HomeMy WebLinkAbout20180925 Ver 1_Permit Drawings BUFFER_20180703�
i
aF i�c�t 9 a r�r In��> >1� li Y�
r�e n rt � l i;r � iivP�t'�i��l ynibols
�_�� l� ���t I F�.r _���v y Conti�l �ne�t
� THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF ARCHDALE.
` �) DETOUR ROUTE
�
� �
�
V
�
�
O
V
TO US
(MAI N �
�
5�'s��'1� ��IF�' �����J�--1� �'�� I ' ��l�l�� � ��
�1�`�'���!���,� ��' I���l���� 19S
RA1�lDOLPH COU1�lT�'
BUFFER DRAWING
SHEET 1 OF 5
LOCATI011t: BRIDGE 1V0. 750416 ON SR 1911 (ASHLAIVD ST)
OVER DALE CREEK
TYPE OF WORK: GRADI11lG, DRAIIVAGE, PAVING AND STRUCTURE
BU FFER IMPACTS PERMIT
SITE 1
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
GRAPHIC SCALES DESIGN DATA
50 25 0 50 t00 ADT 2011 = 1850
T — 7 % *
PLANS V = 40 MPH
* TTST =3% DUAL 4%
50, 25 0 50 100 FUNC CLASS =
�� LOCAL RURAL
PROFILE (HORIZONTAL)
0
SUB—REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY PROJECT = 0.057 MILES
LENGTH STRUCTURES PROJECT = 0.004 MILES
TOTAL LENGTH PROJECT = 0.057 MILES
NCDOT CONTACT: TIM WELCH
NCDOT TPMU
��J ����
D�S�Po A@BD E6tlC+l
FIRM NO. P-0339
2012 ST9NDARD SPECIFIG9TIONS
�� 504 Meadowland Orive
Hillsborough, NC 27278-8551
Voice:(9t9)732-3883
Fax:(919�732-0'776
JERVICFS wwwsummitde.net
RIGHT OF WAY DATE: TRACY N. PARROTf, PE
October 2014 PRo�cr sxcrNEen
LETTING DATE: BRANDON W. JOHNSON, PE
lanuary 27� ZO�S f'ROJECT DESIGN ENGINEER
62
RD.)
�
sTwTe sT�� �Ra�e�T R�N�u�e No.
���� 17BP.8.R.76
ST.�iC VNOl.NO. .w.PROl.vO,
17BP.8.R.76 � NA
176P.8.R.76 NA
17BP.8.R.76 NA
C�7{i[7�7A
Office of:
HI'DRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
P.6.
TI.L
HCC 5H¢CTS
�
ESCYUMION
PE
RiW
CONST
M= FIRM Li�LN_C Nn: s-oy5u
�I`_ ""' FrnnKl:n Rr..�d
Fai�� �r�, P:i. ?io� i�
�.aIJ1 55]--^-13
�.A. �9131 8`,9-��.25a fFPXi
Ni� FiFM LIrEIVSF_ Nc: r-i�671
IOIISchcut 9rive.5uits 100
��ai�;gn. raC 2�r,e�r,
fJ191 NSF6n96
:91'_�) �51-n545 iFAXI
Il�ff�IEll,IIa""d][NAI3�' Il�]L..�N�
DO NOT ['SE POR C9NSTRUCTION
N
O
�
Z
n
O
OC fZ')
W
— Z A �
D p
O
WLET & OUTLEf CHANNEL DETAIL
NOT TO SCALE
N= •\ — — -�s'
����;`s'o��En---� 1 �
joui�r o�'iuiv�
N lo lfT B�IVO�t1iLEi1 0' l0 10, � 10' fo yl
EHis�.
'THE FLOO�PIAIN BENCH SNALL BE COVERED WITH COIR FIBER
ATfING AN� THE PERIMETER SHALL BE LINED WILH C1A55 'I'
RIP k4P IF FILL IS NEEOED FOq iME BENCH, USE CLA55 'I' qLONG
WITH NATIVf MAiERIAL TO FIIL VOIOS.
