HomeMy WebLinkAbout20180919 Ver 1_MB_PCN SWMP_20180702Meadow Brook Stream Restoration Project Page 1 of 1
2. Stormwater Management Plan
The Meadow Brook Stream Restoration Project does not require a Stormwater Management Plan or
antidegradation calculations. The project is not within a protected buffer and does not involve
development. No impervious surfaces are being installed. Existing streams and wetlands are being
enhanced to provide aquatic function for stream mitigation credit. Stormwater onsite will drain into the
wetlands.