Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20170537 Ver 1_401 Application_20180718
July 5th, 2018 Mr. Mac Haupt NC DWR, 401 & Buffer Permitting Branch 512 North Salisbury St. Raleigh, NC 27604 Dear Mr. Haupt, Resource Environmental Solutions is pleased to submit an updated Nationwide Permit 27 Pre- Construction Notification (PCN) for the Hannah Bridge Stream Mitigation Project (“Project”). The Project is located within a watershed dominated by agricultural and residential land use in Johnston County, North Carolina, approximately Five miles south of Four Oaks. The project streams proposed for restoration have been significantly impacted by channelization and agricultural practices. The project will involve the restoration and protection of streams in the Neuse River watershed. Project has been designed in concurrence with the Hannah Bridge Riparian Buffer and Nutrient Offset Mitigation Bank. The objective for this mitigation site is to restore and design natural waterways through stream/wetland complexes with appropriate cross-sectional dimension and slope that will provide function and meet the appropriate success criteria for the existing streams. Accomplishing this objective entails the restoration of natural stream characteristics, such as stable cross sections, planform, and in-stream habitat. The floodplain areas will be hydrologically reconnected to the channels where feasible to provide natural exchange and storage during flooding events. The attached PCN package includes PCN Form, supporting figures, the Jurisdictional Determination package submitted to the USACE, and design plans. Total stream impacts resulting from the proposed project are 3,462 linear feet of permanent impacts due to stream relocation and restoration. Permanent buffer impacts resulting from project are 49,517 square feet of buffer impact in Zone 1 and 24,005 square feet of buffer impact in Zone 2 due to stream relocation and restoration. There will be 0.54 ac of permanent wetland impacts and 2.75 ac of temporary wetland impacts due to stream restoration and enhancement. Furthermore, there will be 0.2 ac of permanent open water impacts due to the removal of a farm pond within the easement. This is an updated application based on feedback from the USACE on the labeling and breakdown of the wetland impacts and of the S2 stream impact. Thank you for your prompt attention to this important project. Please contact me at 919-209-1062 or dingram@res.us if you have any questions or require any additional information. Sincerely yours, Daniel Ingram Project Manager Resource Environmental Solutions, LLC 10055 Red Run Blvd. Suite 130 Owings Mills, MD 21117 412 N. 4th St. Suite 300 Baton Rouge, LA 70802 100 Calhoun St. Suite 320 Charleston, SC 29401 5020 Montrose Blvd. Suite 650 Houston, TX 77006 1200 Camellia Blvd. Suite 220 Lafayette, LA 70508 137½ East Main St. Suite 210 Oak Hill, WV 25901 33 Terminal Way Suite 431 Pittsburgh, PA 15219 302 Jefferson St. Suite 110 Raleigh, NC 27605 1521 W. Main 2nd Floor Richmond, VA 23220 fJ;;;dJP Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: Hannah Bridge Stream and Wetland Mitigation Site 2b. County: Johnston County 2c. Nearest municipality / town: Four Oaks 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3.Owner Information 3a. Name(s) on Recorded Deed: See Supplemental 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form – Version 1.4 January 2009 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 4.Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: Daniel Ingram 4c. Business name (if applicable): Resource Environmental Solutions 4d. Street address: 302 Jefferson Street, Suite 110 4e. City, state, zip: Raleigh, NC 27605 4f. Telephone no.: 919-209-1062 4g. Fax no.: 4h. Email address: dingram@res.us 5.Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B.Project Information and Prior Project History 1.Property Identification 1a. Property identification no. (tax PIN or parcel ID): See Supplement for landowner info 1b. Site coordinates (in decimal degrees): Latitude: 35.38172 Longitude: -78.415618 1c. Property size: 46.2 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Hannah Creek 2b. Water Quality Classification of nearest receiving water: Class C; NSW 2c. River basin: Neuse River Basin - 03020201 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: See Supplement and Figure 4 for existing conditions information 3b. List the total estimated acreage of all existing wetlands on the property: 23.44 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 6,280 3d. Explain the purpose of the proposed project: See Supplement and Figure 5 for the purpose of this project. 3e. Describe the overall project in detail, including the type of equipment to be used: See Supplement and Figure 5 for the project details and stream restoration approach. 4.Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No Unknown Comments: Received August 18, 2016 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Brad Breslow Agency/Consultant Company: RES Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. August 18, 2016, see attached determination and Figure 4 for wetland locations. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6.Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. Page 3 of 10 PCN Form – Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Yes/No W2 -Choose one Yes/No W3 - Choose one Yes/No W4 - Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: See supplemental and Figure 6 for further breakdown of impacts. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Relocation HB1 PER Corps 13 1,484 S2 P Relocation HF1 PER Corps 7 390 S3 P Relocation HB3 PER Corps 5 1,588 S4 T Crossing HB4 PER Corps 23 50 S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 3,512 3i. Comments: Impact is due to relocating stream to natural valley which will provide a net gain in ecological function to the stream system and surrounding wetlands (S1-3). S4 is only a temporary impact, due to restoration work in the channel crossing on the easement (See Figure 6 inset B and C). Page 4 of 10 PCN Form – Version 1.4 January 2009 Choose one Choose one Choose one Choose one 3.29 4.Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open wat impact num Permanent ( Temporary er ber P) or (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of imp ct (acres) O1 P NA Drainage Pond 0.2 O2 - Choose one Choose O3 - Choose one Choose O4 - Choose one Choose 4f. Total open water impacts 0.2 4g. Comments: As part of the wetland enhancement, this pond will be removed and hydrology will be redirected towards the forested and grazed wetlands (See Supplement and Figure 6 Inset A). 5.Pond or Lake ConstructionIf pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Catawba Randleman Other: 6b. Buffer Impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P Stream Restoration HB1 No 11,575.2 5,847.3 B2 P Stream Restoration HF1 No 1,686.1 3,528.5 B3 P Stream Restoration HB3 No 36,254.6 14,628.7 B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 49,517.9 24,005 6i. Comments: See supplement and Figure 6 (Insets B and C) for buffer impact locations. Page 5 of 10 D. Impact Justification and Mitigation 1.Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See Supplemental Information 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. See Supplemental Information 2.Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3.Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4.Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5.Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form – Version 1.4 January 2009 6.Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. No diffuse flow plan is required because there is a zero increase of impervious area. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No diffuse flow plan is required because there is a zero increase of impervious area. