Loading...
HomeMy WebLinkAbout20180705 Ver 1_Lumbee PCN_REV Additional Impact_20180705PCN REVISION for Proposed Impacts Inventory Project Name: Lumbee Tribe Cultural Center Lake Dam Repair Original PCN Submitted Online — May 22, 2018 Submitted by: Amy Black, PE C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): Wetlands Streams — tributaries Buffers ✓Open Waters Pond Construction 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary T 01 -Temporary Cultural Center Lake Staging Area LAKE 0.5 acres 02 -Permanent Cultural Center Lake Expanding slope of dam LAKE 1.1 acres 4f. Total open water impacts 0 4g. Comments: Dam elevation is being raised to a consistent 169.5 and dam face will be constructed to a 3:1 slope. Footprint expansion will be on the downstream side where possible, but will be on the upstream side along the southern end of the dam where existing buildings and Terry Sanford Drive prohibit any expansion. The lake is currently drained in preparation for this work.