HomeMy WebLinkAbout20170905 Ver 2_More Info Received_20180716Strickland, Bev
From: wyatt brown <brownenvgrp@gmail.com>
Sent: Sunday, July 15, 2018 3:06 PM
To: David.E.Bailey2@usace.army.mil; Homewood, Sue; chad huffine
Subject: [External] Alamance Drive In revised culverts detail
Attachments: 2A---2018-03-28 Graham Drive In_Entrance Move_Revised2.pdf; 2B---2018-03-28
Graham Drive In_Entrance Move_Revised2.pdf
David
Please find attached revised culvert drawings showing 2 culverts instead of 1. Please add these to the PCN submittal,
please contact me if any questions.
thank you
Wyatt
Wyatt Brown, LSS, CPESC
Brown's Environmental Group, Inc
919-524-5956
Culvert and Conveyance Summary Information:
Crossing # I (Buffered Stream)
Drainage Area: 0. 15 5cimi (9G acres)
Q design: 2 15 cf5
Diameter: 42" (twin culverts)
HW/D: 1 .81
Length: GS'
Main KV and Emerc
Pipe Length: G8 If.
Affected Buffer Are
Affected Buffer Are
Affected Area Tots
Main KV and 5ecor
Site 5oll5 Classification:
Unclassified. Classification of near surface soils shall be made per
Owner's geotechnical engineering recommendations based on the
evaluation of exposed 5ubgrade soils.
Line Table
Line Bearing Distance
L1 N 73'36'03" W 63.95'
L2 N 20'49'17" W 149.79'
Curve Table
Curve Chord Bearing Chord Radius Length
C1 S 57'47'14" E 397.58' 610.84' 404.96'
C2 N 80'57' 1 1 " W 444.29' 1445.24' 446.05'
Stream Buff
Wetland BoL
Wetland imps
Pipe footprin
Top of Bank
Proposed
pump - A - r
Stream / Bui
Pipe footpri
Narrative,
The proposed crossing
must be crossed with th
existing 5tormwater flow
Culverts will be placed it
Construction sequence:
Obtain all permits a5 rec
Prepare a staging area c
Identify fill material 5ourc
Identify bedding material
Call for precon5truction
Schedule surveying for c
Prepare pump around / c
Receive culvert pipe on
Enter the work area limit
Prepare bedding, lay culv�� ��i vy �� ci iyn icci .
Prepare backfilling and compaction per geotechnical engineers direction.
fill to grade, stabilize embankment slopes and embankment 5ubgrade.
Place permanent erosion control, energy pads or scour pads a5 per plans.
Ensure stabilization of all areas within the work area.
Remove pump around / dewatering systems.
Restore disturbed areas, grade to drain and secure with ground cover.
Call for inspection.
Plan Prepared for:
1-40 Drive -In
P.O. Box 872
Graham, NC 27253
Contact: 33G-229-4225
O�
Graphic Scale
0+00
1+00
NG
T RATIO N
;hannel.
nV from the
er of the twin pipe
2+00
Scale: I'' = 40'
Horizontal
DISCHARGE
DOWN STREAM BEYOND
WORKING AREA PARALLEL
WITH FLOW CHANN EL ON
I'_DROCK OR IN 4'x4'x1 2" with
::oz. jeot-tile under RIP RAP
PLUNGE AND SPLASH PAD
(remove splash pad when
complete)
GRAHAM DRIVE IN
PIN: 8894742981
PRJ: 1-16-1035
oy
a
Kronbery5 Cou
rt
TrIlb Dr. .
•U
SITE m
E
Fkr /So
Interstate 40
NTS Vicinity Map
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH IMPERMEABLE
"""MEMBKANE, TARP OR
OTHER WATER PROOF
MATERIAL
PROPOSED CULVERT / CULVERT SYSTEM
Excavation Neat -line 5uffiaent to place bedding and lay pipe.
Preserve flow line and embedment depth per plan
THROW SPOILS TOWARD PROJECT 51DE OF STREAM
WITHIN 51LTFENCE AREAS OR HAUL TO UPLAND 51TE AREA.
