HomeMy WebLinkAboutDEPCOM Power - NC102 Civil Drawings - Rev 13NC 102 PROJECT LLC
SOLAR FARM
X0X3X2
X1
H1
H2
H3X0X3X2
X1
H1
H2
H3
Typical fixed-tilt array
West elevation
Typical 1-axis Tracker Array
South Elevation
Metering and
Communication
ADJACENT PROPERTY OWNERS
Owner Name and Mailing
Address
1. Berry Blane Criswell, Jr.
and Carrie Ann Criswell,
wife
9419 Hwy 601
Midland, NC 28107
2. Kevin D. Pressley and
Stephanie Pressley, wife
9365 Highway 601
Midland, NC 28107
3. & 4. Nollie C. Pressley and
Janna H. Pressley, wife
9355 Hwy 601
Midland, NC 28107
5. David W. Foster and
Loree T. Foster, wife
8622 Hayden Way
Concord, NC 28025
6.James J. Walker
8754 Hayden Way
Concord, NC 28025
7. Kevin L. Cliff and
Sandra J. Cliff, wife
8766 Hayden Way
Concord, NC 28025
8. Erica Massey and
Christopher Massey,
husband
8767 Hayden Way
Concord, NC 28025
9. George R. Jones and
Deanna C. Jones, wife
8755 Hayden Way
Concord, NC 28025
Property Address Parcel Number
9419 Hwy 601
Midland, NC 28107
Real ID
55469371270000 10-004 -0001.20
9365 Hwy 601
Midland, NC 28107
9355 Hwy 601
Midland, NC 28107
9353 Hwy 601
Midland, NC 28107
8622 Hayden Way
Concord, NC 28025
8754 Hayden Way
Concord, NC 28025
8766 Hayden Way
Concord, NC 28025
8767 Hayden Way
Concord, NC 28025
55560364000000 10-004 -0013.30
55560366360000
55560476130000
10-004 -0013.10
10-004 -0013.00
55561525730000 10-005A-0099.10
55561551270000 10-005A-0093.00
55561550800000 10-005A-0092.00
55561479950000 10-005A-0091.00
8755 Hayden Way
Concord, NC 28025
55561590480000 10-005A-0090.00
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Owner Name and Mailing
Address
51. & 54 Alfred Odell Morgan, Jr.
9801 Hwy 601
Midland, NC 28107
52. & 53 Kevin G. Little and
Lori N. Little, wife
9825 Hwy 601
Midland, NC 28107
55. Sara Scott
9775 Hwy 601
Midland, NC 28107
56. Zaris, Inc.
9690 Hwy 601
Midland, NC 28107
57.James H. Altman and
Brenda L. Altman, wife
6423 E. Mercer Way
Mercer Island, WA 98040
58. Union Lodge 618 AF & AM
Trustee
P.O. Box 497
Midland, NC 28107
59.John L. Kane
9700 Hwy 601
Midland, NC 28107
60. Mark A. Hatcher and
Pamela T. Hatcher, wife
890 Rock Rd.
Rutherfordton, NC 28139
61. William B. King
9500 Hwy 601
Midland, NC 28107
62 Louis J. Tucker Life Estate
9470 Hwy 601
Midland, NC 28107
63. Rebecca Lynn Barnhardt
9450 Hwy 601
Midland, NC 28107
Property Address Parcel Number
Hwy 601 (vacant land)
9801 Hwy 601
Midland, NC 28107
Hwy 601 (vacant land)
