HomeMy WebLinkAbout20180882 Ver 1_Riparian Buffer Authorization_20180625DWR 2 0 1 8 0 8 8 2 State of North Carolina
Department of Environment and Natural Resources
Division of Water Resources Division of Water Resources
15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization
FORM: BA 10-2013
A. Applicant Riparian Buffer Authorization Form Information
1. Project Information
la. Name of project: Mitchell Project
1 b. County: Franklin
1 c. Nearest municipality: Zebulon
1 d. Subdivision name: N/A
1e. Is the project located in any of North Carolina's
twenty coastal counties. If yes, answer 1f below.
❑ Yes ® No
1f. Is the project located within a NC Division of Coastal
Management Area of Environmental Concern (AEC)?
❑ Yes ® No
2. Owner Information
2a. Name on Recorded Deed:
See Attachment 1
2b. Deed Book and Page No.
See Attachment 1
2c. Map Book and Page No.
(include a copy of the recorded
map that indicates when the lot
was created):
See Attachment 1
2d. Responsible Party
(for Corporations):
N/A
2e. Street address:
1808 Pilot -Riley Road
2f. City, state, zip:
Zebulon, NC 27597
2g. Telephone no.:
Eddie - Cell: 919-449-6673 Angela - Cell: 919-971-1591
2h. Fax no.:
N/A
2i. Email address:
emitche11777@bellsouth.net
3. Applicant Information (if different from owner)
3a. Applicant is:
❑ Agent ❑ Other, specify:
3b. Name:
3c. Business name
(if applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
J U N
3h. Email address:
4. Agent/Consultant Information (if applicable) D - ATR ESOU CES
4a. Name:
4b. Business name
(if applicable):
4c. Street address:
4d. City, state, zip:
4e. Telephone no.:
4f. Fax no.:
4g. Email address:
FORM: BA 10-2013 Page 1 of 4
B.
Project Information and Prior Project History
1.
Property Identification
1a. Property identification no. (tax PIN or parcel ID):
See Attachment 1
1 b.
Site coordinates (in decimal degrees):
Latitude: 35054'50.075"N
ILongitude: 78019'22.56'W
1 c.
Property size:
See Attachment 1 (lots highlighted in yellow is where
work is taking place)
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
Moccasin Creek
2b. Water Quality Classification of nearest receiving
water:
Class C, nutrient sensitive water
2c.
River basin:
Neuse River Basin
3.
Project Description
3a.
Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of
this application:
Residential and forest
3b.
Attach an 8'/z x 11 excerpt from the most recent version of the USGS topographic map indicating the location
of the site
3c. Attach an 8 '/i x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map
depicting the project site
3d.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
430 ft
3e. Explain the purpose of the proposed project:
Remove forested material that has been built up for years
3f.
Describe the overall project in detail, including the type of equipment to be used:
10 ton excavator andl0 ton dump truck will be used in removal of material from shoreline
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property/
project (including all prior phases) in the past?
❑ Yes ® No ❑ Unknown
Comments:
4b.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/ Consultant Company:
Other:
4c.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach
documentation.
6.
Project History
5a.
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ® No ❑ Unknown
5b.
If yes, explain and detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ® No
6b.
If yes, explain.
FORM: BA 10-2013 Page 2 of 4
C. Proposed Impacts Inventory
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Silt fence around pond and will plant millet/fescue when finished
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Excavator will have minimum movement within Zone 1. No turning around.
1. Buffer Impacts
2a. Will the project result in an impact within a protected riparian buffer that requires buffer
mitigation?
El es ® No
2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and
calculate the amount of mitigation required in the table below.
1a. Project is in which protected basin?
® Neuse ❑ Tar -Pamlico ❑ Catawba
❑ Randleman ❑ Jordan ❑ Goose Creek
1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out
form.
Section D of this
Buffer impact
number —
Permanent (P)
or Temporary
Reason for
impact
Type of impact
(exempt, allowable,
allowable w/ mitigation)
Stream name
Buffer
mitigation
required?
Zone 1
impact
(sq ft)
Zone 2
impact
(sq ft)
B1 ❑ P ® T
Removal of
debris
Allowable
Moccasin Creek
❑ Yes ® No
6,250
sq ft
B2 ❑ P ® T
Access
Temporary Road
Allowable
Moccasin Creek
❑ Yes ® No
4,000
sq ft
B3 ❑ P ❑ T
❑ Yes ❑ No
B4 ❑ P ❑ T
❑ Yes ❑ No
B5 ❑ P ❑ T
❑ Yes ❑ No
B6 ❑ P ❑ T
❑ Yes ❑ No
Total buffer impacts
1c. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Silt fence around pond and will plant millet/fescue when finished
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Excavator will have minimum movement within Zone 1. No turning around.
