Loading...
HomeMy WebLinkAbout External Action Requested - I-5986 - Electronic Internal External Scoping MeetingCarpenter,Kristi From: Simone, Emaly <Emaly.Simone@mbakerintl.com> Sent: Thursday, June 07, 2018 1:27 PM To: Brown, Andy H; Murphy, Brian G; Hemphill, Bo; Barclay, Carl A; Mclamb, Corey D; Moya-Astudillo, Carlos E; Parker, Cyrus F; Edwards, Charles H; clarence.coleman@dot.gov; Mellor, Colin; crivenbark@mcdot.gov; Weychert, Curtis R; Sturdivant, Darius D; Lewis, Derrick W; Muller, Danie) C; Stutts, David S; eric.c.alsmeyer@usace.army.mil; West, Franklin D; gary�jordan@fws.gov; Burns, Gregory W; Cail, William G; Lovering, Gary R; Muchane, Gichuru; hal.r.pitts@uscg.mil; Marshall, Harrison; Robbins, Jamille A; Harris, James B; Dunlop, James H; Conforti, John G; Cockburn, JoHanna I; Rerko, James J; Steenhuis, Joanne; Pilipchuk, John L; jstrickland@co.cumberland.nc.us; Twisdale, John W; Pleasant, Kyle A; Wilson, Lisa H; Johnston, Lloyd W; Hines, Lee R; militscher.chris@epa.gov; Mclamb, Meredith B; Cox, Marissa R; mrutan@mccog.org; Stanley, Mike; nancy.nixon@nashcountync.gov; Hackler, Nicole M; Roberson, Neil T; Harris, Philip S; Marshall, Raphael A; Gulledge, R. Joel; Keeter, Ronald L; Marsh, William R; McIntyre, Ray; Ridings, Rob; ron.lucas@dot.gov; sclowhorn@ncdot.gov; Kite, Steve; Scales, Shelby M; Coggins, Tony C; Roberts, Tracy; Carroll, Trey H; thomas.steffens@usace.army.mil; Wilson, Travis W.; Clarke, Matthew Cr. Kendall, Steve D; Lancaster, Susan; Pridgen, Glendel S; Wing, Mickey; Boyles, G. Scott; Page, Jerry P. Subject: [External] Action Requested - I-5986 - Electronic Internal/External Scoping Meeting Attachments: I-5986_Scoping_Package_sm.pdf Hello, This email is part of the electronic scoping meeting for NCDOT STIP I-5986. In an effort to provide an efficient scoping process, we are conducting simultaneous internal and external scoping processes via email. Attached you will find maps and the Project Data Sheet to help with your project review. Please return your comments to me via email by July 6, 2018. Key project information is as follows: • NCDOT STIP I-5986 proposes to widen I-95 to eight lanes between I-95 Business/US 301 (Exit 56) in Cumberland County to I-40 (Exit 81) in Johnston County, a distance of about 25 miles. • STIP I-5986 partially overlaps with several other STIP projects: I-5877, I-5878, and I-5883. These projects propose to improve the six I-95 interchanges (Exits 70, 71, 72, 73, 75, and 77) in Harnett County. The interchange projects include replacing bridges over I-95 and realigning service roads to make room for the widening of I-95 (STIP I-5986). All three projects have signed Categorical Exclusion documents (CEs), and right-of-way (ROW) acquisition is underway. • Where necessary to make room for a wider I-95 in the study area, STIP I-5986 includes the replacement of overpasses, realignment of service roads, and improvements to interchanges in Cumberland and Johnston counties. In Harnett County, the interchange improvements are covered under STIPs I-5877, I-5878, and I-5883; however, some service roads between the interchanges will need to be realigned as part of STIP I-5986. The Environmental Features Map will help you locate these areas. • All four STIPs (I-5986, I-5877, I-5878, and I-5883) will be Let together in July 2020. If you have any questions about the project or the handouts, please let me know. Thank you for participating in electronic scoping process. Best Wishes, Emaly Emaly Simone � Environmental Planner � Michael Baker International 8000 Regency Parkway, Suite 600 � Cary, NC �[O] 919-481-5721 emaly.simone@mbakerintl.com � www.mbakerintl.com i� I�I T' i� �C II� � 1� N�p� �� q1. � ���������� '"�uu � �� �" �i r w m��i�r,. � ������r,u^�n�����m�� �u°Mu°ua������:��H��Mr�1��r.�r���r�&&a���W��_.."u�'���r�u"�����:�i��.��uN�.�d��'�^����Ra..��