPERVIOUS STREAM CHANNEL PLUG N.T.S. BANKF POINT BAR PLAN ROOT WAD A BANKFULL Lo O 1 m \ ROOT WAD TO BE w Z Yo AT AOOT \ �� G POINT BAR z \� 1 STREAM BANK Z m0 TRENCH ox z I co LONG, > 10 -IN. DIA. NOTES: SECTION A -A 1. EXCAVATE A TRENCH FOR THE LOG 00Z N 'I 1� ■ o■ 0 ■ 0 ■ ra ■ z= g; n I POINT OF CURVATURE (PC) EDGE OF WATER AT NORMAL FLOW I 0 1 CUT TOP OF STAKE SQUARE ` 2 BUDS / SCARS (MIN.) AND 4 IN (MIN.) EXPOSED I 3/4-2 IN. DIAMETER MAKE ANGLED (45') CUT AT BUTT -END, PLANT BUTT -END DOWN SPACING AS SPECIFIED FOOTER LOGS (12"-18" DIA. MIN.) 0 FLOW DETAIL NO. 5 LIVE STAKING N.T.S. ROOT WAD LOGS (6" -10 - DIA. & 6'-8' LONG) SPACED EVERY 4'-6' --- POINT POINT OF TANGENCY (PT) 1 LIVE STAKES NOTES 1. LIVE STAKES ARE USED FOR VEGETATIVE STREAM BANK STABILIZATION AND RIPARIAN HABITAT RESTORATION. 2. LIVE STAKES SHOULD BE PLACED AT THE STATIONS, OFFSETS, AND ELEVATIONS INDICATED ON THE STREAM MITIGATION DATA TABLE, STREAM MITIGATION PLAN, AND THIS DETAIL, OR AS DIRECTED BY THE ENGINEER. AT A MINIMUM, THE TYPE (SPECIES), SIZE, SPACING, AND QUANTITY OF LIVE STAKES SHOULD BE SPECIFIED IN THE STREAM MITIGATION DATA TABLE. 3. LIVE STAKES SHALL CONSIST OF WOODY LIVE CUTTINGS OF FAST-GROWING SHRUBS AND TREES (SUCH AS WILLOWS, DOGWOODS, BUTTONBUSH, ETC.), WHICH ARE CAPABLE OF GENERATING ROOTS FROM CUTTINGS WHEN PLACED IN WET OR MOIST SOIL. 4. LIVE STAKES SHALL BE AT LEAST ONE YEAR OLD, 0.75 INCH TO 2 INCHES IN DIAMETER, AND A MINIMUM OF 2 FEET LONG, WITH MOIST, GREEN, AND HEALTHY CAMBIUM AND GROWING LEAF BUDS LESS THAN 0.25 INCH. THE MAXIMUM LENGTH OF LIVE STAKES DEPENDS ON THE APPLICATION, AND SHALL BE AS SPECIFIED. WHEN LIVE STAKES ARE INSERTED IN RIP RAP OR STONE FILL, THEY SHALL BE LONG ENOUGH TO EXTEND THROUGH THE SURFACE OF THE RIP RAP OR STONE FILL AND AT LEAST HALF THE LENGTH SHALL BE INSERTED INTO THE SOIL, BELOW THE RIP RAP OR STONE FILL. 5. INSTALLING LIVE STAKES: 5.1. LIVE STAKES HARVESTED DURING DORMANCY SHALL BE MAINTAINED IN COLD STORAGE UNDER MOIST CONDITONS. SOAK THE BASE OF DORMANT -HARVESTED LIVE STAKES IN WATER AT LEAST 24 HOURS BEFORE PLANTING. 5.2. LIVE STAKES HARVESTED ON SITE SHOULD BE INSTALLED THE SAME DAY THEY ARE PREPARED. 5.3. PRIOR TO PLANTING, LIVE STAKES SHALL BE MAINTAINED IN A CONTINUOUSLY COOL, COVERED, AND MOIST STATE, WITH THE BASES SOAKING IN WATER. 5.4. CARE SHALL BE TAKEN NOT TO DAMAGE LIVE STAKES DURING INSTALLATION. THOSE DAMAGED SHALL BE LEFT IN PLACE AND SUPPLEMENTED WITH AN INTACT LIVE CUTTING/LIVE STAKE. 5.5. USE A DIGGING BAR, DIBBLE, OR SIMILAR TOOL TO MAKE A PILOT HOLE IN THE BANK 15 TO 18 INCHES DEEP. 5.6. PLACE THE LIVE STAKE IN THE PILOT HOLE, SO THAT A MINIMUM OF 4 INCHES AND TWO LIVE BUDS OF THE LIVE STAKE ARE EXPOSED. 