HomeMy WebLinkAbout20180981 Ver 1_CAMA Application_20180713Coastal Management
ENVIRONMENTAL QUALITY
July 9, 2018
MEMORANDUM
TO:
20180981
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
✓
Karen Higgins, Compliance and Permitting Unit Supervisor
DWR - Water Quality Program
FROM: Doug Huggett, Major Permits Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator
Division of Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant: Neeld J. Messler
Project Location: Pamlico Sound 3/4 of a mile offshore the Haulover area, north of Buxton,
Dare County.
Proposed Project: Install a 25 -foot -long, Class B pylon, 1 foot in diameter with a weather
station mounted to the side
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 07/30/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Cynthia Rountree
at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE
�'-"Nothing Compares
State of North Carolina I Environmental Quality I Coastal Management
401 S. Griffin St., Ste 300 1 Elizabeth City, NC 27909
252-264-39011252-331-2951[fax]
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Neeld J. Messler
2. LOCATION OF PROJECT SITE: 0 NC Hwy 12; Pamlico Sound 3/4 of a mile off shore;
Dare County
Photo Index — 2006: 174-7864 (X-4)
Latitude: 35017'30.96"N Longitude: 75031'46.08"W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — N/A
Was Applicant Present — N/A
5. PROCESSING PROCEDURE: Application Received Complete — July 3, 2018
Office — Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — none
Land Classification From LUP - none
(B) AEC(s) Involved: Estuarine Waters; Public Trust Area
(C) Water Dependent: no
(D) Intended Use: Commercial/ Community
(E) Wastewater Treatment: Existing - none
Planned -none
(F) Type of Structures: Existing — Duck Blind and Pound Net
Planned - Pylon with mounted weather station
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION: [AREA]
nRFnC,Fn FII I FD SHADE
(A) Open Water
9 sqft
(B) Shallow Bottom
(C) Other
(D) Total Area Disturbed: 9 square Feet
(E) Primary Nursery Area: no
(F) Water Classification: SC/HQW Open: Yes
Field Investigation Report
Page 2
PROJECT SUMMARY:
The applicant proposed to Install a 25 -foot -long, Class B pylon, 1 foot in diameter with a
weather station mounted to the side of it approximately 4,198 feet off shore of the Haulover just
North of Buxton, Dare County.
Proiect Setting
The area proposed for development is located 4,198 feet off shore of the National Park
Service land just north of Buxton. The property located to the east of this location is owned by
the National Park Service and Dare County, with a small Island in the vicinity that is owned by a
private individual. All the properties located to the south are residential lots in Buxton.
Soil types near this site include, but are not limited to, Corolla fins Sand (CoB) and Carteret
Sand (CeA). Also, the water Classification for this site is Tidal Salt Water (SC) and High
Quality Water (HOW). The water depth at this location is approximately 3 feet below Normal
Water Level.
Development Proposal
The applicant proposes to Install a 25 -foot -long, class B pylon, 1 foot in diameter with an 8 inch
tip approximately 4,198 feet off shore just west of Highway 12 in an area known as the
Haulover. The pole will be placed 10 feet into the ground in 3 feet of water, leaving
approximately 12 feet of the pole above the normal water level. On the portion that is above
NWL a wind station is to be installed that will consist of a small 3 foot by 3 -foot platform to
place the electronics and a 10 -foot galvanized rod that will place an anemometer
approximately 22 feet into the air.
Anticipated Impacts
The proposed development of a 25 -foot -long pylon that is 1 foot with a 3 foot by 3 -foot platform
will result in the shading of 9 square feet of open water.
Submitted by: Cynthia Rountree
Date: July 6, 2018
Received
From:
Neeld J. Messler DCM-EC
711 Signal Mountain Road, Suite 137
Chattanooga, TN 37405
To:
North Carolina Coastal Management
401 S. Griffin Street, Ste 300
Elizabeth City, NC 27909
June 27, 2018
North Carolina Coastal Management,
Thank you in advance for your consideration of our permit request.
