Loading...
HomeMy WebLinkAboutTanglewood Business Park - 17-061 Tanglewood Business Park Phase I - SWM StudyTanglewood Business Park – Phase I Table of Contents Stormwater Management Narrative Soils Map USGS Map Composite Runoff Curve Numbers NOAA Rainfall Data (Precipitation Depth) Wet Detention Pond Calculations Watershed Model Schematic, Pond Report, and Stage Storage Discharge 1 Yr 24 Hr Stormwater Summary Report & Pre, Post, and Routed Hydrographs (with Pond Report & TR-55 Time of Concentration Worksheets) 50 Yr 6 Hr Stormwater Summary Report & Storm Pre, Post, and Routed Hydrographs 100 Yr 6 Hr Stormwater Summary Report & Storm Pre, Post, and Routed Hydrographs Appendix Seasonal High Water Table Study Wetland & Stream Delineation Map NC DEQ Notice of Exemption to NC Dam Safety Law Exhibits EX-1.0 Drainage Area Map – Pre-Development EX-1.1 Drainage Area Map – Post-Development Tanglewood Business Park – Phase I Winston-Salem, NC INTRODUCTION The proposed Tanglewood Business Park is located adjacent to Idols Road in Forsyth County, North-Carolina. The site is located just outside of the Village of Clemmons jurisdictional limits and is approximately 1,200 linear feet southwest of the Idols Road and Dillon Industrial Drive intersection. The site can be currently accessed by a gate and gravel drive at the end of Topsider Drive. The 169.74 acre site is currently undeveloped and consists of predominantly wooded ground cover. Tanglewood Business Park will be developed in two phases and will serve as an Industrial park with approximately six lots. The park will be accessed from Topsider Drive, which will be extended through the property over the course of the two phases and connected to Idols Road at the Idols Road and Foxpark Drive Intersection. The project will consist of installing a storm drainage conveyance system that will direct stormwater runoff towards a proposed wet detention pond that will treat the stormwater runoff. Lots that are not served by the wet detention pond will be served by other stormwater control measures that will be designed during the phase 2 design of the park or as each individual lot is developed. The extension of Topsider Drive crosses a stream and will require the installation of a culvert under the proposed roadway in order to maintain the conveyance of runoff within the existing stream channel. The project also consists of a water main extension along Topsider Drive and the installation of a new sanitary sewer line that will serve the park and gravity drain to the future Idols Road Pump Station. The future Idols Road Pump Station will be located on-site along the southern property line and is to be constructed by others under a different project. Phase I development will consist of the Topsider Drive extension, water main extension, sanitary sewer line installation, culvert installation, and the wet detention pond installation. Refer to the construction drawings for the extents of all Phase I items. The proposed wet detention pond has been designed to manage a drainage area of 68.67 acres and will treat runoff from the Phase I development and select areas of the future phase II development. Refer to EX-1.1 Drainage Area Map – Post-Development for a delineation of the wet detention pond drainage area. The location of this project is within a Phase II designated area and therefore has been designed to comply with the Phase II Post-Construction design guidelines. The proposed wet detention pond has been designed to satisfy the wet pond requirements per the current NCDEQ Stormwater Design manual. Additional management in regard to volume and/or peak flow attenuation were not required for this project. DRAINAGE BASIN The pre-developed condition is comprised of a single drainage basin, which drains towards the south west property line and into an existing draw that passes through an adjacent residential property. A hydrograph was calculated for the Pre Development Area (Hydr. #3).The ground cover for this area prior to development is mostly wooded with some smaller areas of grassed and impervious cover. A composite pre-developed curve number was calculated for the Pre Development Area (Hydr. #3) based on ground cover and soil type coverage of the predeveloped area. The post-developed area is comprised of two drainage basins, which are referred to as Post Development Bypass (Hydr. #4) and Post Development (Hydr. #1); Post Development (Hydr. #1) represents the drainage area to the proposed Wet Detention Pond prior to detention. The stormwater management system was modeled by routing Post Development (Hydr. #1) through the Wet Detention Pond. The discharge hydrograph from the Wet Detention