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Page 8 of 10 PCN Form – Version 1.4 January 2009 F.Supplementary Information 1.Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2.Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3.Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4.Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NA Page 9 of 10 PCN Form – Version 1.4 January 2009 5.Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPAC, Natural Heritage Program Database, and USFWS concurrence 6.Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Essential Fish Habitat Mapper 7.Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC SHPO GIS Database and SHPO concurrence 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: Reaches HB3 and HB4 are located within the FEMA 100-year floodplain (Zone AE) of Hannah Creek, and approximately 200 feet of the downstream end of Reach HB4 is located within the FEMA floodway. However, no grading or construction activities are proposed along the portions of the project located within the FEMA floodway. Therefore, it is not anticipated that a No-Rise or CLOMR will be required for the project. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Map Service Center Daniel Ingram Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) 02-28-2018 Date Page 10 of 10 fJ;;;dJP PCN Supplemental Information Hannah Bridge Stream and Wetland Mitigation Site Nationwide Permit 27 Pre-Construction Notification Name and address of the Applicant: Resource Environmental Solutions c/o Daniel Ingram 302 Jefferson Street. Suite 110 Raleigh, NC 27605 PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 2 of 8 A. Applicant Information 3a. Project Parcel and Landowner Information Landowner Pin County Deed Book and Page Number Parcel Acreage J & M HOG FARM INC 157900-32-5319 Johnston 01316-0140 25.555 THOMPSON, RONALD GREY 157900-22-7731 Johnston 03633 - 0723 15.328 THOMPSON, C P JR 157900-34-5414 Johnston -- 19.880 JOHNSON, EARL BENTON JR 157900-43-3410 Johnston 01218 - 0278 20.729 THOMPSON, C P JR 157900-34-8390 Johnston 01432 - 0212 9.965 THOMPSON, RONALD GREY 157900-44-5315 Johnston 03633 - 0723 28.032 B. Project Information and Prior Project History 1. Property Identification no. (tax Pin or parcel ID): See table owner information above. 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The Hannah Bridge Stream and Wetland Mitigation Site (the “Site”) is located within a watershed dominated by agricultural land use in Johnston County, North Carolina, approximately 5 miles south of the town of Four Oaks. The Site lies within USGS Hydrologic Unit Code (HUC) 03020201150020 (USGS, 2012) and within the North Carolina Division of Water Resources (NCDWR) Neuse River Sub-basin 03-04-02 (NCDENR, 2005). The 2010 Neuse River Basin Plan (NRBP) identified the Hannah Creek watershed (HUC 03020201150020) as a Targeted Local Watershed (TLW), a watershed that exhibits both the need and opportunity for wetland, stream, and riparian buffer restoration. The Hannah Creek watershed includes 34 square miles of watershed area, with forty-two percent of the 102 stream miles lacking wooded buffers. Fifty-four percent of the watershed is used for agricultural purposes and seven percent is currently developed. The project area is comprised of two separate easement locations along multiple drainage features that flow into Hannah Creek. The northern easement area captures a single tributary to Hannah Creek and a portion of its headwaters. The southern easement area is separated from the northern area by an active agricultural field, and is divided into three different areas due to a utility crossing and a culvert PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 3 of 8 crossing. The northern portion of the project contains Reach TH3, while the southern portion is comprised of Reaches HB1, HB2, HB3, HB4, HF1, and HF2. The site consists of agricultural fields, cattle pastures and wooded areas. The total easement area is 46.2 acres. The wooded areas along the easement corridor designated for restoration activities are classified as mixed hardwoods. Invasive species are present throughout the wooded areas. Channels proposed for restoration are degraded to a point where they no longer access their floodplain, lack riparian buffers, allow livestock access, and aquatic life is not supported. Current stream conditions along the proposed restoration reaches exhibit habitat degradation as a result of impacts from livestock and channelization performed to promote agricultural activities. Additionally, the riparian buffer is in poor condition throughout most of the project area where it is devoid of trees or shrubs and active pasture is present up to the edge of the existing channel. Wetland delineations identified 13 wetlands in the project area. The Hannah Bridge project consists of stream restoration and enhancement on tributaries that drain directly to Hannah Creek. The project presents 6,688 linear feet of Stream Restoration, Enhancement, and Preservation; and provide approximately 27 acres of wetland protection, re-establishment, enhancement, and preservation. 3d. Explain the purpose of the proposed project: The objective for this mitigation site is to restore and design natural waterways through stream/wetland complexes with appropriate cross-sectional dimension and slope that will provide function and meet the appropriate success criteria for the existing streams. Accomplishing this objective entails the restoration of natural stream characteristics, such as stable cross sections, planform, and in-stream habitat. The floodplain areas will be hydrologically reconnected to the channels where feasible to provide natural exchange and storage during flooding events. The design will be based on reference conditions, USACE guidance, and criteria that are developed during this project to achieve success. Additional site objectives, such as restoring the riparian buffer with native vegetation, ensuring hydraulic stability, and eradicating invasive species, are listed in Section 1. 3e. Describe the overall project in detail, including the type of equipment to be used: The design approach applies a combination of analytical and reference reach based design methods that meet objectives commensurate with both ecological and geomorphic improvements. Proposed treatment activities may range from minor bank grading and planting to re-establishing stable planform and hydraulic geometry. For reaches requiring full restoration, natural design concepts have been applied and verified through rigorous engineering analyses and modeling. The objective of this approach is to design a geomorphically stable channel that provides habitat improvements and ties into the existing landscape. The Site will include Priority I restoration, Enhancement Level I, Enhancement Level II, and Preservation. Priority I restoration reaches will incorporate the design of a single-thread meandering channel, with parameters based on data taken from the reference site described above, published empirical relationships, NC Coastal Plain Regional Curves, and hydrologic and hydraulic analyses. As a result of the restoration of planform and dimension, frequent overbank flows and a restored riparian buffer will provide the appropriate hydrology and sediment transport throughout this Coastal Plain watershed. The Site will include wetland restoration, enhancement, and preservation. Wetland PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 4 of 8 restoration will occur adjacent to Priority I stream restoration reaches. The restoration approach is to reconnect the floodplain wetlands to the stream, fill existing ditches, rough the floodplain surface, and plant native tree and shrub species commonly found in small stream swamp ecosystems. The wetland enhancement treatment will primarily be excluding livestock from the