HomeMy WebLinkAboutNCG190105 Compliance Evaluation Inspection 29Jun2018Permit: NCG190105 Effective:
SOC: Effective:
County: Carteret
Region: Wilmington
Contact Person: John Willard Dudley
Compliance Inspection Report
Expiration: Owner: Dudley's Marina Inc
Expiration: Facility: Dudley's Marina, Inc.
106 Cedar Point Blvd
Title:
Swansboro NC 28584
Phone: 252-393-2204
Directions to Facility:
from swansboro heading towards cape carteret, drive over the two bridges, Dudley's is the first property on the right immedialte
after the second bridge.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 06/29/2018 Entry Time: 02:30PM
Primary Inspector: Brian P Lambe
Secondary Inspector(s):
Exit Time: 03:30PM
Reason for Inspection: Routine Inspection Type:
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Phone:
Compliance Evaluation
Page: 1
Permit: NCG190105 Owner - Facility: Dudley's Marina Inc
Inspection Date: 06/29/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Met with Jerry Jones, Yard Manager, and Sammi Hammonds, Office Manager to review permit requirements. This site was
previously permitted under NCG190032, but it expired years ago. A new permit is required.
We established two sampling points rather than the seven listed in the permit application with potential for ROS.
The area next to the rail needs to be cleaned of all paint chips in the waste soil.
The newly installed secondary storage needs to be plugged. Any discharge from the storage area must be documented. A
locked valve should be installed.
Page: 2
Permit: NCG190105
Inspection Date: 06/29/2018
Owner - Facility: Dudley's Marina Inc
Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: Ensure that you familiarize yourselves with the SWPPP and that proper documentation is
maintained.
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment: Seven samDlina Doints are outlined in the aDDlication and SWPPP. This office reduces the
Yes No NA NE
■❑❑❑
■❑❑❑
■❑❑❑
■1111❑
Yes No NA NE
❑■❑❑
sampling points to two: SD01 is the rail line, SD02 is the boat lift. If they prove in the next year
to be similar, representative outfall status can be requested. The remainder of the outfalls
should be observed, and minimal industrial activity should occur within the drainage areas.
Analytical Monitorinq Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 1:11:1
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 1:10 ❑
Comment: Seven samDlina Doints are outlined in the application and SWPPP. This office reduces the
sampling points to two: SDO1 is the rail line, SD02 is the boat lift. If they prove in the next year
to be similar, representative outfall status can be requested. The remainder of the outfalls
should be observed, and minimal industrial activity should occur within the drainage areas.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Page: 3
Permit: NCG190105 Owner - Facility: Dudley's Marina Inc
Inspection Date: 06/29/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Comment: New permit for a old site.
Page: 4