Pond (Hydr. #2) is then combined with Post Development Bypass (Hydr. #4) to create a combined hydrograph (Hydr. #5), which provides post development runoff rates. This is then compared to the pre-development rates (Hydr. #3) for the 1-year 24 Hour storm event. SOILS AND CURVE NUMBER Soils information was obtained from the City of Winston Salem GIS website. The City references the U.S. Department of Agriculture, Natural Resources Conservation Service dated 2-16-2001 as the source. Pre-developed and Post-developed curve numbers were calculated for each drainage basin based on the SCS curve numbers. Soils present on this site have a hydrologic soils group classification of ‘B’. TIME OF CONCENTRATION Several methods are available and are widely accepted for estimating time of concentration (SCS Lag (1), Kirpich (2), and TR-55 Methods (3)). TR-55 method was used for detention calculations. Calculated time of concentration values less than 0.1 hours (6 min.) are rounded up to 6 minutes, as this is the minimum Tc in TR-55. Post developed time of concentration consists of TR-55 method for overland flow added to the calculated pipe travel time. The pre and post developed drainage maps shows the travel path used in the time of concentration calculations. See the time of concentration section for documentation. PRECIPITATION Precipitation data for the study was taken from NOAA ATLAS 14, Volume 2. NOAA Atlas 14 Volume 2 contains precipitation frequency estimates for Delaware, District of Columbia, Illinois, Indiana, Kentucky, Maryland, New Jersey, North Carolina, Ohio, Pennsylvania, South Carolina, Tennessee, Virginia, and West Virginia. These areas were addressed together in a single project focused on the Ohio River basin and surrounding states. The Atlas supercedes precipitation frequency estimates contained in Technical Paper No. 40 “Rainfall frequency atlas of the United States for durations from 30 minutes to 24 hours and return periods from 1 to 100 years” (Hershfield, 1961), NWS HYDRO-35 “Five- to 60-minute precipitation frequency for the eastern and central United States” (Frederick et al., 1977) and Technical Paper No. 49 “Two- to ten-day precipitation for return periods of 2 to 100 years in the contiguous United States” (Miller et al., 1964). NOAA ATLAS 14, Volume 2 is based on more recent and extended data sets, currently accepted statistical approaches, and improved spatial interpolation and mapping techniques. The work was performed by the Hydrometeorological Design Studies Center within the Office of Hydrologic Development of the National Oceanic and Atmospheric Administration’s National Weather Service. Precipitation depths used in the study are as follows: Precipitation (P) – NOAA Atlas 14 Volume 2 (24-Hour) 1-Year 2.78in. Precipitation (P) – NOAA Atlas 14 Volume 2 (6-Hour) 50-Year 4.47in. 100-Year 4.95in. HYDROGRAPHS Hydraflow Hydrographs by Intelisolve(4) computer software was used to automate the hydrograph and routing procedure. Hydraflow Hydrographs uses the Unit Hydrograph Method for calculating runoff hydrographs. More specifically, it uses the triangular D-hour Unit Hydrograph approach as used in TR-20 (5). Hydrographs were calculated based on a peaking (shape) factor of 484. ROUTINGS Storm hydrograph routing through was performed using the Storage Indication Method as outlined in NEH-4(6). SYSTEM CONFIGURATION The stormwater management system proposed for this project is a wet detention pond. The pond will be located on the south side of the Topsider Drive road extension and to the east of the proposed phase I stream crossing. Stormwater runoff will enter the pond by the way of a 60” RCP at the downstream end of the proposed conveyance system that captures the runoff from the project area. The wet detention pond has a forebay area located at the entry section of the pond. The forebay volume is approximately 20% of the of the main pool volume and is designed to pre- treat stormwater as it enters the pond. The proposed permanent pool elevation is located at the center of a 10 foot wide vegetated shelf. The pond is also designed to have 1 foot of sediment storage at the pond bottom. The ponds outlet system will consist of a precast riser, trash rack, drawdown orifice, bottom drain, and 30 inch D.I. outlet barrel. There is also a 25 foot wide emergency spillway located 2 feet below the top of dam. The outlet barrel discharges stormwater into a rip rap discharge channel before entering the nearby stream that ultimately drains to the Yadkin River. Design elevations for the pond are as follows: Location Elevation Top of Dam 740.50 Emergency Spillway 738.50 Top of Riser 737.00 Top of Shelf 734.50 Permanent Pool & Drawdown Orifice 734.00 Bottom of Shelf 733.50 Bottom of Pond 726.00 Bottom of Sediment Storage Zone 725.00 STUDY POINT #1 PRE / POST / ROUTED RELEASE RATES AND ELEVATION TABLE – 24 HR STORM Flows Represented in this Comparison are based on SCS 1-yr, 24-hr design storm. 