Loading...
HomeMy WebLinkAbout20180925 Ver 1_PCN Form Submission_20180703Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 7/3/2018 4:03:14 PM (Start Event) Accept by Carpenter,Kristi 7/6/2018 12:23:52 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: July 6, 2018 5:00 PM 7/3/2018 4:04 PM i i �� � ����� �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Randolph Is this project a public transportation project?* C Yes l' No lhis is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: 17BP.8. R.76 WBS # (for �ICDOT use only) 1a. Type(s) of approval sought from the Corps:* I7 Section 404 Permit (wetlands, streams and waters, Clean Water Act) I-' Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply r% 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express fJ Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: f Yes C' No C' Yes f' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank a- in-lieu fee program C Yes l" No Acceptance Letter Attachment C7ick the upload button or drag and drop files here to attach docurrent SR 1911 - Bridge 416 Revised - Division 8- STR - Buffer - CF 03.pdf 75.54KB F1LE lYFE MJST BE FDF 1f. Is the project located in any of NC's twenty coastal counties?'� f Yes �' No 1h. Is the project located in a designated trout watershed?* f Yes r No Link to trout information: http://wvwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact? * Art C. king 1b. PrimaryContact Email:* acking@ncdot.gov 1c. PrimaryContact Phone:� (xxx)xxx-xxxx (910)944-2344 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT Highway Division 8 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) NCDOT Highway Div. 8 2d. Address SYreet Address Address Line 2 902 North Sandhills Blvd. aty P,berdeen Fbstal / Zip Code 28315 2e. Telephone Number: (xxx)xxx-�axx (910)944-2344 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* acking@ncdot.gov State / Rovince / Region NC Country C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Randolph Bridge 416 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town:* Archdale 1d. Driving directions* IF it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. I-85 South, exit at Hwy 311 Business Archdale exit. Right onto 311, then in approx 150 yards. right on to Ashland St. 0.5 miles to the bridge 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Ashland St. Address Line 2 aty Archdale Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / Rovince / Faegion NC Caurdry Randolph Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.912474 -79.957376 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Muddy Creek 3b. Water Resources Classification of nearest receiving water:* WS-IV Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Urban,residential, commercial. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrem 3709_001.pdf 499.16KB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Randolph 416 Soil_Map.pdf Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: NA 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 250 372.71 KB 4f. Explain the purpose of the proposed project:* To replace a structurally deficient bridge with a modern structure (culvert) that meets current safety standards. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Replace the exsting bridge with a concrete box culvert in the same location. Equipment required: Dump truck, excavator, crane, compactor, paving equipment. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent SF750416_Permit Drawings_20180625.pdf 1.96MB Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* C' Yes C No !' Unknown Comme nts: Scoping by NCDOT staff, and the consultanting firm, determined that there are no wetlands present within the project footprint. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* f Preliminary Corps AID Number: 6carrple: SAV�2017-99999 r Approved 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: C' Unknown f•' f�llA 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * f Yes C No l" Unknown 7. Future Project Plans 7a. Is this a phased project?* l' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r% Streams-tributaries �7 Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact sqfe� type * Type * Jurisdiction * width * length * S1 culvertconstruction P Fill UTofMuddyCreek Perennial Both 72 47 5 N�p label (e.g. Fd�ad Qossing F2rrranem (Fj or F�rennial (F� or Average (linear feet) 6 1) Terrporary (� interrrittent (IfVn (feet) 4 g2 bank stabilization P Bank " Perennial Both fv�p label (e.g. f3�ad Qossing F2rrranent (P� or Stabilization F�rennial (� or 1) Terrporary (� interrritterd (If� "" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 12 99 1 Average Qinearfeet) , (feet) 7 8 8 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 146 3i. Total temporary stream impacts: 0 3i. Total stream and tributary impacts: 146 3j. Comments: Plans indicate 46.25 ft. culvert length rounded up to 47 ft. for impact mitigation. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. r Neuse r Tar-Pamlico r Catawba �J Randleman r Goose Creek r Jordan Lake r Other 6b. Impact Type * 6c. Per or Temp* allowable with mitigation P Location and 6cerrpt, Allowable, allowable w/ F2rrranent (P) or rritigation Terrporary (� 6h. Total buffer impacts: Temporary impacts: Permanent impacts: Total buffer impacts: 6i. Comments: Zone 1 0.00 Zone 1 2,685.00 Zone 1 2,685.00 6d. Stream name * UT of Muddy Creek Zone 2 0.00 Zone 2 1,077.00 Zone 2 1,077.00 Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. C7ick the upload button or drag and drop files here to attach docurrent SF750416_Permit Drawings_BUFFER_20140108.pdf 750416 2014 SF750416 MUDDY CREEK EAST TRIB SR 1911.PDF Fle rrust be FDF E. Impact Justification and Mitigation 6e. Buffer mitigation required?* Yes 983.13KB 4.12MB 6f. Zone 1 impact* 2,685 (squarefeet) 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* 6g. Zone 2 impact* 1,077 (square feet) Due to the location of adjacent properties and utilities it was necessary to replace the bridge with a culvert in order to meet the hydraulic requirements. The minimum culvert size possible to meet the hydraulic requirements and safety standards is what is proposed. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* The stream will be de-watered and all construction work on the culvert will be done in the dry. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C•' Yes C' No 2c. If yes, mitigation is required by (check all that apply): r DWR r Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank � Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. r Yes 4b. Stream mitigation requested: Qinear feet) 48 4c. If using stream mitigation, what is the stream temperature: warm 4d. Buffer mitigation requested (DWR only): (squarefeet) 3762 4e. Riparian wetland mitigation requested: (acres) NA 4f. Non-riparian wetland mitigation requested: (acres) NA 4g. Coastal (tidal) wetland mitigation requested: (acres) NA 4h. Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) "* Recent changes to the stormwater rules have required updates to this section ."' 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C•' Yes C' No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r Level Spreader fJ Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diffus Flow Documentation Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * C Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * C Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* f Yes l•' No Comme nts: * Meets requirement for state minimum criteria. Storm water management plan is attached to the permit drawings. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* l' Yes C•' No 2b. Is this an after-the-fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes b' No 3b. If you answered "no," provide a short narrative description. The new structure is a minor deviation from the e�asting structure and will not change the development or land use of the area or the adjacent properties. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes f No f•' f�/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?'� C Yes f" No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes �' No 5d. Is another Federal agency involved?* C' Yes C No 5e. Is this a DOT project located within Division's 1-8?* f• Yes r No C' Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USF&W mapping data. On site survey by NCDOT staff. Survey Checklist attached. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* l" Yes l•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * USF&W Web data 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural reservation status e. National Historic Trust desi nation or ro erties si nificant in North Carolina histor and archaeolo * p ( 5•, 9 p p 9 Y 9Y)� l' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * SHPO review NCDOT cultural resources review 7c. Historic or Prehistoric Information Upload Qick the upload button or drag and drop files here to attach docurcent 13_09_0059_PA_NoSurveyReq Br 0416 on SR 1911 Asheland St over Dale Creek Div 472.43KB 08_Randolph Archaeo.pdf 13-09-0059_NoSurveyReq.pdf 2.5MB Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* f Yes �' No 8c. What source(s) did you use to make the floodplain determination?* See Attached stormwater management plan attached to permit plan drawing. Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent Endangered Species Survey Checklist Randolph 4161.docx.pdf 7.69K6 Justification for replacing Bridge 416 Randolph with a culvert submitted by Galen Cail 67.84KB PE.docx.pdf Fle rrust be FDF or 4WQ Signature fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Art C. King Signature � ���r.� C� C�r�'� Date Submitted: 7/3/2018 Initial Review Is this project a public transportation project?* (�) C•' Yes f" No Change only 'rf needed. Has this project met the requirements for acceptance in to the review process? * C•' Yes C' No BIMS # Assigned * 20180925 Version#* 1 Reviewing Office* Central Office - (919) 707-9000 Select Project Reviewer* April Norton:eads\arnorton Is a payment required for this project?* f No payment required f• Fee received f Fee needed - send electronic notification