pasture and currently grazed forested, improving hydrology via pond removal and ditch plugging, and planting native tree and shrub species Stream Restoration Approach Reaches HB1, HB2, HB3, and HB4 A combination of Priority I Restoration, Enhancement Level I, Enhancement Level II, and Preservation is proposed along the primary project channel (Reaches HB1 through HB4) to address existing impairments, particularly channelization and impacts from continued cattle access. The watershed that drains to the upper end of the project is approximately 667 acres, and land use is primarily agricultural and forested. Priority I Restoration is proposed for Reach HB1 which will include relocating the channel towards the north, such that it meanders within the middle of the valley. An existing 24-inch reinforced concrete pipe (RCP) culvert crossing near the upstream end will be removed, and all sections of the abandoned channel will be backfilled to provide positive drainage towards the proposed channel. A minimum of a 100-foot buffer will be established along the majority of Reach HB1 and will be planted with native riparian vegetation. Livestock will be excluded from the buffer with fencing installed along the easement boundary. A 30-foot easement break is proposed near the upstream end of the reach to accommodate an existing overhead powerline. Enhancement Level II is proposed for Reach HB2, beginning approximately 200 feet downstream of the confluence with HF1. The channel is stable throughout, except for a few minor areas of erosion, and provides a variety of aquatic habitats. The riparian buffer is intact and consists primarily of mature hardwoods; however, there are areas of invasive species located throughout the buffer. Minimal grading and live stake planting will be required in the few areas that exhibit bank erosion. Invasive species will be treated and removed during construction, and those areas will be replanted with native riparian vegetation. Priority I Restoration is proposed for Reach HB3 to address historic straightening and irregular banks resulting from cattle impacts. The design approach will include meandering the proposed channel within the natural valley, and backfilling the existing stream. A minimum 50-foot buffer will be established and planted with native riparian vegetation. Because much of the buffer is devoid of significant woody vegetation, woody debris and log grade control structures will be installed along the bed to improve in-stream habitat and stability. Livestock will be excluded with fencing installed along the easement boundary. There is an existing crossing located within the downstream section of the project that will be removed. A 40-foot easement break is proposed at the existing farm crossing located at the reach break between HB3 and HB4. The existing culverts will be removed and replaced with 30 linear feet of 42-inch and 24-inch high-density polyethylene (HDPE) pipes. The 42-inch pipe will be buried one foot to allow for fish passage and to convey baseflow, while the invert of the adjacent 24-inch pipe will be set two to three inches above the channel bed elevation. PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 5 of 8 A combination of Enhancement I and Preservation is proposed for Reach HB4 downstream of the easement break. Enhancement I is proposed for over 500 feet beginning downstream of the easement break, and Preservation is proposed for the channel from the Enhancement I section to the confluence with Hannah Creek. The design approach will include installing log structures at various points along the channel to raise the channel invert within the upper section. Because the channel was previously channelized and relocated to the west side of the valley, the proposed structures will allow flows to frequently inundate the valley floor and existing wetlands located to the east. A floodplain bench will also be constructed along the left bank within the enhancement section. A minimum of a 50-foot buffer will be established along Reach HB4, and the west side of the buffer will be planted with native riparian vegetation. Reach TH3 Enhancement Level II is proposed on Reach TH3. The design approach on this reach will focus on improving the riparian buffer and in-stream habitat and floodplain benching. Proposed activities include cutting a floodplain bench along the south side of the channel along the upper reach, and installing grade control and woody debris structures throughout to improve vertical stability and aquatic habitat. Livestock will be excluded with fencing installed along the easement boundary. All disturbed areas within the proposed buffer will be planted with native riparian and wetland vegetation. A 40-foot easement break is proposed at the existing farm crossing located at the upstream end of the reach. The existing culvert will be removed and replaced with 24 linear feet of 24-inch HDPE pipe. The headwaters of the reach (wetland system) located just upstream of the crossing will also be placed under a conservation easement. All existing ditches will be filled/plugged using adjacent spoil piles. All disturbed areas within the easement will be planted with native wetland vegetation, and cattle will be excluded from the area by installing fencing along the easement limits. Reach HF1 A combination of preservation and restoration is proposed for Reach HF1. The majority of the channel is stable throughout the proposed easement and provides a variety of aquatic habitats. The riparian buffer is intact, but invasive species (privet) are present throughout. All non-vegetated areas within the proposed easement will be planted with native vegetation and any areas of invasive species will be removed and/or treated. Restoration is proposed for approximately 246 feet along the downstream end of the reach. Along this section, a channel will be constructed such that it meanders within the natural valley to reconnect the existing reach to the proposed channel associated with Reach HB1. Construction activities will include installing grade control structures, log toes and/or brush toes for stability and to improve aquatic habitat. Reach HF2 Preservation is proposed for Reach HF2. Upstream of Reach HF2 is a ditch that was deemed non- jurisdictional by DWR, but viable to generate nutrient credits via a separate banking instrument. The riparian buffer of Reach HF2 downstream of the ditch is intact, but invasive species (privet) are present throughout. All non-vegetated areas within the proposed easement will be planted with native vegetation and any areas of invasive species will be removed and/or treated. PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 6 of 8 C.Proposed Impacts Inventory 2.Wetland Impacts 2.h. Wetland Impacts Comments Wetland impacts associated with restoration efforts occurring adjacent to the existing wetlands will be minimized by the restoration plan. Creating a new stream channel and enhancing existing channels will only impact wetlands slightly and will provide an overall increase in wetland function with the addition of native trees and shrubs along the stream banks. Construction in these areas will remove the invasive species. 4.g. Open Water Impacts Comments Proposed wetland enhancement is located along the floodplains of the stream restoration and enhancement reaches within the jurisdictional wetland areas. The construction of a farm pond has 2a. Wetland Impact Number Permanent (P) or Temporary (T) 2b. Type of Impact Wetland Impacted 2c. Type of Wetland 2d. Forested? 