1 yr. 24 hr. PRE- DEVELOPED 1yr. 24 hr. POST DEVELOPED ELEVATION *FIRST 1 in. VOLUME RELEASE RATE 14.37 cfs 10.07 cfs 737.26 0.457cfs *Drawdown time is 2.52 days-see drawdown calculations in Wet Detention Pond Calculations Section. NARRATIVE REFERENCES: (1) SCS, 1972 - (Soil Conservation Service). (2) Z. P. Kirpich, 1940. (3) Technical Release No. 55, USDA Soil Conservation Service, December 1993 (4) Hydrowflow Hydrographs Version 2007 (9.24), Intelisolve Software (5) TR-20: Computer Program Manual 1992 (6) National Engineering Handbook Section 4-Hydrology, USDA Soil Conservation Service, 1972 (7) NOAA Atlas 14, Volume 2, Version 3 – Point Precipitation Frequency Estimates SOILS MAPS Hydrologic Soil Group—Forsyth County, North Carolina (Idols Road - Hydrologic Soil Group) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/27/2017 Page 1 of 439823003982500398270039829003983100398330039835003983700398390039841003982300398250039827003982900398310039833003983500398370039839003984100554200554400554600554800555000555200555400555600 554200 554400 554600 554800 555000 555200 555400 555600 36° 0' 1'' N 80° 23' 57'' W36° 0' 1'' N80° 22' 55'' W35° 58' 55'' N 80° 23' 57'' W35° 58' 55'' N 80° 22' 55'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 450 900 1800 2700 Feet 0 100 200 400 600 Meters Map Scale: 1:10,000 if printed on A portrait (8.5" x 11") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Forsyth County, North Carolina Survey Area Data: Version 16, Sep 19, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Mar 15, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Forsyth County, North Carolina (Idols Road - Hydrologic Soil Group) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/27/2017 Page 2 of 4 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Forsyth County, North Carolina (NC067) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ClB Clifford sandy loam, 2 to 6 percent slopes A 3.8 1.2% ClC Clifford sandy loam, 6 to 10 percent slopes A 1.9 0.6% CoA Codorus loam, 0 to 2 percent slopes, frequently flooded B/D 30.7 9.7% FaD Fairview fine sandy loam, 10 to 15 percent slopes B 5.2 1.7% OkC Oak Level loam, dark surface, 6 to 10 percent slopes C 7.2 2.3% OkD Oak Level loam, dark surface, 10 to 15 percent slopes C 5.3 1.7% RaB Rasalo fine sandy loam, 2 to 6 percent slopes C 25.7 8.1% RaC Rasalo fine sandy loam, 6 to 10 percent slopes C 24.0 7.6% RaD Rasalo fine sandy loam, 10 to 15 percent slopes C 27.9 8.8% SmC Siloam sandy loam, 4 to 10 percent slopes D 2.4 0.7% SmD Siloam sandy loam, 10 to 15 percent slopes D 12.0 3.8% SmF Siloam sandy loam, 15 to 45 percent slopes D 7.2 2.3% TmB Tomlin loam, 2 to 6 percent slopes B 58.6 18.6% TmC Tomlin loam, 6 to 10 percent slopes B 43.7 13.9% TmD Tomlin loam, 10 to 15 percent slopes B 22.5 7.1% ToB2 Tomlin clay loam, 2 to 6 percent slopes, moderately eroded B 3.9 1.2% ToC2 Tomlin clay loam, 6 to 10 percent slopes, moderately eroded B 6.0 1.9% WmB Wickham fine sandy loam, mesic, 2 to 6 percent slopes B 27.2 8.6% Hydrologic Soil Group—Forsyth County, North Carolina Idols Road - Hydrologic Soil Group Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/27/2017 Page 3 of 4 Hydrologic Soil Group— Summary by Map Unit — Forsyth County, North Carolina (NC067) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Totals for Area of Interest 315.1 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Forsyth County, North Carolina Idols Road - Hydrologic Soil Group Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/27/2017 Page 4 of 4 USGS MAP date: EXHIBIT description: project: scale: job #: sheet of 05/21/2018 17-061 Tanglewood Business Park - Phase I 1" = 800'1 1 USGS Map (7.5 Minute Map for Advance, NC) SITE COMPOSITE RUNOFF CURVE NUMBERS Project :Tanglewood Business Park Sheet : 1 Project No.:17-061 Date : 5/29/2018 Designed by:AWK Checked by: DRAINAGE AREA TO STUDY POINT 1 BASIN LAND USE SOIL HYDROL. AREA AREA CURVE NO CN x NAME GROUP (AC.) ( % ) (CN)AREA *TmB B 68.08 90.94%60 4085 0.27 0.36%98 26 *TmB B 6.52 8.70%69 450 TOTALS 74.86 100.0% 4560 WEIGHTED CN (PRE-DEVELOPED) = 61 POST-DEVELOPED CONDITIONS - To Pond BASIN LAND USE SOIL HYDROL. AREA AREA CURVE NO CN x NAME GROUP (AC.) ( % ) (CN)AREA 9.80 14.27%98 960 *WmB B 4.20 6.12%69 290 21.64 31.51%98 2121 *TmB B 3.82 5.56%69 263 4.78 6.96%98 469 *TmB B 0.84 1.23%69 58 3.88 5.64%98 380 *TmB B 0.68 1.00%69 47 5.49 8.00%98 538 *TmC B 2.35 