Loading...
HomeMy WebLinkAboutPoplin Meadows - Poplin Meadows -Stormwater Report - 180605BOHLER ENGINEERING 1927 S TRYON ST. ♦ SUITE 310 ♦ CHARLOTTE, NC 28203 ♦ 980.272.3400 STORMWATER MANAGEMENT REPORT PREPARED FOR: THE MOSER GROUP BONTERRA VILLAGE WAY INDIAN TRAIL, NC UNION COUNTY BEPC #NCC172107 June 5, 2018 PREPARED BY: BOHLER ENGINEERING, NC, PLLC 1927 S. TYRON ST. SUITE 310 CHARLOTTE, NC 28203 (980) 272-3400 __ ________________________________ NORTH CAROLINA LICENSE #043610 MICHAEL THEBERGE, P.E. PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED REGISTERED ENGINEER UNDER THE LAWS OF THE STATE OF NORTH CAROLINA CIVIL & CONSULTING ENGINEERS▪SURVEYORS▪TRAFFIC CONSULTANTS www.bohlereng.com 2 Table of Contents General Project Description ................................................................................................................. 3 Stormwater Management Analysis and BMP Calculations .................................................................. 4 Appendix ............................................................................................................................................... 6 HydroCAD Output .......................................................................................................................... Stormsewer Output ....................................................................................................................... 3 General Project Description/Stormwater Management GENERAL PROJECT OVERVIEW AND EXISTING CONDITIONS The subject site is located along Bonterra Village Way, in Union County. The project site is currently vacant and consists of approximately 11.48 acres and will include approximately 99 single family lots. There is an existing intermittent stream following the southwest side of the property line The site is majority pasture with some wooded areas, with average existing slopes of 3% to 5%. There is currently no stormwater measure provided on the site. Located on the southend of the property is an existing ditch that takes water from the property and directs it thru the existing stream offsite. There is no off-site area examined in this analysis. STORMWATER REQUIREMENTS AND DESIGN OVERVIEW This project is located in the Eastern Catawba district and is adjacent to North Fork Crooked Creek. This project is classified as a high-density project because each drainage area has greater than 12% built upon area. Stormwater quality treatment systems shall treat the runoff generated from the first inch of rainfall. All structural stormwater treatment systems used to meet these requirements shall be designed to have a minimum of 85% average annual removal for total suspended solids and 70% average annual removal for total phosphorus. General engineering design criteria shall be accordance with 15 A NCAC 2H. 1008(c) in the design manual. The peak discharge is attenuated for both the 2-year, 24-hr storm and the 25-year, 24-hr storm events. The 100-year, 24-hr storm event has been analyzed to provide 1’ of freeboard to the top of berm. Areas not controlled by systems due to topographic challenges are sheet flowing through the vegetated buffer, but all proposed impervious areas are treated within the proposed stormwater control measures. Please note that all runoff from the roofs of the homes is to be routed to underground storm drains that discharge into the wet detention pond. Some homes will have direct tie-ins of their roof drains to nearby structures and some will flow overland and in channels to nearby inlets. STORMSEWER DESIGN Stormwater run-off from the site will be directed to the existing outfall locations via a system of storm sewer pipes. The storm sewer was modeled in Hydraflow Storm Sewers Extension for 4 Autodesk AutoCAD Civil 3D. The storm sewer pipes were modeled to ensure their adequate capacity with a minimum slope of 0.5% to promote flushing of the pipes. Stormwater Management and BMP Calculations PRE VS. POST ANALYSIS PEAK ATTENUATION See table below for final flow calculations for the pre and post conditions. It should be noted that time of concentration is accounted for in the summation of the combined peak discharge values. DRAINAGE AREA 2-YR 24 HR(cfs) 25-YR 24 HR(cfs) POI 1 COMBINED: PRE DA 1 20.16 46.62 POST DA 1 15.51 46.39 POI 2: PRE DA 2 4.40 10.73 POST DA 2 1.98 4.85 All associated calculations have been provided within the Appendix section of this report. WATER QUALITY Water quality treatment of the 1” water quality volume, is also provided within the proposed above-ground wet detention pond, and is to be detained between 2-5days (See appendix for calculations). 