9881 Hwy 601
Midland, NC 28107
9775 Hwy 601
Midland, NC 28107
9690 Hwy 601
Midland, NC 28107
Corner of Hwy 601 and
Cal Bost Road
9650 Hwy 601
Midland, NC 28107
9580 Hwy 601,
Midland, NC 28107 and
3965 Cal Bost Rd.,
Midland, NC 28107
9540 Hwy 601
Midland, NC 28107
9500 Hwy 601
Midland, NC 28107
9470 Hwy 601
Midland, NC 28107
9450 Hwy 601
Midland, NC 28107
55562220880000
55561115690000
55561169920000
55561240090000
Real ID
10-004 -0011.40
10-004 -0011.10
10-004 -0011.60
10-004 -0011.20
55560173670000 10-004 -0012.00
55560131690000 10-009 -0004.80
55469174100000 10-009 -0004.00
55469188100000 10-009 -0004.50
55469270590000 10-009 -0004.60
55469252830000 10-009 -0004.20
55469254310000 10-009 09993.10
55469235270000 10-009 -0003.00
55469229160000 10-009 -0001.20
64. JAB Farms LLC a NC LLC
PO Box 18
Norwood, NC 28128
7700 Edgefield Rd.
Concord, NC 28025
55571343380000 10-003 -0001.30
65. David B Riley and
7491 Edgefield Rd.
Concord, NC 28025
55573283500000 10-003 -0013.30
66. Cliff W Honeycutt
7450 Edgefield Rd.
Concord, NC 28025
55574217500000 10-003 -0007.30
Cindy L Riley, wife
7491 Edgefield Rd.
Concord, NC 28025
7450 Edgefield Rd.
Concord, NC 28025
Zoned: AG
Zoned: AG
Zoned: AG
Zoned: AG
Zoned: AG
Zoned: LC
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: AO
Zoned: AO
Zoned: AO
Owner Name and Mailing
Address
10. Kristy Bullock and
Troy Bullock, husband
8739 Hayden Way
Concord, NC 28025
11. Mark Adam Giocondo and
Regina Giocondo, wife
8725 Hayden Way
Concord, NC 28025
12. Kevan G. Lovin and
Treva J. Lovin, wife
8717 Hayden Way
Concord, NC 28025
13.James G. Jolly and
Sally E. Jolly, wife
8705 Hayden Way
Concord, NC 28025
14. Arthur R. Hoyle, IV and
Jennifer P. Hoyle, wife
4504 Chanel Ct.
Concord, NC 28025
15. Evan Moore and
Laura Moore, wife
4512 Chanel Ct.
Concord, NC 28025
16. Darrell J. Eggers and
Stacey Eggers, wife
4524 Chanel Ct.
Concord, NC 28025
17. & 18. Kenney Everett Henderson
and Constance Shiflett
Henderson, wife
4778 Rocky River Rd.
Concord, NC 28027
Property Address Parcel Number
8739 Hayden Way
Concord, NC 28025
8725 Hayden Way
Concord, NC 28025
8717 Hayden Way
Concord, NC 28025
8705 Hayden Way
Concord, NC 28025
4504 Chanel Ct.
Concord, NC 28025
4512 Chanel Ct.
Concord, NC 28025
4524 Chanel Ct.
Concord, NC 28025
4544 Chanel Ct.
Concord, NC 28025
4558 Chanel Ct.
Concord, NC 28025
Real ID
55562503110000 10-005A-0089.00
55562505730000 10-005A-0088.00
55562517050000 10-005A-0087.00
55562509150000 10-005A-0088.00
55562620540000 10-005A-0117.00
55562632410000 10-005A-1116.00
55562644240000 10-005A-0115.00
55562646960000
55562658440000
10-005A-0114.00
10-005A-0113.00
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Owner Name and Mailing
Address
19. Timothy E. Cook and
Amy F. Cook, wife
4570 Chanel Ct.
Concord, NC 28025
20. Rodney Gaston and
Mary Ann Gaston, wife
4586 Chanel Ct.
Concord, NC 28025
21. George G. Tyler and
Glenda Tyler, wife
4598 Chanel Ct.
Concord, NC 28025
22. George Lee McManus and
Barbara Burris McManus,
wife
4599 Chanel Ct.
Concord, NC 28025
23. Bobby Alan Widenhouse
and Nyra Widenhouse, wife
4200 Nesbitt Rd.
Concord, NC 28025
24.John A. Beatty, Jr. and
Carol Lynn Beatty, wife
3220 Winding Trail
Matthews, NC 28105
25. Richard N. Deas, Sr. and
June Beatty Deas, wife
4380 Joyner Road
Concord, NC 28025
26. AI Properties, LLC
a North Carolina LLC
P.O. Box 215
Midland, NC 28107
27. A. J. Vanderburg and
Mary H. Vanderburg, wife
4506 Wild Oak Lane
Greensboro, NC 27406
Property Address Parcel Number
4570 Chanel Ct.
Concord, NC 28025
4586 Chanel Ct.
Concord, NC 28025
4598 Chanel Ct.
Concord, NC 28025
4599 Chanel Ct.
Concord, NC 28025
Real ID
55562760040000 10-005A-0112.00
55562762730000 10-005A-0110.00
55562774060000 10-005A-0109.00
55562754190000 10-005A-0108.00
4200 Nesbitt Dr.
Concord, NC 28025
4179 Nesbitt Dr.
Concord, NC 28025
4380 Joyner Rd.
Concord, NC 28025
4600 Joyner Rd.
Concord, NC 28025
4500 Joyner Rd.
Concord, NC 28025
55561774810000 10-005 -0003.20
55561833940000 10-005 -0003.00
55561990410000 10-005 -0003.30
55560961330000 10-005 -0002.00
55563917510000 10-005 -0003.10
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Owner Name and Mailing
Address
28. Luther Thompson Hartsell,
IV and Jane Hartsell
Crawford, brother & sister
(1/2 interest) and Heath H.
Hedgpeth (1/2 interest)
1217 Greenside Dr.
Concord, NC 28027
30. & 34 E. T. Bost, III
4701 Hwy 200
Concord, NC 28025
Property Address Parcel Number
4700 Joyner Rd.
Concord, NC 28025
Real ID
55571195160000 10-003 -0012.00
4828, 5299 and 5300
Joyner Rd.
Concord, NC 28025
31. Robert E. Lyons
5050 Joyner Road
Concord, NC 28025
32. Whispering Pines Holding,
LLC
a North Carolina LLC
213 Union St. N.
Concord, NC 28025
33. Whispering Pines Holding,
LLC
363 Church St. N.
Concord, NC 28025
35. & 36. Frank E. Williams and
Nanette J. Williams, wife
26450 Red Barn Trail
Locust, NC 28097
37. Pharr Capital, LLC
58 Oak Creek Ln.
Hendersonville, NC 28739
38. Mark A. Stewart, Jr., Trustee
8600 Mt. Pleasant Rd.
Midland, NC 28107
5050 Joyner Rd.
Concord, NC 28025
5083 Joyner Rd.
Concord, NC 28025
10-003 -0013.00
55575034230000 10-003 -0007.10
55576248840000 10-003 -0007.00
7876 Mt. Pleasant Rd.
Midland, NC 28107
7937 Mt. Pleasant Rd.
Midland, NC 28107
8055 Mt. Pleasant Rd.
Midland, NC 28107
8399, 8925 & 9001 Mt.
