Loading...
HomeMy WebLinkAbout20180882 Ver 1_Riparian Buffer Authorization_20180625DWR 2 0 1 8 0 8 8 2 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 A. Applicant Riparian Buffer Authorization Form Information 1. Project Information la. Name of project: Mitchell Project 1 b. County: Franklin 1 c. Nearest municipality: Zebulon 1 d. Subdivision name: N/A 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: See Attachment 1 2b. Deed Book and Page No. See Attachment 1 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): See Attachment 1 2d. Responsible Party (for Corporations): N/A 2e. Street address: 1808 Pilot -Riley Road 2f. City, state, zip: Zebulon, NC 27597 2g. Telephone no.: Eddie - Cell: 919-449-6673 Angela - Cell: 919-971-1591 2h. Fax no.: N/A 2i. Email address: emitche11777@bellsouth.net 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: J U N 3h. Email address: 4. Agent/Consultant Information (if applicable) D - ATR ESOU CES 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): See Attachment 1 1 b. Site coordinates (in decimal degrees): Latitude: 35054'50.075"N ILongitude: 78019'22.56'W 1 c. Property size: See Attachment 1 (lots highlighted in yellow is where work is taking place) 2. Surface Waters 2a. Name of nearest body of water to proposed project: Moccasin Creek 2b. Water Quality Classification of nearest receiving water: Class C, nutrient sensitive water 2c. River basin: Neuse River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential and forest 3b. Attach an 8'/z x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8 '/i x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 430 ft 3e. Explain the purpose of the proposed project: Remove forested material that has been built up for years 3f. Describe the overall project in detail, including the type of equipment to be used: 10 ton excavator andl0 ton dump truck will be used in removal of material from shoreline 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 6. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Silt fence around pond and will plant millet/fescue when finished 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Excavator will have minimum movement within Zone 1. No turning around. 1. Buffer Impacts 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? El es ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. 1a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out form. Section D of this Buffer impact number — Permanent (P) or Temporary Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ❑ P ® T Removal of debris Allowable Moccasin Creek ❑ Yes ® No 6,250 sq ft B2 ❑ P ® T Access Temporary Road Allowable Moccasin Creek ❑ Yes ® No 4,000 sq ft B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Silt fence around pond and will plant millet/fescue when finished 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Excavator will have minimum movement within Zone 1. No turning around. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? El es ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ® No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. Only removing debris and not filling in the wetland with soil 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ® Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal/state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information by First Class Mail via the US Postal Service: 1. Environmental Documentation OR NC DWR, Transportation Permitting Unit 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of ❑ Yes ® No Raleigh, NC 27604 public (federal/state) land? For