2. Buffer Mitigation
2a. Will the project result in an impact within a protected riparian buffer that requires buffer
mitigation?
El es ® No
2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and
calculate the amount of mitigation required in the table below.
Zone
Reason for impact Total impact
(square feet
Multiplier Required mitigation
(square feet
Zone 1
3 (2 for Catawba)
Zone 2
1.5
Total buffer mitigation
required:
2c. If buffer mitigation is required, is payment to a
mitigation bank or NC EEP proposed?
❑ Yes ® No
2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP.
2e. If no, then discuss what type of mitigation is proposed.
Only removing debris and not filling in the wetland with soil
2f. Comments:
FORM: BA 10-2013 Page 3 of 4
E. Diffuse Flow Plan
All buffer impacts and high ground impacts require diffuse flow or other form of
® Diffuse flow
stormwater treatment. Include a plan that fully documents how diffuse flow will be
❑ Other BMP
maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form.
1 a.
If due to site constraints, a BMP other than a level spreader is proposed, please provide a
❑ Yes ® No
plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP
public (federal/state) land?
Manual and attach a BMP Supplement Form.
1 b.
F.
Supplementary Information
by First Class Mail via the US Postal Service:
1.
Environmental Documentation
OR NC DWR, Transportation Permitting Unit
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the use of
❑ Yes ® No
Raleigh, NC 27604
public (federal/state) land?
For all other projects sent by delivery service
1 b.
If you answered "yes" to the above, does the project require preparation of an
❑ Yes ❑ No
OR Karen Higgins
environmental document pursuant to the requirements of the National or State (North
NCDWR — 401 & Buffer Permitting Branch
1617 Mail Service Center
Carolina) Environmental Policy Act (NEPA/SEPA)?
Raleigh, NC 27699 - 1617
1c.
If you answered "yes" to the above, has the document been finalized by the State
❑ Yes ❑ No
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.)
Comments:
2.
Violations
2a.
Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland
® Yes ❑ No
Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian
Buffer Rules (15A NCAC 02B .0200)?
2b.
Is this an after -the -fact permit application?
® Yes ❑ No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
Heavy equipment was in the riparian buffer
r
Appli nt/Agenfs Printed Name Applica t/Agent's Signature Dat
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Send 3 complete sets of this form and accompanying documents to the following:
For government transportation projects sent
For government transportation projects sent by
by First Class Mail via the US Postal Service:
delivery service (UPS, FedEx, etc.):
NC DWR, Transportation Permitting Unit
OR NC DWR, Transportation Permitting Unit
1617 Mail Service Center
512 N. Salisbury Street
Raleigh, NC 27699 - 1617
Raleigh, NC 27604
For all other projects sent by First Class Mail
For all other projects sent by delivery service
via the US Postal Service
(UPS, FedEx, etc.):
Karen Higgins
OR Karen Higgins
NCDWR — 401 & Buffer Permitting Branch
NCDWR — 401 & Buffer Permitting Branch
1617 Mail Service Center
512 N. Salisbury Street
Raleigh, NC 27699 - 1617
Raleigh, NC 27604
FORM: BA 10-2013 Page 4 of 4
Mr dnm ei-t+ 1
Name on Deed
Lot
Deed Book/Page No.
Map Book/Page No.
Parcel ID/PIN
Edgar Franklin Mitchell
Lot A
875/372
C3 / 36B
1339 / 2708-08-7217
Edgar F. Mitchell
Lot A2
869/585
PRF 3 / SL 36B
1338 / 2708-08-6127
Angela D. Mitchell
Edgar F. Mitchell
Lot A3
947/649
C3 / 36B
1340 / 2708-08-5077
Angela D. Mitchell
Edgar F. Mitchell
Lot 1
17187/36
2004/269
1337 / 2708-07-5990
Angela D. Mitchell
Charlotte P. Tingen
1718/36
O&D 9 / PG 31
1798 / 2708-08-2574
Maurice S. Privette
Rosemary P. Naylor
Elsie M. Nelson
Ainsworth Privette
Edgar F. Mitchell
Angela D. Mitchell
— - Np Ngpl. - pp .. L m MTNW 4I.—
/ CAREY KFdpDALL PRIVETTE
W4H4M � N4RTH
L. E. P
y euWY IMI m 4w srwrWl of I • lY rbxe rad NrrNod A✓wn
YrpkxMqe uMw mrv�•Yw•��I.b�� bOWby Y lavl iru�dun N°0�'m�I d .Pole N� E IrMI�IwIVNI MrNY
Hq•W �a Nleia a rb�xe � e°�nw� ini •�IYwvnlWo'Yen Imi•9 PaFMPriY4� C'wWy.