LEGEND
BZ � BUFFER ZONE 1(30 FEET)
gZ Z BUFFER ZONE 2(20 FEET)
� ALLOWABLE IMPACTS ZONE 1
����� ALLOWABLE IMPACTS ZONE 2
� . __ __ i;.. .__ _ ;j_
� � �-- --- �� __ _ � F':
i � �
D ETAI L
,�or �o ��a«
MULTI— BARREL CULVERT
LOW FLOW CHANNEL,SILLS
AND FLOOD PLAIN BENCH
'NOTES
I�NATIVE MATERIAL CONSISTS OF NJ.TERIAt THAT
IS EXCnVATED FROM THE THE STREAM OR
FLOODPLqIN AT THE PROJECT SITE �URING
CONSTRUCTION. FIP-RAP MAY BE USEO TO $UPPIEMENT
THE NATIV[ BED NWTLRIAL IN THE HIGH
FLOW Cl1LVCRT �AP.REL.I� RIP-RAP IS
� �t��
� _�n,--�i
cub-l�t",� .�m-n
0-3.� r�s
d-OE2If
I nJ'.
0 015
i_mp
JAAIE$ A. 6 WILLIE R. CARREIL
DONALO R, NILLARD �
RIP-RAP ��-
EM�p.NKMENT
:J� DETAIL 3 \ J
SPEC LfnT�EESpEEDIATCH �\ �
� / �� m%
� - SRAcS II IRi�I `"j D N
� a VIN I� F��VCE � a I _-
J��
�� � u`� IEiF -' � G� � C >E�r�
IH' r�O�E
� -- —��-- — _ -- --
II L�S HWY3ll _J..__ __
�----� - is°e�F " --- wo
—T � GRASS EIF � I� A_I � �•}� �
II mo PLAnIT[�SY ��
ULUAN W.PETERSON ��'
SPEC L4T V DITCH /
SEE DETAIL 1 iSFu � / �
RIP RAP -:'. / �
tMenNi<rnENi BENJAAIiN CWID HiNES
SEE DETAIL 3
STREP,MBANK
STABILIZATION
CL 'I' RIP-RAP FLOODPtAIN
EST 20 TONS pENCH
°', � a� EST 32 SY GPD
ie ti tc.�
� h
�3 tIR
-icmp. M �
I:.ip- LIF EIP
USED TO LINE THE I-IIGH FLO�"/ CULVERT �
BARREL NATIVE MATERIAL SHOULD BE PL4CE0
ON TOI' TO FILL vOIDS AND PROVI�E A
FLAT SUftFAGE FOR ANIMAL PASSAGE NATNE
MATERIAI IS SUBIECT TO APPROVAL BV
THE ENGINEER AND MAY BE SUBIEGT TO �
PERMR CONDIilONS.
2) SILLS ARE TO OE 1.0 FT. WIDE, CAST —
SEPARATELY AND ATTACHED BY DOWELS.
3) DO NOT SET ELEVATION OF HIGH SILI rH�GH SiLL �
ABOVE BANK FUtL. 1
F�000awN
BENCH
T
SILLS AT J
INLET AND OUTLEf ��
I HIGH SILLT
BACK FIL/AfIVE MAi\O
SILL HEIGHT
LOW FLOW BARREL
PLAN VIEW
� �
�� — � —
;------ _
SITE 1
PROJECT REFERENCE NO.
BUFFER DRAWING �7BP.8R.76
RNJ SHEET N(
S H E ET 2 O F � ROADNGIN DRSIGN
uy
E'iF_
� �
�
SHEE! NO.