What you will discover as you review the application is that we are seeking a permit to install a single
pylon approximately % of a mile offshore from the location designated by the National Park Service as
"Haulover." It is also commonly known as "Canadian Hole."
Up and down the coast from Nags Head to Ocracoke — Sound side as well as Oceanside — there are
various wind stations that have been erected to measure wind speeds, temperature, and barometric
pressure throughout the day. Examples of wind stations located on the Sound are: off shore of Frisco
Woods Campground in Frisco, off shore of Ocean Air Sports in Avon, off shore of Real Watersports in
Waves - just to name a few.
These sites have measuring equipment installed by a company called WeatherFlow that installs and
maintains the equipment and then provides the availability of this data via subscription.
Many use this data extensively as to predict, monitor, and ascertain past, current and future weather
conditions for sports such as kiteboarding and windsurfing. I am guessing this data is also used by
boaters as well as other interested parties in need of wind data.
What I have found is there is a "hole" in the data collection between Frisco Woods Campground and
Avon Sound wind stations.
Canadian Hole is a popular location for kite boarders and windsurfers alike. Users of this location refer
to data that is being collected either miles to the east at Frisco Woods or miles to the north on the north
end of Avon. With this said, the goal with this permit is to be able to fill in this "hole" of missing wind
data with the installation of a new wind station offshore from Canadian Hole. This data would be
extremely useful to sport enthusiasts in this area.
.wrti, Received
APPLICATION for
Major Development Pomft Dcrn-Ec
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant! Landowner Information
Business Name
Project Name (if applicable)
Buxtoncottage.Net
Canadian Hole (Haulover) Sound side Pylon Wind Station
Applicant 1: First Name
MI
Last Name
Neeld
J.
Messier
Last Name
Applicant 2: First Name
MI
Last Name
n/a
n/a
n/a
MI
If additional applicants, please attach an additional page(s) with names listed.
Last Name
Mailing Address
PO Box
City
State
n/a
P.O. Box 1644
Buxton
NC
ZIP
Country
Phone No.
FAX No.
27920
U.S.A.
423 - 322 -
8895 ext.
423 - 265 - 8875
Street Address (if different from above)
City
State
Phone No. 2
ZIP
711 Signal Mountain Road, Suite 137
Chattanooga
TN
37405-
Email
Contractor #
neeld2@gmail.com
n/a
34220
2. Agent/Contractor Information
Business Name
Cape Dredging Inc.
Agent/ Contractor 1: First Name
MI
Last Name
Darren
T.
Burrus
Agent/ Contractor 2: First Name
MI
Last Name
n/a
n/a
n/a
Mailing Address
PO Box
City
State
n/a
446
Buxton
NC
ZIP
Phone No. 1
Phone No. 2
27920
252 - 475 -
0663 ext.
n/a - - ext.
FAX No.
Contractor #
n/a
34220
Street Address (if different from above)
City
State
ZIP
n/a
N/A
n/a
n/a -
Email
Darren@CapeDredging.com
<Form continues on back>
252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Received Major Development Permit
3. Project Location
County (can be multiple)
Street Address®� p g
State Rd. #
Dare
-C
n/a 'Y1 G
n/s
Subdivision Name
City
State
Zip
n/a
n/a
NC
n/a -
Phone No.
Lot No.(s) (if many, attach additional page with list)
n/a - - ext.
n/a, I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Pasquotank
Pamlico Sound
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Pamlico Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
❑Yes ®No
work falls within.
i. Is the proposed project consistent with the applicable zoning?
n/a
4.
Site Description
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
pylon in Pamlico Sound near Canadian Hole (Haulover)
n/a
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
n/a, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
n/a ❑NHW or ❑NWL
e.
Vegetation on tract
n/a
f.
Man-made features and uses now on tract
duck blind / pound net
g.
Identify and describe the existing land uses adiacent to the proposed project site.
used recreationally by visitors to the Cape Hatteras National Seashore
h.