all other projects sent by delivery service 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No OR Karen Higgins environmental document pursuant to the requirements of the National or State (North NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Carolina) Environmental Policy Act (NEPA/SEPA)? Raleigh, NC 27699 - 1617 1c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ® Yes ❑ No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ® Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Heavy equipment was in the riparian buffer r Appli nt/Agenfs Printed Name Applica t/Agent's Signature Dat (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by by First Class Mail via the US Postal Service: delivery service (UPS, FedEx, etc.): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 For all other projects sent by First Class Mail For all other projects sent by delivery service via the US Postal Service (UPS, FedEx, etc.): Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Branch NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 Mr dnm ei-t+ 1 Name on Deed Lot Deed Book/Page No. Map Book/Page No. Parcel ID/PIN Edgar Franklin Mitchell Lot A 875/372 C3 / 36B 1339 / 2708-08-7217 Edgar F. Mitchell Lot A2 869/585 PRF 3 / SL 36B 1338 / 2708-08-6127 Angela D. Mitchell Edgar F. Mitchell Lot A3 947/649 C3 / 36B 1340 / 2708-08-5077 Angela D. Mitchell Edgar F. Mitchell Lot 1 17187/36 2004/269 1337 / 2708-07-5990 Angela D. Mitchell Charlotte P. Tingen 1718/36 O&D 9 / PG 31 1798 / 2708-08-2574 Maurice S. Privette Rosemary P. Naylor Elsie M. Nelson Ainsworth Privette Edgar F. Mitchell Angela D. Mitchell — - Np Ngpl. - pp .. L m MTNW 4I.— / CAREY KFdpDALL PRIVETTE W4H4M � N4RTH L. E. P y euWY IMI m 4w srwrWl of I • lY rbxe rad NrrNod A✓wn YrpkxMqe uMw mrv�•Yw•��I.b�� bOWby Y lavl iru�dun N°0�'m�I d .Pole N� E IrMI�IwIVNI MrNY Hq•W �a Nleia a rb�xe � e°�nw� ini •�IYwvnlWo'Yen Imi•9 PaFMPriY4� C'wWy. e•rlpr pmt Rm pole I :r�n°"•"I°y w.°� m mwn'NwMN'� ("gwpr.`x'°"�q N.iv�.Y I�'ugYry�'pppr °Y`°nwo"'etnal°'°M " e "u�°w' :u�M � , `tWpprev°I�N awp NpallANtl YNn�YP°N•PoG N*yy�'91Meii W NorM q•nl�uN �vWid,l >anWe w� YN�gI•E > ✓•Yw•i lr'� M4aR bM� wuh k1e wyvl r4tt IbIM Wh IwIW@ev� M pMY•Ry Iwdw®el Irq eWpua rWr h e.dw p de.r•w pn tlmo° el YNM tW, F•lan"'maNmMM. o•r. /9G :I rww5p`. cauNyax�m°ge.°`✓e}�pY'�g1'"°'FC°Niw Smr,,.ax+,Nei. �a� mI' wWo``°'p��rorwao� i�•„"I"� r� rs�io HN a• ww'ro'0r'F arylnulY.Y•_,e(}Y> Mai,•iN .svu, M lMl IN• mW Mw IIMerN Iw r an9 N In• OlpnYo/I/JyW ^•W.'•J+"/%rSyy'Jx'. punavlvbn y-L�)_ o♦ �/9T rte__ n MY •wWY Nol pm ✓bMNaro w MpIN•Y nw•ee M• Mn YMNd cw•W+R Iv W FrmVA 4bunlY &AM'Iqu M1WMbu. .�� cnamwx F1m1w C.wW FbmNv N°✓d `/� - . W •� wle, W®bq rMlmrm•mnu •n•p e ro o 1 ssgglMk p ibW PppFpTY URVEY F' �pp Pep �Ae� iwarWp 1ae1 w !Iw adl 1 N N gq•61 ✓ P• omn+J a ! a•• Oaw n•q•�dM c h v Mu+• IM Ip °I�YOMw; wyl. // GWtlV Nmmp✓ O ' J6 � J� [ •—YS l��\ //�J/I 1 � '+A fpm-rTh WMUM SETNAGIt lWE IEWRRENERT4 FII4NT • p4' m6 • Ip REPR • 48' Man 16316� N xmTIIYPD O • , YfQ11DY 6 x;.TTETE6TAiE•, mP M4fV 1971. it EI..YP.�L'A �• nxie+inc caxcr•re uvnuuex+ 1 m nr nw.r ETAYE OF NpRTN CARpIINA uuurpr e+rva✓ ry wotwwwu•ms.nuwnrw•exn w�u�•rrypsnur,nunrtyuw,uur rn,w. tw.. ...rtlunlorw wm uwn*wu�((w tn( nenr JSLJIIE�.nifl.w�.�evtw.x ' eT1Y®U'7)(.�xGYIjYY_•otn.'11y,�p.,�p,n �•9AR+ new .w .x r ,w � „ • . x r •w � .x m n .�._ r.� .rxp . rtrunuwwrwou✓vow✓uwrr•nus.aNWw.Y•ID.o_ ware. vn r✓nwele��m•eo.+•M naoneeeu uilwe �rrewue✓ww,• \,"f':te .,am..,.ewemxxr,.w.exwt. .°�.e� .0 aieumw °5ww•uc jYj-,•1.>I» .