HomeMy WebLinkAboutNCG500322_Inspection_20180705Water Resources
ENVIRONMENTAL QUALITY
July 5, 2018
CERTIFIED MAIL # 7016 1320 0000 2596 0283
RETURN RECEIPT REQUESTED
Russel Smyer, Director of Facilities Management
Gaston College
201 Highway 321 South
Dallas, NC 28034
Subject: Notice of Violation
Tracking Number NOV-2018-PC-0219
Gaston College/ Boiler Plant
NPDES Permit NCG500322
Gaston County
Dear Mr. Smyer:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Please find enclosed the Compliance Evaluation Inspection for the site visit conducted on July 3, 2018 by
Ori Tuvia. Your cooperation during the site visit was much appreciated.
The main area of concern noted in the inspection was the records reviewed were incomplete for calendar
year 2017 and the first half of calendar year 2018 by failing to record pH and flow.
Since the previous inspection, the facility has been tied -in to the City collection system (on April 1, 2018)
and no longer discharges for surface waters. As such, the facility no longer requires the NPDES discharge permit,
and may request to have the permit rescinded. Please contact Mr. Derek Denard at derek.denardkncdenr. og_v or
at:
N. C. Division of Water Resources
Water Quality Permitting Section - NPDES
1617 Mail Service Center
Raleigh, NC 27699-1617
Due to the fact the subject facility is no longer discharging to surface waters, the Mooresville Regional
Office will not pursue any further action on the violations listed provided that this Office receives a copy of the
request for recession of permit NCG500322 within fifteen (15) days of your receipt of this correspondence. You
should be aware that the subject facility will be continue to be considered in violation until such time as the
requested permit rescission documentation is received and therefore could subject the facility to the possible
assessment of civil penalties.
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748
If you have any questions, please contact Ori Tuvia at (704) 663-1699, or via email at
ori.tuviakncdenr. gov.
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
Cc: Derek Denard (E -copy)
MRO Files (Laserfiche)
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 2 15 1 3 I NCG500322 111 12 I 18/07/03 I17 18 I S J 19 LG] 201 I
211111 1 1 1 1 1 1 II I I I I I I I I I I I I I I I I I I I I I I I II I I I I 1166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 1.0 70 IJ 71 I„ I 72 n 73 �74 751 I I I I I I 180
u
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:25AM 18/07/03
15/12/29
Boiler Plant
1020 Rodes Perimeter Dr
Exit Time/Date
Permit Expiration Date
Dallas NC 28034
10:15AM 18/07/03
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Joseph D Keith,PO Box 1044 Belmont INC 280121044//704-825-3737/7048253775
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenance 0 Records/Reports Self-Monitoring Program
Facility Site Review Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
Ori A Tuvia MRO WQ//704-663-1699/
CC--E— 7/5/2018
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
A14CC681AF27425...
7/5/2018
Page#
NPDES yr/mo/day Inspection Type
NCG500322 I11 12, 18/07/03 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCG500322
Inspection Date: 07/03/2018
Owner - Facility: Boiler Plant
Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
❑
0
❑
❑
Is the facility as described in the permit?
❑
0
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
M
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: Facility blowdown was tied -in into the city wastewater on April 1 st 2018.
No Discharge.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
❑
0
❑
❑
Is all required information readily available, complete and current?
❑
0
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
❑
0
❑
❑
Are analytical results consistent with data reported on DMRs?
❑
❑
0
❑
Is the chain -of -custody complete?
❑
❑
0
❑
Dates, times and location of sampling
❑
for the first
Name of individual performing the sampling
❑
Results of analysis and calibration
❑
Dates of analysis
❑
Name of person performing analyses
❑
Transported CM
❑
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
0
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
0
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
0
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment: Records were reviewed for the year 2017 and the first half of 2018. The records reviewed
were incomplete for the year 2017, failing to recorded pH and flow, and missing
for the first
L -IF -4: IM -1 O
Effluent Sampling
Yes No NA NE
Page# 3
Permit: NCG500322 Owner - Facility: Boiler Plant
Inspection Date: 07/03/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
❑
0
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
❑
❑
0
❑
Is sample collected below all treatment units?
❑
❑
0
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
0
❑
Celsius)?
❑
❑
0
❑
Is the facility sampling performed as required by the permit (frequency, sampling type
❑
❑
0
❑
representative)?
Comment: Permit requires arab sampling.
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
❑
0
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
❑
0
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
0
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
0
❑
Comment: Statesville Analvtical was used for analvzinq COD and oil and frease sample in 2017
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ 0 ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: Facility blowdown was tied -in into the city wastewater on April 1 st 2018
Page# 4