Pleasant Rd.
Midland, NC 28107
8600 Mt. Pleasant Rd.
Midland, NC 28107
55576191210000 10-003 -0008.10
55567978110000
55568424730000
10-003 -0001.11
10-003 -0001.12
55567696660000 10-003 -0001.50
55564783150000 10-003 -0001.80
Zoned: CR
Zoned: AO
Zoned: CR
Zoned: AO
Zoned: AO
Zoned: AO
Zoned: AO
Zoned: AO
Zoned: CR
Owner Name and Mailing
Address
40., 41,
42, 43 &
44
Gary W. Laton, LLC
a NC LLC
P.O. Box 1129
Concord, NC 28026
Property Address Parcel Number Real ID
5811 Kristi Ln.
Concord, NC 28025
5833 Kristi Ln.
Concord, NC 28025
5855 Kristi Ln.
Concord, NC 28025
9000 Mt. Pleasant Rd.
Midland, NC 28107 and
5822 Kristi Ln.
Concord, NC 28025
5800 Kristi Ln.
Concord, NC 28025
45. Nancy A. Kucera
6308 Gold Wagon Lane
Charlotte, NC 28227
46. Kristopher L. Finsel and
Joli A. Finsel, wife
9700 Mt. Pleasant Rd.
Midland, NC 28107
47. & 48 Lana M. Hathcock
4135 Brownwood Lane
Concord, NC 28027
49. Alexander Development
Corp., a NC corp.
7755 Hilliard Ln.
Concord, NC 28025
50. David E. Wheeler and
Sarah Wheeler
8501 Rock Hole Rd.
Stanfield, NC 28163
9220 & 9225 Mt.
Pleasant Rd.
Midland, NC 28107
9700 Mt. Pleasant Rd.
Midland, NC 28107
9714 Mt. Pleasant Rd.
Midland, NC 28107
9730 Mt. Pleasant Rd.
Midland, NC 28107
9901 Hwy 601
Midland, NC 28025
9889 Hwy 601
Midland, NC 28025
55564672640000
55565622050000
55565651940000
55565547180000
10-003A-0003.00
10-003A-0002.00
10-003A-0001.00
10-003A-0005.00
55564598540000 10-003A-0004.00
55564358710000 10-004 -0002.00
55563290630000 10-004 -0006.40
55563168590000
55563156760000
10-004 -0006.20
10-004 -0006.30
55562132590000 10-004 -0008.00
55562240890000 10-004 -0011.70
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
Zoned: CR
X0X3X2
X1
H1
H2
H3X0X3X2
X1
H1
H2
H3
“”
“”
”
X0X3X2
X1
H1
H2
H3X0X3X2
X1
H1
H2
H3
X0X3X2X1H1H2H3X0X3X2X1H1H2H3
NOTES:
The compost media shall be derived from well-decomposed organic
matter source produced by controlled aerobic (biological) decomposition
that has been sanitized through the generation of heat and stabilized to
the point that it is appropriate for this particular application. Compost
material shall be processed through proper thermophilic composting,
meeting the US Environmental Protection Agency’s definition for a
‘Process to Further Reduce Pathogens’ as defined at 40 CFR Part 503.
The compost portion shall meet the chemical, physical and biological
properties specified in Practice 6.18, Compost Blankets Table 6.18a,
with the exception of particle size. Slightly more coarse compost is
recommended for the socks, as follows:
Particle Size Distribution
Sieve Size: Percent Passing Selected Sieve Mesh Size, Dry Weight
Basis
2” 99 % (3” Maximum Particle Size)
3/8” 30-50 %
Practice Standards and Specifications
Figure 6.66b Compost Sock Installation
Maryland Standards and Specifications
for Soil Erosion and Sediment Control,
2011, Maryland Department of
Environment, Water Management
Administration
6.66.8 Rev. 5/13
2377 – McBride Place Energy, LLC
formed in residuum weathered from fine-grained metasedimentary and metavolcanic rocks of the
Carolina Slate Belt.
Another secondary soil is mapped as Kirksey silt loam (10% of the site) on 1-6% slopes. The Kirksey
series consists of deep, moderately well drained, moderately slowly permeable soils that formed in
material mostly weathered from Carolina slate of the Piedmont Uplands.
The remaining four soil types range from 0.7 to 5.6% of the site on slopes ranging 0-15%.
78% of the soil types also are classified with channery soils. Channery soil is, by volume, more than
15 percent thin, flat fragments of sandstone, shale, slate, limestone, or schist as much as 6 inches along
the longest axis. A single piece is called a channer. The presence of channery soil increases the
permeability and thus reduces the runoff characteristics.
See Soil Map in Appendix
Critical Erosion Areas
Critical erosion areas include but are not limited to slopes exceeding 3:1 in grade. There are three
areas exceeding 3:1 within construction areas as shown on the plans (Sheet 5.0).
Erosion and Sediment Control Measures
Unless otherwise indicated, all vegetative and structural erosion and sediment control practices shall
be constructed and maintained according to existing minimum standards and specifications of North
Carolina Department of Environment and Natural Resources Erosion and Sediment Control
Regulations, latest edition.