5 Appendix DESIGN: GIVEN: 7.63 Ac. 65% 4.1 FEET 65% SA/DA = 1.60 % = 0.0160 Updated MDC SA REQUIRED = 7.63 Ac. X 0.0160 = 0.12 Ac. = 5,316 SF THE VOLUME FOR THE 1" STORM EVENT CAN BE CALCULATED AS: Design Rainfall = 1 Inch Drainage Area = 7.63 Acres Rv = 0.05 + 0.9(I) I = Percent Impervious = 65% Rv = 0.64 in./in. V1 =0.404 acre-feet = 17,607 ft3 Pond Height above Orifice = 625.41 feet Orifice Invert Elevation = 623.50 feet Orifice Diameter (D) = 2.00 inches = 0.17 feet Orifice Area (a) = 0.0218 square feet Gravitational Constant (g) = 32.2 ft/sec2 Head (H) = 1.83 feet Driving Head (HO) =0.609 feet Discharge Coefficient (CD) =0.6 Drawdown rate (Q) = 0.082 cfs Time (t) = 214,806 seconds = 2.49 days Note: The above calculation is based on the orifice equation where: 3) Pond Drawdown Time ALLOCATED AS A PERMANENT POOL V1 = (Design Rainfall)(Rv)(Drainage Area) WET POND #1 Poplin (Union county) WATER QUALITY TO MEET 85% TSS REMOVAL Self-Storage FacilityLAND USE = ESTIMATED PERCENT IMPERVIOUS = DRAINAGE AREA TO FACILITY = AVERAGE POOL DEPTH = 1) SA/DA RATIO: PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION PERCENT IMPERVIOUS = 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS 6/5/2018 3:55 PM Page 1 of 1 Elev Area (sf)Inc Storage (cf)Total Storage (cf) 623.50 8,755 0 0 624.50 10,050 9,403 9,403 625.50 11,405 10,728 20,130 626.50 12,815 12,110 32,240 627.50 14,275 13,545 45,785 628.50 15,800 15,038 60,823 629.50 17,380 16,590 77,413 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 618.50 2,555 0 0 619.50 3,041 0 0 620.50 3,556 3,299 3,299 621.50 4,129 3,843 7,141 622.50 4,730 4,430 11,571 623.50 8,754 17,906 32,166 Elev Area (sf) Inc Storage (cf) Total Storage (cf) 618.50 359 0 0 619.50 539 0 0 620.50 757 648 648 621.50 1,011 884 1,532 622.50 1,303 1,157 2,689 Wet Pond 1 Design Wet Pond 1 Treatment Volume Wet Pond 1 Permanent Pool - Forebay Wet Pond 1 Permanent Pool Volume - Main Pool 6/5/2018 3:56 PM Page 1 of 1 1S Pre DA 1 2S Pre DA 2 4S Post DA 1 Controlled 7S Post DA 1 Sheet Flow 8S Post DA 2 5P Pond 1 6L POI 1 Combined Routing Diagram for NCC172107 - Poplin Road - 180604 - ATZ Prepared by Bohler Engineering, Printed 6/5/2018 HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Subcat Reach Pond Link NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 2HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 3.060 61 >75% Grass cover, Good, HSG B (4S) 1.500 80 >75% Grass cover, Good, HSG D (7S) 7.150 80 Pasture/grassland/range, Good, HSG D (1S, 2S) 4.560 98 Paved roads w/curbs & sewers, HSG B (4S) 3.200 93 Paved roads w/open ditches, 50% imp, HSG D (1S, 7S) 6.850 77 Woods, Good, HSG D (1S, 2S, 7S, 8S) 26.320 82 TOTAL AREA NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 3HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 7.620 HSG B 4S 0.000 HSG C 18.700 HSG D 1S, 2S, 7S, 8S 0.000 Other 26.320 TOTAL AREA NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 4HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 3.060 0.000 1.500 0.000 4.560 >75% Grass cover, Good 0.000 0.000 0.000 7.150 0.000 7.150 Pasture/grassland/range, Good 0.000 4.560 0.000 0.000 0.000 4.560 Paved roads w/curbs & sewers 0.000 0.000 0.000 3.200 0.000 3.200 Paved roads w/open ditches, 50% imp 0.000 0.000 0.000 6.850 0.000 6.850 Woods, Good 0.000 7.620 0.000 18.700 0.000 26.320 TOTAL AREA NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 5HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 5P 623.50 623.00 75.0 0.0067 0.011 18.0 0.0 0.0 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 6HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Time span=0.00-60.00 hrs, dt=0.05 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Runoff Area=11.150 ac 7.17% Impervious