2e. Type of Jurisdiction 2f. Acres W1 P Stream Restoration W1 Bottomland Hardwood Forest No Corps 0.24 W2 T Stream Restoration W1 Bottomland Hardwood Forest No Corps 1.17 W3 P Stream Restoration W3 Bottomland Hardwood Forest No Corps 0.05 W4 T Stream Restoration W3 Bottomland Hardwood Forest No Corps 0.31 W5 P Stream Restoration W4 Bottomland Hardwood Forest No Corps 0.16 W6 T Stream Restoration W4 Bottomland Hardwood Forest No Corps 0.89 W7 P Stream Restoration W6 Bottomland Hardwood Forest No Corps 0.04 W8 T Stream Restoration W6 Bottomland Hardwood Forest No Corps 0.18 W9 P Stream Restoration W7 Bottomland Hardwood Forest No Corps 0.05 W10 T Stream Restoration W7 Bottomland Hardwood Forest No Corps 0.20 Total Wetland Impacts 3.29 PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 7 of 8 altered surface drainage and placed spoil across the floodplain. As part of the wetland enhancement, this pond will be removed and hydrology will be redirected towards the forested and grazed wetlands. The existing pasture areas on the Site will be treated with Wetland Enhancement at a credit ratio of 2:1. A credit ratio of 3:1 is proposed for the grazed, forested wetland areas. The wetland mitigation treatment will primarily be re-planting the disturbed pastures as forested wetlands and excluding livestock from the pasture and currently grazed forested wetlands. Enhancement activities will include: reconnecting low-lying areas of hydric soil with the floodplain, farm pond removal, planting native tree and shrub species commonly found in small stream swamp ecosystems, and surface roughening to increase infiltration and storage. For the pond removal, the pond will be drained before breaching the dam and removing all existing PVC pipe. Per direction of the engineer, it is expected that excess spoil from the project will be placed within the existing pond footprint. Combined with the proposed stream restoration, these actions will result in a sufficiently high-water table and flood frequency to support hydrophytic vegetation and wetland hydrology, resulting in enhanced riparian wetlands. PCN Supplemental Information - Hannah Bridge Stream and Wetland Mitigation Site Page 8 of 8 D. Impact Justification and Mitigation 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project: Due to the nature of this project, complete avoidance is not possible. Both stream and wetland impacts were considered when designing the Hannah Bridge project. This project should uplift the ecological quality of streams and wetlands on site. The existing channel length is 6,522 LF. The proposed project will result in 6,687 LF of stream. 1a. Mitigation Type by Reach 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Impacts are minimized using a staged construction approach. Where possible the channel will be constructed prior to turning stream flow into a segment. This approach allows minimization of the impact of each stage during the project construction. Additionally, all work in wetlands and streams will be conducted during dry conditions and/or with mats to protect soil structure. Efforts will be made to preserve individual high value trees located within the stream restoration area. Reach Mitigation Type Existing Length (LF) Proposed Length (LF) HB1 Restoration 99 117 HB1 Restoration 1,385 1,313 HB2 Enhancement II 392 392 HB3 Restoration 1,588 1,807 HB4 Enhancement I 579 579 HB4 Preservation 228 228 HF1 Preservation 1,386 1,386 HF2 Preservation 149 149 TH3 Enhancement II 716 716 Totals 6,522 6,688 Hannah Creek WatershedTLW: 03020201150020 Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, EsriJapan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia,NGCC, © OpenStreetMap contributors, and the GIS User Community 0 2 41 Miles Figure 1 Vicinity Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Hannah Bridge Easement Targeted Local Watershed Date: 11/21/2017 Drawn by: MDE Document Path: C:\Users\mengel\Dropbox (RES)\@RES GIS\Projects\nc\Hannah Bridge\MXD\PCN\Figure 1 - Vicinity Map.mxd Review by: JRM»1 inch = 2 miles Copyright:© 2013 National Geographic Society, i-cubed 0 1,000 2,000500 Feet Figure 2 USGS Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Hannah Bridge Easement Date: 11/21/2017 Drawn by: MDE Document Path: C:\Users\mengel\Dropbox (RES)\@RES GIS\Projects\nc\Hannah Bridge\MXD\PCN\Figure 2 - USGS.mxd Review by: JRM»1 inch = 1,000 feet Bb Ly Bb GeB Ra GeB GeB GoA Ly UcB GeB UcB GoA Bb Bb GeB GeB UcB GoA AaA GeB Ly UcB AaA Ly GoA GoA UcBUcB Ra UcB 0 500 1,000250 Feet Figure 3 Soils Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Hannah Bridge Easement Hydric Rating Hydric (100%) Nonhydric (0%) Predominantly Nonhydric (1-32%) Date: 11/21/2017 Drawn by: MDE Document Path: C:\Users\mengel\Dropbox (RES)\@RES GIS\Projects\nc\Hannah Bridge\MXD\PCN\Figure 3 - Soils Map.mxd Review by: JRM»1 inch = 500 feet W4 W1 W3 W13 W10 W5 W9 W2 W6 W11 W7 W8 W12 0 500 1,000250 Feet Figure 4 Existing Conditions Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend !CCrossings Proposed_Easement Existing Stream Location Existing Pond Existing Wetland Condition Forested- Not Disturbed Forested-Disturbed Non-Forested Date: 11/21/2017 Drawn by: MDE Document Path: C:\Users\mengel\Dropbox (RES)\@RES GIS\Projects\nc\Hannah Bridge\MXD\PCN\Figure 4 - Existing Conditions Map.mxdReview by: JRM»1 inch = 500 feet [[[ [ [[[[[[[ [ [[[[[[[[[ [[[[[[[[[[[[[[[[[[ [[[[[HB2Remove farm pond EExisting Crossings Powerline PPlug ditches HB3HF1H B 1 TH3 H F 2 HB4W1 W6 W5 W4 W3 W9 W14 W11 W14 W4 W8 NC Center for Geographic Information & Analysis, Esri, HERE, Garmin, © OpenStreetMap contributors 0 500 1,000250 Feet Figure 5 Conceptual Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Proposed Easement Existing Pond Stream Mitigation Restoration Enhancement I Enhancement II Preservation Ditch Wetland Mitigation Protection Restoration Enhancement (2:1) Enhancement (3:1) Preservation Date: 7/5/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Hannah Bridge\MXD\PCN\Figure 5 - Conceptual Map.mxdReview by: XXXX»1 inch = 500 feet Inset A Inset C Inset B 0 500 1,000250 Feet Figure 6 Impacts Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Proposed_Easement Date: 11/22/2017 Drawn by: MDE Document Path: C:\Users\mengel\Dropbox (RES)\@RES GIS\Projects\nc\Hannah Bridge\MXD\PCN\Figure 6 - Impacts Map.mxdReview by: JRM»1 inch = 500 feet HB2HB10 150 30075 Feet Figure 6 Impacts Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Proposed_Easement !CCrossings Existing Top of Bank Mitigation Approach Proposed Center Line Drain Pond Impacts Zone 1 Buffer Impacts Zone 2 Buffer Impacts Permanent Wetland Impact Temporary Wetland Impact Date: 11/21/2017 Drawn by: MDE Document Path: C:\Users\mengel\Dropbox (RES)\@RES GIS\Projects\nc\Hannah Bridge\MXD\PCN\Figure 6 - Impacts Map_InsetA.mxdReview by: JRM»1 inch = 150 feet Inset A Open Water Impacts:Drain Pond 0.2 ac W4 W1 W3 HB1HF1HB20 150 30075 Feet Figure 6 Impacts Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Existing Top of Bank Proposed_Easement Wetlands !CCrossings Proposed Center LIne Drain Pond Impacts Zone 1 Buffer Impacts Zone 2 Buffer Impacts Permanent Wetland Impact Temporary Wetland Impact Date: 7/5/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Hannah Bridge\MXD\PCN\Figure 6 - Impacts Map_InsetB.mxdReview by: XXXX»1 inch = 150 feet Inset B Wetland Impacts: W1: 0.42 ac of Permanent Impacts W2: 1.17 ac of Temporary Impacts W3: 0.05 ac of Permanent Impacts W4: 0.31 ac of Temporary Impacts W5: 0.16 ac of Permanent Impacts W6: 0.89 ac of Temporary Impacts Stream Impacts: S1: Relocation 1,484 impacted linear feet Stream Impacts: S2: 390 impacted linear feetW1W2 W3W4 W5W6 Buffer Impacts:B2 Zone 1 Impacts: 1,686.1 sq ftB2 Zone 2 Impacts: 3,528.5 sq ft Buffer Impacts B1 Zone 1 Impacts: 11,575.2 sq ft B1 Zone 2 Impacts: 5847.3 sq ft W3 W4 W3 W6 W7 W6 W7 HB3 HB2HB4HB1 0 150 30075 Feet Figure 6 Impacts Map Hannah Bridge Mitigation Site Johnston County, North Carolina Legend Proposed_Easement Wetlands !CCrossings Proposed Center Line Existing Top of Bank Drain Pond Impacts Zone 1 Buffer Impacts Zone 2 Buffer Impacts Permanent Wetland Impact Temporary Wetland Impact Date: 7/5/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Hannah