HomeMy WebLinkAboutNC0020621_Compliance Evaluation Inspection_20180629 ROY COOPER
Governor
MICHAEL S.REGAN
Secretary
LINDA CULPEPPER
Water Resources Interim Director
Environmental Quality
June 29, 2018
Mr. Rick Miller
Director of Public Utilities
Town of Boone
P.O. Drawer 192
Boone, NC 28607 SV�®j� ,,
®�e4
SUBJECT: Compliance Evaluation Inspection JUL i® 20'�
Town of Boone-Jimmy Smith WWTP
Dal/Slater
NPWatDES auga County t No. NC0020621 �er�lin—sour as
Dear Mr. Miller:
On June 6, 2018, Kelli Park and Gary Hudson, of this office, met with Rudy Broschinski,
ORC,to perform a Compliance Evaluation Inspection on the Town of Boone wastewater treatment
facility. This type of inspection consists of two basic parts: an in-office file review and an on-site
inspection of the treatment facility. The attached EPA inspection form notes the areas that were
evaluated for this inspection. The findings and observations are outlined below:
I. Permit
The new NPDES permit became effective May 1, 2017 and expires March 31, 2021. A copy of
the permit was available during the inspection.an
II. Self-Monitoring Program
Monthly self-monitoring reports (DMRs) were reviewed for the period January 2017 through
December 2017. All monitoring was performed at the frequencies specified in the permit. The
facility was in consistent compliance with all parameters, except for one small ammonia violation
in April.
III. Flow Measurement
The plant flow is metered by an ISCO 3010 unit. The values are reported on the DMR. The meter
was calibrated on July 29, 2017 by Johnston Inc.
IV. Sludge Handling and Disposal •
The sludge handling and disposal is performed by the Town. Grade A residuals are generated.
Mr. Rick Miller �- -Nothing Compares—
State of North Carolina I Environmental Quality
450 W.Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105
Phone:336-776-98001 FAX:336-776-9797
Page 2
June 29, 2018
V. Operations and Maintenance
No concerns were noted with respect to the operation and maintenance of the facility. Mr.
Broschinski and the WWTP staff do aan excellent job in maintaining the existing equipment in
working condition.
VI. Facility Site Review
The VVWTP facility consists of the following: mechanical screening, influent pump station, aerated
grit removal, dual oxidation ditches, dual secondary clarifiers, UV disinfection, deep bed tertiary
filters, and cascade aeration of the effluent.
VII. Records/Reports
All monitoring and laboratory records are maintained as specified by the permit.
VIII. Effluent/Receiving Waters
The effluent to the South Fork New River, a class C+waters in the New River Basin was crystal
clear, with no odor, and no solids.
The WWTP staff appears to be doing an excellent job with respect to the operation and
maintenance of the Town of Boone Wastewater Treatment Plant. Should you have any questions
concerning this report, please contact Gary Hudson or me at (336) 776-9800.
Sincerely,
Sherri V. Knight, P.E.
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments: BIMS Inspection Checklist
cc: Rudy Broschinski, ORC
Central Files
'NPDES)
WSRO
1
United States Environmental Protection Agency Form Approved.
EPA Washington,D C 20460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A National Data System Coding(i e,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 fit,j 2 IL I 3 I NC0020621 I11 12 I 18/06/06 117 18 is] 19 I S I 201 I
211111L1 111111111 11 111I1I1 1111111 111111l1111 166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA --- -Reserved---
67 I 1 70 I I 71 1 1 72 12,J, 1 73 11 174 751 1 1, 1 1 1 1 180
' Section B:Facility Data "
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 10:30AM 18/06/06 17/05/01
Town of Boone Jimmy Smith WWTP
201 Casey Ln Exit Time/Date Permit Expiration Date
Boone NC 28607 - 12 00PM 18/06/06 21/03/31
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Rudolph E Broschinski/ORC/828-268-6271/
. i
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
George M Sudderth,PO Drawer 192 Boone NC 286070192/1828-262-4530/
No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit • Flow Measurement I. Operations&Maintenance • Records/Reports
• Self-Monitoring Program • Facility Site Review • Effluent/Receiving Waters
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
la'
-411, Ail, inlY6/0\- z 9 LTLA i S'
Name(s)and Sig "ture(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Gary Hudson Division of Water Quality//336-776-9694i
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date `>
dt,tijir. 1,Z1,,P b L2—ei 1 I
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type 1
31 NC0020621 111 121 18/06/06 117 18 LI
I
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
•
Permit NC0020621 Owner-FacilityTown of Boone Jimmy Smith WWTP
Inspection Date 06/06/2018 Inspection Type Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • 0 ❑ 0
Does the facility analyze process control parameters,for ex:MLSS,MCRT,Settleable • 0 ❑ 0
Solids,pH, DO,Sludge Judge,and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ MI ❑
application? -
Is the facility as described in the permit? • ❑ 0 0
#Are there any special conditions for the permit? ❑ • ❑ ❑
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • • ❑ ❑ ❑
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • ❑ ❑ ❑
Is all required information readily available,complete and current? • ❑ ❑ ❑
Are all records maintained for 3 years(lab.reg.required 5 years)? • ❑ El El
Are analytical results consistent with data reported on DMRs? I ❑ ❑ ❑
Is the chain-of-custody complete? • ❑ ❑ ❑
Dates,times and location of sampling U
Name of individual performing the sampling U
Results of analysis and calibration
Dates of analysis a
Name of person performing analyses
Transported COCs ■
Are DMRs complete.do they include all permit parameters? • ❑ ❑ ❑
Has the facility submitted its annual compliance report to users and DWQ? • ❑ ❑ ❑
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator ❑ 0 • ❑
on each shift?