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH NONWOVEN
GEOTEXTILE FILTER (hoz.
or heavier) FABRIC
CRO55I NG DETAILS (NOT TO SCALE)
EXCAVATION
Neat -line Excavation one bucket width to
sufficient depth to establish line and grade and
with appropriate bedding
)P OF BANK
YPJ
1
TYPICAL CULVERT CROSSING ILLUSTRATION
Embankment 311: 1 V
,e flow
:er surface
�Idincq
embedded riprap armor
CALL DEI=ORE YOU DIG! ITS THE LAW
ULOCO North Carolina One Call Center
1-800-632-4949
2 2
5-24-2017
DATE
a
11
REVISIONS
4/4/2018 Revisions for
Additional Evaluation
4/24/2018 Revisions for
Additional Evaluation
5/20/2018 Revisions for
Additional Evaluation
6/20/2018 Revisions for
NCDEQ AND USACE
I I�
W 0
U
6-27-201(
\\111111 111111]
O .QQ•F��ES S/qq0��••. 2 .
t SEAL S
n ; 24924 ;
%FS D
SURVEYOR'S LEGEND
Proposeddge of Pavement
r
o
Existing Iron Pipe (EIP)
S
p
•
New Iron Pipe (NIP)
J
Property Line
Proposed Dump5ter
— — —
Adjoiner's Property Line
V
/—••—••—
Right of Way line
7f/t
+
Calculated Point (CP)
Proposed Contour Line
PK Nail (Found)
♦
PK Nail (Set)
®
/
Right Way Monument
��
Overhead Utility Lines
rel
—o
Utility Pole (with Guy Wire)
EXIStinp Contour Line
Q0 #
Light Pole
\4 o
®
Sanitary Sewer Manhole
Stream Buff
Wetland BoL
Wetland imps
Pipe footprin
Top of Bank
Proposed
pump - A - r
Stream / Bui
Pipe footpri
Narrative,
The proposed crossing
must be crossed with th
existing 5tormwater flow
Culverts will be placed it
Construction sequence:
Obtain all permits a5 rec
Prepare a staging area c
Identify fill material 5ourc
Identify bedding material
Call for precon5truction
Schedule surveying for c
Prepare pump around / c
Receive culvert pipe on
Enter the work area limit
Prepare bedding, lay culv�� ��i vy �� ci iyn icci .
Prepare backfilling and compaction per geotechnical engineers direction.
fill to grade, stabilize embankment slopes and embankment 5ubgrade.
Place permanent erosion control, energy pads or scour pads a5 per plans.
Ensure stabilization of all areas within the work area.
Remove pump around / dewatering systems.
Restore disturbed areas, grade to drain and secure with ground cover.
Call for inspection.
Plan Prepared for:
1-40 Drive -In
P.O. Box 872
Graham, NC 27253
Contact: 33G-229-4225
O�
Graphic Scale
0+00
1+00
NG
T RATIO N
;hannel.
nV from the
er of the twin pipe
2+00
Scale: I'' = 40'
Horizontal
DISCHARGE
DOWN STREAM BEYOND
WORKING AREA PARALLEL
WITH FLOW CHANN EL ON
I'_DROCK OR IN 4'x4'x1 2" with
::oz. jeot-tile under RIP RAP
PLUNGE AND SPLASH PAD
(remove splash pad when
complete)
GRAHAM DRIVE IN
PIN: 8894742981
PRJ: 1-16-1035
oy
a
Kronbery5 Cou
rt
TrIlb Dr. .
•U
SITE m
E
Fkr /So
Interstate 40
NTS Vicinity Map
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH IMPERMEABLE
"""MEMBKANE, TARP OR
OTHER WATER PROOF
MATERIAL
PROPOSED CULVERT / CULVERT SYSTEM
Excavation Neat -line 5uffiaent to place bedding and lay pipe.
Preserve flow line and embedment depth per plan
THROW SPOILS TOWARD PROJECT 51DE OF STREAM
WITHIN 51LTFENCE AREAS OR HAUL TO UPLAND 51TE AREA.
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH NONWOVEN
GEOTEXTILE FILTER (hoz.
or heavier) FABRIC
CRO55I NG DETAILS (NOT TO SCALE)
EXCAVATION
Neat -line Excavation one bucket width to
sufficient depth to establish line and grade and
with appropriate bedding
)P OF BANK
YPJ
1
TYPICAL CULVERT CROSSING ILLUSTRATION
Embankment 311: 1 V
,e flow
:er surface
�Idincq
embedded riprap armor
CALL DEI=ORE YOU DIG! ITS THE LAW
ULOCO North Carolina One Call Center
1-800-632-4949
2 2
5-24-2017
DATE
a
11
REVISIONS
4/4/2018 Revisions for
Additional Evaluation
4/24/2018 Revisions for
Additional Evaluation
5/20/2018 Revisions for
Additional Evaluation
6/20/2018 Revisions for
NCDEQ AND USACE
I I�
W 0
U
6-27-201(
\\111111 111111]
O .QQ•F��ES S/qq0��••. 2 .
t SEAL S
n ; 24924 ;
%FS D
M
W N n ~
r
4U�Hu
1=1
S
p
J
h
ice, o
r
V
V
J
V
D
Q
rel
•s
•
Q)
G
h�
W
•�
w
a
Culvert and Conveyance Summary Information:
Cr0551nq #2 (Buffered Stream)
Drainage Area: 0.0475 5ciml (29 acres)
Q design: 85 cfs
Diameter: 3G" (twin culverts)
HW/D: 1.09
Length: 70
Main patron entrance to drive-in, and facility. /
Pipe Length: 7G If.
