Loading...
HomeMy WebLinkAbout20180816 Ver 1_More Info Received_20180710Strickland, Bev From: Bobby Tucker <bobby@bodhila ndanddesign.com> Sent: Tuesday, July 10, 2018 8:07 AM To: Homewood, Sue Cc: David.E.Bailey2@usace.army.mil Subject: Re: [External] Re: Watts driveway permit Attachments: C-2_v2.pdf Sue, I attached the revised sheet C-2 of the plans. Please let me know if there is another preferred means to send this. Thanks, Bobby On Mon, Jul 9, 2018 at 10:03 PM, Homewood, Sue <sue.homewood@ncdenr.gov> wrote: Sorry, my mistake. If you could just update the plan to show proper installation/elevation that will be sufficient. Thanks Sent from my Verizon, Samsung Galaxy smartphone -------- Original message -------- From: Bobby Tucker <bobby@bodhilandanddesign.com> Date: 7/9/18 4:22 PM (GMT -05:00) To: "Homewood, Sue" <sue.homewood@ncdenr.gov> Cc: "David. E.Bailey2@usace.army.mil" <david.e.bailey2@usace.army.mil> Subject: [External] Re: Watts driveway permit Sue, Just a quick clarification/question: the plans actually show riprap at the inlet side of the culvert to dissipate the small amount of roadway drainage as it enters the channel. I did not propose rip rap at the outlet side as I don't believe it is needed and it could potentially do more harm than quick. GC 4139 No. 18 seemed to support this. However, I can certainly add a riprap apron to the outlet if the permit requires. Regardless, I will modify the plans to show that the inlet apron is not above the existing grade of the channel. Thanks again, Bobby On Mon, Jul 9, 2018 at 12:29 PM, Homewood, Sue <sue.homewood@ncdenr.gov> wrote: Hello Bobby, I am reviewing the application for this project and need a couple things before I can issue the approval: 1.The General Certification #4139 Condition 11. 11 requires that the pipe be installed below the elevation of the streambed by 20% of the diameter of the pipe. Based on the profile shown on Sheet C-2 it looks like you are proposing that the pipe outlet be "at grade" and therefore it wouldn't meet this condition. Please modify the plans to reflect compliance with this condition. 2.The plans show that there will be a riprap apron below the outlet of the pipe. We require that this apron be constructed such that the top of the riprap matches the natural streambed elevation. Can you please provide a drawing that shows proper installation of the riprap. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Bobby Tucker, PE I President Bodhi Land and Design, PLLC 1300 Silk Hope -Liberty Rd. Siler City, NC 27344 e bobby(a-)-bodhilandanddesign.com m 919.200.3387 Bobby Tucker, PE I President Bodhi Land and Design, PLLC 1300 Silk Hope -Liberty Rd. Siler City, NC 27344 bobby(a-)-bodhilandanddesign.com m 919.200.3387 ::i 870 :.1 850 840 830 0+81.92 -30 -20 -10 0 Offset 1110 20 