Runoff Depth=4.05"Subcatchment 1S: Pre DA 1 Flow Length=1,778' Tc=22.4 min CN=81 Runoff=46.62 cfs 3.761 af Runoff Area=2.200 ac 0.00% Impervious Runoff Depth=3.74"Subcatchment 2S: Pre DA 2 Flow Length=1,220' Tc=14.4 min CN=78 Runoff=10.73 cfs 0.685 af Runoff Area=7.620 ac 59.84% Impervious Runoff Depth=4.26"Subcatchment 4S: Post DA 1 Controlled Tc=5.0 min CN=83 Runoff=56.28 cfs 2.704 af Runoff Area=4.600 ac 17.39% Impervious Runoff Depth=4.37"Subcatchment 7S: Post DA 1 Sheet Flow Tc=10.0 min CN=84 Runoff=29.52 cfs 1.673 af Runoff Area=0.750 ac 0.00% Impervious Runoff Depth=3.64"Subcatchment 8S: Post DA 2 Flow Length=260' Slope=0.0300 '/' Tc=5.0 min CN=77 Runoff=4.85 cfs 0.227 af Peak Elev=627.77' Storage=50,459 cf Inflow=56.28 cfs 2.704 afPond 5P: Pond 1 Primary=17.36 cfs 2.616 af Secondary=0.00 cfs 0.000 af Outflow=17.36 cfs 2.616 af Inflow=46.39 cfs 4.289 afLink 6L: POI 1 Combined Primary=46.39 cfs 4.289 af Total Runoff Area = 26.320 ac Runoff Volume = 9.052 af Average Runoff Depth = 4.13" 76.60% Pervious = 20.160 ac 23.40% Impervious = 6.160 ac Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 7HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Pre DA 1 Runoff = 46.62 cfs @ 12.15 hrs, Volume= 3.761 af, Depth= 4.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.18" Area (ac) CN Description 6.450 80 Pasture/grassland/range, Good, HSG D 3.100 77 Woods, Good, HSG D 1.600 93 Paved roads w/open ditches, 50% imp, HSG D 11.150 81 Weighted Average 10.350 92.83% Pervious Area 0.800 7.17% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.5 150 0.0200 0.22 Sheet Flow, Range n= 0.130 P2= 3.55" 3.4 200 0.0200 0.99 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 7.5 1,428 0.0110 3.17 9.50 Channel Flow, Area= 3.0 sf Perim= 5.0' r= 0.60' n= 0.035 Earth, dense weeds 22.4 1,778 Total Subcatchment 1S: Pre DA 1 Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.18" Runoff Area=11.150 ac Runoff Volume=3.761 af Runoff Depth=4.05" Flow Length=1,778' Tc=22.4 min CN=81 46.62 cfs Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 8HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: Pre DA 1 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.21 0.00 0.00 4.00 0.30 0.00 0.00 5.00 0.39 0.00 0.00 6.00 0.49 0.00 0.00 7.00 0.61 0.01 0.11 8.00 0.74 0.03 0.25 9.00 0.91 0.07 0.51 10.00 1.12 0.14 0.86 11.00 1.45 0.29 1.88 12.00 4.10 2.20 29.83 13.00 4.77 2.78 5.21 14.00 5.07 3.05 2.71 15.00 5.27 3.23 2.01 16.00 5.44 3.38 1.58 17.00 5.57 3.50 1.34 18.00 5.69 3.60 1.18 19.00 5.80 3.70 1.03 20.00 5.88 3.78 0.87 21.00 5.96 3.85 0.80 22.00 6.04 3.92 0.77 23.00 6.11 3.98 0.74 24.00 6.18 4.05 0.71 25.00 6.18 4.05 0.00 26.00 6.18 4.05 0.00 27.00 6.18 4.05 0.00 28.00 6.18 4.05 0.00 29.00 6.18 4.05 0.00 30.00 6.18 4.05 0.00 31.00 6.18 4.05 0.00 32.00 6.18 4.05 0.00 33.00 6.18 4.05 0.00 34.00 6.18 4.05 0.00 35.00 6.18 4.05 0.00 36.00 6.18 4.05 0.00 37.00 6.18 4.05 0.00 38.00 6.18 4.05 0.00 39.00 6.18 4.05 0.00 40.00 6.18 4.05 0.00 41.00 6.18 4.05 0.00 42.00 6.18 4.05 0.00 43.00 6.18 4.05 0.00 44.00 6.18 4.05 0.00 45.00 6.18 4.05 0.00 46.00 6.18 4.05 0.00 47.00 6.18 4.05 0.00 48.00 6.18 4.05 0.00 49.00 6.18 4.05 0.00 50.00 6.18 4.05 0.00 51.00 6.18 4.05 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 6.18 4.05 0.00 53.00 6.18 4.05 0.00 54.00 6.18 4.05 0.00 55.00 6.18 4.05 0.00 56.00 6.18 4.05 0.00 57.00 6.18 4.05 0.00 58.00 6.18 4.05 0.00 59.00 6.18 4.05 0.00 60.00 6.18 4.05 0.00 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 9HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Pre DA 2 Runoff = 10.73 cfs @ 12.06 hrs, Volume= 0.685 af, Depth= 3.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.18" Area (ac) CN Description 1.500 77 Woods, Good, HSG D 0.700 80 Pasture/grassland/range, Good, HSG D 2.200 78 Weighted Average 2.