3.43%69 162 2.08 3.03%98 204 *TmB B 1.36 1.99%69 94 *TmB B 3.82 5.56%69 264 2.75 4.00%98 269 *TmB B 1.18 1.71%69 81 TOTALS 68.67 100.0% 6200 WEIGHTED CN (DEVELOPED) = 90 BASIN LAND USE SOIL HYDROL. AREA AREA CURVE NO CN x NAME GROUP (AC.) ( % ) (CN)AREA *TmB B 15.70 20.97%60 942 0.00 0.00%98 0 *TmB B 4.64 6.20%69 320 TOTALS 20.34 27.2% 1262 WEIGHTED CN (PRE-DEVELOPED) = 62 * Dominant soil group only is listed above; refer to soil map for complete list of soil types within each area. PRE-DEVELOPED CONDITIONS Woods - Fair Impervious Open Space - Fair Co. Lot 5 - Open Space - Fair Condition Lot 3 - Open Space - Fair Condition Lot 5 - Impervious SCS RUNOFF CURVE NUMBERS R/W - Impervious Lot 1 - Impervious Lot 1 - Open Space - Fair Condition Lot 2 - Impervious Lot 6 - Impervious Lot 6 - Open Space - Fair Condition Lot 2 - Open Space - Fair Condition Lot 3 - Impervious Woods - Fair Impervious Open Space - Fair Co. POST DEVELOPED CONDITIONS - Bypass R/W - Open Space - Fair Condition BMP Area - Open Space - Fair Cond. Offsite Area - Impervious Offsite Area - Open Space - Fair Co. NOAA RAINFALL DATA (PRECIPITATION DEPTHS) 9/15/2017 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9917&lon=-80.3850&data=depth&units=english&series=pds 1/4 NOAA Atlas 14, Volume 2, Version 3 Location name: Clemmons, North Carolina, USA* Latitude: 35.9917°, Longitude: -80.385° Elevation: 735.26 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.375 (0.346‑0.407) 0.445 (0.411‑0.484) 0.521 (0.480‑0.566) 0.573 (0.527‑0.622) 0.632 (0.579‑0.686) 0.672 (0.611‑0.729) 0.707 (0.639‑0.768) 0.737 (0.662‑0.804) 0.770 (0.684‑0.843) 0.792 (0.696‑0.870) 10-min 0.599 (0.552‑0.650) 0.711 (0.657‑0.774) 0.834 (0.769‑0.907) 0.916 (0.842‑0.995) 1.01 (0.922‑1.09) 1.07 (0.973‑1.16) 1.12 (1.01‑1.22) 1.17 (1.05‑1.27) 1.22 (1.08‑1.33) 1.25 (1.10‑1.37) 15-min 0.748 (0.690‑0.813) 0.894 (0.826‑0.973) 1.06 (0.972‑1.15) 1.16 (1.07‑1.26) 1.28 (1.17‑1.39) 1.35 (1.23‑1.47) 1.42 (1.28‑1.54) 1.47 (1.32‑1.61) 1.53 (1.36‑1.68) 1.57 (1.38‑1.72) 30-min 1.03 (0.946‑1.11) 1.24 (1.14‑1.34) 1.50 (1.38‑1.63) 1.68 (1.54‑1.82) 1.89 (1.73‑2.05) 2.04 (1.86‑2.22) 2.17 (1.97‑2.36) 2.30 (2.06‑2.50) 2.44 (2.17‑2.67) 2.54 (2.23‑2.79) 60-min 1.28 (1.18‑1.39) 1.55 (1.43‑1.69) 1.92 (1.77‑2.09) 2.19 (2.01‑2.37) 2.52 (2.31‑2.73) 2.76 (2.52‑3.00) 3.00 (2.71‑3.26) 3.22 (2.89‑3.51) 3.50 (3.11‑3.83) 3.70 (3.25‑4.07) 2-hr 1.49 (1.37‑1.61) 1.80 (1.66‑1.96) 2.25 (2.08‑2.45) 2.59 (2.38‑2.81) 3.02 (2.76‑3.28) 3.35 (3.04‑3.64) 3.68 (3.31‑3.99) 3.99 (3.56‑4.35) 4.41 (3.88‑4.82) 4.72 (4.10‑5.17) 3-hr 1.59 (1.47‑1.73) 1.93 (1.78‑2.10) 2.41 (2.23‑2.62) 2.78 (2.55‑3.01) 3.26 (2.98‑3.54) 3.63 (3.29‑3.94) 4.00 (3.60‑4.34) 4.36 (3.89‑4.74) 4.85 (4.26‑5.29) 5.21 (4.52‑5.71) 6-hr 1.93 (1.78‑2.11) 2.34 (2.16‑2.55) 2.92 (2.70‑3.19) 3.38 (3.10‑3.67) 3.99 (3.63‑4.33) 4.47 (4.04‑4.84) 4.95 (4.44‑5.37) 5.44 (4.82‑5.90) 6.10 (5.32‑6.64) 6.60 (5.69‑7.20) 12-hr 2.29 (2.12‑2.50) 2.77 (2.56‑3.03) 3.48 (3.20‑3.80) 4.04 (3.70‑4.40) 4.81 (4.36‑5.21) 5.42 (4.88‑5.86) 6.04 (5.39‑6.53) 6.69 (5.90‑7.23) 7.58 (6.57‑8.20) 8.28 (7.06‑8.96) 24-hr 2.78 (2.58‑3.00) 3.36 (3.12‑3.63) 4.21 (3.90‑4.55) 4.89 (4.52‑5.28) 5.80 (5.34‑6.27) 6.54 (6.00‑7.06) 7.29 (6.67‑7.87) 8.06 (7.35‑8.72) 9.13 (8.27‑9.89) 9.97 (8.99‑10.8) 2-day 3.23 (3.00‑3.47) 3.88 (3.62‑4.18) 4.83 (4.49‑5.19) 5.56 (5.16‑5.97) 6.54 (6.05‑7.03) 7.32 (6.75‑7.87) 8.11 (7.45‑8.72) 8.91 (8.16‑9.60) 10.0 (9.12‑10.8) 10.9 (9.86‑11.7) 3-day 3.42 (3.20‑3.68) 4.12 (3.84‑4.42) 5.10 (4.75‑5.47) 5.86 (5.45‑6.29) 6.89 (6.39‑7.39) 7.70 (7.12‑8.28) 8.53 (7.86‑9.18) 9.38 (8.61‑10.1) 10.5 (9.61‑11.4) 11.4 (10.4‑12.4) 4-day 3.62 (3.39‑3.89) 4.35 (4.07‑4.67) 5.36 (5.01‑5.75) 6.16 (5.75‑6.60) 7.24 (6.72‑7.76) 8.09 (7.49‑8.69) 8.96 (8.27‑9.64) 9.85 (9.05‑10.6) 11.1 (10.1‑12.0) 12.0 (10.9‑13.0) 7-day 4.15 (3.89‑4.44) 4.95 (4.64‑5.30) 6.02 (5.64‑6.43) 6.86 (6.42‑7.33) 8.00 (7.46‑8.56) 8.90 (8.27‑9.52) 9.81 (9.09‑10.5) 10.7 (9.92‑11.5) 12.0 (11.0‑12.9) 13.0 (11.9‑14.0) 10-day 4.72 (4.45‑5.02) 5.62 (5.30‑5.97) 6.75 (6.36‑7.18) 7.64 (7.19‑8.12) 8.83 (8.28‑9.38) 9.76 (9.13‑10.4) 10.7 (9.98‑11.4) 11.7 (10.8‑12.4) 12.9 (12.0‑13.8) 13.9 (12.8‑14.9) 20-day 6.36 (6.02‑6.71) 7.51 (7.11‑7.93) 8.88 (8.40‑9.38) 9.96 (9.41‑10.5) 11.4 (10.7‑12.1) 12.6 (11.8‑13.3) 13.7 (12.8‑14.5) 14.9 (13.9‑15.8) 16.5 (15.3‑17.5) 17.7 (16.3‑18.9) 30-day 7.87 (7.51‑8.27) 9.26 (8.82‑9.71) 10.7 (10.2‑11.3) 11.9 (11.3‑12.4) 13.4 (12.7‑14.0) 14.5 (13.7‑15.2) 15.6 (14.8‑16.4) 16.7 (15.8‑17.6) 18.2 (17.1‑19.2) 19.3 (18.0‑20.4) 45-day 9.90 (9.48‑10.4) 11.6 (11.1‑12.1) 13.2 (12.7‑13.8) 14.5 (13.9‑15.1) 16.2 (15.4‑16.9) 17.4 (16.5‑18.2) 18.6 (17.7‑19.5) 19.8 (18.7‑20.8) 21.3 (20.1‑22.4) 22.5 (21.1‑23.7) 60-day 11.8 (11.4‑12.4) 13.8 (13.3‑14.4) 