Loading...
HomeMy WebLinkAbout20180936 Ver 1_West Fork 12MC blasting_20180705G.5i. If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. For the West Fork 12-Mile Gravity Sewer Project blasting and mechanical methods of rock removal is anticipated. The duration of these operations will be determined upon rock location, depth, and hardness. It is anticipated that the contractor will perform blasting along the pipe corridor (where allowed) in the early stages of the project for the full length of the alignment. Areas where rock removal is required but not allowed, mechanical methods will be used. Refer to the attached Hazen Specifications 02202 “Excavation By Blasting” for general blasting requirements.