Is the ORC visitation log available and current? • ❑ ❑ ❑
Is the ORC certified at grade equal to or higher than the facility classification? • ❑ ❑ ❑
Is the backup operator certified at one grade less or greater than the facility classification? • ❑ El ❑
Is a copy of the current NPDES permit available on site'? • ❑ 0 ❑
Page# 3
Permit: NC0020621 Owner-Facility Town of Boone Jimmy Smith WWTP
Inspection Date: 06/06/2018 Inspection Type Compliance Evaluation
Record Keeping Yes No NA NE
Facility has copy of previous year's Annual Report on file for review? • 000
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? ❑ 0 ❑ •
Are the receiving water free of foam other than trace amounts and other debris? • 000
If effluent (diffuser pipes are required) are they operating properly? 00110
Comment:
Flow Measurement- Effluent Yes No NA NE
#Is flow meter used for reporting? • 000
Is flow meter calibrated annually? • 000
Is the flow meter operational? U 000
(If units are separated)Does the chart recorder match the flow meter? 000 •
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual ❑
b.Mechanical
Are the bars adequately screening debris? • 000
Is the screen free of excessive debris? 11000
Is disposal of screening in compliance? U ❑ ❑ ❑
Is the unit in good condition? 111000
Comment:
Grease Removal Yes No NA NE
#Is automatic grease removal present? 11000
Is grease removal operating properly? U ❑ ❑ ❑
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? 1110 ❑ ❑
Page# 4
Permit. NC0020621 Owner-Facility Town of Boone Jimmy Smith 1/MTP
Inspection Date: 06/06/2018 Inspection Type Compliance Evaluation
Secondary Clarifier - Yes No NA NE
Is the site free of excessive buildup of solids in center well of circular clarifiers • 0 0 0
Are weirs level? • 0 0 0
Is the site free of weir blockage? • 0 0 0
Is the site free of evidence of short-circuiting? • 0 ❑ 0
Is scum removal adequate? • 0 0 0
Is the site free of excessive floating sludge? • 0 0 0
Is the drive unit operational? • 0 0 0
Is the return rate acceptable(low turbulence)? • 0 0 0
Is the overflow clear of excessive solids/pin floc? • 0 0 0
Is the sludge blanket level acceptable'?(Approximately' of the sidewall depth) 0 0 0 •
Comment:
Oxidation Ditches Yes No NA NE
Are the aerators operational? • 0 0 •❑
Are the aerators free of excessive solids build up'? • 0 0 0
#Is the foam the proper color for the treatment process'? • 0 0 0
Does the foam cover less than 25%of the basin's surface'? • 0 0 0
Is the DO level acceptable? • 0 0 0
Are settleometer results acceptable(>30 minutes)? • 0 0 0
Is the DO level acceptable?(1.0 to 3 0 mg/I) 0 0 0 U
Are settelometer results acceptable'?(400 to 800 ml/I in 30 minutes) • 0 0 0
Comment:
Disinfection -UV Yes No NA NE
Are extra UV bulbs available on site? • 0 0 0
Are UV bulbs clean? • 0 0 0
Is UV intensity adequate? • 0 0 0
Is transmittance at or above designed level? • 0 0 0
Is there a backup system on site? 0 0 0 •
Is effluent clear and free of solids? • 0 ❑ 0
Comment:
Effluent Sampling Yes No NA NE
Page# 5
Permit NC0020621 Owner-Facility Town of Boone Jimmy Smith WWTP
Inspection Date- 06/06/2018 Inspection Type Compliance Evaluation,
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • 0 0 0
Is sample collected below all treatment units? • 0 0 0
Is proper volume collected? • 0 0 0
Is the tubing clean? • 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees • 0 0 0
Celsius)?
Is the facility sampling performed as required by the permit(frequency,sampling type • 0 0 0
representative)?
Comment: _
Page# 6