15.6 (15.0‑16.2) 16.9 (16.2‑17.6) 18.6 (17.9‑19.4) 19.9 (19.1‑20.8) 21.2 (20.2‑22.1) 22.4 (21.3‑23.4) 23.9 (22.7‑25.0) 25.0 (23.7‑26.3) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top 9/15/2017 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9917&lon=-80.3850&data=depth&units=english&series=pds 2/4 PF graphical Back to Top Maps & aerials Small scale terrain 9/15/2017 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9917&lon=-80.3850&data=depth&units=english&series=pds 3/4 Large scale terrain Large scale map Large scale aerial + – 3km 2mi + – 100km 60mi + – 100km 60mi 9/15/2017 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9917&lon=-80.3850&data=depth&units=english&series=pds 4/4 Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi WET DETENTION POND CALCULATIONS Project:IDOLS ROAD Project No.:17-061 Designed By:AWK Checked By:KBG Date:9/26/2017 Revised: DRAINAGE BASIN INFORMATION WATERSHED INFORMATION On-Site Drainage Area to Pond =64.75 acres Watershed =Yadkin River On-Site Proposed Impervious Area =47.67 acres Classification =Class IV On-Site Future Impervious Area =0.00 acres Total On-Site Impervious Area = 47.67 acres Offsite Drainage Area to Pond =3.92 acres Offsite Impervious Area =2.75 acres Offsite Future Impervious Area =0.00 acres Total Offsite Impervious Area = 2.75 acres Total Drainage Area = 68.67 acres Total Impervious Area = 50.41 acres Total Impervious % = 73.4% DETERMINE DESIGN VOLUME (DV) Runoff Coefficient (Rv) = 0.05 + 0.9 x IA IA = Impervious Fraction (Impervious Area/Drainage Area) Design Volume (DV) = 3630 x RD x RV x A, (Cubic Feet) RD = Design Storm Depth (in) A = Drainage Area (ac) Design Storm Depth (in) =1.00 IA =0.734 RV =0.711 DV =177,162 Cubic Feet WATER QUALITY POND DESIGN Wet Pond 1 ON-SITE DATA OFFSITE DATA SIMPLE METHOD Page 1 WET DETENTION POND POND SIZING CALCULATIONS Stage-Storage Data Stage (Feet) Elevation (Feet) Forebay Area (SF) Forebay Volume (CF) Cumulative Forebay Volume (CF) Main Pool Area (SF) Main Pool Volume (SF) Cumulative Main Pool Volume (CF) Cumulative Combined Volume (CF) 0.0 726.00 1519 0 0 31025 0 0 0 2.0 728.00 5622 7141 7141 35978 67003 67003 74144 4.0 730.00 8728 14350 21491 41146 77124 144127 165618 6.0 732.00 10835 19563 41054 46528 87674 231801 272855 7.5 733.50 12542 17533 58587 50706 72926 304727 363313 8.0 734.00 14442 6746 65333 55348 26514 331240 396573 8.5 734.50 75666 32754 363994 429326 10.0 736.00 81108 117580.5 481574 546907 12.0 738.00 88563 169671 651245 716578 14.0 740.00 96242 184805 836050 901383 14.5 740.50 98227 48617.25 884667.25 950000 CHECK FOREBAY SIZE Stage at Permanent Pool = 8 Elevation = 734.00 Forebay Volume = 65,332.75 Main Pool Volume = 331,240.00 Forebay volume shall be 15-20% of Main Pool Volume : 19.72%Forebay Size OK CHECK MAIN POOL SIZING HRT Method (Hydraulic Retention Time Method) Volume of Main Pool (VMP) = 0.87 x (HRT/Ts) x DV 0.87 = Factor to adjust for the volume of the forebay VMP = Main pool volume, not including the forebay (CF) HRT = Required hydraulic Retention time (14 days) TS = Average time between storm events (5 days) DV = Design Volume (CF) VMP =431,567 Cubic Feet Volume Too Small Per HRT Method, Check SA/DA Method SA/DA & Average Depth Method Average depth when shelf is submerged: Average Depth (Davg) = (VPP - Vshelf)/Abottomofshelf Davg = Average depth in feet VPP = Total volume of permanent pool (CF) Vshelf = Volume over shelf only (CF) Abottomofshelf = Area of wet pond at the bottom of the shelf (SF) Vshelf = 0.5 x Depthmaxovershelf x Perimeterpermpool x Width submergedshelf Depthmaxovershelf = Depth of water at the deep side of the shelf (FT) Perimeterpermanentpool = Perimeter of permanent pool at bottom of shelf (FT) Widthsubmergedshelf = Width from deep side of shelf to dry side (FT) Page 2 WET DETENTION POND Depthmaxovershelf =0.50 FT Perimeterpermanentpool =1046.00 FT Widthsubmergedshelf =5.00 FT Vshelf =1,308 Cubic Feet Stage at Bottom of Shelf =7.50 Elevation = 733.50 Abottomofshelf =50,706.00 VPP =331,240.00 Cubic Feet Davg =6.51 FT 3.0 4.0 5.0 6.0 7.0 8.0 10% 0.51 0.43 0.37 0.30 0.27 0.25 20% 0.84 0.69 0.61 0.51 0.44 0.40 30% 1.17 0.94 0.84 0.72 0.61 0.56 40% 1.51 1.24 1.09 0.91 0.78 0.71 50% 1.79 1.51 1.31 1.13 0.95 0.87 60% 2.09 1.77 1.49 1.31 1.12 1.03 70% 2.51 2.09 1.80 1.56 1.34 1.17 80% 2.92 2.41 2.07 1.82 1.62 1.40 90% 3.25 2.64 2.31 2.04 1.84 1.59 100% 3.55 2.79 2.52 2.34 2.04 1.75 73.4% 2.65 2.20 1.89 1.65 1.44 1.25 Required SA/DA ratio =1.54 Required surface area = 46,085.68 SF Provided surface area = 55,348.00 SF Provided Surface Area OK per SA/DA Method 20.1% Larger than required surface area DETERMINE DESIGN VOLUME STORAGE ELEVATION & DESIGN ORIFICE