Affected Buffer Area Zone I : Osf. O U Jl
Affected Buffer Area Zone 2: 3,848 5f. \
Affected Area Total Buffer: 3,848 5f. /
Main KV and secondary emergency access loop from public right of way.
Proposed Edge of Pavement
O
Existing Contour Llne \ O
Proposed Contour Line 0 Q
Proposed
pump - A - round
Top of Bank
NIP
ripe footprint 7
IV
Wetland Impact (permanent)
•
Proposed Silt Fence
Proposed Buffer Impact
Stream / Buffer Impact (temporary)
KIr IAP AKMOK
�nV
� IL1
Ix
F.
Site 5oiI5 Classification:
Unclassified. Classification of near surface soils shall be made per
Owner's geotechnical engineering recommendations based on the
evaluation of exposed 5ubgrade soils.
Wetland Boundary from field work
Wetland Impact (permanent)
CHANNEL CONDITIONS EXISTING
WITH PKOP05ED CONDITIONS ILLU5TKATION
i %� TWIN 3G" RCP CULVERTS center line superimposed over the existing 24" CMP.
at the crossing location. Note the stream channel "tops of bank' from the
/ / foreground to the background and the termination of the center of the twin pipe
system Iles in the center of the channel in the background.
(embedded top fo back to top of bank) Top of Bank
Existing City Sewer
Existing Public Sewer Easement
Narrative, Ju5tlflcatlon and Con5tructlon 5equence: stream Buffer -
The proposed crossing 15 required to facilitate the main patron access to the site and the facility. An existing stream channel
must be crossed with the crossing proposed a5 near perpendicular a5 possible. The culvert system 15 designed accommodate 01OI O0'
existing 5tormwater flows, provide adequate cover for the pipe structure and maintain grades for the proposed access drive.
Culverts will be placed in parallel and provide for the required embedment to preserve base flow. I I I I I
Construction sequence:
Obtain all permits as required. Graphic, 5 ca l e
Prepare a staging area outside the buffer and impact areas for equipment and materials.
Identify fill material source and haul route.
Identify bedding material source and haul route. I I _
Call for precon5truction meeting with the site engineer. 5 ca l e • 1 — 20'
Schedule surveying for crossing specific items, erosion control and disturbance limits.
Prepare pump around / dewatering and diversion per plans. PLAN V I LF
W
Receive culvert pipe on site and inspect pipe materials.
Enter the work area limiting and minimizing disturbance.
Prepare bedding, lay culvert per plans or a5 directed by site engineer.
Prepare backfilling and compaction per geotechnical engineers direction.
fill to grade, stabilize embankment slopes and embankment 5ubgrade.
Place permanent erosion control, energy pads or scour pads a5 per plans.
Ensure stabilization of all areas within the work area.
Remove pump around / dewatering systems.
Restore disturbed areas, grade to drain and secure with ground cover.
Call for inspection.
Plan Prepared for:
1-40 Drive -In
P.O. Box 872
Graham, NC 27253
Contact: 33G-229-4225
Line Table
Line Bearing Distance
L1 N 73'36'03" W 63.95'
L2 N 20'49'17" W 149.79'
Curve Table
Curve Chord Bearing Chord Radius Length
C1 S 57'47'14" E 397.58' 610.84' 404.96'
C2 N 80'57' 1 1 " W 444.29' 1445.24' 446.05'
DISCHARGE
DOWN STREAM BEYOND
WORKING AREA PARALLEL
WITH PLOW CHANNEL ON
I' _DKOCK OR IN 4'x4'x 12" with
G. oz. geotextile under RIP RAP
PLUNGE AND SPLASH PAD
(remove splash pad when
complete)
GRAHAM DRIVE IN
PIN: 8894742981
PRJ: 1-16-1035
oy
a
Kronbery5 Cou
rt
/
TrIlb Dr. .
•U
SITE I m
E
Interstate 40
NTS Vicinity Map
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH IMPERMEABLE
MEMBRANE, TARP OR
OTHER WATER PROOF
MATERIAL
PROP05ED CULVERT / CULVERT SYSTEM
Excavation Neat -line sufficient to place bedding and lay pipe.
Preserve flow line and embedment depth per plan
THROW SPOILS TOWARD PROJECT 51DE OF STREAM
WITHIN 51LTFENCE AREAS OR HAUL TO UPLAND 51TE AREA.