Bridge\MXD\PCN\Update\Figure 6 - Impacts Map_InsetC.mxdReview by: XXXX»1 inch = 150 feet Inset C Wetland Impacts: W7: 0.04 ac of Permanent Impacts W8: 0.18 ac of Temporary Impacts W9: 0.05 ac of Permanent Impacts W10: 0.20 ac of Temporary Impacts Stream Impacts: S3: Relocation 1,588 impacted linear feet Stream Impacts: S4: Temporary Impact Stream Crossing ≤ 50 linear feet W7W8 W9W9W10 Buffer Impacts:B3 Zone 1 Impacts: 36,254.6 sq ftB3 Zone 2 Impacts: 14,628.7 sq ft U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2015-01799 County: Johnston U.S.G.S. Quad: NC -FOUR OAKS Property Owner: Address: Telephone Number: NOTIFICATION OF JURISDICTIONAL DETERMINATION EBX an RES company Daniel Ingram 909 Capability Drive Suite 3100 Raleigh, NC, 27606 919 209-1062 Size (acres) 47.94 Nearest Waterway Hannah Creek USGS HUC 03020201 Nearest Town Four Oala River Basin Upper Neuse Coordinates Latitude: 35.38172 Longitude: -78.415618 Location description: Proposed Hannah Bridge Mitigation Project located off of Green Pasture Road, adjacent to Hannah Creek , south of Four Oaks, in Johnston County, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination X Based on preliminary information, there may be waters of the U.S. including wetlands on the above described project area . We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, ajurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. Please see remarks section in re and to this Jurisdictional Determination. B. Approved Determination There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. Page 1 of 2 _ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on _. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years fi om the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact John Thomas at 919-554-4884 x25 or John.T.Thomas.JRO.usace armv mil. C. Basis For Determination: Site includes trlbalaries of Hannah the Atlantic ocean. Creek whic/z flows to the Neuse River and on to D. Remarks: For the purpose of mitigation bank planning,the Corps concurs with the review request received on August 16 2016 E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Actjurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room IOM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA 1 71, it must be received at the above address by 10/18/2016. **It is not necessary to submit an RFti f�rin to the correspondence.** Y Corps Regulatory Official: Date: August 18, 2016 if you do notAiect to the determination in this The Wilmington District is committed to providing the highest level of support to the public. To help LIS ensure We continue to do so, please complete our Customer Satisfaction Survey, located online at ham.//regii latorv�usacesw vey,com/. NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Daniel Ingram File Number: SAW -2015-01799 Date: August 18, 2016 EBX an RES company Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of ermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of ennission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION n SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at htto:%!wwvv.usace army mil,Missions'Civilworks;Re ulatoraProgmmandPetmits asps x or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terns and conditions therein, you may request that the permit be modified accordingly. You must complete Section 11 of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address al l of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form trust be received by the division engineer within 60 days of the date of this notice. D: APPROVED information. You may accept or appeal the approved JD or provide new ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION Y d ou o not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) HUUI I iviNAL wrUKMATION: The appeal is limited to a review ofthe administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division, Attn: John Thomas If you only have questions regarding the appeal process you may also contact: Mr. Jason Steele, Administrative Appeal Review Officer CESAD-PDO U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room I OM 15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunit to articipate in all site investipatinnc of appellant or For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, John Thomas, For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 0 21 Miles FIGURE 1 Vicinity MapHannah Bridge Mitigation Site Johnston County, North Carolina Legend Prop osed Easement TLW 03 02020 11500 20 ©Document Path: C:\Users\apric_000\Dropbox\@RES Projects\North Carolina\Hannah Bridge\GIS\MXD\JD\Figure 1 - HB Vicinity Map - Copy.mxdHannah BridgeMitigation Site Copyright:© 2013 National Geographic Society, i-cubed 0 2,0001,000 Feet FIGURE 2 USGS Topographic MapHannah Bridge Mitigation Site Johnston County, North Carolina Legend Proposed Easement ProjectStreams ©Date: 5/27/2016 Drawn by: BPB Checked by: DPI Document Path: C:\Users\apric_000\Dropbox (Andrew)\@RES Projects\North Carolina\Hannah Bridge\GIS\MXD\JD\Figure 2 - HB USGS Map - Copy.mxd 0 600300 Feet FIGURE 3 National Wetlands Inventory MapHannah Bridge Mitigation Site Johnston County, North Carolina Legend Type En hancement I En hancement II Resto ra tion NWI Wetland s ©Date: 5/27/2016 Drawn by: BPB Checked by: DPI Document Path: C:\Users\apric_000\Dropbox (Andrew)\@RES Projects\North Carolina\Hannah Bridge\GIS\MXD\JD\Figure 3 - HB NWI Map - Copy.mxd Bb GeB GeB UcB Ra Ly GeB GeB UcB LaB GoA Ly UcB Ra UcB AaA Pn GeD UcB To GoA AaA GeB UcB GoA Ly GeD Ud UcB Ra GeD 0 600300 Feet FIGURE 5 Soils MapHannah Bridge Mitigation Site Johnston County, North Carolina Legend Prop osed Easement Streams Hydric Soils ©Date: 5/27/2016 Drawn by: BPB Checked by: DPI Document Path: C:\Users\apric_000\Dropbox (Andrew)\@RES Projects\North Carolina\Hannah Bridge\GIS\MXD\JD\Figure 5 - HB Soils Map - Copy.mxdSoil SymbolAaAAltavista fine sandy loam, 0 to 2 percent slopes, occasionally floodedBbBibb sandy loam, 0 to 2 percent slopes, frequently floodedGeBGilead sandy loam, 2 to 8 pe rc ent slopesGoAGoldsboro sandy loa m, 0 to 2 percent slopesLyLynchburg sandy loa m, 0 to 2 percent slopesRaRains sandy loam, 0 to 2 pe rc ent slopesUcBUchee loamy coarse sa nd, 2 to 6 percent slopes W1 W2 W3 W6 W4 W5 W7W7 W10 W9 W8 W11W12W13 HB-1UT-1UT-5 U T-2 UT-4GREEN PASTURE 0 450225 Feet FIGURE 7 Exsting Conditions MapHannah Bridge Mitigation Site Johnston County, North Carolina Legend Proposed Easement Streams Wetland Type Non-Forested Forested- Not DIsturbed Forested-Disturbed ©Date: 6/22/2016 Drawn by: BPB Checked by: DPI Document Path: C:\Users\Brad\Dropbox (RES)\@RES Projects\North Carolina\Hannah Bridge\GIS\MXD\JD\Figure 7 - HB Existing Condition_JD.mxd WKD PROJ. NO.: 2015020500 10/5/2017COVER1RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 302 JEFFERSON ST, SUITE 110 RALEIGH, NC 27605 VICINITY MAP NTS HANNAH BRIDGE STREAM MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA LOWER HANNAH CREEK: HUC 030202011302 OCTOBER 2017 300 600300150 HORIZ. 