How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
n/a
(Attach zoning compliance certificate, if applicable)
❑Yes ❑No ®NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k.
Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No ®NA
National Register listed or eligible property?
<Form continues on next page>
252-808-2808 . 1-888-4RCOAST .. www.nccoastalmanagernent.net
Form DCM MP -1 (Page 3 of 4) Received APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? DCN -EC ❑Yes NNo
(ii) Are there coastal wetlands on the site? ❑Yes NNo
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes NNo
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
n/a
o. Describe existing drinking water supply source.
n/a
p. Describe existing storm water management or treatment systems.
n/a
5. Activities and Impacts
a.
Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government
®Private/Community
b.
Give a brief description of purpose, use, and daily operations of the project when complete.
This permit is for installation of a single pylon in the Pamlico Sound as to be storm resistant that will serve as a mounting
pole for a weather / wind station. Location is in out in the body of water, approximately 3/4 mile off shore, with the closest
recongnizable named land location being that of the Cape Hatteras National Seashore pullout called "Haulover" or as
referred to locally as Canadian Hole. The purpose and use of this pylon would be to install weather / wind station that would
track wind speed, wind direction, wind gusts, wind lulls, average wind speed, temperature, and pressure during multiple auto
data recording times throughout each and every hour, 24 hours per day, 365 days per year, year after year.
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Pylon installed by boat / dredge type of equiptment by Cape Dredging.
d.
List all development activities you propose.
This permit is for installation of a single pylon in the Pamlico Sound as to be storm resistant that will serve as a mounting
pole for a weather / wind station. Location is out in the body of water, approximately 3/4 mile off shore, with the closest
recongnizable named land location being that of the Cape Hatteras National Seashore pullout called "Haulover" or as
referred to locally as Canadian Hole.
e.
Are the proposed activities maintenance of an existing project, new work, or both? new work
f.
What is the approximate total disturbed land area resulting from the proposed project? 4 NSq.Ft or ❑Acres
g.
Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No NNA
that the public has established use of?
h.
Describe location and type of existing and proposed discharges to waters of the state.
There are no existing discharges currently and there will not be any future discharges to waters of the state.
i.
Will wastewater or stormwater be discharged into a wetland? ❑Yes ❑No NNA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No SNA
j.
Is there any mitigation proposed? ❑Yes ❑No [DNA
If yes, attach a mitigation proposal.
252-808-2808 .. 1-888-4RCOAST .. www. nccoastallmanagement. net
Form DCM MP -1 (Page 4 of 4) Received APPLICATION for
Major Development Permit
<Form continues on OMEC
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative. _ ee SheF �ul V,^�;�- 1S J 11��.
b. An accurate, dated work plat (including plan view and cross -sec ional drawingsl drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Cape Hatteral National Seashore, c/o Sabrina Henry Phone No. 252-473-2111
Address 1401 National Park Drive, Manteo, NC 27954
Name Bernice J. Ballance, c/o Kala Ballance Phone No. 252-216-6020
Address P.O. Box 69, Buxton, NC 27920
Name Dare County Phone No. 252-475-5000
Address P.O. Box 1000, Manteo, NC 27954
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
nia
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date June 27, 2018 Print Name Neeld J. Messler
Signature
Please indicate application attachments pertaining to your proposed proje#/
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
®DCM MP -4 Structures Information
252-808-2808 .. 1-888-4RCOAST .. www.nccoastalmanagement.net
f
DCM MP -1
Question #6a
Received
DCN! -EC
The area north of Buxton, south of Avon, is used extensively by outdoor sport enthusiasts for wind
surfing and kite boarding. The Pamlico Sound has other locations used for this as well as mounted
weather stations ranging from Frisco, Avon, Waves, and others. The area near Buxton is just as popular
for these sport enthusiasts as the other locations and lacks having a weather station that offers current
data collection of wind speed, direction, temperature, pressure etc. This data could benefit area users
as well as be a collective of weather cycles and patterns.