3b 40 890 890 880 880 870 870 860 860 850 850 840 840 830 830 1+20.18 PROPOSED GRADE RIP RAP SLOPE ARMOR, 12" THICK REGRADE BANK SLOPE AND STABILIZE WITH COIR MATTING (ACF CM700 OR EQUIVALENT) 6" AGGREGATE ROAD BED COMMON DETAIL FILL PER 2.1 777748" 1 1 REGRADE BANK SLOPE AND 3 3 SHEET C-3 48" RCP STABILIZE WITH COIR MATTING LENGTH = 60' - - _ INV. IN: 855.8' (ACF CM700 OR EQUIVALENT) INV. OUT: 849.2' n n SLOPE = 3.0% EXISTING GRADE RCP, INV 0.8' BELOW EXISTING CHANNEL ELEV. PIPE BEDDING PER -30 -20 -10 0 Offset 1110 20 3b 40 890 890 880 880 870 870 860 860 850 850 840 840 830 830 1+20.18 -30 -20 -10 0 Offset 10 20 3'0 STREAM CROSS-SECTIONS I I I I co 0000001-- I I 1 / SL -3•/ I \\ \ \\ \ \ I I \ \ \ \ I I I \ I I I / I o 0 0 0 0 \ \ \\ \\ ./ I I I \ I I I TEMPORARY DIKE W/ I o O o O oQ0 O O o \\ \ \ I I I PUMP -AROUND INTAKE •\ \ \ 48" RCP n \ \ I I / I I I PIPE LENGTH = 60 LF PIPE SLOPE = 0.030 FT/FT \ \\ \ \\ / )'000' l I I o 0 0 0 0 0 0 0 0 0 \ \\ / f/ I i o 0 o I \ o�o� 10 0 0Dc Cjo� I \ / I -4— SL-2 —SL -2 i I _ / _ 2 \ I �� � —7- NCDOT CLASS B RIP RAP SLOPE ARMOR, i I I 12 MIN. THICKNESS PROPOSED 12' GRAVEL ROAD / I CENTERLINE I I I I \ I WINGED ENDWALL II I \\ STRUCTURE i (TYP OF 2) SL -1 � I I 1 I I I I I 1 I i I I i EXISTING STREAM II I • 1 • i I. T CENTERLINE I r I I I I I I I I 0 II5 10 I 20 SCALE: 1"=10' 1 1-0 N O 860UJI Q Z 855 Q 850 890 890 880 880 870 870 860 860 850 850 840 840 40 830 830 1+71.11 PROPOSED GRADE RIP RAP SLOPE ARMOR, 12" THICK REGRADE BANK SLOPE AND STABILIZE WITH COIR MATTING (ACF CM700 OR EQUIVALENT) 6" AGGREGATE ROAD BED COMMON DETAIL FILL PER 2.1 777748" 1 1 i 3 3 SHEET C-3 48" RCP LENGTH = 60' INV. IN: 855.8' INV. OUT: 849.2' n n SLOPE = 3.0% EXISTING GRADE RCP, INV 0.8' BELOW EXISTING CHANNEL ELEV. PIPE BEDDING PER DETAIL 2.1 -30 -20 -10 0 Offset 10 20 3'0 STREAM CROSS-SECTIONS I I I I co 0000001-- I I 1 / SL -3•/ I \\ \ \\ \ \ I I \ \ \ \ I I I \ I I I / I o 0 0 0 0 \ \ \\ \\ ./ I I I \ I I I TEMPORARY DIKE W/ I o O o O oQ0 O O o \\ \ \ I I I PUMP -AROUND INTAKE •\ \ \ 48" RCP n \ \ I I / I I I PIPE LENGTH = 60 LF PIPE SLOPE = 0.030 FT/FT \ \\ \ \\ / )'000' l I I o 0 0 0 0 0 0 0 0 0 \ \\ / f/ I i o 0 o I \ o�o� 10 0 0Dc Cjo� I \ / I -4— SL-2 —SL -2 i I _ / _ 2 \ I �� � —7- NCDOT CLASS B RIP RAP SLOPE ARMOR, i I I 12 MIN. THICKNESS PROPOSED 12' GRAVEL ROAD / I CENTERLINE I I I I \ I WINGED ENDWALL II I \\ STRUCTURE i (TYP OF 2) SL -1 � I I 1 I I I I I 1 I i I I i EXISTING STREAM II I • 1 • i I. T CENTERLINE I r I I I I I I I I 0 II5 10 I 20 SCALE: 1"=10' 1 1-0 N O 860UJI Q Z 855 Q 850 890 890 880 880 870 870 860 860 850 850 840 840 40 830 830 1+71.11 V TTseT NOTES: 1. EXISTING CONTOUR LINES IN PLAN BASED ON LIDAR DATA. 2. STREAM CENTERLINE, CROSS SECTIONS, AND WETLAND BOUNDARY BASED ON FIELD SURVEY. 