1 inch = 300ft.COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING NUMBER:PLOT DATE:DRAWING TITLE:PROJECT NAME:community infrastructure consultants720 CORPORATE CENTER DRIVERALEIGH, NC 27607(t)919-782-0495(f)919-782-9672WWW.WKDICKSON.COMLICENSE NO.FILE PATH:O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT COVER.dwgO:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT COVER.dwg, BCARROLL, 10/5/2017 2:41:09 PMPROFESSIONAL SEAL PROJ. DATE:PROJ. MGR.:PRINCIPAL.:CAD TECH:Q.C.:Q.C. DATE:REV RECORD: DESCRIPTIONBY DATE REV RECORD: NOTICE TO CONTRACTOR PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL "811" A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. DESCRIPTIONBY DATE JUN 2016MSFEB 2016FMMSSWDRAWING LIST TABLE DRAWING NUMBER DRAWING TITLE 1 COVER A1 OVERALL AERIAL E1 EXISTING CONDITIONS INDEX E2 EXISTING CONITIONS E3 EXISTING CONITIONS S1 REACH HB S2 REACH HB S3 REACH HB S4 REACH HB S5 REACH HB S6 REACH HB S7 REACH HB S8 REACH HB S9 REACH HB S10 REACH HB S11 REACH HF1 S12 REACH HF1 S13 REACH HF1 S14 REACH TH3 S15 REACH TH3 W1 WETLAND ENHANCEMENT W2 WETLAND ENHANCEMENT F1 FENCING PLAN P1 PLANTING PLAN P2 PLANTING PLAN M1 MONITORING PLAN D1 DETAILS D2 DETAILS D3 DETAILS D4 DETAILS D5 DETAILS D6 DETAILS 0 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_OVERALL.dwg - October 5, 2017 - Ben Carroll 200 400 200 ---- ---- ----OVERALL AERIAL2015020500 MS JUN 2016 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINANC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE: DWG E2 DWG E3 GREEN PASTUR E R O A DMA T C H L I N E MA T C H L I N E O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT EXIST COND.dwg - October 5, 2017 - Ben Carroll 200 400 200 ---- ---- ----EXISTING CONDITIONS INDEX2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINANC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:MS JUN 2016 MATCH LINE SEE DRA WIN G E3 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT EXIST COND.dwg - October 5, 2017 - Ben Carroll 100 200 100 ---- ---- ----EXISTING CONITIONS2015020500 MS JUN 2016 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINANC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 LEGEND MA T C H L I N E S E E D R AW I NG E 2 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT EXIST COND.dwg - October 5, 2017 - Ben Carroll 100 200 100 ---- ---- ----EXISTING CONITIONS2015020500 MS JUN 2016 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINANC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 LEGEND TB TB TBTBTBTB TBTBTBTBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB T B TBTBTB TB TB TBTBTB TBTB TBTBTB TBTBPP BBBBBBBBB B BBBBBBBB BB BBBBBBBB BB B B BBBB BB BB BB BBBBBB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBEUGENE A. LEE DB 519, PG 506 OHPOHPOHPOHPOHPOHPOHPOHPOHP24"GT 24"T 15"GT 18"GT 15"OT 12"T 18"GT 15"GT 12"T 12"GT 15"OT 15"GT 18"OT 24"T15"GT 18"GT12"GT 15"GT 18"GT15"GT 20"GT 20GT 20"OT 24"GT 18"GT 15"MT 18"GT 20"T 18"OT15"OT 24"GT 15"OT 15"GT 18"OT 18"OT FILL EXISTING CHANNEL. SEE DWG D20+001+00 2+ 0 0 3+00 4+ 0 0 5+00MATCH LINE 4+50S2SCALE: HOR 1"=30'; VERT 1"=3' 115 117 120 123 126 129 132 135 115 117 120 123 126 129 132 135 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 LOG GRADE CONTROL STA 0+29 ELEV 125.58 LOG GRADE CONTROL STA 2+93 ELEV 124.44 LOG SILL STA 2+03 ELEV 124.91 STA 0+47.34 ELEV 125.46STA 0+59.04 ELEV 124.97STA 0+66.39 ELEV 124.95STA 0+76.09 ELEV 125.42STA 0+88.13 ELEV 125.28STA 1+01.85 ELEV 124.83STA 1+22.49 ELEV 124.76STA 1+32.15 ELEV 125.23STA 1+62.31 ELEV 125.00STA 1+72.97 ELEV 124.59STA 1+81.35 ELEV 124.56STA 1+88.22 ELEV 125.04STA 2+16.68 ELEV 124.45STA 2+30.07 ELEV 124.40STA 2+38.49 ELEV 124.87STA 2+64.32 ELEV 124.53STA 3+01.19 ELEV 124.17STA 3+24.75 ELEV 124.09STA 3+33.64 ELEV 124.56STA 3+51.02 ELEV 124.42STA 3+64.83 ELEV 123.76STA 3+87.10 ELEV 123.68STA 3+96.79 ELEV 124.35STA 4+10.65 ELEV 124.21STA 4+25.99 ELEV 123.82STA 4+43.60 ELEV 124.09LOG SILL STA 4+35 ELEV 124.20 EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED TOP OF BANK PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 MS JUN 2016 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINANC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TB TB TB TB T B T B TB TB TB T B BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BBB B BB BB BBBB BB BB BBBBBBBBBB15"OT 18"OT15"GT 15"MT 20"T EIP EIP 15"T 18"T 15"T 18"T FIL L E X I S T I N G C H A N N E L . SE E D W G D2 FILL EXISTING CHANNEL. SEE DWG D2 4+ 0 0 5+006 + 0 0 7+00 8+00 9+00 MATCH LINE 4+50S1MATCH LINE 9+00S3SCALE: HOR 1"=30'; VERT 1"=3' 115 117 120 123 126 129 132 135 115 117 120 123 126 129 132 135 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00STA 4+74.69 ELEV 123.59STA 4+87.07 ELEV 124.05STA 5+59.86 ELEV 123.19STA 5+75.75 ELEV 123.14STA 5+86.17 ELEV 123.70STA 5+99.66 ELEV 123.55STA 6+17.09 ELEV 123.61STA 6+53.49 ELEV 123.01STA 6+62.58 ELEV 123.47STA 6+93.26 ELEV 122.79STA 7+09.79 ELEV 122.69STA 7+20.68 ELEV 123.27STA 7+86.61 ELEV 122.55STA 7+94.58 ELEV 123.02STA 8+50.44 ELEV 121.90STA 8+60.04 ELEV 122.40STA 8+69.56 ELEV 122.33STA 7+43.47 ELEV 123.10STA 8+80.30 ELEV 122.06STA 8+90.30 ELEV 122.29STA 8+24.87 ELEV 121.97STA 6+24.31 ELEV 123.53STA 6+35.08 ELEV 123.08STA 7+70.54 ELEV 122.60STA 8+94.68 ELEV 122.25STA 5+07.42 ELEV 123.87STA 5+23.51 ELEV 123.47STA 5+35.76 ELEV 123.87STA 4+53.44 ELEV 123.67STA 6+09.03 ELEV 123.24DOUBLE LOG DROP STA 8+15 ELEV 122.95 LOG SILL STA 5+48 ELEV 123.74 LOG JHOOK STA 6+81 ELEV 123.30 DOUBLE LOG DROP STA 8+21 ELEV. 122.66 EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED TOP OF BANK PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTBTBTBTB TBTB TB TB TBTB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBB18"GT 20"T EIP 12"T EIP 16"PT 12"T 15"PT 12"MT15"PT 15"T 18"PT 12"T 18"T15"T 24"PT 12"T 15"PT 12"PT 12"GT 18"PT 18"PT 12"MT 12"GT 12"T 12"T 15"T 14"GT 14"PT 20"T 18"T 14"T 15"T16"T 12"T 12"PT 12"T 14"PT 12"PT 12"T 18"T 15"MT 24"T 15"GT 18"GT 15"T 12"PT 14"PT 16"PT 12"T 14"PT 12"PT 18"PT 24"PT 12"PT 12"OT 14"PT 14"PT 14"PT 15"T 15"T 15"T 12"T 18"T 22"GT EAX FILL EXISTING CH A N N E L . FILL EXISTING CHANNEL. SEE DWG D2 FILL EXISTIN G C H A N N E L . SEE DWG 9+00 10+00 11+0012+00 13+ 0 0 16+15 14+0015+0016+00REACH HF1 P1 RESTORATION (SEE DWG S13)MATCH LINE 9+00S2MATCH LINE 13+00S4SCALE: HOR 1"=30'; VERT 1"=3' 109 111 114 117 120 123 126 129 109 111 114 117 120 123 126 129 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00STA 9+09.48 ELEV 121.81STA 9+16.27 ELEV 122.23STA 9+26.63 ELEV 121.39STA 9+43.09 ELEV 121.33STA 9+77.55 ELEV 121.19STA 9+90.50 ELEV 121.15STA 9+99.52 ELEV 121.65STA 10+04.75 ELEV 121.59STA 10+24.83 ELEV 121.58STA 10+31.96 ELEV 121.52STA 10+40.60 ELEV 121.04STA 10+46.99 ELEV 121.04STA 10+55.01 ELEV 121.49STA 10+66.60 ELEV 121.42STA 10+95.04 ELEV 121.34STA 11+50.31 ELEV 121.18STA 11+91.14 ELEV 120.54STA 12+25.28 ELEV 120.94STA 12+32.87 ELEV 120.87STA 12+43.06 ELEV 120.63STA 10+80.09 ELEV 120.91STA 12+05.27 ELEV 120.51STA 9+01.95 ELEV 121.83STA 9+56.17 ELEV 121.80STA 10+16.14 ELEV 121.30STA 11+10.62 ELEV 121.25STA 11+23.63 ELEV 120.69STA 11+41.30 ELEV 120.66STA 12+52.80 ELEV 120.85STA 12+99.95 ELEV 120.01STA 12+68.90 ELEV 120.07LOG GRADE CONTROL STA 11+69 ELEV 121.00 LOG SILL STA 12+64 ELEV 120.75 LOG SILL STA 9+68 ELEV 121.63 LOG SILL STA 9+21 ELEV 122.21 PROPOSED TOP OF BANK EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTBTBTBTB TBTBTB TB TBTB TB TB TB T B TBTB T B T B TB TB TB TB TBTBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBEARL BENTON JOHNSON, JR. LOIS T. JOHNSON DB 1218, PG 278 PB 35, PG 265 12"GT 12"T 12"T 15"T 14"GT 14"PT 20"T 14"T 15"T 16"T 12"T 12"PT 12"T 14"PT 12"PT 12"T 14"T 12"GT 14"T 16"PT 12"PT 12"PT 14"T 16"PT 14"PT 14"PT 12"PT 16"PT 14"PT 15"PT 14"PT 15"PT 15"PT 16"PT 14"T 12"PT 12"PT 16"PT 12"T 18"T 15"MT 24"T 12"T 14"T 15"T 12"PT 24"PT 12"OT 14"PT 14"PT 14"PT 12"OT 12"OT12"PT 14"PT 12"OT 12"GT 16"GT 16"GT 15"T 15"T 15"T 12"T 18"T 12"GT 14"T 12"T 16"GT 12"GT 14"GT 14"PT20"PT EIS 12"GT 20"OT 24"PT 18"PT 14"PT 14"PT 16"PT 12"PT 16"PT 18"PT 18"PT 12"PT 14"OT 12"PT 12"T 22"GT 12"GT 24"T12"T36"PT 12"GT 14"GT 12"GT 16"PT 24"T 12"PT 16"PT 14"OT 20"GT 14"GT 20"OT 14"PT 12"T 14"PT 12"PT 12"PT 12"PT 16"PT 16"PT 22"PT FILL EXISTING CHANNEL. SEE DWG D2 13+00 1 4 + 0 0 15+00 16+ 0 0 17+00 18+0019+0016+15 MATCH LINE 13+00S3M A T C H L I N E 1 8 + 0 0 S 5 SCALE: HOR 1"=30'; VERT 1"=3' 110 111 114 117 120 123 126 129 110 111 114 117 120 123 126 129 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 LOG GRADE CONTROL STA 14+18 ELEV 120.07 STA 13+08.83 ELEV 120.46STA 13+62.30 ELEV 119.79STA 13+73.67 ELEV 120.26STA 13+82.68 ELEV 120.19STA 13+97.85 ELEV 119.75STA 14+05.13 ELEV 120.14STA 14+25.82 ELEV 119.78STA 13+18.08 ELEV 120.39STA 13+25.06 ELEV 120.11STA 13+34.74 ELEV 120.38STA 13+47.47 ELEV 120.25LOG SILL