The proposed sight location is just west of Highway 12 of the pull out area called "Haulover." The
location would be in the Pamlico Sound approximately 4,198 off shore. Construction would consist of a
25' long, Class B pylon, 1' round with an 8" tip. The pole would be placed 10' into ground in 3' of water,
leaving approximately 12' of pole exposed out of water. Once installed, a wind station would be
installed. This would consist of brackets holding the weather system and a 10', 1" schedule 40
galvanized rod that places the wind anemometer approximately 22' high.
Having this structure installed could help users of this area to have a better understanding of current
weather conditions for increased pleasure and safety, being able to understand specifically what the
current weather conditions are through the use of factual data rather than mental guesses. This
information would be available through potential websites such as IKiteSurf.com and/or similar sites.
I
Received
Form DCM MP -4
STRUCTURES DMEC
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCK/NG'FACIUMMAR/NA CHARACTERISTICS ®This section not applicable
a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
❑Commercial ❑Public/Government ❑Private/Community ❑Yes ❑No
c. (i) Dock(s) and/or pier(s)
d. (i) Are Finger Piers included? ❑Yes ❑No
(ii) Number
If yes:
(iii) Length
(ii) Number
(iv) Width
(iii) Length
(v) Floating ❑Yes [--]No
(iv) Width
(v) Floating ❑Yes []No
e. (i) Are Platforms included? ❑Yes ❑No
f. (i) Are Boatlifts included? ❑Yes ❑No
If yes:
If yes:
(ii) Number
(ii) Number
(iii) Length
(iii) Length
(iv) Width
(iv) Width
(v) Floating ❑Yes ❑No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
(ii) Number of slips existing
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ("wet slips") only, number of slips:
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
i. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water; dredging for basin and/or channel
❑Open water; no dredging required
❑Other; please describe:
k. Typical boat length:
m. (i) Will the facility have tie pilings?
❑Yes ❑No
(ii) If yes number of tie pilings?
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
I. (i) Will the facility be open to the general public?
❑Yes ❑No
252-808-2808:: 1-888-4RCOAST :: www.nccoastaimanagement.net
revised: 12/27/06
Form DCM MP -4 (Structures, Page 2 of 4)
f 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers Receivea
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
DCM-EC
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanageement.net revised: 12/27/06
I
of
FReceived
Form DCM MP-4 (Structures, Page 3 of 4)
t
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
[-]Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation ("101VISAan
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Government ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a ruck groin, use MP -2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS [:1 This section not applicable
a. Is the structure(sy.
®Commercial ❑PubliGGovernment ®Private/Community
c. Distance to be placed beyond shoreline approximately 4,198'
Note: This should be measured from marsh edge, if present.
e. Arc of the swing n/a
7. GENERAL
b. Number 1
d. Description of buoy (color, inscription, size, anchor, etc.)
A 25' long, Class B pylon, V round with an 8" tip would be
installed approximately 10' into ground with bottom
down in approximatley 3' of water, leaving
approximately 12' of pylon out of water.
252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmanagement.net revised: 12127106
Form DCM MP -4 (Structures, Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines
approximately 4,198 mile off shore, or more acurately
describe through GPS location N 35 degrees 17.516', W
075 degrees 31.768'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
approximately 16,228 feet to Shoal Island and 160,000
across Pamlico Sound.
e. (i) Will navigational aids be required as a result of the project?
❑Yes ❑No ®NA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
approximately 7,049 feet from the one to the south and
12,156 feet from the one to the north.
d. Water depth at waterward end of structure at NLW or NWL
approximately 3' deep
8. OTHER E] This section not applicable
a. Give complete description:
The proposed sight location is just west of Highway 12 of the pull out area called "Haulover." The location would be in the
Pamlico Sound approximately 4,198 off shore, or more acurately describe through GPS location N 35 degrees 17.516', W 075
degrees 31.768'. Construction would consist of a 25' long, Class B pylon, 1' round with an 8" tip. The pole would be placed
10' into ground in 3' of water, leaving approximately 12' of pole exposed out of water. Once installed, a wind station would be
installed. This would consist of brackets holding the weather system and a 10', 1" schedule 40 galvanized rod that places the
wind anemometer approximately 22' high.