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.4 100 0.0500 0.26 Sheet Flow, Grass: Short n= 0.150 P2= 3.55" 3.0 860 0.0200 4.73 23.67 Channel Flow, Area= 5.0 sf Perim= 9.0' r= 0.56' n= 0.030 Earth, grassed & winding 5.0 260 0.0300 0.87 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 14.4 1,220 Total Subcatchment 2S: Pre DA 2 Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 25-Year Rainfall=6.18" Runoff Area=2.200 ac Runoff Volume=0.685 af Runoff Depth=3.74" Flow Length=1,220' Tc=14.4 min CN=78 10.73 cfs Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 10HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 2S: Pre DA 2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.21 0.00 0.00 4.00 0.30 0.00 0.00 5.00 0.39 0.00 0.00 6.00 0.49 0.00 0.00 7.00 0.61 0.00 0.00 8.00 0.74 0.01 0.03 9.00 0.91 0.04 0.08 10.00 1.12 0.09 0.14 11.00 1.45 0.21 0.34 12.00 4.10 1.96 9.30 13.00 4.77 2.52 0.83 14.00 5.07 2.77 0.48 15.00 5.27 2.95 0.37 16.00 5.44 3.09 0.29 17.00 5.57 3.20 0.25 18.00 5.69 3.31 0.22 19.00 5.80 3.40 0.19 20.00 5.88 3.48 0.16 21.00 5.96 3.55 0.15 22.00 6.04 3.61 0.15 23.00 6.11 3.68 0.14 24.00 6.18 3.74 0.14 25.00 6.18 3.74 0.00 26.00 6.18 3.74 0.00 27.00 6.18 3.74 0.00 28.00 6.18 3.74 0.00 29.00 6.18 3.74 0.00 30.00 6.18 3.74 0.00 31.00 6.18 3.74 0.00 32.00 6.18 3.74 0.00 33.00 6.18 3.74 0.00 34.00 6.18 3.74 0.00 35.00 6.18 3.74 0.00 36.00 6.18 3.74 0.00 37.00 6.18 3.74 0.00 38.00 6.18 3.74 0.00 39.00 6.18 3.74 0.00 40.00 6.18 3.74 0.00 41.00 6.18 3.74 0.00 42.00 6.18 3.74 0.00 43.00 6.18 3.74 0.00 44.00 6.18 3.74 0.00 45.00 6.18 3.74 0.00 46.00 6.18 3.74 0.00 47.00 6.18 3.74 0.00 48.00 6.18 3.74 0.00 49.00 6.18 3.74 0.00 50.00 6.18 3.74 0.00 51.00 6.18 3.74 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 6.18 3.74 0.00 53.00 6.18 3.74 0.00 54.00 6.18 3.74 0.00 55.00 6.18 3.74 0.00 56.00 6.18 3.74 0.00 57.00 6.18 3.74 0.00 58.00 6.18 3.74 0.00 59.00 6.18 3.74 0.00 60.00 6.18 3.74 0.00 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 11HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 4S: Post DA 1 Controlled [49] Hint: Tc<2dt may require smaller dt Runoff = 56.28 cfs @ 11.95 hrs, Volume= 2.704 af, Depth= 4.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.18" Area (ac) CN Description 4.560 98 Paved roads w/curbs & sewers, HSG B 3.060 61 >75% Grass cover, Good, HSG B 7.620 83 Weighted Average 3.060 40.16% Pervious Area 4.560 59.84% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Post DA 1 Controlled Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 25-Year Rainfall=6.18" Runoff Area=7.620 ac Runoff Volume=2.704 af Runoff Depth=4.26" Tc=5.0 min CN=83 56.28 cfs Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 12HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 4S: Post DA 1 Controlled Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.21 0.00 0.00 4.00 0.30 0.00 0.00 5.00 0.39 0.00 0.00 6.00 0.49 0.00 0.06 7.00 0.61 0.02 0.16 8.00 0.74 0.05 0.26 9.00 0.91 0.10 0.51 10.00 1.12 0.18 0.81 11.00 1.45 0.35 1.80 12.00 4.10 2.37 48.01 13.00 4.77 2.97 2.77 14.00 5.07 3.24 1.66 15.00 5.27 3.42 1.32 16.00 5.44 3.57 1.02 17.00 5.57 3.70 0.90 18.00 5.69 3.81 0.80 19.00 5.80 3.90 0.69 20.00 5.88 3.98 0.58 21.00 5.96 4.06 0.55 22.00 6.04 4.13 0.53 23.00 6.11 4.19 0.51 24.00 6.18 4.26 0.49 25.00 6.18 4.26 0.00 26.00 6.18 4.26 0.00 27.00 6.18 4.26 0.00 28.00 6.18 4.26 0.00 29.00 6.18 4.26 0.00 30.00 6.18 4.26 0.00 31.00 6.18 4.26 0.00 32.00 6.18 4.26 0.00 33.00 6.18 4.26 0.00 34.00 6.18 4.26 0.00 35.00 6.18 4.26 0.00 36.00 6.18 4.26 0.00 37.00 6.18 4.26 0.00 38.00 6.18 4.26 0.00 39.00 6.18 4.26 0.00 40.00 6.18 4.26 0.00 41.00 6.18 4.26 0.00 42.00 6.18 4.26 0.00 43.00 6.18 4.26 0.00 44.00 6.18 4.26 0.00 45.00 6.18 4.26 0.00 46.00 6.18 4.26 0.00 47.00 6.18 4.26 0.00 48.00 6.18 4.26 0.00 49.00 6.18 4.26 0.00 50.00 6.18 4.26 0.00 51.00 6.18 4.26 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 6.18 4.26 0.00 53.00 6.18 4.26 0.00 54.00 6.18 4.26 0.00 55.00 6.18 4.26 0.00 56.00 6.18 4.26 0.00 57.00 6.18 4.26 0.00 58.00 6.18 4.26 0.00 59.00 6.18 4.26 0.00 60.00 6.18 4.26 0.00 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 13HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 7S: Post DA 1 Sheet Flow Runoff = 29.52 cfs @ 12.01 hrs, Volume= 1.673 af, Depth= 4.