5.7. TAMP THE SOIL AROUND LIVE STAKES. 6. ALL MATERIALS ARE TO BE APPROVED BY ENGINEER OR ENGINEER'S ONSITE CONSTRUCTION OBSERVER. 7. LIVE STAKES SHALL BE PAID FOR PER EACH. 8. PAYMENT SHALL INCLUDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO INSTALL THE LIVE STAKES. PLACE MULCH INSI['E' FABRIC WRAP BANKFULL FOOD STAKES rOR ANCHORING REINFORCED EARTH 4 3 2 1 2"x4"x18" WOODEN STAKE NOTE: STAKES MAY BE MADE BY SAWING A 2x4 DIAGONALLY IN HALF. WOOD STAKE RESTORE DISTURBED AREA WITH TOPSOIL, SEEDING, MULCHING AND PLANTING POOL NORMAL FLOW WATER BRANCH CUTTINGS 1 a'- SURFACE (EL. OF LIVE STAKES \ 18" MIN.�, DOWNSTREAM RIFFLE _ I EXISTING REINFORCED EARTH � \ `) GROUND BANKFULL_ _ I<< ? ANCHOR ROCK I I I ROOT � _ WAD zu)2 EXCAVATION \ \ LIMITS TOE WOOD \ (SEE NOTE 2)WOVEN GEOTEXTILE 18" MIN. 12 ABOVE WATER ANCHOR ROCK (TYP) FOOTER LOGS OVERHANG SURFACE PROVIDE ROCK SILL AT UPSTREAM A TOE WOOD AND DOWNSTREAM END OF TOE WOOD (SEE NOTE 2) EXTENDING UP TO BANK FULL. USE 24" TO 36" BOULDERS STACKED. PLAN SECTION A -A RIPARIAN PLANTINGS AND LIVE STAKES NOTES: 1. IF AN APPROVED ON-SITE SOURCE IS AVAILABLE, SOD MATS LAYERS MAY BE USED INSTEAD OF REINFORCED EARTH. SOD MATS MAY ALSO BE OBTAINED FROM CLEARING AND EXCAVATION WORK ASSOCIATED WITH THE PROJECT. THE NUMBER OF LAYERS OF REINFORCED EARTH OR SOD MATS MAY VARY WITH THE BANK HEIGHT. 2. TOE WOOD CONSISTS OF A MIX OF LOGS, BRANCHES, BRUSH, AND OTHER WOODY VEGETATION INSTALLED AT VARIOUS ANGLE, BUT NOT PARALLEL TO THE FLOW. LAYER THE WOOD WITH LARGER MATERIAL ON THE BOTTOM AND A MAT OF BRANCHES AS THE TOP LAYER. ANGLE ROOT WADS SLIGHTLY UPSTREAM INTO THE FLOW. 3. THE TOP LAYER OF TOE WOOD SHALL BE AT THE ESTABLISHED NORMAL FLOW ELEVATION. 4. FILL BETWEEN ROOT WADS WITH A MIX OF WOODY DEBRIS PER NOTE 2. 5. LAYER REINFORCED EARTH AND CUTTINGS TO BANKFULL. 1 1 DETAIL NO. 7 TOE WOOD WITH GEOLIFT AND LIVE BRUSH LAYERING N.T.S. 5 MIX IN TOPSOIL AND TILL AT LEAST 4" DEEP 4:1 SLOPE EXISTING GROUND 5 FT. MIN COIR FIBER MATTING BANKFULL STAGE IMPERVIOUS L1 FT. MIN. DEPTH BELOW SELECT MATERIAL EXISTING CHANNEL GRADE 2' WIDER SOIL/ALLUVIAL FILL IN THAN EXISTING ABANDONED STREAM CHANNEL IMPERVIOUS CHANNEL SELECT MATERIAL TOP OF BANK i EXISTING STREAM / — CHANNEL 2WIDER THAN EXISTING WAW --W CHANNEL Fk-OW NOTES: PLAN 1. BEFORE WRAPPING PLUG WITH COIR FIBER MATTING, MIX IN TOPSOIL AND TILL INTO AT LEAST THE UPPER 4" TO HELP VEGETATION TO ESTABLISH. 