June 27, 2018
Date
Canadian Hole (Haulover) Sound side Pylon Wind Station
Project Name
Neeld J. Messler
Applican a
Appliodnt Signature '(/
Received
DMEC
252-808-2808 :: 1-88"RCOAST :: www.nccoastalmanagement.net revised: 12/27/06
r,
MAJOR PERMIT FEE MATRIX
Applicant: 6x+anc4+ojNp .. Kier / Wte(d -3 . d�le5ste�
Cawe, Jin_n Norio I/4 u1^ue_A s�r�d 5fr�o
1p,itCh W"
Selection
Development Type
Fee
DCM %
DWO %
(143001601435100093 1625 6253)
(24300 1602 435100095 2341)
I. Private, non-commercial
E]
development that does not
$250
100%($250)
0%($0)
involve the filling or
excavation of any wetlands
oro en water areas:
II. Public or commercial
development that does not
$400
100%($400)
0%($0)
involve the filling or
excavation of any wetlands
oro en water areas:
Major Modification to a
$250
100%($250)
0%($0)
CAMA Major permit
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B, C, or D below applies:
III(A). Private, non -
E]
commercial development, if
$250
100%($250)
0%($0)
General Water Quality
Certification No. 4097 (See
attached) can be applied:
III(B). Public or commercial
®
development, if General
$400
100%($400)
0%($0)
Water Quality Certification
No. 4097 (See attached)
can be applied:
III(C). If General Water
❑
Quality Certification No.
$400
60%($240)
40%($160)
4097 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life:
III(D). If General Water
Quality Certification No.
$400
60%($240)
40%($160)
4097 (see attached) cannot
be applied:
IV. For development that
involves the filling and/or
$475
60%($285)
40%($190)
excavation of more than
one acre of wetlands and/or
o en water areas:
tf�
uoilelS puiM pasodoad / /V1 .89L l£ 5L
(910H ueipueZ)) JanoI
I .M L l .S£t
uolxng) uolxng
:-Q
am
5S N
un
0-7 01 V
6t � yJv L
1 O
tZ O��ARVC od-d-j4rs t
6Z ki PieB
b.ZIJIOK+t got g t
9
IZ J b �\ w 8
i 1 •. �� >• � 1 c y
to AHJN H p S
n1] V4
.L.Mvs�V"OUlei+
N � ,VpAO
l L * C. tro yet aft
fjpt y e ,� Zi
% � ► t C /
i t
8 + r
S f
t Z f yr
uW►y C ,/� wwgnee
?9t•.t���}� 0102 If90 v4) massa
LviVIMvp fS )n 05- n01 nv�' �1 0� vv yl'fv-;I-? :'a %" " -T ,�
Pam e LA^O(' k I i -v (&Q I o v l") .50011_01 id -c toy I"
�P (rLA,, ".' Pe-f-UZ. tiesste✓' or, &/A7118 � s J q
P `?
n��
CeviJi an 14 (-C t.✓?4 sal
�c h �� •' lUe �. /l�eSsl� I-" Out 2017 Received
NOV 13,
DCM-EC
JX
cv °1
cn 1i iIL
c(/S
1�.
--�
tit
31�s-
S
1p
9
�
31�s-
S
C,ckr-Kksoth ijo f -e- ` ttAvIdven � J1uuno�
S c .t PLj (wt
v
0A *^ I Pdabit, �h to 6
auM
5
p1w t P,
Le
TreA�c��-
Pro J j eJ— Nom .-(-wdc.I w, 1+6-t< ( f �,.����., � SO 'd s' cAp- 6/ovx Lj,,„ d sew,
s �� Py f Un, I��
PAA +Zl1� we fi cS
SkorL. �►4es orc )c4-l��a��� `�`^�k7 ,�eokr Shore, J�
��
A