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.18" Area (ac) CN Description 1.500 77 Woods, Good, HSG D 1.500 80 >75% Grass cover, Good, HSG D 1.600 93 Paved roads w/open ditches, 50% imp, HSG D 4.600 84 Weighted Average 3.800 82.61% Pervious Area 0.800 17.39% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 7S: Post DA 1 Sheet Flow Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-Year Rainfall=6.18" Runoff Area=4.600 ac Runoff Volume=1.673 af Runoff Depth=4.37" Tc=10.0 min CN=84 29.52 cfs Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 14HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 7S: Post DA 1 Sheet Flow Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.21 0.00 0.00 4.00 0.30 0.00 0.00 5.00 0.39 0.00 0.00 6.00 0.49 0.01 0.05 7.00 0.61 0.02 0.11 8.00 0.74 0.06 0.17 9.00 0.91 0.11 0.32 10.00 1.12 0.21 0.50 11.00 1.45 0.39 1.08 12.00 4.10 2.46 29.37 13.00 4.77 3.06 1.79 14.00 5.07 3.33 1.05 15.00 5.27 3.52 0.82 16.00 5.44 3.67 0.64 17.00 5.57 3.80 0.56 18.00 5.69 3.91 0.49 19.00 5.80 4.01 0.42 20.00 5.88 4.09 0.36 21.00 5.96 4.16 0.34 22.00 6.04 4.23 0.32 23.00 6.11 4.30 0.31 24.00 6.18 4.37 0.30 25.00 6.18 4.37 0.00 26.00 6.18 4.37 0.00 27.00 6.18 4.37 0.00 28.00 6.18 4.37 0.00 29.00 6.18 4.37 0.00 30.00 6.18 4.37 0.00 31.00 6.18 4.37 0.00 32.00 6.18 4.37 0.00 33.00 6.18 4.37 0.00 34.00 6.18 4.37 0.00 35.00 6.18 4.37 0.00 36.00 6.18 4.37 0.00 37.00 6.18 4.37 0.00 38.00 6.18 4.37 0.00 39.00 6.18 4.37 0.00 40.00 6.18 4.37 0.00 41.00 6.18 4.37 0.00 42.00 6.18 4.37 0.00 43.00 6.18 4.37 0.00 44.00 6.18 4.37 0.00 45.00 6.18 4.37 0.00 46.00 6.18 4.37 0.00 47.00 6.18 4.37 0.00 48.00 6.18 4.37 0.00 49.00 6.18 4.37 0.00 50.00 6.18 4.37 0.00 51.00 6.18 4.37 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 6.18 4.37 0.00 53.00 6.18 4.37 0.00 54.00 6.18 4.37 0.00 55.00 6.18 4.37 0.00 56.00 6.18 4.37 0.00 57.00 6.18 4.37 0.00 58.00 6.18 4.37 0.00 59.00 6.18 4.37 0.00 60.00 6.18 4.37 0.00 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 15HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 8S: Post DA 2 [49] Hint: Tc<2dt may require smaller dt Runoff = 4.85 cfs @ 11.96 hrs, Volume= 0.227 af, Depth= 3.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.18" Area (ac) CN Description 0.750 77 Woods, Good, HSG D 0.750 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 260 0.0300 0.87 Shallow Concentrated Flow, Woodland Kv= 5.0 fps Subcatchment 8S: Post DA 2 Runoff Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 Type II 24-hr 25-Year Rainfall=6.18" Runoff Area=0.750 ac Runoff Volume=0.227 af Runoff Depth=3.64" Flow Length=260' Slope=0.0300 '/' Tc=5.0 min CN=77 4.85 cfs Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 16HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 8S: Post DA 2 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 1.00 0.06 0.00 0.00 2.00 0.14 0.00 0.00 3.00 0.21 0.00 0.00 4.00 0.30 0.00 0.00 5.00 0.39 0.00 0.00 6.00 0.49 0.00 0.00 7.00 0.61 0.00 0.00 8.00 0.74 0.01 0.01 9.00 0.91 0.03 0.03 10.00 1.12 0.08 0.05 11.00 1.45 0.19 0.12 12.00 4.10 1.89 4.19 13.00 4.77 2.43 0.25 14.00 5.07 2.68 0.15 15.00 5.27 2.85 0.12 16.00 5.44 2.99 0.09 17.00 5.57 3.11 0.08 18.00 5.69 3.21 0.07 19.00 5.80 3.30 0.06 20.00 5.88 3.38 0.05 21.00 5.96 3.45 0.05 22.00 6.04 3.51 0.05 23.00 6.11 3.58 0.05 24.00 6.18 3.64 0.05 25.00 6.18 3.64 0.00 26.00 6.18 3.64 0.00 27.00 6.18 3.64 0.00 28.00 6.18 3.64 0.00 29.00 6.18 3.64 0.00 30.00 6.18 3.64 0.00 31.00 6.18 3.64 0.00 32.00 6.18 3.64 0.00 33.00 6.18 3.64 0.00 34.00 6.18 3.64 0.00 35.00 6.18 3.64 0.00 36.00 6.18 3.64 0.00 37.00 6.18 3.64 0.00 38.00 6.18 3.64 0.00 39.00 6.18 3.64 0.00 40.00 6.18 3.64 0.00 41.00 6.18 3.64 0.00 42.00 6.18 3.64 0.00 43.00 6.18 3.64 0.00 44.00 6.18 3.64 0.00 45.00 6.18 3.64 0.00 46.00 6.18 3.64 0.00 47.00 6.18 3.64 0.00 48.00 6.18 3.64 0.00 49.00 6.18 3.64 0.00 50.00 6.18 3.64 0.00 51.00 6.18 3.64 0.00 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 52.00 6.18 3.64 0.00 53.00 6.18 3.64 0.00 54.00 6.18 3.64 0.00 55.00 6.18 3.64 0.00 56.00 6.18 3.64 0.00 57.00 6.18 3.64 0.00 58.00 6.18 3.64 0.00 59.00 6.18 3.64 0.00 60.00 6.18 3.64 0.00 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 17HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Pond 5P: Pond 1 Inflow Area = 7.620 ac, 59.84% Impervious, Inflow Depth = 4.26" for 25-Year event Inflow = 56.28 cfs @ 11.95 hrs, Volume= 2.704 af Outflow = 17.36 cfs @ 12.09 hrs, Volume= 2.616 af, Atten= 69%, Lag= 7.9 min Primary = 17.36 cfs @ 12.09 hrs, Volume= 2.616 