ENGINEER
�SfiLAND STREET CNURCN 1���ll.Il�"�di\r� IPi`�'� �"�...5\\?,�
DO NOT t'SF, FO CONSTRVCTTON
FLOODPLAIN
BCNCN
STRUCTUftE N0.i5041b
WOp� & CONCREiE BRI�GE
WITH PAVEU CECk
\ � STREAM6ANK
STABIIIZATION JOMN C. & IVA R. ROLAI�
CL I' RIP-RAP
\ ST 20 TONS
m BP.II.K
T 31 SY GFD CHu�CH SiGnl
� �Sr,LNJ SrkE7 RAfPS7 CHURCH
pp'. as ' a�r aaarcimc t�r ove ex. 1 �
�2 siu� ��
��. �� P���P i �� i � 4�'
�, F�A�F� � - \ DETAIL 1
PGIF� I %,10 SPECIAL L4TERAL '�' DITCH
GRASS �Noiio S�ale�
REM�VE� �� � ��P
` �EN'-� S1�x � I Q U
�� �v � � � _ � ..
�-- � —=�--l—w-- i._ p.�°`� —r��n
" SR 191i AHUWO ST �-0 FA tG F0�1CiW l -� I Nowra� , D f O $1ope
6round p; Ms
2����10'x6' RETAIN / RETAIN ' � 7U NC o2
— -- –i- =��--�– ,a----
-� " Min. D lA F.
- `— L � ` .r � 1�01�� \ / % �—
Q - I t, - �/ �� ���EIF FROM STA.11+58 TO STA.12+65 -L- RT
� `�,� RETAIN Il � P'� r,RAS- t''
� �� a��aiN o� �ua,s ��� c�, � � <z., DETAIL 2
24 RCP �I� a ^< SPECIAL L4TERAL BASE DITCH
511��.. �� e' I 4.i T _ I Ha� io s�oin�
� W : ��' ;�.i
m~ '�
�� �i sRo o_ i� � Na���i � o� � r���
yN � IS.'c:� _ � ,� Gro�,d � A-- v
V� � _ "� KELLY H, WELCH Q�� � P°��Q
^�.aJ' B Min.D-1.0 Fl.
/ JEFF NAZELTON Exs'r aRio�To e-z.a F�
b LORENE KWG gE REMOV D
FROM STA.11+50 10 STA.12+65 -L- L7
srREAnnanNK DETAIL 3
SiA81LIZATION � RIP RAP AT EMBANKMENT
CL 'I' RIP-RAP I N��� smie�
E5T 18 TONS / �a.m�� .,t — Ci i Rir-anP
E5T 2) SY GF� I
/ L D'i�ch —
JEIR Grodc 10'min —15
—'� `�e.F IOO� O� IOO� ?OO� 300� GEOTEXTILE - NWS
iz+sa ro iz+�o �r iz��,s 10 iz-n ar
EST 13 TONS EST 9 TONS
EST 19 SY GFD EST 1S SY GFD
SCALE:I'= IOO' FROM STA.12+53 TO STA.12r70-L-LT
FROM STA.72-55TO STA.12-F71-L-RT
�.. . �. . : . . . . . . . . . . _ _ _ _ . . I I �I I I. . . . . , . : . .. . .I . � . , , � . � .. � � . � . . � : : . �. .. , , . : : . � . � . � . , , . .: :_ . . �
_
I Illi� I I -:: ';i: :I II 11 Illli I I I I I1111 I -: I I11
I' nVUU",��i C��tu������UU�fUU�'��
ie�mnnA'sia'ia�inir��nn'����nii�iniia'mn
u■����omo���m-���o�a•i�����m��ra�``�� �o�—�����oo�n
I■������uNn�������=������'li������������ fi71� ���� �����������I
I���������V���������������`!���������0� ��������������������I
�N��N��Mp������Y=����� C ��� ��M�M�E�' �������� �����������I
� ��������I�I��� ' GIII�I �G�G���
�
-Dl_SC
-E�E
-r�►�v
■�i'iu i c�u� ��
��iiiiii� s�u, .:�!!y,�
—�������u�a�u�iu� ■���
��::::::�.:::::::. �e::�e:�
�����������������m ��o���
� ������0�������������� ��
� ��IG�IMA�����N�����I����G
�
�
Yy F� .__
FT
CFS :
YRS
FT : :
�;
�
�
i � �
N
Z
0
�
Sta. =12 + 65 —L— Lt
Q10 =16.64 cfs
V10 = 3.4 fps
d = 0.82 ft
s=1.47%
n = 0.035
Liner—Temp. Matting
JAMES A. & WILLIE Ro CARRELL
����� Hr�F�L
�� — —
� I
�
RI P-RAP @
E �A,NKMENT
S�E� D ETAI L 3
SPEC L�T� BASE DITCH \
I �SEE D TA��
I � � �
� o,:,
II� � ���
m ��I , D
�:� � � i
J=
—W— --�_
i-;RA��
N W. PETERSON
SPEC LAT V DITCH
SEE DETAIL 1
RI P-RAP @
EMBANKMENT �
SEE DETAIL 3
Sta. =12 + 65 —L— Rt
Q10 = 3.24 cfs
V10 = 2.0 fps
d = 0.64 ft
s=1.07%
n = 0.035
Liner=Temp. Matting
LIP7
��— -^ E � r=,
�,�� n�
� �� � n!�
I� � � �� G F:`�'�� �
r�-� �� =� � T 0 I'� E
R
��
l
SITE 1
ENLARGED VIEW
RR
� \
� PDE
�� � � PLANTER�� � '
� i � '��''r,/ � _.�.;
j � �;�
, � -�� P
� ��=c� ,
,'
� J �� )
BENJAMIN CHAD HINES '
EIR
(1
STREAMBAN K
STABILIZATION
CL 'I' RIP-RAP
EST 20 TONS
EST 32 SY GFD
FLOODPLAIN
BENCH
�
ASHLAND STREET CHURCH
BUFFER DRAWING
SHEET 3 OF 5
z
a
v
FLOODPLAIN w�
BENCH �DA—
N O
�} O
����C����AE ����,�� ��I�����_r
WOOD & �i��f�,ICRETE BRID�=E
WITH �AVED DEC��;
STREAMBAN K
STABILIZATION
CL 'I' RIP—RAP
ST 20 TONS , _
� �F����:
.�ST 31 SY GFD ���IUR H S���f��
,_ .
���l�L,qlV� �TRCET �r'��'T�ST (�i�l�iF'�'l�
\ AS�h'A�T F,�RI�;INv �OT `� � OVE EX. I
2' SILL�, zl
� � �
� �,, P� T�P � «, �
�\ � FLAI,� � � �'�
�` a Po�F ��
� I ) ; ,,_,
�� ���� v �� '� _ REMOV , II
� � � -��8�'�IIII FENC , DI �
�,
� �
� ---- �„- � __ - - �- ��— -
� c, �/� /�'// ia`,/-��,q�/�� _`,/o �(�� F';a��(� l�(.�����V� � �
2@10'x6' RETAIN /
TG - �
RETAIN
�.��_ — DI i �; -,�I �'� � '� %
� ��
^/i J��, m�
. .-, � ' �_i .�ti ,z�? c� � �� � � 7 -. .,, ,
� � � :\ � —
\�oW� RETAIN I � �`
RE�AIN ��������� � �
24`� RCP �� � /���
�J
� �� � � c, I
� �i: � �
i�
I LEGEND
JEFF HAZELTON
& LORENE KING
STREAMBAN K
STABILIZATION
CL 'I' RIP-RAP
EST 18 TONS
EST 29 SY GFD
PROJECT REFERENCE NO. I SHEE! NO.
ENGINEER 1 ENGINEER
]���➢.I1�d�N_�I$�' ��,�?�'�
DO NOT t'SF, FO CONSTRVCTTON
,,�
��'��� ��� BZ 1 BUFFER ZONE 1(30 FEET)
�
z�
T�
BZ 2 BUFFER ZONE 2(20 FEET)
EXST BRID E TO
BE REMOV D / /
� � ALLOWABLE IMPACTS ZONE 1
� � � ALLOWABLE IMPACTS ZONE 2
I
40' 0' 40' 80' 120'
SCALE:I'= 40'
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
1 2@10'X6' RCBC 12+81 -L- X 2685.0 1077.0 3762.0
TOTAL: 2685.0 1077.0 3762.0 0.0 0.0 0.0
Rev.Jan 2009