2. RAKE SOIL LEVEL AND ADD TEMPORARY AND PERMANENT SEED AND MULCH BEFORE INSTALLING COIR FIBER MATTING. DETAIL NO. 6 IMPERVIOUS STREAM CHANNEL PLUG N.T.S. BANKF POINT BAR PLAN ROOT WAD A ROOT WAD N.T.S. Q z cr 0 O ~ U ir W cUn c w 0 Z O N W cc ■ BANKFULL Lo O COIR FIBER MATTING m 0 ROOT WAD TO BE �•1 H AT AOOT \ J SLIGHT DOWNWARD POINT BAR ANGLE INTO THE \ rjl STREAM BANK Z m0 TRENCH FO TER BOULDERS EXCAVATION ROOT WAD 8-10 FT. co LONG, > 10 -IN. DIA. NOTES: SECTION A -A 1. EXCAVATE A TRENCH FOR THE LOG PORTION OF THE ROOT WAD. THE ROOT WAD SHOULD BE INSTALLED IN A TRENCH EXCAVATED PERPENDICULAR TO THE BANK AND FAR ENOUGH BELOW THE STREAM BED TO ACCOMMODATE THE ROOT WAD LOG. � 2. THE TOP OF THE ROOT WAD SHOULD BE AT THE SAME ELEVATION AS THE HEAD OF THE DOWNSTREAM RIFFLE. 3. PLACE A BOULDER ON TOP OF THE LOG AND BACKFILL ON TOP OF THE ROOT WAD TO BANKFULL. cn DETAIL NO. 8 ROOT WAD N.T.S. Q z cr 0 O ~ U ir W cUn c w 0 Z O N W cc ■ ■ 0 Lo O m 0 c} �•1 H M � J 3 W rjl O Z m0 a � O 1 co F W cn N 0 1 � O 00 Z cn 0 a v Lo L o 11 N CON 00 U c 1 � co v 1 V) . O coM co CD 0 � RT L? 'P4 t i m E W o N � O cm N H U Wa � oz W J O aWza� a D Lu J a� O W C = O Z aZLu cn LuC r a Lu Lo LoT ■ 0 m 0 c} w J 3 W J Z m0 a � U co Z W cn N 0 0 W 2 w Z cn 0 a ■ 0 FOR PERMITTING PURPOSES DRAWING NO.A NOT FOR CONSTRUCTION EC401 SHEET 13 OF 17 4 3 2 1 m 0 J Z 0 ¢ w cn w 0 0 0 rr 0 Q FOR PERMITTING PURPOSES DRAWING NO.A NOT FOR CONSTRUCTION EC401 SHEET 13 OF 17 4 3 2 1 I: G F E D Q 0 a a A h 1 7 1 6 1 5 1 4 1 3 1 2 1 1 7 16 1 5 1 4 1 3 12 11 Imw If F C C 11 L DETAIL NO. 9 DETAIL NO. 10 TEMPORARY GRAVEL TEMPORARY STREAM CONSTRUCTION ENTRANCE CROSSING - WOOD MAT N.T.S. N.T.S. � z o PUBLIC ROAD 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW. 0 U 2. HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS. c o 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. Z 4. LINE STREAMBANK AND ACCESS RAMP AREA WITH NON -WOVEN FILTER FABRIC. 0 5. INSTALL STREAM CROSSING AT RIGHT ANGLE TO THE FLOW. cn O �'O o 6. TRANSPLANT SOD FROM ORIGINAL STREAM BANK ONTO SIDE SLOPES FOR LATER USE. W r00 0 R=40'� 7. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL oC �00 R=40' BY INSTALLING SILT FENCE ON ALL FOUR CORNERS ADJACENT TO THE STREAM. SEE SILT FENCE DETAIL. 00 0 8. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE WOOD MAT. 0 9. THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND WIDTH TO SUPPORT THE LARGEST VEHICLE CROSSING THE CHANNEL. 0000°0 10. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED, RECOMMENDED AT A 5:1 SLOPE. o z 00 00 � o 0 LLJ° Q 0 �000 �000�00 0 z 12' MIN low Lo 00o SILT FENCE NO GAPS ARE ALLOWABLE H � BETWEEN LOGS INSTALL SIDE WOODEN KICK PLATE CLASS B STONE RAMP 91 0 ON SIDE OF WOOD MAT WOOD MAT c CLASS B STONE o°o°g� ° 00 00 O° J Lo 0 0 --i ° O o =--- 0 ° °00 O°o° = O O°° 00 b no o 'pa 0 O °O °O - _ --- oo o° 0 000 O 0 00� 00 PUBLIC ROAD f'.5'�-1 00°�0� 000°°0� o°00000 _ �0°0 to 1 \ O o 00 E 6" MINIMUM THICKNESS OF WASHED CLASS A STONE /. 