Structural Practices
1. Construction Entrance
Temporary construction entrances shall be installed as shown on the plan in five locations.
Construction entrance must contain at least 2-3-inch stone and be maintained in a condition that will
prevent tracking or direct flow of mud onto streets. Periodic topdressing with stone will be necessary.
Install water bars, ditch diversions or other suitable measures so that stormwater does not leave the
limits of disturbance through the construction entrances, as needed. [G.S. 113A-57(3), 15A NCAC 4B
.0105]
2 | Page
2377 – McBride Place Energy, LLC
Entrance Construction
1. Clear the entrance and exit area of all vegetation, roots, and other objectionable material and
properly grade it.
2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it.
3. Provide drainage to carry water to a sediment trap or other suitable outlet.
4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage
or high-water table.
Maintenance
Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site.
This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used
to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled,
washed, or tracked onto public roadways.
2. Construction Road & Service Path Stabilization
The temporary stabilization of access roads, construction staging areas, and other on-site vehicle
transportation routes shall be implemented with stone immediately after grading.
Construction Road Stabilization Construction
3 | Page
2377 – McBride Place Energy, LLC
1. Clear roadbed and parking areas of all vegetation, roots, and other objectionable material.
2. Ensure that road construction follows the natural contours of the terrain, if it is possible.
3. Locate staging and concrete washout areas on naturally flat areas, if they are available. Keep grades
sufficient for drainage, but generally not more than 2 to 3%.
4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts
(References: Runoff Control Measures, North Carolina E&SC Manual, 6.20).
5. Keep cuts and fills at 2:1 or flatter for safety and stability and to facilitate establishment of vegetation
and maintenance.
6. Spread a 6-inch course of “ABC” crushed stone evenly over the full width of the road and smooth
to avoid depressions.
7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile
fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain).
8. Vegetate all roadside ditches, cuts, fills, and other disturbed areas or otherwise appropriately
stabilize as soon as grading is complete (References: Surface Stabilization, Practice 6.10).
9. Provide appropriate sediment control measures to prevent off-site sedimentation.
Maintenance
Inspect construction roads and staging areas periodically for condition of surface. Top-dress with new
gravel, as needed. Check road ditches and other seeded areas for erosion and sedimentation after
runoff-producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment-producing
areas should be treated immediately.
3. Silt Fence
A temporary sediment barrier constructed of posts, filter fabric and, in some cases, a wire support
fence, placed across or at the toe of a slope or in a minor drainage way to intercept and detain sediment
and decrease flow velocities from drainage areas of limited size; applicable where sheet and rill erosion
or small concentrated flows may be a problem. Contractor to install silt fence where shown on the site
plans or where deemed necessary to avoid sediment runoff.
4 | Page
2377 – McBride Place Energy, LLC
Silt Fence Construction
1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics.
2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface.
(Higher fences may impound volumes of water sufficient to cause failure of the structure.)
3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints.
When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum
overlap to the next post.
4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the
posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then
fabric on the upslope side of the fence post. Wire or plastic zip ties should have 50-pound tensile
strength.
5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts
should be driven securely into the ground a minimum of 24 inches.
6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence.
Securely fasten the filter fabric directly to the posts. Wire or plastic zip ties should have minimum 50-
pound tensile strength.
7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts
and upslope from the barrier. (See detail)
8. Place 12 inches of the fabric along the bottom and side of the trench.
9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the
backfill is critical to silt fence performance.
10. Do not attach filter fabric to existing trees.
Maintenance
Inspect sediment fences at least once a week and after each rainfall. Make any required repairs
immediately.
Should the fabric of a sediment fence collapse, tear, decompose, or become ineffective, replace it
promptly.
Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to
reduce pressure on the fence. Take care to avoid undermining the fence during cleanout.
Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize
it after the contributing drainage area has been properly stabilized.
5 | Page
2377 – McBride Place Energy, LLC
4. Temporary Sediment Trap
A temporary sediment trap shall be constructed as shown on the plans. It shall be constructed such
that all site runoff shall concentrate in the sediment trap before leaving the site.
TEMPORARY SEDIMENT TRAP
NTS
Temporary Sediment Trap Construction
1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all
surface soil containing high amounts of organic matter, and stockpile or dispose of it properly. Haul
all objectionable material to the designated disposal area.
2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and
other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Over
fill the embankment 6 inches to allow for settlement.
3. Construct the outlet section in the embankment. Protect the connection between the riprap and the
soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and soil.
4. Place the filter fabric between the riprap and the soil. Extend the fabric across the spillway
foundation and sides to the top of the dam; or
5. Excavate a keyway trench along the center line of the spillway foundation extending up the sides
to the height of the dam. The trench should be at least 2 feet deep and 2 feet wide with 1:1 side slopes.
6. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout.
7. All cut and fill slopes should be 2:1 or flatter.
8. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 feet
and maximum side slopes of 1:1 that extend to the bottom of the spillway section.
9. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side
slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the
spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade
to assure design capacity.
6 | Page
2377 – McBride Place Energy, LLC
10. Material used in the stone section should be a well-graded mixture of stone with a d5050size of 9 inches
(class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may
be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be
hard, angular, and highly weather-resistant.
11. Discharge inlet water into the basin in a manner to prevent erosion. Use temporary slope drains or
diversions with outlet protection to divert sediment- laden water to the upper end of the pool area to
improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection).
12. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment
until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the
edges of the stone outlet section flush with the surrounding ground, and shape the center to confine the
outflow stream (References: Outlet Protection).
13. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not
damage the embankment.
14. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from
the trap immediately after construction (References: Surface Stabilization).
15. Show the distance from the top of the spillway to the sediment cleanout level (1/2 the design depth)
on the plans and mark it in the field.
16. Install porous baffles as specified in Practice 6.65, Porous Baffles
17. Sediment basins shall be stabilized immediately after installation.
Maintenance
Inspect temporary sediment traps at least weekly and after each significant (½ inch or greater) rainfall
event and repair immediately. Remove sediment, and restore the trap to its original dimensions when
the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is
removed in the designated disposal area, and replace the part of the gravel facing that is impaired by
sediment.
Check the structure for damage from erosion or piping. Periodically check the depth of the spillway
to ensure it is a minimum of 1.5 feet below the low point of the embankment. Immediately fill any
settlement of the embankment to slightly above design grade. Any riprap displaced from the
spillway must be replaced immediately.
After all sediment-producing areas have been permanently stabilized, remove the structure and all
unstable sediment. Smooth the area to blend with the adjoining areas, and stabilize properly
7 | Page
2377 – McBride Place Energy, LLC
5. Temporary Sediment Basin
A temporary barrier or dam with a controlled storm water release structure formed by constructing an
embankment of compacted soil across a drainageway shall be constructed as shown on the plans.
Construction
1. Site preparations- Clear, grub, and strip topsoil from areas under the embankment to remove trees,
vegetation, roots, and other objectionable material. Delay clearing the pool area until the dam is
complete and then remove brush, trees, and other objectionable materials to facilitate sediment
cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the
embankment to facilitate vegetative establishment. Place temporary sediment control measures below
the basin as needed.
2. Cut-off trench- Excavate a cut-off trench along the center line of the earth fill embankment. Cut
the trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must
extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width
8 | Page
2377 – McBride Place Energy, LLC
and fence and mark basins with warning signs if trespassing is likely. Follow all state and local
requirements.
Maintenance
Inspect temporary sediment basins at least weekly and after each significant (1/2 inch or greater) rainfall
event and repair immediately. Remove sediment and restore the basin to its original dimensions when
it accumulates to one-half the design depth. Place removed sediment in an area with sediment controls.
Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping
and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser
and pool area.
6. Temporary & Permanent Seeding
Temporary seeding shall be applied to disturbed areas that will not be brought to final grade for a
period of more than 14 days, in accordance with North Carolina E&SC Manual, Chapter 6.10.1.
Permanent seeding is used to control runoff and erosion on disturbed areas by establishing perennial
vegetative cover with seed after all construction activity is complete.
Seeding Installation
Complete grading before preparing seedbeds, and install all necessary erosion control practices such
as, dikes, waterways, and basins. Minimize steep slopes because they make seedbed preparation
difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to
a depth of 6-8 inches using a ripper, harrow, or chisel plow.
Seedbed Preparation
Good seedbed preparation is essential to successful plant establishment. A good seedbed is well-
pulverized, loose, and uniform. Where hydro-seeding methods are used, the surface may be left with
a more irregular surface of large clods and stones.
Liming
Apply lime according to soil test recommendations. If the pH(acidity) of the soil is not known, an
application of ground agricultural limestone at the rate of 1 to 1 1/2 tons/acre on coarse-textured soils
and 2-3 tons/acre on fine- textured soils is usually sufficient. Apply limestone uniformly and
incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed.
Fertilizer
Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at
700-1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If
a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application.
Surface roughening
If recent tillage operations have resulted in a loose surface, additional roughening may not be
required, except to break up large clods. If rainfall causes the surface to become sealed or crusted,
10 | Page
2377 – McBride Place Energy, LLC
Erosion and Sediment Control Narrative
Project Description
The purpose of this project is the development of a 75 MW (AC) Solar Farm located on 653.4± acres
in Cabarrus County, North Carolina near the intersection of US Route 601 and Mt. Pleasant Road
South. Construction will include installation of nearly 2,660 ground-mounted solar racks, a solar PV
breaker panel connected to a Union Power substation on Mt. Pleasant Road, approximately 2.1 miles
north of its intersection with Route 601.
A total of 533.8± acres (484.9± acres from the original plans plus an additional 48.9± acres in the new
submittal) will be disturbed during construction.
Existing Site Conditions
The site is undeveloped, cleared land that is bisected in the southern quarter by Bost Creek. It is
relatively flat with rolling knolls. Elevations range from 490’ in the southeast to 590’ in the northwest
(separated by a distance of 1.2 miles). There is a wetland area on the site - 2.87± acres. The Bost Creek
100-year flood plain encompasses approximately 8.28± acres.
Adjacent Property
The property is bounded primarily by CR (Countryside Residential) zoning. To the east are six
Agricultural parcels. See the list of Adjacent Properties in the Site Plans.
Offsite Area
Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of
Solid Waste Management. Trash/debris from demolition activities or generated by any activities on
site must be disposed of at a facility regulated by the Division of Solid Waste Management or per
Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A
NCAC 4B .0110]
Soils
The primary soil in the project area is mapped as Misenheimer channery silt loam (nearly 2/3 of the
site) on 0-4% slopes. The Misenheimer series consists of shallow, moderately well drained, and
somewhat poorly drained, moderately rapidly permeable soils that formed in residuum weathered from
fine-grained metavolcanic rock. During wet seasons these soils have perched water tables.
