Loading...
HomeMy WebLinkAboutNC0026271_Performance Summary_20180712 Jun 151810:30a Town of Taylorsville 828-632-2079 p.1 Performance Annual Report Town of Taylorsville (2017-2018) I.General Information Facility System Name: Taylorsville Wastewater Treatment Plant&Collection System Responsible Entity: Town of Taylorsville 67 Main Ave Dr,Taylorsville NC,28681 Person in Charge/Contact: David Robinette-Public Works Director/CS ORC—(828)-632-2218 Applicable Permit(s): NC0026271-WWTP&WQCS00135 Collection System Description of Collection System&Treatment Process: The Town of Taylorsville's Collection System consists of approximately 22 miles of sewer pipe and 22 regularly maintained pump stations. Domestic sewage flows into an 830,000 gallon per day Treatment Facility where it is properly treated for discharge into the Lower Little River. The WWTP consists of one micro-screening device for solids removal,INF pumping station for grit removal and washing units,Lime feed system for pH control, two(2)415,000 gallon aeration basins for BODS and NH removal,two(2) 45 foot diameter Clarifiers for settling solids,two(2)CL2 chambers for water disinfection,and one(1)SO2 chamber to reduce CU levels in treated water. Also,there are four(4)aerobic digester which treat an average of 1.2 million gallons of sludge per year for land application. Each process operated efficiently throughout this fiscal year. The Effluent has been compliant with state regulations each month. II. Performance: Text summary of System Performance for the fiscal year 2017-2018. The sewer system is effectively maintained and operated at all times to prevent improper discharge to land or surface waters. A map of the sewer system has been developed and actively updated. An operation and maintenance plan has been developed and implemented. A general observation of the entire sewer system is conducted at a least one per year. Inspection and maintenance records are kept for a period of three 15)years. Also,any overflows or bypasses(SSO's)are reported to our division regional office in accordance to 15A NCAC 2B.0506(a)as well as public notification(as needed). The Town's Sewage Collection System operated efficiently with only minor clogs that were quickly unstopped to prevent SSO's. The WWTP successfully removed over 99%of organic biological contaminants,and over 90%of the settable solids from the wastewater throughout the year,and produced a clear-clean water to introduce into the receiving stream. --One(1)SSO was reported for the 2017-2018 fiscal year. This event occurred 6-14-2018 at the Alexander Correctional Facility Pump Station spilling 5000 gallons(according to scada estimates)into Glade Creek. The resulting spill was cleaned up and no fish kill was observed. The SSO was properly reported to NC DWR. All incidents of SSO's(if any)are reported to the State Division of Water Quality(DWQ)in Mooresville as regulations require,and repairs and cleanup performed also per stringent state regulations. i Ill. Notifications: This report will be published in the local newspaper and the public will be advised that copies will be available at the Town Hall. IV. Certification: I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system,and that those users have been notified of its availability.Dfig'"*-4"c-C24A RL:te-k--- July 3, 2018 David Robinette Public Works Director-Town of Taylorsville