00Oo o ° 0 0� 0— - e - ��_- _ 000 ° W = 1.5 °00 00 0000 111 �--c N c� m co o o ° 0 E :.: :.: :.: :.: :.: :.: e 0,300 0 000 e _ ° 0000 OOOOo \ � �" cn co co 0 o0�ga'� 000 ncps_ 0 00� 0�°0 : ;.: ;.: ;.: ;.:•:FILTER;FA�f21C, ;,;• ;,;•; ; 00O °°�00 W o 1 1 0 0 Lo FILTER FABRIC -W V N CROSS SECTION WOOD MAT—/•S� PLAN VIEW tm r m GOEOTEXTOILE FABRIC (TYPE II) STREAM CHANNEL �y W y NOTES: "N.C. SPECIFICATION NO. 6.06 - CONSTRUCTION ACCESS EROSION AND SEDIMENT ^, CONTROL PLANNING AND DESIGN MANUAL MAY 2013" Lo N DETAIL NO. 11 DETAIL NO. 12 Cj ROCK DAM TEMPORARY STREAM CROSSING - WOOD Lu Z MAT WITH CULVERT (IF NEEDED) CULVERTS W N.T.s. 0 J N.T.S. FLOW a�a� Y m Y m FENCE NO GAPS ARE ALLOWABLE LLQ Z Q SILT IL BETWEEN LOGS ca 1= 0 U w w o CLASS B STONE RAMP U = INSTALL SIDE WOODEN KICK PLATE Q U) CONSTRUCTION AREA UPSTREAM N ON SIDE OF WOOD MAT WOOD MAT 0 CLASS B STONE °o Lu cn 0 008 0 00 00 0F o002 0 �° ° 3: �_m z #57 STONE STILLING BASIN 0 00000 --- ° o °O�gooO Ogo ° °OoOo —_ --_- --. -1 O° °O 00000 ° o O o o OOO° _ e 00° °O° 00 ° 00° Q • Z Lu (2 FT. MAX DEPTH) 0�� ° oo O o 0 �O0 O 0 , ' 00�— v _ e o X000000 - 00. - W 1.5 _ Q O 0 F . 5'�-�►1 OOo 00 _ o0oo( e - O'-0 00 - FILTER FABRIC 0 000 Oo0000 e �---_ 000 Oo0000 JD —� o — — OO LL 0°00 00000 °O W O ooO O Q O ir CDC=) ... .. .. .. .. .. .. .. . • .. .. . • WOOD MAT � CLASS 2 STONE CLASS A AND CLASS B STONE CROSS SECTION PLAN VIEW � o NON -WOVEN STREAM CHANNEL o v EXISTING CHANNEL CULVERTS GEOTEXTILE FABRIC m (MIN. 48") (TYPE II) � Lo T PLAN VIEW 2' NOTES: 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW. 2. HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS. J m Q Luo 0 1 Q o 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. Z FLOW T 2 2 T 4. LINE STREAMBANK AND ACCESS RAMP AREA WITH NON -WOVEN FILTER FABRIC. 5. INSTALL STREAM CROSSING AT RIGHT ANGLE TO THE FLOW. W o "' O 1 1/2 BANKFULL 6. TRANSPLANT SOD FROM ORIGINAL STREAMBANK ONTO SIDE SLOPES FOR LATER USE. ? = cn MAXIMUM DEPTH 7. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL a BY INSTALLING SILT FENCE ON ALL FOUR CORNERS ADJACENT TO THE STREAM. SEE SILT FENCE DETAIL. 8. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 9. THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND WIDTH TO SUPPORT THE LARGEST VEHICLE CROSSING THE CHANNEL. 10. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED, w o m #57 STONE FILTER FABRIC CLASS 2 STONE RECOMMENDED AT A 5:1 SLOPE. cn w O CROSS SECTION o o Q DRAWING NO.: FOR PERMITTING PURPOSES NOTES: NOT FOR CONSTRUCTION EC402 CLEAN OUT STILLING BASIN OF TRAPPED SEDIMENT PRIOR TO REMOVAL. SHEET 14 OF 17 7 16 1 5 1 4 1 3 12 11 Imw If F C C 11 L 1:11 l;lf 1 ©1 too 0 1 DI VAN 7 TEMPORAR IMPERVIOI (SEE PROJECT SPECIAL PROS STABILIZED OUTLET CONSTRUCT WITH A MIX OF BOULDERS AND CLASS B STONE TO STABILIZE STREAM AT PUMP -AROUND OUTLET 0 DETAIL NO. 13 TYPICAL PUMP -AROUND OPERATION N.T.S. EXISTING GROUND SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP -AROUND 1. INSTALL STABILIZED OUTLET AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP -AROUND PUMP AND THE TEMPORARY FLEXIBLE HOSE THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLING BASIN OR STABILIZED OUTLET 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. THE CONTRACTOR WILL COMPLETE ALL GRADING AND STABILIZATION IN ONE DAY WITHIN THE PUMP -AROUND AREA BETWEEN THE IMPERVIOUS DIKES. 8. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE SPECIAL STILLING BASIN AND STABILIZED OUTLET AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 7 6 5 PERVIOUS DIKE =E PROJECT SPECIAL PROVISIONS) INSTALL 2 INCH PAD OF #57 STONE BETWEEN SPECIAL STILLING BASIN AND FILTER FABRIC NOTES: 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. THE PUMP -AROUND PUMP SHOULD ADEQUATELY CONVEY BASE FLOW CONDITIONS OF THE STREAM. 5 LARGE STAK TRENCH--,, TOP OF STREAMBANK LARGE STAKES 4 PLACE COIR FIBER MATTING IN 6 INCH DEEP TRENCH, STAKE, BACKFILL, AND COMPACT /--TOP OF STREAMBANK 3 DETAIL NO. 14 EROSION CONTROL MATTING TOE OF SLOPE - PLACE COIR FIBER MATTING AT TOE OF SLOPE. SECURE MATTING WITH LARGE MATTING STAKE BOTTOM OF CHANNEL CROSS SECTION VIEW NOTES: 1. BANKS SHOULD BE SEEDED AND STRAWED PRIOR TO PLACEMENT OF MATTING. 2. USE COIR FIBER MATTING. 3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 18" APART. 4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE. N.T.S. 2 2.5 INCH ROOFING NAIL TYPICAL LARGE MATTING STAKE THE WOOD STAKE SHALL HAVE THE FOLLOWING DIMENSIONS: LEG LENGTH 17.00IN 43.18CM TAPERED TO POINT WIDTH 1.51N 3.81 CM THICKNESS 1.51N 3.81 CM //-TRENCH TOP OF STREAMBANK • 11.00IN • HEAD WIDTH • 3.18CM • 0.40IN • • 0.601N 1.52CM TAPERED TO POINT • 0.401N • TOTAL LENGTH • 30.48CM • a� • 0 • �=OZ • c • N • o • • • cn • • • • • • • • O �' • • O • • • 0 • • To • • N • IP-4 � c Lo T %4q V) coM v . M 1 1 �O • • • Lo • • • k • , T • . • m • � � • W • • • • • • • • • • � • • • Lo • • • • • PLAN VIEW WIRE OR PLASTIC ZIP TIES WITH A MINIMUM TENSILE STRENGTH OF 50 LB SHALL BE USED TO CONSTRUCT THE FENCE. MESH CONSISTING OF 14 GAGE WIRE AT MAX SPACING OF 6"x6" WIRE MESH FILTER FABRIC MECHANICALLY COMPACTED FILL 2 PASSES OF A COMPACTION DEVICE_ EXERTING AT LEAST 60 LB/IN2 ON BOTH SIDES OF FENCE 4 RUNOFF DIRECTION I I 18, FILTER FABRIC 4"_ LARGE STAKES STAKES COIR FIBER MATTING TO BE EXTENDED TO TOE OF SLOPE DETAIL NO. 15 TEMPORARY SILT FENCE N.T.S. 