Loading...
HomeMy WebLinkAboutWQ0040131_Issuance of Permit_20180703g e, ' �" Water Resources ENVIRONMENTAL QUALITY July 3, 2018 Chandra Farmer, P.E., Director of Public Utilities Johnston County Public Utilities P.O. Box 2263 Smithfield, NC 27577 Subject: Permit No. WQ0040131 Johnston County Public Utilities Sierra Heights — Phase Four Wastewater Collection System Extension Permit Johnston County ROY COOPER Govei nor MICHAEL S. REGAN Sect etag LINDA CULPEPPER Intel un Du ectot RECEiVE®IDENRIDWR JUL 10 2018 Water Resources n Permitting Dear Ms. Farmer: In accordance with your application received June 4, 2018, we are forwarding herewith Permit No. WQ0040131 dated July 3, 2018, to Johnston County Public Utilities (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a permit modification request for a name change must first be approved by this office. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed .with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section www ncwaterquality.org 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Johnston County Public Utilities Permit No. WQ0040131 If you need additional information concerning this matter, please contact Thomas McKinney at (919) 791-4233 or via e-mail at thomas.mcl<inney@ncdenr.gov. Sincerely, for Linda Culpepper Interim Director, Division of Water Resources by S. Daniel Smith, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: Lee R. Hines, Jr., PE, Lee R. Hines, Jr., PE (via email: richiehinespe@nc.rr.com) Johnston County Health Department Raleigh Regional Office Files Water Resources Central Files Page 2 of 8 North Carolina Department of Environmental Quality - STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Johnston County Public Utilities Johnston County for the construction and operation of approximately 3,280 linear feet of 8 -inch gravity sewer, to serve a residential development consisting of 53 lots with three-bedroom homes, as part of the Sierra Heights — Phase Four project of the Johnston County Public Utilities and the total discharge of 12,720 gallons per day of collected domestic wastewater into the Johnston County Public Utilities existing sewerage system, pursuant to the application received May 29, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated in March 2008, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the da of issuance until rescinded and shall be subject to the specified conditions and limitations on nod th r in. ,�� /0, 1 � q , Linda 61p,epper Interim Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0040131 Permit Issued: July 3, 2018 Page 3 of 8 ` '.�: �! E. �' G t +.,i b 4�g i F 3 +•I � 3 � 's.... Johnston County Public Utilities is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The, sewage and wastewater collected by this system shall be treated in the Johnston County Public Utilities Wastewater Treatment Facility in accorda-ice with Permit Number NC0030716. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated March 2008, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent .upon compliance with the Standard Conditions and any Special Conditions identified below. O p.lol. No special conditions 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2 This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12; 1996 and updated March 2008, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T.01101 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: Page 4 of 8 The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected everyday (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High-priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Raleigh Regional Office, telephone number (919) 791-4200, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: Page 5 of 8 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee tc appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided. Page 6 of 8 c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by-case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T.0116] 8. Gravity sewers installed greaterthan ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case-by-case basis. Resolution of such request shall be evident priorto completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T.0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 and updated March 2008, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 and updated March 2008 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T.0104; 15A NCAC 02T .0108(b -c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T.0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have Jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Johnston County Public Utilities PERMIT #: WQ0040131 PROJECT: Sierra Heights —Phase Four ISSUE DATE: July 3, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the-Regional-Supervisor,—Water-Quality-Regional-Operations-Section-at-the-address-at-the bottom Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated March 2008, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and updated March 2008, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section