% RECORDED Ql,4, Atecnt TOTAL AREA NY D.M.D. METHOD . & 453 ACRES IpgO° M. KEITH WRENN FWNFwrr anvYYm rpR g REG75TERE0 LANG SURVEYOR ZELDA P. MITCHELL LOUISBURG, N. C L-2063 FII F N(h NRI49 13T.]0Y EMILIE ROSE PRIVETTE B OTHERS D.B. 959 PG. 855 -------- 011, DGBi. SIE �' RPNE------ 1. WALLACE 0, CLARK. JR, CERTIFY THAT THIS MAP WAS DRAWN UNDEfl MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MT SUPERVISION. - -- THAT THE RATIO OF PRECISION AS CALCULATED PRF 43 SLIDE 36-0 IS 1: 28,000 , THAT THE BOUNDARIES NOT KNIGHTDALE, NORTH CAROLINA 27545 SURVEYED ARE SHOWN AS BROKEN LINES TEL (919) 188-871 1 FAX (919) 286-9732 PLOTTED FROM INFORMATION FOUND IN BOOKS hA REFERENCED. THAT THIS MAP WAS PREPARED IN ACCORDANCE WITH G.S. 47-30 AS AMENDED, WITNESS MY HAND AND SEAL THIS 2BRH DAY 1 Q` 9 IGP �•-. qb Of JULY 2004. O - g p 1.809 ACRES O3 Z PROFESSIONAL LAND SURVEYOR L-3691 - L-3691 AF tg � TD a N, gym. 8 77 92'01.6 3B3.Bq' �pq O, G NIP 11 WALLACE 0. CLARK. JR. CERTIFY ca�nMN P THAT THIS MAP IS OFA SURVEY THAT CREATES A SUBDIVISION OF LAND WITHIN THE AREA OF A COUNTY OR MIN IC IPALITY THAT HAS AN ORDINANCE THAT REGUTATfi�A=L -_ ,�ND. 2 PROFESSIONAL LAND SURVEYOR L-3691 3,227 ACRES TOTAL RECORDED IN BOOK OF MAPS 2004 PG. c2(A EMILIE ROSE PRIVETTE PIN# 2708- I8-1576 coxma cauaR A-1 EDGAR MITCHELL - -- N 55°43'51'W PRF 43 SLIDE 36-0 30.00' KNIGHTDALE, NORTH CAROLINA 27545 A-2 TEL (919) 188-871 1 FAX (919) 286-9732 ALL DISTANCES ARE HOR12. GROUND. hA v • AlI• � "q bIT^ LT' 3 O ? 1.809 ACRES O3 Z 1,933 ACRES A-3 y! r TD a N, gym. 8 77 92'01.6 3B3.Bq' �pq O, G NIP iT 20)14 AP ca�nMN P O 2 ' 3,227 ACRES TOTAL y a N -1.040 AC. RiW -0.348 AC. EASEMENT 1,839 ACRES NET I n�... N T7°E4'92'W EMILIE ROSE PRIVETTE PIN# 2708- I8-1576 coxma cauaR ________ P 883°49'21• E 8X8, 188.98' '(1 EW N 55°43'51'W 78de' 30.00' KNIGHTDALE, NORTH CAROLINA 27545 NP TEL (919) 188-871 1 FAX (919) 286-9732 ALL DISTANCES ARE HOR12. GROUND. v • AlI• � "q bIT^ LT' 3 O ? 1.809 ACRES O3 g )y 1,933 ACRES OF 2 73'S0'3g.B,tpO N iT 20)14 AP 2ELDA P. MITCHELL Er P'pp D.B. 677 PG. 382 RP iV $9 0.833 ACRE q OR, REMAINING y ,� i PILOT—RILEY "B2°9s'3zw EP RP D97z' G RD. —1/03 xR G3.2q, pNu M -------- 60' Riw W 79°gp,91 N 'C. N, TED UPCHURCH D.B. 770 PG. 280 I HEREBY CERTNY THAT THE WBDMSION PLAT SHOWN HEREON HCS BEEN FOUND TO COMPLY WITH THE SUBDMSION REGULATIONS of FRNNAM COUNTY, WITH ALL VARIANCES NOTED IN THE MINUTES OF THE FRANUN COUNTY PIANNINO BOARD. THAT ALL EASEMENT& SHOWN HEREON, ARE ACCEPTED BY FRAN" COUNTY, SLE.ECT TO THE APPROVAL BY THE DEPARTMENT OF TRANSPORTATION WHICH "SUMS NO RESPONSIBILITY 70 OPEN OR MAINTAIN THE BANE, AND THAT THIS MAP HAS BEEN P F IECOROBN IN TIE OFFICE OF THE REGISTER OF DE�o& &-b Aad 2DD`f MO19 ATOR OR ASSIST T A APPROVAL EMPIRES IF NOT RECORDED ON OR BEFORE It, SR_10 S DOHAND MIST BE SUBMITTED FOR REAPPROVAL DATE STATE OF NORTH CAROLINA COUNTY OF FRANKLIN Ad"!bb WE OFFICER OF FRANKLIN CWNTY, CERTIFY THAT THE MAP OR PIAT TO WHICH THAI CERTIFICATION IB AFFIXED OLL 9TATUT Y REOUIREMENTB FOR RECORON0. � REVIEW OFFICER DATE 1 HETHE BY CERTIFY THAT I AM THE OWNER OF E PROPERTY SHOWN AND DESCRIBED HEREON YMICH WAS CONVEYED TO ME BY DEED RECORDED IN D.B. P0. AND THAT I HE ADOPT THIS PLAN OF SUBDIVISION WITH MY FREE CONSENT, ESTABLISH THE MINIMIM BUILDING LINES, AND DEDICATE ALL DRAINAGEWAYS AND OTHER OPEN SPACE TO PUBLIC OR PRIVATE USE AS NOTED. FUTHER I CEATIFY THAT THE LAND SHOWN HEREON IS WITHIN THE SUBDIVISION REGU ATION JURIBDICTIGN OF FRAMNLIN CO„ N.C. ON -0 OWNER DATE g- icy-oq 5 MAURICE S. PRIVETTE ET AL D.B. 1005 PG. 795 98.32, MBE To SO - LINDA H. STONE, REGISTER OF