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE, REQUIRES USE OF EXTRA STRENGTH FILTER FABRIC) (4' MAX. WITHOUT WIRE, NORMAL STRENGTH FILTER FABRIC) FENCE HEIGHT MAX 24" ABOVE GROUND III I POST DEPTH 24" MINIMUM 3 TYPICAL SMALL MATTING STAKE THE WOOD STAKE SHALL HAVE THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00IN 27.94CM HEAD WIDTH 1.251N 3.18CM HEAD THICKNESS 0.40IN 1.02CM LEG WIDTH 0.601N 1.52CM TAPERED TO POINT LEG THICKNESS 0.401N 1.02CM TOTAL LENGTH 12.00IN 30.48CM T -POSTS SHALL BE 1.33 LB/LF STEEL WITH A MINIMUM LENGTH OF 5 FEET AND SHALL BE CONSTRUCTED SO AS TO ALLOW FOR FASTENING OF THE FABRIC FILTER FABRIC SHALL BE STANDARD OR EXTRA STRENGTH SYNTHETIC FIBER CERTIFIED BY THE MANUFACTURER TO COMPLY WITH MATERIAL REQUIREMENTS IN ASTM STANDARDS D 6461, 4632, 4491, 4751, AND 4355. NOTES: 1. AVOID JOINTS, UNAVOIDABLE JOINTS MUST HAVE 4' OF CLOTH OVERLAP AND SHOULD TIE INTO THE NEXT ADJACENT POST. 2. PLACE ON CONTOUR EXCEPT ENDS WHICH SHOULD BE 1' ABOVE GRADE TO PREVENT CUT AROUND. 3. WRAP APPROX. 6" OF FABRIC AROUND END POSTS AND SECURE WITH TIES. REMOVE ONCE AREA IS STABLE. 0 � z CC o_ O In ~ U � Lu m w p z O cn w m w Q p 0 Z �1 G lm E C 0 m 0 J Z p Q W Q W o' 0 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC403 2 SHEET 15 OF 17 1 V Ln °0 � O Z o M J H I:T W �W06 Lu OC.) � O a� U 0 W �=OZ c aZcn N 0 o Lu x rn cn a co /Lu O �' �%noo O a o0 o 0 Lo To N c U IP-4 � c Lo T %4q V) coM v . M 1 1 �O Oo� Lo O k v' , T . � m � � i m W O � O Lo N �1 G lm E C 0 m 0 J Z p Q W Q W o' 0 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC403 2 SHEET 15 OF 17 1 W Q � O Z W H�aO J a � W �W06 Lu OC.) _ J a� U 0 W �=OZ aZcn N 0 Q Lu x z cn a /Lu a w 0) Lo Lo T �1 G lm E C 0 m 0 J Z p Q W Q W o' 0 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC403 2 SHEET 15 OF 17 1 m p c} W J � W 0 _ Q p U Z W N 0 Q w x z cn a �1 G lm E C 0 m 0 J Z p Q W Q W o' 0 0 m Q FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC403 2 SHEET 15 OF 17 1 II I G W1 I©1 0 C LAS OQUINN WILLIAM V OQUINN CAROLYN A 0853-04-63-9646 BARE ROOT 7 1 6 — �xoo/16 i 50--�/ /go, 0/12+50---'7 3X `>> o/ . �xs� 0� O �k00` / 00 14+50 L1OO7 10+50ili ` 5 1 4 1 3 1 2 EQUITY TRUST COMPANY JAMES E STOVALL IRA 0853-04-71-5646 MARBREY JASON K 0853-03-92-5108 The following table lists bare -root vegetation selection for the project site. Species shall be planted at a density of 694 stems per acre. Total planting area is approximately 13.16 acres. Exact placement of species will be determined prior to site planting. _ _ _ SEABOARD AIRLINE RAILWAY - —21 0021 5022+pp kOoi26 50— 27t9p-27+ 50,28xp _ _ NORTH so �,. / ,off - x x\ , r'dx /32 \0, I I Spm o �s ,� Xn ftwft I�Xixp 24+00`�� 0�9 ��Nx�` xsO` / �XS� 30+00 I x.03 4�50 A-50 1aoi00 1 10 PROPOSED PLANTING PLAN SCALE IN FEET 0 100 200 Streambanks (Live Stakes) Tree total PERCENT PLANTED BY 436 stems per acre COMMON NAME SCIENTIFIC NAME SPECIES Coralberry Stream Restoration Buffer-60%of the planting (10' X 10' Spacing -436 trees/acre) Southern Arrowwood River Birch Betula nigra 13% 57 stems per acre Sugarberry Celtis laevigata 5% 22 stems per acre Green Ash Fraxinus pennsylvanica 10% 44 stems per acre Black Walnut Juglans nigra 5% 22 stems per acre Sycamore Platanus occidentalis 12% 52 stems per acre Swamp Chestnut Oak Quercus michauxii 10% 44 stems per acre Willow Oak Quercus phellos 8% 35 stems per acre Northern Red Oak Quercus rubra 7% 31 stems per acre Persimmon Diospyros virginiana 7% 31 stems per acre Black Gum Nyssa sylvatica 8% 35 stems per acre Box Elder Acernegundo 7% 31 stems per acre Chenybark Oak Quercus pagoda 8% 35 stems per acre _ _ _ SEABOARD AIRLINE RAILWAY - —21 0021 5022+pp kOoi26 50— 27t9p-27+ 50,28xp _ _ NORTH so �,. / ,off - x x\ , r'dx /32 \0, I I Spm o �s ,� Xn ftwft I�Xixp 24+00`�� 0�9 ��Nx�` xsO` / �XS� 30+00 I x.03 4�50 A-50 1aoi00 1 10 PROPOSED PLANTING PLAN SCALE IN FEET 0 100 200 Streambanks (Live Stakes) Tree total 100% 436 stems per acre Early Successional Shrubs and Trees — 40% of the planting (13' X 13' Spacing - 258 treeslacre) plan set and according to the Coralberry Symphoricarpos orbiculatus 5% 13 stems per acre Southern Arrowwood Vibumum dentatum 10% 26 stems per acre Virginia Sweetspire Itea virginica 5% 13 stems per acre Elderberry Sambucus canadensis 8% 21 stems per acre Chicksaw Plum Prunus augustifolia 5% 13 stems per acre Common Winterbeny Ilex verticillata 7% 18 stems per acre Silky Dogwood Comus amomum 10% 26 stems per acre Flowering Dogwood Comus florida 10% 26 stems per acre Eastern Redbud Cercis canadensis 8% 21 stems per acre Swamp Rose Rosa palustris 7% 18 stems per acre Parsely-leaf Hawthorn Crataegus marshallii 5% 13 stems per acre Tag Alder Alnus serrulata 5% 13 stems per acre Spicebush Lindera benzoin 5% 13 stems per acre Possumhaw Viburnum Vibumum nudum 5% 13 stems per acre Possumhaw Ilex decidua 5% 13 stems per acre 0.45 Shrub total 100% 258 stems per acre _ _ _ SEABOARD AIRLINE RAILWAY - —21 0021 5022+pp kOoi26 50— 27t9p-27+ 50,28xp _ _ NORTH so �,. / ,off - x x\ , r'dx /32 \0, I I Spm o �s ,� Xn ftwft I�Xixp 24+00`�� 0�9 ��Nx�` xsO` / �XS� 30+00 I x.03 4�50 A-50 1aoi00 1 10 PROPOSED PLANTING PLAN SCALE IN FEET 0 100 200 Streambanks (Live Stakes) a Live stakes were