www newaterquality.org 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 T '1on0 D- ­i rn,:.._ D-1-1, NT(' 7'7uno T- f0101'7RR_'71 SQ State of North Carolina Department of Environmental Quality Division of Water Resources r QW -_R _, ^� 15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM E%TENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W�q� 0 0 0 7 I (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: County of Johnston (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Chandra Cox Farmer, PE per 15A NCAC 02T .0106(b) Title: Director of Utilities 11 4. Applicant's mailing address: Post Office Box 2263 eDept Qualit% City: Smithfield State: NC Zip: 27577- 5. Applicant's contact information: Phone number: 919 209-8333 Email Address: chandra.coats@iohnstonnc.com � gni Regional Office H. PROJECT INFORMATION: 1. Project name: Sierra Heights -Phase Four 2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ0031042 3. County where project is located: Johnston County 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.6140° Longitude: -78.3715° 5. Parcel ID (if applicable): 168700-69-2873 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Lee R. Hines, Jr, PE License Number: 22993 Firm: Lee R. Hines, Jr., PE Mailing address: 630 Aiken Parkway City: Fuquay-Varina State: NC Zip: 27526 - Phone number:919 422-8011 Email Address: richiehinespe@nc.rr.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Johnston County Regional WWTP Permit Number: NC 0030716 Owner Name: Johnston County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ0029931 Downstream (Receiving) Sewer Size: 6 inch System Wide Collection System Permit Numbers (if applicable): WQCS © o(o (7 Owner Name(s): d6bAt w\ co" FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories El Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T.0 103(20)) ,Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T.01 14(f)? `Yes MNo ➢ If yes, provide a cony of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see OZT.0114(fi Daily Design Flow 2,b No. of Units Flow Residential Dwelling Units 80 gal/bedroom 53 @ 3 br 12,720 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total T12,720 GPD a See 15A NCAC 02T .0114()b , (d) (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 12,720 GPD (per 15A NCAC 02T.0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Q 1 2 3 4 Size (inches) Length (feet) Material 8 2,935 PVC 8 345 DIP .�1 ➢ Section lI & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT Pump station number or name: Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° Design flow of the pump station: millions gallons per day (firm capacity) Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)'. ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS -I waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS -I or WS -V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item DX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(f) cannot be achieved. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaee ➢ If noncompliance with 02T.0305() org), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A 9 See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B 0200? ® Yes ❑ No ❑ N/A This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? 9 Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high-priority?" Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 0446 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version). and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? M Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. Professional Engineer's Certification: p attest that this application for (Professional En ineer' name from A lication Item 111. 1.) 's RUM H5IG F1 TS — PI1AS& f0()F_ has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.ol North Carolina Professional Engineer's seal, signature, and date: Applicant'�srCeQrttiification per 15A NCAC 02T.0106(b): cI I, A N " \ COX W -K) r—i P` r6GT 0r_ OF UT / bI T Iy s attest that this application for (Signature Authority's name & title from Applica'on Item I.3.) SfE�A Hf)(Gh - PRAst FoUf� has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: (Lk NA Date: FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environment and Natural Resources jT';4: Division of Water Resources •_,J _2 IAsion of Watcr lZesoijrres Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Johnston County Project Name for which flow is being requested: Sierra Heights - Phase 4 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Central Johnston County WWTP b. WWTP Facility Permit #: NCO030716 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 9.5 MGD 2.1350 5.4020 0.01272 7.5498 79.5% Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (C) (D)=(B+C) (A) (B) Design Total Current Pump Tributary Average Daily Approx. Station Firm Flow** Current Avg (Name or Capacity,* (Firm / po, Daily Flow, Number) MGD MGD MGD Knolls of the Neuse 0.3845 0.1538 0.02510 Ives Landing 0.4637 0.1854 0.03425 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity*** 