STA 16+61 ELEV 119.47 PROPOSED TOP OF BANK EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTBT B TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TBTB TB TB TB TB TB TB TB TBT B T B TB TBTBTBTBTBTBTBTBTB BBBBBBBBBBBBB B BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BB12"GT 12"GT 14"GT 14"PT 20"PT 12"GT 24"PT 18"PT 14"PT 14"PT 16"PT 12"PT 16"PT 18"PT 18"PT 12"PT 14"OT 14"PT 12"PT 12"PT 12"PT 16"PT 12"PT 12"PT 12"GT 18"PT 16"PT 16"PT 22"PT 14"T 14"T 26"GT14"GT 26"GT 12"T EIP 12"MT FILL EXISTING CHANNEL. SEE DWG D2 18+00 19+00 20+00 21+00 2 2 + 0 0 2 3 + 0 0 MATCH LINE 18+00S4MATCH LINE 22+50S6SCALE: HOR 1"=30'; VERT 1"=3' 105 108 111 114 117 120 123 105 108 111 114 117 120 123 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50STA 18+42.24 ELEV 118.10STA 18+48.91 ELEV 117.72STA 18+57.60 ELEV 117.69STA 18+64.08 ELEV 118.04STA 18+70.14 ELEV 117.93STA 19+21.11 ELEV 117.84STA 19+27.65 ELEV 117.77STA 19+37.37 ELEV 117.31STA 19+51.14 ELEV 117.25STA 19+59.79 ELEV 117.72STA 20+09.21 ELEV 116.95STA 20+19.89 ELEV 117.52STA 20+78.03 ELEV 117.33STA 21+01.31 ELEV 117.17STA 21+13.14 ELEV 116.65STA 21+48.13 ELEV 117.10STA 18+87.98 ELEV 117.95STA 18+79.84 ELEV 117.58STA 19+76.36 ELEV 117.62STA 20+63.69 ELEV 117.02STA 19+07.22 ELEV 117.39STA 19+14.89 ELEV 117.36STA 19+90.82 ELEV 117.00STA 21+38.48 ELEV 116.57STA 21+87.27 ELEV 116.37STA 22+16.16 ELEV 116.30STA 22+27.34 ELEV 116.83LOG GRADE CONTROL STA 18+99 ELEV 117.82 LOG SILL STA 20+43 ELEV 117.41 LOG SILL STA 21+69 ELEV 116.98 LOG JHOOK STA 22+44 ELEV 116.73 EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED TOP OF BANK PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TB TB T B T B TB TB TB TB TB TB TB TB TB TB TBTB T BTBTBTB TB TB TBTBTBTBTBTBTBTBTBT B TBTBTBTBTBTBTBTBTB TBTBTBTBTBTBT B TBBBBBBBBBBBBB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB T B TB TB TBTBTBTBTBTBTBT BTBTB GATE GATE B B B B B B BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B B B B B BB BB BB BB BB BB BB BB BB BB BB B B B B 14"T 14"T 26"GT 14"GT26"GT 12"T EIP 14"T 12"T FILL E XI S TI N G C H A N N E L. 22+ 0 0 23+0 0 24 + 0 0 25+0026+00 27+00FILL EXISTING CHANNEL. SEE DWG D2MA T C H L I N E 2 2 + 5 0 S 5 MATCH LINE 27+00S7SCALE: HOR 1"=30'; VERT 1"=3' 105 108 111 114 117 120 123 105 108 111 114 117 120 123 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00STA 22+54.71 ELEV 116.25STA 22+69.49 ELEV 116.21STA 22+78.50 ELEV 116.68STA 22+91.06 ELEV 116.54STA 23+01.41 ELEV 116.19STA 23+35.20 ELEV 116.04STA 25+16.55 ELEV 115.27STA 25+26.00 ELEV 114.77STA 25+62.98 ELEV 115.25STA 26+18.76 ELEV 114.57STA 26+37.71 ELEV 114.43STA 26+48.29 ELEV 113.92STA 26+70.13 ELEV 113.84STA 26+80.11 ELEV 114.38STA 24+91.58 ELEV 115.48STA 23+07.92 ELEV 116.57STA 25+94.44 ELEV 114.07STA 25+53.39 ELEV 114.75STA 23+54.63 ELEV 115.99STA 23+61.45 ELEV 116.40STA 23+86.07 ELEV 116.22STA 23+95.08 ELEV 115.80STA 24+11.55 ELEV 115.75STA 24+20.70 ELEV 116.20STA 24+41.01 ELEV 115.09STA 24+80.91 ELEV 114.92LOG SILL STA 25+89 ELEV 115.10 DOUBLE LOG DROP STA 24+31 ELEV 116.20 DOUBLE LOG DROP STA 24+37 ELEV. 115.88LOG SILL STA 23+27 ELEV 116.48 EXISTING GRADE ALONG STREAM CENTERLINEPROPOSED TOP OF BANK PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TB TBTB TB TB TB TB TB TB TB TB TB TB TB TB TBTBTBTBTBTBTBT B T B TBTBTB TBTBTBTBTBTBTBTBTBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBB BB BB BB BB BB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBB12"PT 24"OT 16"PT 16"T BOTTOM OF POND N O T S U R V E Y E D (APPEARS TO BE 8' T O 9 ' I N P L A C E S ) WATER ELEVATION = 1 1 7 . 8 8 ' ( 4 - 2 0 - 1 6 ) FILL EXISTING CHANNEL. SEE DWG D2 27+ 0 0 28+0 0 29+00 30+0 0 31+00 32+00FILL EXISTING C HAN NEL.SEE DW G D2CONSTRUCT SWALE. SEE SWALE TYPICAL SECTION THIS DWG.MATCH LINE 27+00S6MATCH LINE 31+50S8SCALE: HOR 1"=30'; VERT 1"=3' 102 105 108 111 114 117 120 102 105 108 111 114 117 120 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50STA 27+19.75 ELEV 113.71STA 27+64.88 ELEV 114.10STA 27+93.73 ELEV 113.43STA 28+08.93 ELEV 113.39STA 28+17.24 ELEV 113.93STA 28+27.01 ELEV 113.86STA 28+43.81 ELEV 113.39STA 28+57.20 ELEV 113.80STA 28+95.45 ELEV 112.91STA 29+03.08 ELEV 113.35STA 29+25.97 ELEV 113.20STA 29+98.29 ELEV 113.06STA 30+30.02 ELEV 112.47STA 30+41.13 ELEV 112.92STA 30+70.52 ELEV 112.34STA 30+97.93 ELEV 112.73STA 31+22.79 ELEV 112.58STA 31+38.40 ELEV 112.13STA 29+37.56 ELEV 112.78STA 29+53.20 ELEV 112.70STA 29+60.26 ELEV 113.18STA 27+56.01 ELEV 113.63STA 28+73.39 ELEV 113.68STA 29+72.30 ELEV 113.08STA 29+79.16 ELEV 112.62STA 29+91.39 ELEV 112.57STA 30+88.53 ELEV 112.27STA 28+82.09 ELEV 112.97LOG SILL STA 27+11 ELEV 114.12 DOUBLE LOG DROP STA 28+73 ELEV 113.72 DOUBLE LOG DROP STA 28+79 ELEV. 113.24 LOG JHOOK STA 27+84 ELEV 113.97 EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED TOP OF BANK PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA5.0' SWALE TYPICAL SECTION ℄ 0.5' 10.0' TB TB TB TB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBGATE TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TB TB T B TBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TBTBTBTBTBT B T B T B TB TB PATH BBBBBBBBBBBBBB BB BB BB BB BB BB BBBBBBBBBBB B BBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BBBBBBB B BB BB BB BB BB BBBBBBBBBBBBBBBBEUGENE STEWART LAURA A. STEWART DB 656, PG 553 C.P. THOMPSON, JR. EVELYN H. THOMPSON DB 3633, PG 723 12"PT 24"OT 16"PT 16"PT 16"T EIP EIP 14"T 12"GT 18"MT 3 0 + 0 0 31 + 0 0 32+0033+00 34+003 5 + 0 0 36+0 0MATCH LINE 31+50S7MATCH L INE 36+00S9SCALE: HOR 1"=30'; VERT 1"=3' 102 105 108 111 114 117 120 102 105 108 111 114 117 120 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 LOG GRADE CONTROL STA 31+87 ELEV 112.39 LOG SILL STA 34+16 ELEV 111.78 STA 31+55.79 ELEV 112.08STA 31+67.34 ELEV 112.54STA 32+13.21 ELEV 111.85STA 32+64.34 ELEV 112.15STA 33+18.89 ELEV 111.58STA 33+73.29 ELEV 111.23STA 33+93.01 ELEV 111.17STA 34+06.66 ELEV 111.83STA 34+37.30 ELEV 111.11STA 34+54.53 ELEV 111.07STA 34+66.39 ELEV 111.65STA 34+80.22 ELEV 111.50STA 34+91.73 ELEV 111.18STA 33+30.11 ELEV 112.05STA 32+30.22 ELEV 112.36STA 32+88.23 ELEV 111.63STA 33+60.38 ELEV 111.78STA 35+13.85 ELEV 111.52STA 34+27.22 ELEV 111.60STA 35+55.02 ELEV 111.40EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED TOP OF BANK PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTB T B TB TBT B TBTB TB TB TB TB TB TBTBTBTBTBTBTBTBTBTB TBTBTB TB TB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB PATHBBBBBBBBBBBBBBBBB B BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBB BB BB BB BB BB BBBB BB BB BB BB BB EUGENE STEWART LAURA A. STEWART DB 656, PG 553 EIP 12"GT 18"MT 12"T 12"T 12"T 12"MT 12"T 12"MT 18"T 18"T 12"T FILL EXISTING CHANNEL. SEE DWG D235+0036 + 0 0 37+0 0 38+00 39+00 40+00 41+00 MATCH LINE 36+00S8MATCH LINE 41+00S10SCALE: HOR 1"=30'; VERT 1"=3' 99 102 105 108 111 114 117 99 102 105 108 111 114 117 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 LOG SILL STA 37+34 ELEV 110.70 BRUSH BED SILL STA 39+20 ELEV 110.00 PROPOSED 30 LF OF 24 INCH CORRUGATED HDPE PIPE @ 0.83%STA 36+35.73 ELEV 111.19STA 36+48.61 ELEV 111.15 STA 36+78.69 ELEV 110.89 STA 37+39.62 ELEV 109.83PROPOSED 30 LF OF 42 INCH CORRUGATED HDPE PIPE @ 0.87% BRUSH BED SILL STA 40+41 ELEV 109.90 EXISTING GRADE ALONG STREAM CENTERLINE PROPOSED CHANNEL BOTTOM 3.5 5.0 3.5 6.5 3.5 2.1 12.0 12.0 TYPICAL POOL CROSS SECTION STRAIGHT REACH TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ ℄ 2.5 3.6 TYPICAL SHALLOW CROSS SECTION 6.53.5 12.0 ℄ 1.6 12.2 TYPICAL LEFT MEANDER CROSS SECTION O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINAS10 TB TB TB TB TB TB TB TB T B TB TB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB1 2 " T TBTB HANNAH CREEKBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB BB BBB B BB BB BBBB3633, PG 723 JAMES KEVIN MASSENGILL JAMES BRYSON MASSENGILL DB 3938, PG 696 EUGENE STEWART LAURA A. STEWART DB 656, PG 553 18"T 18"T 18"T 12"T 12"T 15"T 12"T 12"T 20"T 24"T 12"T 12"T 12"T 15"T 15"T 12"T 18"T 18"T 12"T 15"T 15"T 12"T 24"T 12"T 30"T 20"T 12"T 15"T 24"T 12"T 15"T20"T12"T 12"T 12"T 12"T 12"T 12"T 18"T 12"T 12"T 12"T 12"T 24"T 20"T 16"T 18"T 45+06 41+00 42+00 43 + 0 0 44+00 45+0 0MATCH LINE 41+00S9SCALE: HOR 1"=30'; VERT 1"=3' 100 102 105 108 111 114 117 120 100 102 105 108 111 114 117 120 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 BRUSH BED SILL STA 42+20 ELEV 109.90 EXISTING GRADE ALONG STREAM CENTERLINE O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HB.