DIAMETER Design Volume Storage Elevation DV = 177,162 Cubic Feet Permanent Pool Elevation = 734.00 Volume = 396,573 Cubic Feet Contour Above Permanent Pool = 738.00 Volume = 716,578 Cubic Feet Head Difference = 4.00 ∆ =320,005 Cubic Feet Min. DV Elevation =736.21 Design Orifice Diameter Orifice Equation: Q = Cd x A x (2gH)0.5 Cd = Coefficient of Discharge A = Area of Orifice Opening, Based on Diameter of Orifice g = gravity H = Driving Head, Use H/3 for Drawdown Calculations Q = Orifice Discharge Percent Impervious Permanent Pool Average Depth (ft) Table 1: Piedmont and Mountain SA/DA Table (Adapted from Driscoll, 1986) Page 3 WET DETENTION POND Cd = 0.6 Diameter of Orifice = 6.0 in A = 0.19635 SF g = 32.2 H = 2.21 FT H/3 = 0.74 FT Q = 0.812 CFS Determine Drawdown Time Drawdown Time = DV/Q Target Drawdown Time = 2 - 5 Days DV = 177,162 Cubic Feet Drawdown Time = 60.59 Hrs 2.52 Days Page 4 WET DETENTION POND WATERSHED MODEL SCHEMATIC, POND REPORT, AND STAGE STORAGE DISCHARGE 1 2 34 5 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Project: Storm Routing.gpw Tuesday, 05 / 29 / 2018 Hyd.Origin Description Legend 1 SCS Runoff Post to Pond 2 Reservoir Wet Pond 3 SCS Runoff Pre 4 SCS Runoff Post Bypass 5 Combine Post Total Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 05 / 29 / 2018 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 726.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 726.00 32,544 0 0 2.00 728.00 41,600 73,952 73,952 4.00 730.00 49,874 91,340 165,291 6.00 732.00 57,363 107,139 272,431 7.50 733.50 63,248 90,413 362,844 8.00 734.00 69,790 33,243 396,087 8.50 734.50 75,666 36,351 432,437 10.00 736.00 81,108 117,545 549,982 12.00 738.00 88,563 169,599 719,582 14.00 740.00 96,242 184,733 904,315 14.50 740.50 98,227 48,612 952,926 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 30.00 6.00 0.00 0.00 Span (in)= 30.00 6.00 0.00 0.00 No. Barrels = 1 100 Invert El. (ft)= 725.00 734.00 0.00 0.00 Length (ft)= 140.00 0.00 0.00 0.00 Slope (%)= 4.12 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 16.00 25.00 Inactive Inactive Crest El. (ft)= 737.00 738.50 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 Ciplti Rect --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 300.0 330.0 Stage (ft) 0.00 726.00 3.00 729.00 6.00 732.00 9.00 735.00 12.00 738.00 15.00 741.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q 1-YR 24 HR STORM PRE, POST, AND ROUTED HYDROGRAPHS 1-YR 24 HR STORMWATER SUMMARY REPORT & STORM PRE, POST, AND ROUTED HYDROGRAPHS (WITH POND REPORT & TR-55 TIME OF CONCENTRATION WORKSHEETS) Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 202.54 2 716 416,712 ------ ------ ------ Post to Pond 2 Reservoir 9.204 2 788 398,685 1 737.26 657,182 Wet Pond 3 SCS Runoff 14.37 2 726 75,615 ------ ------ ------ Pre 4 SCS Runoff 4.706 2 726 22,623 ------ ------ ------ Post Bypass 5 Combine 10.07 2 786 421,308 2, 4 ------ ------ Post Total Storm Routing.gpw Return Period: 1 Year Wednesday, 05 / 30 / 2018 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 05 / 29 / 2018 Hyd. No. 1 Post to Pond Hydrograph type = SCS Runoff Peak discharge = 202.54 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 416,712 cuft Drainage area = 68.670 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.00 min Total precip. = 2.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Post to Pond Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 05 / 29 / 2018 Hyd. No. 2 Wet Pond Hydrograph type = Reservoir Peak discharge = 9.204 cfs Storm frequency = 1 yrs Time to peak = 788 min Time interval = 2 min Hyd. volume = 398,685 cuft Inflow hyd. No. = 1 - Post to Pond Max. Elevation = 737.26 ft Reservoir name = Wet Pond Max. Storage = 657,182 cuft Storage Indication method used. Wet pond routing start elevation = 734.00 ft. 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Wet Pond Hyd. No. 2 -- 1 Year Hyd No. 2 Hyd No. 1 Total storage used = 657,182 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 05 / 29 / 2018 Hyd. No. 3 Pre Hydrograph type = SCS Runoff Peak discharge = 14.37 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 75,615 cuft Drainage area = 74.860 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.10 min Total precip. = 2.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 Q (cfs) Time (min) Pre Hyd. No. 3 -- 1 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 05 / 29 / 2018 Hyd. No. 4 Post Bypass Hydrograph type = SCS Runoff Peak discharge = 4.706 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 22,623 cuft Drainage area = 20.340 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.10 min Total precip. = 2.78 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) Post Bypass Hyd. No. 4 -- 1 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 05 / 29 / 2018 Hyd. No. 5 Post Total Hydrograph type = Combine Peak discharge = 10.07 cfs Storm frequency = 1 yrs Time to peak = 786 min Time interval = 2 min Hyd. volume = 421,308 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 20.340 ac 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Post Total Hyd. No. 5 -- 1 Year Hyd No. 5 Hyd No. 2 Hyd No. 