0.06656 0.09166 0.06214 0.06656 0.1008 0.08466 Wilson Mills 0.720 0.288 0.08713 •0.2781 0.3652 -0.07724 L •o( Y The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *Y'° A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 08-13 FTSE PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 97% % and 0.2781 MGD of the Available Capacity (E) in Pump Station Wilson Mills Rd ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.04 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Wilsons Mills Road WWPS Upgrade is in design or under construction with planned completion in 2019or 80% capacity ; and/or d. The following applies: Preliminary design of an upgrade to the Wilson's Mills Rd WWPS will be included as a capital project in the FY 2018-19 budget. The actual flow to the Wilson's Mills WWPS is only 30% of the capacity. An upgrade will be designed and ready for when flow to the station approaches 80% of capacity. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. 0/\_� C'.1 - Signing Official Signature Page 3 of 6 FTSE 08-13 �0F W ATFR4� Michael F. Easley, Govemor r� William G. Ross Jr., Secretary CO Alan W. Klimek, P.E., Director North Carolina Department of Environment and Natural Resources D C Division of Water Quality May 18, 2005 Timothy Broome, PE, Director of Infrastructure and Engineering Johnston County Public Utilities PO Box 2263 Smithfield, NC 27577 Subject: Johnston County Residential Flow Reduction Approval Johnston County Dear Mr. Broome: On February 22, 2005, the Division of Water Quality received a flow reduction request for . residences in Johnston County. The letter requests an allowable flow rate of 80 GPD per residential bedroom based on the evaluated data for three similar existing subdivisions. The water use data provided between November 2003 and October 2004 with daily readings taken during November 2004 Was analyzed by central office and regional office staff with additional information requested. Based upon this data and the County response to our additional information requests, the Division hereby approves the use of 80 GAD per residential bedroom, with a minimum of 160 gpd for one and twb bedroom units in all applicable non -discharge permit applications. Flow shall be incremented by 80%gpd for each bedroom above two., Regardless of the adiusted defined in the NPDES permit for the treatment facility or exceed the capacity of the sewers downstream of any new sewer extension or service connection(s). A permit modification and fee is required to apply this flow reduction to any existing permits where flows have been allocated. If you have any questions or comments regarding this matter, please contact Marie Doklovic at (919)733-5083 ext. 371. . Sincerely, eF�,Alan W. Klimek, P. E. cc: Ken Schuster, Raleigh Regional Office Barry Herzberg, Raleigh Regional Office Mark McIntire, NPDES East Program Kimberly Rineer, PE, Johnston County Public Utilities PERCS Flow Reduction File One Pretreatment, Emergency Response and Collection Systems Unit Internet http'//h2o.enr.nc.state.us/ndpu NoxthCaroaa 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer ��q¢y�yrf 1(p Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper Fast Track Application Sierra Heights — Phase Four Neuse River Approx Location of SS Outfall Line Pump Station at t the Neuse (Not To Scale) Fast Track Application Sierra Heights — Phase Four Entrance to Sierra Heights off of Vinson Road OD LEE R. HINES, JR., PE Civil Engineering Land Planning & Development Project Management June 1, 2018 Raleigh Regional Office — Water Quality Section 1628 Mail Service Center Raleigh, NC 27699-1628 Subject: Sierra Heights Subdivision, Phase Four Johnston County, NC 630 Aiken Parkway F uquay-Varina, NC 27526 Phone 919.422 8011 Email richiehinespe@nc.rr.com NC Dept ofEnvironmeniai Quaiit- JUN 0 4 2018 Raleigh Regional O ft i c: - Please find attached a Fast Track Application package for the subject project. Sierra Heights is a multi -phase residential subdivision located off of SR 1903 (Vinson Road) in Johnston County. The development proposes 285 lots on approximately 190 acres. Sewer from Sierra Heights is collected in a gravity system and flows through an outfall line to a pump station located in The Knolls at the Neuse, a nearby residential subdivision. The first two phases of 110 lots, as well as the gravity outfall line, were issued an approval (WQ 0031042) in November of 2006. Phase Three, which was 59 lots, was issued an approval (WQ 0039421) in July of 2017. Phase Four is the next phase of 53 lots, with an anticipated flow of 12,720 GPD. Johnston County has planned their collection and treatment systems anticipating full build -out of Sierra Heights, so there should be no issue in their system as the lots are developed. I trust that you find this satisfactory, but please do not hesitate to contact me at (919) 422-8011 or at richiehinespe c-mc.rr.com if you have any questions or need additional information. Thank you for your assistance. Sincerely, Lee R. Hines, Jr. (Richie), PE LRH/ Attachments