DEEDS FRANKLIN COUNTY, N.C. FILED: FOR REGISTRATION DATE:_f� 'A ac� TIME: G:4si a. AA*. BOOK: �.C(�4 PAGE: ; I � SURVEY FOR ZELDA P. MITCHELL DUNN TOWNSHIP FRANKLIN COUNTY. N.C. DATE: 07-28-2004 SCALE: 1" -IOD' PINI 2708-08-8170 ZONED: R-40 BUILDING BETBACK9: FRONT SO' BIDE EO' REAR 50' GIL CLARK SURVEYING P.O. BOX 1243 2329 HODGE RD. KNIGHTDALE, NORTH CAROLINA 27545 NOTE: AREA COMPUTED BY COORDINATE METHOD. NO "C"MONS. WITHIN 2000', TEL (919) 188-871 1 FAX (919) 286-9732 ALL DISTANCES ARE HOR12. GROUND. LEGEND: 100 O 100 200 300 EIP EXISTING IRON PIPE NIP NEW IRON PIPE NPI NO POINT INSTALLED GRAPHIC SCALE -FEET PROJECTR 24070 125 Ft x 5ff.7- 6260 sq.ft of aroa In this r � spore will k►e re movod from shoreline 16W,,ft.-9,25ff =A000 sq.ff. In ffii ��,rea will only be an access road 525ft away is where spore will be dumped A 35' 5952'N 35° 5447N 741500 741S30 741560 741290 741627 741650 741680 Map Sole: 1:1,530 T printed on A landscape (11" x 0.51 sheet. Meters N 0 20 40 80 120 A Feet 0 0 50 100 20D S00 lam: Wes Mercator Comermordhaoes: WGSS4 Edge tla: UTMZone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Soil Map—Franklin Courty, North Carolira (Eddie Mitchell) i a 35° W 52r, 741710 741740 741770 7418M 1 35° 54'45"N A_ 6/19/2018 Page 1 of 3 MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Sod Map Unit Polygons .,,. Sod Map Unit Lines ® Sod Map Unit Points Special Point Features tJ Blowout ' Borrow Pt Clay Spot Closed Depression Y Gravel Pi: Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Cuarry 71 Miscellaneous Water Perennial Water Rock Outcrop Sal re Spot Sandy Spot _. Severely Eroded Spot Sinihole Slide or Slip Sodic Spot Soil Map—Franklin County, North Carolina (Eddie Mitchell) Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation +-ori Rails .v Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Sol Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil lire placement. The maps do not show the small areas of j contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Franklin County, North Carolina Survey Area Data: Version 20, Oct 2, 2017 Soil map units are labeled (as space allows) for map scales 1:50.00D or larger. Date(s) aerial images were photographed: Oct 29, 2014—Dec 9, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 6/19/2018 +� Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Franklin County, North Carolina Map Unit Legend Eddie Mitchell Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI 0.2°% ChA Chewada and Wehadkee soils, 0 to 3 percent slopes, frequently flooded 0.0 HeB Helena sandy loam, 2 to 6 percent slopes 0.1 1.7% W Water 0.3 3.9°% WaB Wake -Saw -Wedowee complex, 2 to 8 percent slopes, rocky 1.3 17.8°% WbD Wake-Wateree-Wedowee complex, 8 to 15 percent slopes, rocky 5.6 76.3% Totals for Area of Interest 7.4 100.0°% USD.N Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 611 912 0 1 8 Page 3 of 3 *NkIn,, , Irl i Y a �. j � w b , -055 a. 1 a � T lex 160 ft X 25ft 4000 sq.ft. "ky In this,areawwill only. be an access road Ilk, 6 -525ft away is where spore will be dumped * r i r e 1 USDA-NRCS-NGCE & USDA=rFSA-APFO, Copyrighk0 2013 National• +. Geographic Society, i -cubed' 1 DIFFUSE FLOW The project will not have any ditches or any water concentrated to any area. All water will be allowed to sheet flow across the landscape. A temporary vegetation (Pearl Millet) will be established to the finished project covered by straw. A silt fence will also be installed on the streamline for erosion control. Fescue will be planted this fall for a permanent vegetation when seeding dates arrive.