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HB2015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TB TB T B TB TB TB TBTB TB TB TB TB TBTBTBTBTBTBTB TB TB TBTB TB TBTBTB TB TB TB TBTBBB BBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB B B BBBB BB BB BBBB BB BB BB BB BBBB BB BB 2+00 3+00 4+005+00 6+007+00 7+90 6+007+00 MATCH LINE 6+50S12SCALE: HOR 1"=30'; VERT 1"=3' 120 123 126 129 132 135 138 141 120 123 126 129 132 135 138 141 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HF2.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HF12015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TBT B TB TB TBTBTBTBTB TBTB TB TB TB TBT B TB TB TB TB TB TB TB TB TB TB TBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BBBB BB BB B B BB BB BB BB BB B B BB BB EIP 7+00 8+00 9+ 0 0 10 + 0 0 11+00 7+90 MATCH LINE 6+50S11SCALE: HOR 1"=30'; VERT 1"=3' 117 120 123 126 129 132 135 138 117 120 123 126 129 132 135 138 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HF2.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HF12015020500 MS JUN 2016 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TBTB TB TB TBTB TB TB TB TB T B TBTBTBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BB EAX 11+00 12+ 0 0 13+0014+00 15+00 16+00 16+15 11+00 12+00MATCH LINE 11+50S12SCALE: HOR 1"=30'; VERT 1"=3' 112 114 117 120 123 126 129 132 112 114 117 120 123 126 129 132 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+20 LOG SILL STA 13+28 ELEV 123.44 DOUBLE LOG DROP STA 15+76 ELEV 121.81 LOG SILL STA 15+51 ELEV 122.23 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT HF2.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH HF12015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA4.0 1.0 6.0 TYPICAL RIGHT MEANDER CROSS SECTION ℄ ℄ 1.5 1.5 TYPICAL SHALLOW CROSS SECTION 4.01.0 6.0 ℄ 0.7 6.0 TYPICAL LEFT MEANDER CROSS SECTION TBTBTBTBTBTBTBTBTBTB TBTBTB TB TB TBTBTBTBTBTBGATE GATE GATEPATHGATETB T B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TB TB TB TB TB TB TBTB PATH BBBBBBBBBBBB BBBB BBBB BBBB BB BB BBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB BB BB BB BB BB BBBB C.P. THOMPSON, JR. EVELYN H. THOMPSON DB 1432, PG 212 24"T 18"T EIS 24"T 0+00 1+00 2+00 3+00 4+00 5+00M A T C H L I N E 5 + 0 0 S1 5 SCALE: HOR 1"=30'; VERT 1"=3' 106 108 111 114 117 120 123 126 106 108 111 114 117 120 123 126 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 BRUSH BED SILL STA 4+37 ELEV 116.21 BRUSH BED SILL STA 4+64 ELEV 115.38 LOG SILL STA 1+90 ELEV 119.20 LOG SILL STA 3+00 ELEV 118.30 LOG SILL STA 4+00 ELEV 116.90 LOG SILL STA 3+50 ELEV 117.60 30' LF 18" Corrugated HDPE Pipe @ 0.17% O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT TH2.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH TH32015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA TBT B TB TB T BTBTBTBTBT B TBTBTBT B T B TB TB TB TB TB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB P A T H BBBBBBBBBBBBBBBBBBBBBBBBB B B B BB BB BB BB BB BB BB BB BB BB C.P. THOMPSON, JR. EVELYN H. THOMPSON DB 3633, PG 723 JAMES KEVIN MASSENGILL JAMES BRYSON MASSENGILL DB 3938, PG 696 15"T 15"T 24"T 15"T 15"T15"T 15"T 12"T 24"T 12"T 15"T 12"T 18"T 15"T 12"T 12"T 15"T 15"T 15"T 12"T 12"T 12"T 12"T 12"T 15"T 36"T 15"T 15"T 20"T 18"T 12"T 4+ 0 0 5+00 6+00 7+00 7+79MATCH L INE 5+00S14SCALE: HOR 1"=30'; VERT 1"=3' 102 105 108 111 114 117 120 123 102 105 108 111 114 117 120 123 5+00 5+50 6+00 6+50 7+00 7+50 7+79 BRUSH BED SILL STA 5+24 ELEV 114.54 BRUSH BED SILL STA 5+72 ELEV 113.78 BRUSH BED SILL STA 5+94 ELEV 113.25 O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA_SHT TH2.dwg - October 5, 2017 - Ben Carroll 30 60 30 ---- ---- ----REACH TH32015020500 FEB 2016 PERMITTING - NOT FOR CONSTRUCTION10/5/2017NC. LICENSE NO. F-0374 community infrastructure consultants Transportation Urban Development Geomatics Water Resources+ + 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com 0 FULL SCALE: 1"= COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. 2" = FULL SCALE 1" = HALF SCALE FILE NAME: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.DRAWING TITLE:PROJECT NAME:PROJ. N0.: DRAWING NUMBER: PROJ. DATE: Q.C. DATE: Q.C.:OWNER / 24 HR CONTACT:ADDRESS:PHONE:MOBILE:DESCRIPTIONMARK DATEREVISIONS:RELEASED FOR:PLOT DATE:TB 50 50 42 MS JUN 2016HANNAH BRIDGE STREAM MITIGATION PROJECTJOHNSTON COUNTY, NORTH CAROLINA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA SHT PLANTING.dwg - October 5, 2017 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 EIP x X—� I �m ry��s \ . ��. EIP . m/ \\ / m m m (fl 919.782.9672 www.wkdickson.com , �� -/ // FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1 " = HALF SCALE I\ ui 0 0 H � O o CL z O 1— —%ems---- / H U) z O z o O LL O so �ea�� O Lu LL O z a z o ' U r�°�/ I�-_;;s��� �i�SS `, \ \\ O FILL EXISTING DITCH UP TO TOP OF BANK Y w Q w w w X /���,,i ,r C) U J J U U) z W O 4" PVC ELEVATIONS. Q I— J O z cr H NW INV=132.56 � U LU z z z z 0 F_ w UZ w SE INV= 131.45 \ 0 Z W Q z Q w Er _ � o W F_ WU) Lu �zz �U) o I 1111 I I I I I I I A. > o LL o w ���y•��3 `•I••I W Lu C --:)C0 G Z Q 2 = ~ NO z Q 0 N M a) 1-- z O __ &j z z Ir U) i rn LLj . . X O Q oOm a o O Q0- PROJ. DATE: FEB 2016 Q.C.: MS %/ J X_t_ ` I 1 I I I _-- j � 1 � III I I I I- EIS —0 HP 7,\1 l \1I PROJ. NO.: 2015020500 1 \\ \\\\\` i I x__I i�_ i I — / I � i x x °H x � REMOVE PVC PIPE AND �'' �,' A, _-Ad A, A, � � EI I % // I DISPOSE OF OFFSITE,-- \ EIP //--- -11 ` x m m m A, INSERT B NOTE: DRAIN POND PRIOR TO CUTTING NOTCH IN DAM AND REMOVING EXISTING PVC PIPE. EXCESS SCALE 1:30 CUT (SPOIL) MAY BE PLACED WITHIN THE EIP j EXISTING POND FOOTPRINT PER DIRECTION OF x ENGINEER. \ \ I I I \ \ \ .0 Im m ID �x 'y / I P `•�\\ \ � IT / \ \ \ \ \ \ I I I � CP Epi IP - - - o IT \ I I /,fie I I \\ II\ \ --&P, \ EIP EPh \ EIP J\\ \\\ \\ \\\ �l z- \ \ —'r _ �\ INSERT B - X - - - - - - - - - - \ \ \ 1 I � \\ ,' I /�,�/ \\\\\ _-'\, \`\ �� __ 1\ • {, ' . � � • F %� INSERT A - ---------------- \� SMOOTH/REGRADE </ �i ALL AREAS \ IMPACTED BY CATTLE LOCATED OUTSIDE OF THE TREELINE. \ REMOVE SMALL BERM LOCATED ALONG EXISTING TREELINE. A, m \ A. j ya +4 Ja W W W m m W m ya Ja \ ---- I / LEGEND 1 / � t�A II / A. WETLAND RESTORATION + / GENERAL WETLAND NOTES: L 1. PLUG/FILL ALL DITCHES AND REMOVE BERMS/SPOIL WETLAND ENHANCEMENT -HIGH \ Is PILES LOCATED WITHIN WETLAND ENHANCEMENT - HIGH EIS A, IfCV1k\ � I `tom'' \\ I A \\ � 1 / AREAS. 2. ALL WETLAND ENHANCEMENT AREAS LOCATED WITHIN WETLAND ENHANCEMENT - LOW \\ ACTIVE PASTURES ARE TO BE PLANTED WITH WETLAND INSERT A VEGETATION. SEE PLANTING PLAN SHEETS P1 AND P2. WETLAND PRESERVATION SCALE 1:30 COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2015020500RA - Hannah Bridge Mitigation Site\CADD\Plan Set\2015020500RA SHT PLANTING.dwg - October 5, 2017 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (fl 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1 " = HALF SCALE I\ ui 0 0 H � O o CL z O H U) z O z o O LL O w ,o O Lu LL O z a z o ' U O Y w Q w w w CE Ix 0- C) U J J U U) z W O Q I— J O z cr H O Q z w N U LU z z z z 0 F_ w UZ w 0 Z W Q z Q w Er _ � o W F_ WU) Lu �zz �U) o 0 g o W F_< z 0o w zW > o LL o w ���y•��3 `•I••I W Lu C --:)C0 G Z Q 2 = ~ NO z Q 0 N M a) 1-- z O __ &j z z Ir U) i rn LLj . . WLu Lu Q z O Q oOm a o O Q0- PROJ. DATE: FEB 2016 Q.C.: MS Q.C. DATE: JUN 2016 DRAWING NUMBER: w 1 PROJ. NO.: 2015020500