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 1 Post to Pond Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.36 0.00 0.00 Land slope (%) = 0.39 0.00 0.00 Travel Time (min) = 2.27 + 0.00 + 0.00 = 2.27 Shallow Concentrated Flow Flow length (ft) = 359.00 0.00 0.00 Watercourse slope (%) = 7.39 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.39 0.00 0.00 Travel Time (min) = 1.36 + 0.00 + 0.00 = 1.36 Channel Flow X sectional flow area (sqft) = 3.14 7.07 15.90 Wetted perimeter (ft) = 6.28 9.43 14.14 Channel slope (%) = 1.00 1.00 1.00 Manning's n-value = 0.013 0.013 0.013 Velocity (ft/s) =7.20 9.45 12.40 Flow length (ft) ({0})507.0 639.0 14.1 Travel Time (min) = 1.17 + 1.13 + 0.02 = 2.32 Total Travel Time, Tc .............................................................................. 6.00 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 3 Pre Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.36 0.00 0.00 Land slope (%) = 0.30 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Shallow Concentrated Flow Flow length (ft) = 217.00 0.00 0.00 Watercourse slope (%) = 2.90 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.75 0.00 0.00 Travel Time (min) = 1.32 + 0.00 + 0.00 = 1.32 Channel Flow X sectional flow area (sqft) = 3.00 0.00 0.00 Wetted perimeter (ft) = 6.32 0.00 0.00 Channel slope (%) = 2.20 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =5.16 0.00 0.00 Flow length (ft) ({0})3166.0 0.0 0.0 Travel Time (min) = 10.23 + 0.00 + 0.00 = 10.23 Total Travel Time, Tc .............................................................................. 14.10 min TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. 4 Post Bypass Description A B C Totals Sheet Flow Manning's n-value = 0.011 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.36 0.00 0.00 Land slope (%) = 0.30 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Shallow Concentrated Flow Flow length (ft) = 217.00 0.00 0.00 Watercourse slope (%) = 2.90 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.75 0.00 0.00 Travel Time (min) = 1.32 + 0.00 + 0.00 = 1.32 Channel Flow X sectional flow area (sqft) = 3.00 0.00 0.00 Wetted perimeter (ft) = 6.32 0.00 0.00 Channel slope (%) = 2.20 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =5.16 0.00 0.00 Flow length (ft) ({0})3166.0 0.0 0.0 Travel Time (min) = 10.23 + 0.00 + 0.00 = 10.23 Total Travel Time, Tc .............................................................................. 14.10 min 50-YR 6 HR STORMWATER SUMMARY REPORT & STORM PRE, POST, AND ROUTED HYDROGRAPHS Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 194.73 2 144 786,849 ------ ------ ------ Post to Pond 2 Reservoir 77.21 2 158 775,365 1 738.34 751,156 Wet Pond 3 SCS Runoff 54.15 2 154 281,424 ------ ------ ------ Pre 4 SCS Runoff 15.89 2 154 80,832 ------ ------ ------ Post Bypass 5 Combine 92.62 2 156 856,197 2, 4 ------ ------ Post Total Storm Routing.gpw Return Period: 50 Year Wednesday, 05 / 30 / 2018 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 1 Post to Pond Hydrograph type = SCS Runoff Peak discharge = 194.73 cfs Storm frequency = 50 yrs Time to peak = 144 min Time interval = 2 min Hyd. volume = 786,849 cuft Drainage area = 68.670 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.00 min Total precip. = 4.47 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 0 60 120 180 240 300 360 420 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Post to Pond Hyd. No. 1 -- 50 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 2 Wet Pond Hydrograph type = Reservoir Peak discharge = 77.21 cfs Storm frequency = 50 yrs Time to peak = 158 min Time interval = 2 min Hyd. volume = 775,365 cuft Inflow hyd. No. = 1 - Post to Pond Max. Elevation = 738.34 ft Reservoir name = Wet Pond Max. Storage = 751,156 cuft Storage Indication method used. Wet pond routing start elevation = 734.00 ft. 