Secondary soil is mapped as Badin channery silt loam (approximately 15% of the site) on 5-15%
slopes. The Badin series consists of moderately deep, well drained, moderately permeable soils that
1 | Page
2377 – McBride Place Energy, LLC
wide enough to permit operation of excavation and compaction equipment, but in no case less than 2
feet. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the same as
those for the embankment. Keep the trench dry during backfilling and compaction operations.
3. Embankment- Take fill material from the approved areas shown on the plans. It should be clean
mineral soil, free of roots, woody vegetation, rocks, and other objectionable material. Scarify areas
on which fill is to be placed before placing fill. The fill material must contain sufficient moisture so it
can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too
wet for proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length
of the fill area and compact it. Compaction may be obtained by routing the construction hauling
equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or
tread track of heavy equipment, or a compactor may be used. Construct the embankment to an
elevation 10 percent higher than the design height to allow for settling.
4. Conduit spillways- Securely attach the riser to the barrel or barrel stub to make a watertight
structural connection. Secure all connections between barrel sections by approved watertight
assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use
pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti-seep
collars. Place the fill material around the pipe spillway in 4-inch layers, and compact it under and
around the pipe to at least the same density as the adjacent embankment. Care must be taken not to
raise the pipe from firm contact with its foundation when compacting under the pipe haunches.
Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with
construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent
flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the
embankment is complete.
5. Emergency spillway- Install the emergency spillway in undisturbed soil. The achievement of
planned elevations, grade, design width, and entrance and exit channel slopes are critical to the
successful operation of the emergency spillway.
6. Inlets- Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet
protection to divert sediment-laden water to the upper end of the pool area to improve basin trap
efficiency (References: Runoff Control Measures and Outlet Protection).
7. Erosion control- Construct the structure so that the disturbed area is minimized. Divert surface
water away from bare areas. Complete the embankment before the area is cleared. Stabilize the
emergency spillway embankment and all other disturbed areas above the crest of the principal
spillway immediately after construction (References: Surface Stabilization).
8. Install porous baffles as specified in NCDEQ Erosion and Sediment Control Planning and Design
Manual, Chapter 6, Practice 6.65.1, Porous Baffles.
9. Safety- Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and
9 | Page
2377 – McBride Place Energy, LLC
loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or
furrow slopes steeper than 3:1 on the contour before seeding (Practice 6.03, Surface Roughening).
Plant Selection
Select an appropriate species or species mixture from Table 6.10a for seeding in late winter and early
spring, Table 6.10b for summer, and Table 6.10c for fall.
In the Mountains, December and January seedlings have poor chances of success. When it is
necessary to plant at these times, use recommendations for fall and a securely tacked mulch.
Seeding
Evenly apply seed using a cyclone seeder (broadcast), drill, culti-packer seeder, or hydro-seeder. Use
seeding rates given in Tables 6.10a-6.10c. Broadcast seeding and hydro-seeding are appropriate for
steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of
the difficulty in achieving a uniform distribution.
Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2
inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a
roller or culti-packer. Hydro-seeded mixtures should include a wood fiber (cellulose) mulch.
Mulching
The use of an appropriate mulch will help ensure establishment under normal conditions, and is
essential to seeding success under harsh site conditions (Practice 6.14, Mulching). Harsh site
conditions include:
• seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use),
• slopes steeper than 3:1,
• excessively hot or dry weather,
• adverse soils (shallow, rocky, or high in clay or sand), and
• areas receiving concentrated flow.
If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with
netting (Practice 6.14, Mulching).
11 | Page
2377 – McBride Place Energy, LLC
Maintenance
Reseed and mulch areas where seedling emergence is poor, or where erosion occurs, as soon as possible.
Do not mow. Protect from traffic as much as possible.
Table 6.10a Temporary Seeding Recommendations for Late Winter and Early
Spring
seeding mixture
Rye (grain)
Annual lespedeza (Kobe in
Piedmont and Coastal Plain,
in Mountains)
seeding dates
Mountains—Above 2500 feet: Feb. 15 - May 15
Below 2500 feet: Feb. 1- May 1
Piedmont—Jan. 1 - May 1
Coastal Plain—Dec. 1 - Apr. 15
soil amendments
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 750 lb/acre 10-10-10 fertilizer.
mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting,
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
maintenance
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
Rate (lb/acre)
120
50
Omit annual lespedeza when duration of temporary cover is not to
extend beyond June.
12 | Page
2377 – McBride Place Energy, LLC
Table 6.10b Temporary Seeding Recommendations for Summer
seeding mixture
German millet
Rate (lb/acre)
40
In the Piedmont and Mountains, a small-stemmed Sudangrass may be
substituted at a rate of 50 lb/acre.
seeding dates
Mountains—May 15 - Aug. 15
Piedmont—May 1 - Aug. 15
Coastal Plain—Apr. 15 - Aug. 15
soil amendments
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 750 lb/acre 10-10-10 fertilizer.
mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting,
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
maintenance
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
13 | Page
2377 – McBride Place Energy, LLC
Table 6.10c Temporary Seeding Recommendations for Fall
seeding mixture
Rye (grain)
Rate (lb/acre)
120
seeding dates
Mountains—Aug. 15 - Dec. 15
Coastal Plain and Piedmont—Aug. 15 - Dec. 30
soil amendments
Follow soil tests or apply 2,000 lb/acre ground agricultural limestone
and 1,000 lb/acre 10-10-10 fertilizer.
mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting,
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
maintenance
Repair and refertilize damaged areas immediately. Topdress with 50
lb/acre of nitrogen in March. If it is necessary to extent temporary cover
beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal
Plain) or Korean (Mountains) lespedeza in late February or early
March.