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH NONWOVEN
GEOTEXTILE FILTER (Goz.
or heavier) FABRIC
CRO551 NG DETAI L5 (NOT TO 5CALE)
EXCAVATION
Neat -line Excavation one bucket width to
sufficient depth to establish line and grade and
with appropriate bedding
TYPICAL CULVERT CK0551NG ILLU5TKATION
Embankment 3H: I V
SURVEYOR'S LEGEND
o
Existing Iron Pipe (EIP)
•
New Iron Pipe (NIP)
II
Property Line
— — —
Adjoiner s Property Line
—••—••—
Right of Way line
*
Calculated Point (CP)
+
PK Nail (Found)
♦
PK Nail (Set)
®
Right of Way Monument
-------
Overhead Utility Lines
.—o
Utility Pole (with Guy Wire)
*
Light Pole
0
Sanitary Sewer Manhole
DISCHARGE
DOWN STREAM BEYOND
WORKING AREA PARALLEL
WITH PLOW CHANNEL ON
I' _DKOCK OR IN 4'x4'x 12" with
G. oz. geotextile under RIP RAP
PLUNGE AND SPLASH PAD
(remove splash pad when
complete)
GRAHAM DRIVE IN
PIN: 8894742981
PRJ: 1-16-1035
oy
a
Kronbery5 Cou
rt
/
TrIlb Dr. .
•U
SITE I m
E
Interstate 40
NTS Vicinity Map
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH IMPERMEABLE
MEMBRANE, TARP OR
OTHER WATER PROOF
MATERIAL
PROP05ED CULVERT / CULVERT SYSTEM
Excavation Neat -line sufficient to place bedding and lay pipe.
Preserve flow line and embedment depth per plan
THROW SPOILS TOWARD PROJECT 51DE OF STREAM
WITHIN 51LTFENCE AREAS OR HAUL TO UPLAND 51TE AREA.
SAND BAG TO AT OR
ABOVE TOP OF BANK
WRAPPING ENTIRE DIKE
WITH NONWOVEN
GEOTEXTILE FILTER (Goz.
or heavier) FABRIC
CRO551 NG DETAI L5 (NOT TO 5CALE)
EXCAVATION
Neat -line Excavation one bucket width to
sufficient depth to establish line and grade and
with appropriate bedding
TYPICAL CULVERT CK0551NG ILLU5TKATION
Embankment 3H: I V
510
O 0+00 1+00
0' 40' 80' 400'
Graphic Scale
2+00
R
Scale: I" = 40'
Horizontal
2 2
YB
5-24-2017
DATE
5CALE
BSB/CDH
6
REVISIONS
4/4/2018 Revisions for
Additional Evaluation
4/24/2018 Revisions for
Additional Evaluation
5/20/2018 Revisions for
Additional Evaluation
6/20/2018 Revisions for
NCDEQ AND U5ACE
\J
W
z
Q �
z �
z 0
U
—2% -201c
�N CARP
o .•FESS/o•.•jQ .
t SEAL S
n ; 24924 ; 4,.
D N\\\.��.
C-1939
L z
WE
IJ
U
/'+
CU LVEKT
CK0551 NG #2
embedded riprap armor
II
�
o
�
N
v
r�
—
-�
525
J
V
L
�
Q)
v
Q
QJ
>
rel
Koad section
�I
TWI N 3011 KCP
W
w
s se
INV. I N 5 1 G.
:-gull edlmin. cover
520
°�'°
h PgiINV. O T 5 1 5
SFCT�O�,VT 9 a`'e
structural fell
base flow
Q �7 �7
7 G I f@ I .9 / /O
water surface
CVLVE,eT
3H: IV
Max Embank
ent
O—
— —
— —
slope
exist"
Uniform Alpe bedding
0
515
_—
—
_
--
of bank top
RIP RqP
be'stn
d s/
pe
CALL PEEOKE YOU DIG! ITS THE LAW
ULOCO North Carolina One Call Center
1-800-632-4949
510
O 0+00 1+00
0' 40' 80' 400'
Graphic Scale
2+00
R
Scale: I" = 40'
Horizontal
2 2
YB
5-24-2017
DATE
5CALE
BSB/CDH
6
REVISIONS
4/4/2018 Revisions for
Additional Evaluation
4/24/2018 Revisions for
Additional Evaluation
5/20/2018 Revisions for
Additional Evaluation
6/20/2018 Revisions for
NCDEQ AND U5ACE
\J
W
z
Q �
z �
z 0
U
—2% -201c
�N CARP
o .•FESS/o•.•jQ .
t SEAL S
n ; 24924 ; 4,.
D N\\\.��.
C-1939
L z
WE
IJ
U
/'+
W N n ~
Ly N S+
ISI
z
o
�
N
v
r�
V
J
V
Q)
v
Q
rel
�I
W
W
w
a