Loading...
HomeMy WebLinkAbout20180963 Ver 1_401 Application_20180718Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 7/10/2018 3:22:01 PM (Start Event) Accept by Montalvo, Sheri A 7/12/2018 2:56:55 PM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: July 13, 2018 5:00 PM 7/10/2018 3:22 PM DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Wake Is this project a public transportation project?* f Yes f• No This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project. 1a. Type (s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* IJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Number Other: List all IWV nurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply IJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express F Non -404 Jurisdictional General Permit IJ Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: O Yes O No For the record only for Corps Permit: O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program f Yes C No 1f. Is the project located in anyof NC's twentycoastal counties?* r Yes C No 1h. Is the project located in a designated trout watershed?* t' Yes f• No Link to trout information: http://vmw.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* MELANIE NGUYEN 1b. Primary Contact Email:* MELANIE. NGUYEN@RALEIGHNC. GOV 1c. Primary Contact Phone:* (XXX)XXX-XXXX (919)996-4003 1d. Who is applying for the permit? ❑ Owner V Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: HOOVER, CHRISTIAN B and HOOVER FELICIA G 2b. Deed book and page no.: Book 007625 Page 00762 2c. Responsible party: (for Corporations) 2d. Address Street Address 6100 Crestdale Circle Address Line 2 City Raleigh Fbstal / Zip Code 27612 2e. Telephone Number: (XXX)XXX-XXXX 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* MELANIE. NGUYEN@RALEIGHNC. GOV 2a. Name(s) on recorded deed: MATTHEWS, MICHAEL S and MATTHEWS, MICHELE 2b. Deed book and page no.: book 010587 Page 01309 2c. Responsible party State/ Province/ Fbgion NC Country USA (for Corporations) 2d. Address Street Address 6101 CRESTDALE CIRCLE Address Line 2 Qty State / Province / Pbegion Raleigh NC Postal / Zip Code Country 27612 USA 2e. Telephone Number: (XXX)XXX-)O= 2f. Fax Number: (XXX)XXX-XXXX 2g. Email Address:* melanie.nguyen@raleighnc.gov 3. Applicant Information (if different from owner) 3a. Applicant is: f Agent r Other CITY OF RALEIGH IF other please specify. 3b. Name: BLAIR HINKLE 3c. Business Name: (if applicable) 3d. Address Street Address 127 W. Hargett St Address Une 2 Suite 800 Qty State / Province / Fbgion Raleigh NC Postal / Zip Code Country 27601 USA 3e. Telephone Number: (919)996-4011 (XXX)XXX-XXXX 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* BLAIR. HINKLE@RAL EIG HNC. GOV C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* 6100 and 6101 Crestdale Circle Stream Bank Stabilization 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: * City of Raleigh 1d. Driving directions* It it is a new project and can not easily be found in a GPS rrapping system Please provide directions. HWY 70 to NC 50, Right on Lynn Road, Right on Valley Estates Drive, Right on Crestdale Circle 2. Project Identification 2a. Property Identification Number: (tax PIN or parcel ID) 0796599872 2b. Property size: (in acres) 2c. Project Address Street Address 6100 and 6101 Crestdale Circle Address Line 2 Oty Raleigh Fbstal / Zip Code 27612 State / Province/ Region NC Country USA 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.864444 -78.676065 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Mine Creek 3b. Water Resources Classification of nearest receiving water:* C;NSW Surface Water Lookup .................................................... 3c. What river basin(s) is your project located in?* Neuse River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The existing condition of the project is consisting of residential land use and one elementary school. These subdivisions were built in the late 1970's and early 1980's. The proposed project location has been experiencing severe erosion. Due to the active severe erosion of the stream banks that is currently reaching the vicinity of nearby residential structures and potentially leading to public safety issue, appropriate measures are proposed to prevent this severe bank erosion from continuing to migrate. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent Crestdale Topo.pdf File type mist be pdf 1.48MB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) nick the upload button or drag and drop files here to attach docurrent Crestdale and Valleyfield Circle Soil Map.pdf 2.26MB File type mast be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (intermttent and perennial) 435 4f. Explain the purpose of the proposed project:* The purpose of this project is to stabilize the stream banks with rock toes and using native plants to strengthen the current stream banks to prevent future severe erosion which will minimize the loss of residential structures and public safety. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* A series of rock toes, riffles, and slope banks with matting will be constructed using less impacted equipment such as rubber tracks to prevent heavy compaction. Rock toes to armor the stream banks at the bend sections. Live stakes will be planted to create the natural condition and the roots to help with stabilize natural stream banks. 