HomeMy WebLinkAboutNCG130086_Facility Layout and Drainage_20180709J*
-q6--%_ ry
.ill—
(IMPERVIOUS�
1
� x '
=-2
)03
J
i o►
Aw
01
CP
i
1
d4
nnaA
iz
' t�i v
POND IMPERVIOU�
TAR
LEGEND:
APPROXIMATE PROPERTY LINE
.�► STORM SEWER
® STORM CATCH BASIN 001
N ® POND INLET
SCALE IN FEET C SUMP LOCATION
50 0 50 100 SUMP DRAIN PIPE
STORM WATER / SPILL DIRECTION
OUTFALLS
PUMP
500 GALLON DIESEL TANK
'VW.
Stantec FACILITY LAYOUT AND DRAINAGE
1165 Scheuring Road, Green Bay, Wisconsin 54115
Phone: 920-592-8400 Fax: 920-592-8444 CARAUSTAR INDUSTRIES
This drawing and all information contained thereon is the property of Stantec. Stantec will not be held liable for 4915 HOVIS ROAD
improper or incorrect usage. Professional seals and signatures do not apply to electronic drawing files. Theuser CHARLOTTE, NORTH CAROLINA
assumes all responsibility and risk for the accuracy and verification of all information contained in electronic files.
DATE: 06/23/17 1 DRAWN BY: JRB I PROJECT MANAGER: MBR PROJECT NUMBER: 193705470 FIGURE 2