3. CONTRACTOR SHALL INSTALL NON -WOVEN GEOTEXTILE UNDER ALL RIP RAP ARMORING. 4. THE INLET AND OUTLET INVERTS OF THE PROPOSED CULVERT SHALL BE BURIED A MINIMUM OF 0.8' BELOW THE EXISTING CHANNEL BOTTOM ELEVATION. PROPOSED GRADE RIP RAP SLOPE ARMOR, 12" THICK REGRADE BANK SLOPE AND STABILIZE WITH COIR MATTING (ACF CM700 OR EQUIVALENT) (NCDOT CLASS B) 1 1 i 3 3 SHEET C-3 48" RCP LENGTH = 60' INV. IN: 855.8' INV. OUT: 849.2' n n SLOPE = 3.0% V TTseT NOTES: 1. EXISTING CONTOUR LINES IN PLAN BASED ON LIDAR DATA. 2. STREAM CENTERLINE, CROSS SECTIONS, AND WETLAND BOUNDARY BASED ON FIELD SURVEY. 3. CONTRACTOR SHALL INSTALL NON -WOVEN GEOTEXTILE UNDER ALL RIP RAP ARMORING. 4. THE INLET AND OUTLET INVERTS OF THE PROPOSED CULVERT SHALL BE BURIED A MINIMUM OF 0.8' BELOW THE EXISTING CHANNEL BOTTOM ELEVATION. 845 0+25 1+00 CULVERT PROFILE - VERT SCALE 1" = 3' 0 10 20 40 SCALE: 1" = 20' Architect: 880 • 870 www.bodhilandanddesign.com Plans, maps, specifications, studies, and reports not containing a red ink 860 seal imprint accompanied by an original signature by the licensed professional may have been fraudulently altered and shall not be considered an original copy. All information should be disregarded unless verified by the professional whose signature appears above. 850 Copyright Protected 2013. Project Owner: 840 Z W 830 a 0W a. Feeffel OOM (D 0 N Q 860 Z 855 Q 850 845 2+00 Stamp: O, Issue For: JONATHAN WATTS Issue Date: JULY 6, 2017 REVISIONS .................................... .................................... PRINCIPAL IN CHARGE: B. TUCKER PROJECT MANAGER: DRAWN BY: B. TUCKER Project Address: 5218 WILLIARD ROAD OAK RIDGE, NC 27310 Project Number: 1 Sheet Title: 1 CULVERT PLAN Sheet Number: C=02 PROPOSED GRADE RIP RAP SLOPE ARMOR, 12" THICK (NCDOT CLASS B) 1 1 (2) WINGED ENDWALL PER DETAIL 3.1, 3 3 SHEET C-3 48" RCP LENGTH = 60' INV. IN: 855.8' INV. OUT: 849.2' SLOPE = 3.0% EXISTING GRADE 845 0+25 1+00 CULVERT PROFILE - VERT SCALE 1" = 3' 0 10 20 40 SCALE: 1" = 20' Architect: 880 • 870 www.bodhilandanddesign.com Plans, maps, specifications, studies, and reports not containing a red ink 860 seal imprint accompanied by an original signature by the licensed professional may have been fraudulently altered and shall not be considered an original copy. All information should be disregarded unless verified by the professional whose signature appears above. 850 Copyright Protected 2013. Project Owner: 840 Z W 830 a 0W a. Feeffel OOM (D 0 N Q 860 Z 855 Q 850 845 2+00 Stamp: O, Issue For: JONATHAN WATTS Issue Date: JULY 6, 2017 REVISIONS .................................... .................................... PRINCIPAL IN CHARGE: B. TUCKER PROJECT MANAGER: DRAWN BY: B. TUCKER Project Address: 5218 WILLIARD ROAD OAK RIDGE, NC 27310 Project Number: 1 Sheet Title: 1 CULVERT PLAN Sheet Number: C=02