applied to all restored streambanks following the details in this plan set and according to the construction Streambank and Floodplain Areas - 15 lbs/ac PERCENT PLANTED BY w COMMON NAME SCIENTIFIC NAME SPECIES 0.75 Silky Willow Salix sericea 30% 944 stems Black Willow Salix nigra 10% 315 stems Silky Dogwood Cornus amomum 40% 1258 stems Elderberry Sambucus canadensis 20% 629 stems Fox Sedge Live stake total 100% 3145 stems PERMANENT SEED MIXTURE a COMMON NAME SCIENTIFIC NAME PERCENTAGE Density (lbs/ac) Streambank and Floodplain Areas - 15 lbs/ac < w Big Bluestem Andropogon gerardii 5% 0.75 Tick Seed Bidens frondosa 8% 1.2 Hop Sedge Carex lupulina 4% 0.6 Shallow Sedge Carex lurida 4% 0.6 Tussock Sedge Carex stricta 4% 0.6 Fox Sedge Carex vulpinoidea 4% 0.6 River Oats Chasmanthium latifolium 5% 0.75 Lance Leaf Coreopsis Coreopsis lanceolata 5% 0.75 Virginia Wildrye Elymus virginicus 8% 1.2 Purple Lovegrass Eragrostis spectabilis 2% 0.3 Soft Rush Juncus effusus 5% 0.75 Pink Muhly Grass Muhlenbergia capillaris 2% 0.3 Switchgrass Panicum virgatum 5% 0.75 Pennsylvania Smartweed Polygonum pennsylvanicum 3% 0.45 Little Bluestem Schizachyrium scoparium 4% 0.6 Indian Grass Sorgastrum nutans 5% 0.75 Gamma Grass Tripsicum dactyloides 5% 0.75 Patridge Pea Chamaecrista fasciculate 5% 0.75 Indian Woodoats Chasmanthium latifolium 5% 0.75 Showy Tick Trefoil Desmodium canadense 3% 0.45 Joe Pye Weed Eupatorium fistulosum 4% 0.6 Greater Bladder Sedge Carex intumescens 5% 0.75 U .� Total 100% 15 Fescue Planting Area = 5.19 Acres *CONTRACTOR WILL CONTROL INVASIVE SPECIES WITHIN THE EASEMENT (WITHIN 50' OF TOP OF BANK ON BOTH SIDES)* 7 U 5 4 I, 1 JACKSON BETTY JAMES 0863-03-03-1220 PLANTING LEGEND PROPOSED FESCUE PLANTING ZONE (5.19 ACRES) PROPOSED RIPARIAN REVEGETATION ZONE (13.16 ACRES) �III�I►d1�7:7_1:�'�����71►Cr The following table lists the temporary seed mix for the project site. All disturbed areas were stabilized using mulch and temporary seed. COMMON NAME RATE DATES ANNUAL RYE (COOL SEASON) 130 LBS/ACRE SEPTEMBER TO MARCH MILLET (WARM SEASON) 40 LBS/ACRE APRIL TO AUGUST 3 ' 36+0~36-I I i i i i I 78 0 o CE 0 O U � W cUn cr w 0 Z N W Ir 1 n1 G / a } J a } m ZY m o < w w Q 0 = Z � U Z _ F 0 0 z Z w x a J Z M cn a IL / / 000 O H Cl) � RAMIREZ MARTIN O RAMIREZ CLAUDIA c 0863-03-03-9368 - F c co 1 � o CO O o 1 1 ~ NO � � U .� 1 1 � Nco M m 0 3 O 0 `O / 'P.1 , m i E W O N I U Wa � oz W a J O aWZa� D Lu V J a� 0 W cn=O0 aZW LU W = C C/) a �: o � w 0) LO LO T Z a } J a } m ZY m o < w CE = Z � U Z _ F 0 N Z w x a J Z M cn a IL 0 w o m JZ p Q w Cn W 00 0 0 0 rr 0 - FOR FOR PERMITTING PURPOSES DRAWING NO.: A NOT FOR CONSTRUCTION EC500 SHEET 16 OF 17 2 1