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Wet Pond Hyd. No. 2 -- 50 Year Hyd No. 2 Hyd No. 1 Total storage used = 751,156 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 3 Pre Hydrograph type = SCS Runoff Peak discharge = 54.15 cfs Storm frequency = 50 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 281,424 cuft Drainage area = 74.860 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.10 min Total precip. = 4.47 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 0 60 120 180 240 300 360 420 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Pre Hyd. No. 3 -- 50 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 4 Post Bypass Hydrograph type = SCS Runoff Peak discharge = 15.89 cfs Storm frequency = 50 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 80,832 cuft Drainage area = 20.340 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.10 min Total precip. = 4.47 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 0 60 120 180 240 300 360 420 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Post Bypass Hyd. No. 4 -- 50 Year Hyd No. 4 100-YR 6 HR STORMWATER SUMMARY REPORT & STORM PRE, POST, AND ROUTED HYDROGRAPHS Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 220.16 2 144 894,599 ------ ------ ------ Post to Pond 2 Reservoir 92.77 2 158 883,103 1 738.75 788,488 Wet Pond 3 SCS Runoff 71.53 2 154 354,776 ------ ------ ------ Pre 4 SCS Runoff 20.74 2 154 101,326 ------ ------ ------ Post Bypass 5 Combine 113.04 2 156 984,429 2, 4 ------ ------ Post Total Storm Routing.gpw Return Period: 100 Year Wednesday, 05 / 30 / 2018 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 1 Post to Pond Hydrograph type = SCS Runoff Peak discharge = 220.16 cfs Storm frequency = 100 yrs Time to peak = 144 min Time interval = 2 min Hyd. volume = 894,599 cuft Drainage area = 68.670 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.00 min Total precip. = 4.95 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 0 60 120 180 240 300 360 420 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (min) Post to Pond Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 2 Wet Pond Hydrograph type = Reservoir Peak discharge = 92.77 cfs Storm frequency = 100 yrs Time to peak = 158 min Time interval = 2 min Hyd. volume = 883,103 cuft Inflow hyd. No. = 1 - Post to Pond Max. Elevation = 738.75 ft Reservoir name = Wet Pond Max. Storage = 788,488 cuft Storage Indication method used. Wet pond routing start elevation = 734.00 ft. 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (min) Wet Pond Hyd. No. 2 -- 100 Year Hyd No. 2 Hyd No. 1 Total storage used = 788,488 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 3 Pre Hydrograph type = SCS Runoff Peak discharge = 71.53 cfs Storm frequency = 100 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 354,776 cuft Drainage area = 74.860 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.10 min Total precip. = 4.95 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 0 60 120 180 240 300 360 420 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (min) Pre Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 4 Post Bypass Hydrograph type = SCS Runoff Peak discharge = 20.74 cfs Storm frequency = 100 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 101,326 cuft Drainage area = 20.340 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.10 min Total precip. = 4.95 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 0 60 120 180 240 300 360 420 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (min) Post Bypass Hyd. No. 4 -- 100 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Wednesday, 05 / 30 / 2018 Hyd. No. 5 Post Total Hydrograph type = Combine Peak discharge = 113.04 cfs Storm frequency = 100 yrs Time to peak = 156 min Time interval = 2 min Hyd. volume = 984,429 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 20.340 ac 0 240 480 720 960 1200 1440 1680 1920 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Post Total Hyd. No. 5 -- 100 Year Hyd No. 5 Hyd No. 2 Hyd No. 4 APPENDIX SEASONAL HIGH WATER TABLE STUDY WETLAND & STREAM DELINEATION MAP LEGEND Site Boundary Intermittent Stream Perennial Stream Ephemeral Swale Wetland Culvert Data Point Verification Changes THE LOCATIONS OF FEATURES SHOWN ON THIS MAP ARE APPROXIMATE.THEY WERE VERIFIED BY MS.JEAN GIBBY WITH THE USACAE AND MS.SUE HOMEWOOD WITH THE NCDEQ-DWR ON JUNE 7,2017.THE LOCATIONS OF FEATURES SHOWN ON THIS MAP HAVE NOT BEEN SURVEYED OR GEOLOCATED. FLAG NUMBERS/INFO WETLAND FLAGS = STREAM FLAGS = Stream/Pond Flags = Origins only Wetland Flags = 235 Total Flags = 235 Wetland Map Idols Road Approximate 169.5 Acre Tract Clemmons, Forsyth County, NC Pilot Project 1899.2 Drawing 5 Aerial Imagery from ESRI and Pilot Field Notes Scale: 1” = 500’ Date: 6.7.17 WA 1-8 WAA 1-5 DP-1 DP-2 WA 10-20 WAA 5-10 ISCA WB 1-35 WB 36-102 WB 103-117 WCA 6-12 WC 1-7 WCA 1-5 WB WD 1-69 WB 1-12 ISCB 1-2 DP-1 WB 1-12 NCDEQ NOTICE OF EXEMPTION TO NC DAM SAFETY LAW EXHIBITS EX-1.0 DRAINAGE AREA MAP – PRE- DEVELOPMENT EX-1.1 DRAINAGE AREA MAP – POST- DEVELOPMENT