14 | Page
2377 – McBride Place Energy, LLC
7. Other practices shall be provided if determined by the Engineer or NC-DEQ Administrator.
Management Strategies
1. Perimeter sediment trapping measures to be installed prior to any excavation on site.
2.Construction Entrance and Construction Road Stabilization shall be installed as a first measure
following installation of sediment trapping measures.
3. Construction shall be conducted so that existing cover will not be disturbed more than necessary.
4. Construction shall be sequenced so that grading operations can begin and end as quickly as possible.
5. Permanent seeding and other stabilization shall follow immediately after grading.in accordance with
7 or 14-day ground stabilization requirements.
6. The job superintendent shall be responsible for the installation and maintenance of all erosion and
sediment control practices.
7. After achieving adequate stabilization to the satisfaction of the E&SC Administrator, the temporary
E&S controls shall be removed.
Permanent Stabilization
All areas disturbed by construction and not otherwise stabilized, shall be stabilized within 7 days on
perimeter areas and slopes greater than 3:1, and ground stabilization must occur within 14 days on other
areas. These requirements supersede any less stringent stabilization requirement on the plans and apply
for any section of the project for any period of inactivity or project completion [G.S. 143-215.1]
When it is clear that plants have not germinated on an area or have died, these areas must be reseeded
immediately to prevent erosion damage. In all seeding operations, seed, fertilizer, and lime shall be
applied prior to mulching. Erosion control blankets shall be installed over fill slopes which have been
brought to final grade and have been seeded to protect the slopes from rill and gully erosion and to allow
seed to germinate properly. Mulch (straw or fiber) shall be used on relatively flat areas. In all seeding
operations, seed, fertilizer, and lime shall be applied prior to mulching.
Storm Water Management/Water Quality
There are no permanent storm water management practices proposed for this site, and there are no water
quality measures proposed. The proposed impervious area is 2.3%.
15 | Page
2377 – McBride Place Energy, LLC
Construction Schedule
1. Obtain site plan approval and other applicable permits.
2. Hold a pre-construction conference at least one week prior to any construction activity.
3. Construction Area #1
a. Flag the work limits, including the perimeter buffer area and no-build area along Bost Creek for
protection of trees and creek.
b. All perimeter Erosion/Sediment Control measures in all areas, such as sediment fencing,
diversions, and sediment basins shall be installed before any clearing, grubbing, or topsoil stripping
takes place. Temporary diversion ditches designed to direct clean water entering the site to an area
off-site must be stabilized immediately after installation with vegetation and matting. Due to the
nature of this project and the required number and size of temporary sediment basins and associated
control measures, it is necessary to install erosion control measures within the prescribed perimeter
Buffer Area and in areas where Solar Arrays will ultimately be installed. Once the need for the
temporary measures ceases, the Buffer Area shall be re-established and the grade beneath Solar
Arrays created and stabilized.
c. Obtain permission from County/DEQ ESC Inspector to proceed.
d. Install temporary gravel Construction Entrance/Exit.
e. Complete site clearing and grubbing.
f. Construct Construction Staging Area and Concrete Washout Area as shown on Sheet 5.10, details
“Service Aisle, Rack Path & and Construction Staging Area Soil Section” and Concrete Washout.
g. Begin Perimeter Fence Installation
h. Grade Construction Area #1 portion of the site as shown on the Site Plan, Sheets 5.0, 5.1, & 5.2.
Bare areas should be vegetated or mulched, if grading ceases for more than two weeks.
i. Construct Service Roads and Service Paths as shown on Sheet 5.0, 5.1 & 5.2 and Sheet 5.10, detail
“Service Aisle, Rack Path & and Construction Staging Area Soil Section.”
j. Install solar array inverter pads per solar manufacturer's directions at locations shown on Sheets
5.1 & 5.2.
k. Install solar array anchors/support beams per manufacturer's instructions in areas not impacted by
sediment basins. Anchors and beams for solar arrays located within temporary sediment basins
shall be installed after removal of temporary erosion control measures and drainage area for
temporary erosion control stabilization. Installation of anchors and beams causes no risk of soil
erosion or creation of sediment.
l. Install cabling from array pads to a location, to be determined, near the Union Power pad.
m. Inspect all erosion and sediment controls weekly and after all rainfall events. Needed repairs are
to be completed immediately.
16 | Page
2377 – McBride Place Energy, LLC
n. Install remaining solar array anchors/support beams in areas previously occupied by temporary
sediment control measures.
o. Install solar arrays onto supports and test.
p. After obtaining approval from the County/DEQ ESC Inspector, remove temporary sediment
control measures, and stabilize the entire Construction Area #1.
q. Establish permanent vegetation.
r. Estimated time before final stabilization - 7 months
4. Construction Areas #2 - #4
Repeat steps 3.a. - 3.q. for Areas #2 - #4.
5. Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the mining act of 1971, or a landfill regulated by the division of
solid waste management. Trash/debris from demolition activities or generated by any activities on site
must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division
of Solid Waste Management or Division of Water Resources rules and regulations. [15a NCAC 4b
.0110]
6. Pursuant to the NPDES permit that went into effect August 3, 2011, ground stabilization must occur
within 7 days on perimeter areas and slopes greater than 3:1, and ground stabilization must occur
within 14 days on other areas. These requirements supersede any less stringent stabilization
requirement on the plans and apply for any section of the project for any period of inactivity or project
completion. [G.S. 143-215.1]
7. Construction Entrances must contain at least 2-3-inch stone and be maintained in a condition that will
prevent tracking or direct flow of mud onto streets. Periodic top dressing with stone will be necessary.
Install water bars, ditch diversions or other suitable measures so that stormwater does not leave the
limits of disturbance through the construction entrances, as needed. [G.S. 113a-57(3), 15a NCAC 4b
.0105]
Maintenance
In general, all erosion and sediment control measures shall be checked daily and after each significant
rainfall. The following items shall be checked, in particular:
1. The seeded area shall be checked regularly to ensure that a good stand is maintained. Areas shall be
fertilized and reseeded as needed.
2. The gravel Construction Entrance shall be maintained in a condition which will prevent tracking or
flow of mud onto public rights-of-way. Periodic top dressing with additional stone or the washing and
reworking of existing stone shall be required when the stone is covered or has been pushed into the
soil and shall be returned to its original minimum depth of 6".
17 | Page
2377 – McBride Place Energy, LLC
3. The Silt Fence barrier, if used, shall be checked regularly (no less than weekly) for undermining or
deterioration of the fabric. Sediment shall be removed when the level of sediment deposition becomes
6” deep at the fence.
4. Self-Inspection requirements:
As a minimum, the inspections shall be performed after each of the following phases of a plan:
1. Installation of perimeter erosion and sediment control measures.
2. Installation of sediment traps/basins.
3. Clearing and grubbing of existing ground cover.
4. Completion of any phase of grading that requires provision of stabilization.
5. Installation of measures during any phase of the project.
6. Completion of construction or development.
7. Installation of stormwater retention measures.
8. Quarterly until the establishment of permanent ground cover is fully established.
18 | Page
NOTES
STRAW BALE
STRAW BALE
(TYP)
10 mil PLASTIC LINING
VARIES
10' MINIMUM
BINDER WIRE
NATIVE MATERIAL
(OPTIONAL)
STAPLES
(2 PER BALE)
WOOD OR
METAL STAKES
(2 PER BALE)
SECTION B-B
NOT TO SCALE
10 mil PLASTIC LINING
B B
PLAN
NOT TO SCALE
CONCRETE WASHOUT
SIGN DETAIL
(OR EQUIVALENT)
PLYWOOD
48"X24"
PAINTED WHITE BLACK LETTERS
6" HEIGHT
LAG SCREWS
36"
36"
TYPE "ABOVE GRADE" WITH STRAW BALES
2"
8"1.12" DIA
STEEL WIRE
STAPLE
DETAIL
CONCRETE
WASHOUT
10' MINIMUM
VARIES
10 mil PLASTIC LINING
PLAN
NOT TO SCALE
10 mil PLASTIC LINING
WOOD FRAME SECURELY
FASTENED AROUND
ENTIRE PERIMETER
WITH TWO STAKES
TWO-STACKED
2X12 ROUGH
WOOD FRAME
STAKE
(TYP)
TYPE "ABOVE GROUND"
WITH WOOD PLANKS
SECTION B-B
NOT TO SCALE
B B
VARIES
10' MINIMUM
AA
10 mil PLASTIC LINING
10 mil PLASTIC LINING
SANDBAG
BERM
BERM
3'
LATH AND
FLAGGING ON
3 SIDES
PLAN
NOT TO SCALE
SECTION A-A
NOT TO SCALE
SANDBAG
TYPE "BELOW GRADE"
WOOD POST
3.5"X3.5"X8'
1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD.
2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED
WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT
FACILITY.
3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE
WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE
OF THE WORK AND DISPOSED OF OR RECYCLED.
4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE
CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE
WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND
STABILIZED TO PREVENT EROSION.
REFERENCE:
CITY OF RALEIGH PUBLIC WORKS DEPARTMENT
SW-20.25 - CONCRETE WASHOUT
10/22/2012.
PLAN NTS
NOTES:
1. ALL MATERIAL TO MEET
FILTREXX®
SPECIFICATIONS.
2. FILTER MEDIA™ FILL TO
MEET APPLICATION
REQUIREMENTS.
3. COMPOST MATERIAL TO
BE DISPERSED ON SITE, AS
DETERMINED BY ENGINEER.FILTREXX® SEDIMENT CONTROL
WORK AREA
AREA TO BE
PROTECTED
2" X 2" X 36" WOODEN STAKES PLACED
10' O.C.
FILTREXX® SOXX™ (12"
TYPICAL)WATER FLOW
2" X 2" X 36" WOODEN STAKES
PLACED 10' O.C.
SECTION NTS
FILTREXX® SOXX™ (12" TYPICAL)BLOWN/PLACED
FILTER MEDIA™AREA TO BE PROTECTED
WORK AREA
X0X3X2
X1
H1
H2
H3X0X3X2
X1
H1
H2
H3