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 627.77' @ 12.09 hrs Surf.Area= 14,890 sf Storage= 50,459 cf Plug-Flow detention time= 290.7 min calculated for 2.614 af (97% of inflow) Center-of-Mass det. time= 272.9 min ( 1,074.0 - 801.1 ) Volume Invert Avail.Storage Storage Description #1 623.50' 78,405 cf Above Permanent Pool (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 623.50 8,755 0 0 629.50 17,380 78,405 78,405 Device Routing Invert Outlet Devices #1 Primary 623.50'18.0" Round Culvert L= 75.0' RCP, groove end w/headwall, Ke= 0.200 Inlet / Outlet Invert= 623.50' / 623.00' S= 0.0067 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 623.50'2.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 625.41'36.0" W x 28.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 627.75'20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #5 Secondary 628.25'70.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=17.33 cfs @ 12.09 hrs HW=627.76' TW=0.00' (Dynamic Tailwater) 1=Culvert (Barrel Controls 17.33 cfs @ 9.81 fps) 2=Orifice/Grate (Passes < 0.26 cfs potential flow) 3=Orifice/Grate (Passes < 34.62 cfs potential flow) 4=Sharp-Crested Rectangular Weir (Passes < 0.04 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=623.50' TW=0.00' (Dynamic Tailwater) 5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 18HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Pond 5P: Pond 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.620 ac Peak Elev=627.77' Storage=50,459 cf 56.28 cfs 17.36 cfs 17.36 cfs 0.00 cfs Pond 5P: Pond 1 Total Primary Secondary Stage-Discharge Discharge (cfs) 250200150100500Elevation (feet)629 628 627 626 625 624 Culvert + Orifice/Grate Orifice/Grate Sharp-Crested Rectangular Weir Broad-Crested Rectangular Weir Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 19HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Pond 5P: Pond 1 Surface Storage Stage-Area-Storage Storage (cubic-feet) 75,00070,00065,00060,00055,00050,00045,00040,00035,00030,00025,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 16,00014,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)629 628 627 626 625 624 Above Permanent Pool Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 20HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Pond 5P: Pond 1 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) Primary (cfs) Secondary (cfs) 0.00 0.00 0 623.50 0.00 0.00 0.00 2.50 0.00 0 623.50 0.00 0.00 0.00 5.00 0.00 0 623.50 0.00 0.00 0.00 7.50 0.21 764 623.59 0.01 0.01 0.00 10.00 0.81 4,381 623.98 0.08 0.08 0.00 12.50 4.41 36,868 626.81 14.59 14.59 0.00 15.00 1.32 22,421 625.67 1.48 1.48 0.00 17.50 0.85 21,429 625.59 0.91 0.91 0.00 20.00 0.58 20,885 625.54 0.64 0.64 0.00 22.50 0.52 20,636 625.52 0.54 0.54 0.00 25.00 0.00 19,544 625.43 0.19 0.19 0.00 27.50 0.00 18,013 625.29 0.17 0.17 0.00 30.00 0.00 16,550 625.16 0.16 0.16 0.00 32.50 0.00 15,145 625.04 0.15 0.15 0.00 35.00 0.00 13,800 624.91 0.15 0.15 0.00 37.50 0.00 12,516 624.79 0.14 0.14 0.00 40.00 0.00 11,294 624.68 0.13 0.13 0.00 42.50 0.00 10,134 624.56 0.13 0.13 0.00 45.00 0.00 9,037 624.46 0.12 0.12 0.00 47.50 0.00 8,006 624.35 0.11 0.11 0.00 50.00 0.00 7,039 624.26 0.10 0.10 0.00 52.50 0.00 6,140 624.16 0.10 0.10 0.00 55.00 0.00 5,307 624.08 0.09 0.09 0.00 57.50 0.00 4,543 624.00 0.08 0.08 0.00 60.00 0.00 3,848 623.92 0.07 0.07 0.00 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 21HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Stage-Discharge for Pond 5P: Pond 1 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 623.50 0.00 0.00 0.00 623.60 0.02 0.02 0.00 623.70 0.04 0.04 0.00 623.80 0.06 0.06 0.00 623.90 0.07 0.07 0.00 624.00 0.08 0.08 0.00 624.10 0.09 0.09 0.00 624.20 0.10 0.10 0.00 624.30 0.11 0.11 0.00 624.40 0.11 0.11 0.00 624.50 0.12 0.12 0.00 624.60 0.13 0.13 0.00 624.70 0.13 0.13 0.00 624.80 0.14 0.14 0.00 624.90 0.15 0.15 0.00 625.00 0.15 0.15 0.00 625.10 0.16 0.16 0.00 625.20 0.16 0.16 0.00 625.30 0.17 0.17 0.00 625.40 0.17 0.17 0.00 625.50 0.44 0.44 0.00 625.60 0.98 0.98 0.00 625.70 1.69 1.69 0.00 625.80 2.53 2.53 0.00 625.90 3.50 3.50 0.00 626.00 4.56 4.56 0.00 626.10 5.72 5.72 0.00 626.20 6.97 6.97 0.00 626.30 8.29 8.29 