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach docurrent Permit Set 3-9-2018.pdf File type rust be pdf 5. Jurisdictional Determinations 4.49MB 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* f Yes C No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary f Approved r Unknown r N/A Corps AID Number: Exarrple: SAW -2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Crick the upload button or drag and drop files here to attach docurrent File type mist be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? f Yes r No r Unknown 7. Future Project Plans 7a. Is this a phased project? * f Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F Wetlands W Streams -tributaries rJ Buffers F Open Waters F Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream type * Type * S1 Bank Stabilization P Bank UT to Mine Creek Perennial Ivbp label (e.g. f3bad Crossing Permanent (P) or Stabilization Perennial (MR) or 1) Temporary (T) intermittent (INT) * All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 390 3i. Total temporary stream impacts: 0 3i. Total stream and tributary impacts: 390 3j. Comments: 3f. Type of 3g. Stream 3h. Impact sqfe Jurisdiction* width* length* DWR 6 390 2 Average (linear feet) (feet) 3 4 0 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)? * Check all that apply. V Neuse F Catawba F- Goose Creek F Other F- Tar -Pamlico F- Randleman F Jordan Lake 6b. Impact Type * 6c. Per or 6d. Stream name * 6e. Buffer mitigation 6f. Zone 1 6g. Zone 2 Temp* required?* impact* impact* Construction Access/Tree T UT to Mine Creek No 14,434 1,512 Removal Fbrrranent (P) or (square feet) (square feet) Location and Exenpt, Allowable, allowable w/ Tenporary (T) mitigation Construction Access/Tree P UT to Mine Creek No 3,215 0 Removal Fbrrmnent(P)or (square feet) (square feet) Location and Exenpt, Allowable, allowable w/ Temporary (T) mitigation 6h. Total buffer impacts: Zone 1 Zone 2 Temporary impacts: 14,434.00 1,512.00 Zone 1 Zone 2 Permanent impacts: 3,215.00 0.00 Zone 1 Zone 2 Total buffer impacts: 17,649.00 1,512.00 6i. Comments: Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Click the upload button or drag and drop files here to attach docurrent Permit Set 3-9-2018.pdf 4.49MB Crestdale Circle PERMIT.pdf 1.71 MB File must be FBF E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The project was designed to only address the minimum required linear footage and area in resolving this current severe bank erosion. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* The project will only address the minimum required linear footage and area in resolving this current severe bank erosion. Rubber tires will be use to minimize soil disturbance. Minimal amount of tree removal will be taken into account to construct only the section of stream in need of repair. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes t'• No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: NWP13 - bank stabilization is allowed. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r- Level Spreader r- Vegetated Conveyance (lower SHWT) r- Wetland Swale (higher SHWT) r- Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diff us Flow Documentation Click the upload button or drag and drop files here to attach docurent File type rust be FDF 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes r No To look up low density requirement click here 15A NCAC 02H.1 003(2) G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* ryes r No Comments: * Project is funded through City of Raleigh Capital Improvement Program 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)? * ryes r No 2b. Is this an after -the -fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* O Yes O No 3b. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes f Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* O Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* f Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* f Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes f No 5g. Does this project involve bridge maintenance or removal? f Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* f Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? hftps:wm.fvvs.gov/Raleigh/PR—l.html 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* hftps:www.Nus.gov/Raleigh/PR—l.html 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* hftp://gis.ncdcr.gov/hpoweb/ 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach document File nest be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* f Yes IT No 8c. What source(s) did you use to make the floodplain determination?* FEMA FLOODPLAIN MAP FIRM PANEL 0796 Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach document File must be FDF or KNE Signature V By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Blair Hinkle Signature Sign Date Submitted: 7/10/2018 Initial Review .............................................................................................................................................................................. Is this project a public transportation project?* M f Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process? * r Yes r No BIMS # Assigned* 20180963 Version#* 1 Reviewing Office* Central Office - (919) 707-9000 Select Project Reviewer* Paul Wojoski:EADS\pawojoski Is a payment required for this project?* f No payment required f Fee received r Fee needed - send electronic notification What amout is owed?* r $240.00 r $570.00