0.00 626.40 9.70 9.70 0.00 626.50 11.18 11.18 0.00 626.60 12.72 12.72 0.00 626.70 14.24 14.24 0.00 626.80 14.56 14.56 0.00 626.90 14.87 14.87 0.00 627.00 15.18 15.18 0.00 627.10 15.48 15.48 0.00 627.20 15.77 15.77 0.00 627.30 16.06 16.06 0.00 627.40 16.35 16.35 0.00 627.50 16.63 16.63 0.00 627.60 16.90 16.90 0.00 627.70 17.17 17.17 0.00 627.80 17.44 17.44 0.00 627.90 17.70 17.70 0.00 628.00 17.96 17.96 0.00 628.10 18.22 18.22 0.00 628.20 18.47 18.47 0.00 628.30 20.66 18.71 1.95 628.40 29.08 18.96 10.13 628.50 41.14 19.20 21.94 628.60 56.29 19.44 36.85 Elevation (feet) Discharge (cfs) Primary (cfs) Secondary (cfs) 628.70 74.51 19.67 54.83 628.80 96.00 19.91 76.09 628.90 119.09 20.14 98.95 629.00 142.78 20.37 122.42 629.10 168.02 20.59 147.43 629.20 194.68 20.81 173.87 629.30 223.07 21.03 202.03 629.40 253.25 21.25 232.00 629.50 284.14 21.47 262.67 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 22HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 5P: Pond 1 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 623.50 8,755 0 623.60 8,899 883 623.70 9,043 1,780 623.80 9,186 2,691 623.90 9,330 3,617 624.00 9,474 4,557 624.10 9,618 5,512 624.20 9,761 6,481 624.30 9,905 7,464 624.40 10,049 8,462 624.50 10,193 9,474 624.60 10,336 10,500 624.70 10,480 11,541 624.80 10,624 12,596 624.90 10,767 13,666 625.00 10,911 14,750 625.10 11,055 15,848 625.20 11,199 16,961 625.30 11,342 18,088 625.40 11,486 19,229 625.50 11,630 20,385 625.60 11,774 21,555 625.70 11,918 22,740 625.80 12,061 23,939 625.90 12,205 25,152 626.00 12,349 26,380 626.10 12,493 27,622 626.20 12,636 28,878 626.30 12,780 30,149 626.40 12,924 31,434 626.50 13,068 32,734 626.60 13,211 34,048 626.70 13,355 35,376 626.80 13,499 36,719 626.90 13,642 38,076 627.00 13,786 39,447 627.10 13,930 40,833 627.20 14,074 42,233 627.30 14,217 43,648 627.40 14,361 45,077 627.50 14,505 46,520 627.60 14,649 47,978 627.70 14,793 49,450 627.80 14,936 50,936 627.90 15,080 52,437 628.00 15,224 53,952 628.10 15,368 55,482 628.20 15,511 57,026 628.30 15,655 58,584 628.40 15,799 60,157 628.50 15,943 61,744 628.60 16,086 63,345 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 628.70 16,230 64,961 628.80 16,374 66,591 628.90 16,517 68,236 629.00 16,661 69,895 629.10 16,805 71,568 629.20 16,949 73,256 629.30 17,092 74,958 629.40 17,236 76,674 629.50 17,380 78,405 Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 23HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Summary for Link 6L: POI 1 Combined Inflow Area = 12.220 ac, 43.86% Impervious, Inflow Depth > 4.21" for 25-Year event Inflow = 46.39 cfs @ 12.02 hrs, Volume= 4.289 af Primary = 46.39 cfs @ 12.02 hrs, Volume= 4.289 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Link 6L: POI 1 Combined Inflow Primary Hydrograph Time (hours) 605856545250484644424038363432302826242220181614121086420Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Inflow Area=12.220 ac 46.39 cfs 46.39 cfs Type II 24-hr 25-Year Rainfall=6.18"NCC172107 - Poplin Road - 180604 - ATZ Printed 6/5/2018Prepared by Bohler Engineering Page 24HydroCAD® 10.00-20 s/n 03478 © 2017 HydroCAD Software Solutions LLC Hydrograph for Link 6L: POI 1 Combined Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 6.00 0.05 0.00 0.05 7.00 0.11 0.00 0.11 8.00 0.20 0.00 0.20 9.00 0.38 0.00 0.38 10.00 0.58 0.00 0.58 11.00 1.19 0.00 1.19 12.00 45.98 0.00 45.98 13.00 6.88 0.00 6.88 14.00 3.17 0.00 3.17 15.00 2.30 0.00 2.30 16.00 1.80 0.00 1.80 17.00 1.53 0.00 1.53 18.00 1.35 0.00 1.35 19.00 1.17 0.00 1.17 20.00 1.00 0.00 1.00 21.00 0.91 0.00 0.91 22.00 0.87 0.00 0.87 23.00 0.84 0.00 0.84 24.00 0.80 0.00 0.80 25.00 0.19 0.00 0.19 26.00 0.17 0.00 0.17 27.00 0.17 0.00 0.17 28.00 0.16 0.00 0.16 29.00 0.16 0.00 0.16 30.00 0.16 0.00 0.16 31.00 0.16 0.00 0.16 32.00 0.15 0.00 0.15 33.00 0.15 0.00 0.15 34.00 0.15 0.00 0.15 35.00 0.15 0.00 0.15 36.00 0.14 0.00 0.14 37.00 0.14 0.00 0.14 38.00 0.14 0.00 0.14 39.00 0.14 0.00 0.14 40.00 0.13 0.00 0.13 41.00 0.13 0.00 0.13 42.00 0.13 0.00 0.13 43.00 0.12 0.00 0.12 44.00 0.12 0.00 0.12 45.00 0.12 0.00 0.12 46.00 0.12 0.00 0.12 47.00 0.11 0.00 0.11 48.00 0.11 0.00 0.11 49.00 0.11 0.00 0.11 50.00 0.10 0.00 0.10 51.00 0.10 0.00 0.10 Time (hours) Inflow (cfs) Elevation (feet) Primary (cfs) 52.00 0.10 0.00 0.10 53.00 0.09 0.00 0.09 54.00 0.09 0.00 0.09 55.00 0.09 0.00 0.09 56.00 0.09 0.00 0.09 57.00 0.08 0.00 0.08 58.00 0.08 0.00 0.08 59.00 0.08 0.00 0.08 60.00 0.07 0.00 0.07 6RLO0DS²8QLRQ&RXQW\1RUWK&DUROLQD1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRIƒ  1ƒ  :ƒ  1ƒ  :ƒ  1ƒ  :ƒ  1ƒ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²1RY7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUHFRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQGLPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJRIPDSXQLWERXQGDULHVPD\EHHYLGHQW6RLO0DS²8QLRQ&RXQW\1RUWK&DUROLQD1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH:HE6RLO6XUYH\1DWLRQDO&RRSHUDWLYH6RLO6XUYH\3DJHRI 0DS8QLW/HJHQG 0DS8QLW6\PERO 0DS8QLW1DPH $FUHVLQ$2, 3HUFHQWRI$2, &P% &LGFKDQQHU\VLOWORDPWR SHUFHQWVORSHV   *V% *ROGVWRQ%DGLQFRPSOH[WR SHUFHQWVORSHV   6F$ 6HFUHVW&LGFRPSOH[WR SHUFHQWVORSHV   7RWDOVIRU$UHDRI,QWHUHVW   6RLO0DS²8QLRQ&RXQW\1RUWK&DUROLQD 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI Temporary Sediment Trap Okay 0.54 Disturbed Area (Acres) 1.6 Peak Flow from 10-year Storm (cfs) 1944 Required Volume ft3 697 Required Surface Area ft2 18.7 Suggested Width ft 37.3 Suggested Length ft 20 Trial Top Width at Spillway Invert ft 50 Trial Top Length at Spillway Invert ft 2 Trial Side Slope Ratio Z:1 3.5 Trial Depth ft (1.5 feet below grade + 2 to 3.5 feet above grade) 6 Bottom Width ft 36 Bottom Length ft 216 Bottom Area ft2 2014 Actual Volume ft3 Okay 1000 Actual Surface Area ft2 Okay 5 Trial Weir Length ft 0.5 Trial Depth of Flow ft 5.3 Spillway Capacity cfs Okay Q = ciA 6.38 Disturbed Area (Acres) i 3.67 14.0 Peak Flow from 10-year Storm (cfs) C 0.6 11484 Required Volume ft3 4566 Required Surface Area ft2 47.8 Suggested Width ft 95.6 Suggested Length ft 100 Trial Top Width at Spillway Invert ft 173 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 11 Trial Depth ft (2 to 13 feet above grade) 34 Bottom Width ft 107 Bottom Length ft 3638 Bottom Area ft2 112268 Actual Volume ft3 Okay 17380 Actual Surface Area ft2 Okay 70 Trial Weir Length ft 0.5 Trial Depth of Flow ft 74.2 Spillway Capacity cfs Okay 2 Skimmer Size (inches) Skimmer Size 0.167 Head on Skimmer (feet) (Inches) 2.25 Orifice Size (1/4 inch increments) 1.5 2.40 Dewatering Time (days) 2 Suggest about 3 days 2.5 3 4 5 6 8 SKIMMER BASIN #1 Poplin Meadows Project: Location: Project Number: Date: Designed:ATZ Checked:MT Outlet ID: Pipe diameter=36 inches Pipe slope=0.5 % Roughness Coef.=0.013 Full Flow Capacity=52.02 cfs Full flow velocity=7.36 ft/sec Zone from graph above =3 Is grade of apron 10% or more:n Y/N 3 Length =24.0 ft. Outlet pipe diameter=36 in.Width at Outlet =9.0 ft. Outlet flowrate=52.0 cfs Width at end of Pad=36.7 ft. Outlet velocity=7.36 ft/sec Stone diameter =10 in. Material =Class I Thickness =15 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual Special study required Jun-07-2018 RRA Inlcudes 1.1 Factor of Safety Zone used = NCC172107 Riprap Outlet Protection Design Poplin Subdivision Indian Trail, NC 7.4 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10Velocity (ft/sec)Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Project: Location: Project Number: Date: Designed:ATZ Checked:MT Outlet ID: Pipe diameter=15 inches Pipe slope=0.5 % Roughness Coef.=0.013 Full Flow Capacity=5.04 cfs Full flow velocity=4.11 ft/sec Zone from graph above =1 Is grade of apron 10% or more:n Y/N 1 Length =5.0 ft. Outlet pipe diameter=15 in.Width at Outlet =3.8 ft. Outlet flowrate=5.0 cfs Width at end of Pad=9.5 ft. Outlet velocity=4.11 ft/sec Stone diameter =4 in. Material =Class A Thickness =6 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class I 10 15 8 x D(o) 4 Class I 10 15 8 x D(o) 5 Class II 14 21 10 x D(o) 6 Class II 14 21 10 x D(o) 7 Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual NCC172107 Riprap Outlet Protection Design Poplin Subdivision Indian Trail, NC Special study required Jun-07-2018 RRB Inlcudes 1.1 Factor of Safety Zone used = 4.1 ft/sec 0 5 10 15 20 25 0 1 2 3 4 5 6 7 8 9 10Velocity (ft/sec)Pipe diameter (ft) Figure 8.06.b.1 Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7