e•rlpr pmt Rm
pole
I :r�n°"•"I°y w.°� m mwn'NwMN'� ("gwpr.`x'°"�q N.iv�.Y I�'ugYry�'pppr °Y`°nwo"'etnal°'°M " e "u�°w' :u�M � ,
`tWpprev°I�N awp NpallANtl YNn�YP°N•PoG N*yy�'91Meii W NorM q•nl�uN �vWid,l >anWe w�
YN�gI•E > ✓•Yw•i lr'� M4aR bM� wuh k1e wyvl r4tt IbIM Wh IwIW@ev�
M pMY•Ry Iwdw®el Irq eWpua rWr h e.dw p de.r•w pn tlmo° el YNM tW,
F•lan"'maNmMM.
o•r. /9G
:I rww5p`. cauNyax�m°ge.°`✓e}�pY'�g1'"°'FC°Niw Smr,,.ax+,Nei. �a� mI' wWo``°'p��rorwao� i�•„"I"� r�
rs�io HN a• ww'ro'0r'F arylnulY.Y•_,e(}Y> Mai,•iN .svu, M lMl IN• mW Mw IIMerN
Iw r an9 N In• OlpnYo/I/JyW ^•W.'•J+"/%rSyy'Jx'.
punavlvbn y-L�)_
o♦ �/9T rte__
n MY •wWY Nol pm ✓bMNaro w MpIN•Y nw•ee M• Mn YMNd cw•W+R Iv
W FrmVA 4bunlY &AM'Iqu M1WMbu. .��
cnamwx F1m1w C.wW FbmNv N°✓d `/� -
. W •� wle, W®bq rMlmrm•mnu •n•p e ro o 1
ssgglMk p ibW PppFpTY URVEY F'
�pp Pep �Ae� iwarWp 1ae1 w !Iw adl 1 N N gq•61 ✓ P• omn+J a !
a•• Oaw n•q•�dM c h v Mu+• IM Ip °I�YOMw; wyl. //
GWtlV Nmmp✓ O ' J6 � J� [ •—YS l��\ //�J/I
1 � '+A fpm-rTh
WMUM SETNAGIt lWE IEWRRENERT4
FII4NT • p4' m6 • Ip REPR • 48'
Man 16316�
N xmTIIYPD
O • , YfQ11DY 6 x;.TTETE6TAiE•, mP M4fV 1971.
it EI..YP.�L'A
�• nxie+inc caxcr•re uvnuuex+
1 m nr nw.r
ETAYE OF NpRTN CARpIINA uuurpr e+rva✓
ry wotwwwu•ms.nuwnrw•exn w�u�•rrypsnur,nunrtyuw,uur
rn,w. tw.. ...rtlunlorw wm uwn*wu�((w tn( nenr JSLJIIE�.nifl.w�.�evtw.x
' eT1Y®U'7)(.�xGYIjYY_•otn.'11y,�p.,�p,n �•9AR+ new
.w .x r ,w � „ • . x r •w � .x m n .�._ r.� .rxp .
rtrunuwwrwou✓vow✓uwrr•nus.aNWw.Y•ID.o_ ware. vn r✓nwele��m•eo.+•M naoneeeu uilwe �rrewue✓ww,• \,"f':te
.,am..,.ewemxxr,.w.exwt. .°�.e� .0 aieumw °5ww•uc jYj-,•1.>I» .%
RECORDED Ql,4, Atecnt
TOTAL AREA NY D.M.D. METHOD . & 453 ACRES
IpgO° M. KEITH WRENN
FWNFwrr anvYYm rpR
g REG75TERE0 LANG SURVEYOR
ZELDA P. MITCHELL LOUISBURG, N. C
L-2063
FII F N(h NRI49 13T.]0Y
EMILIE ROSE PRIVETTE B OTHERS
D.B. 959 PG. 855
-------- 011,
DGBi. SIE �'
RPNE------
1. WALLACE 0, CLARK. JR, CERTIFY THAT THIS MAP
WAS DRAWN UNDEfl MY SUPERVISION FROM
AN ACTUAL SURVEY MADE UNDER MT SUPERVISION.
- --
THAT THE RATIO OF PRECISION AS CALCULATED
PRF 43 SLIDE 36-0
IS 1: 28,000 , THAT THE BOUNDARIES NOT
KNIGHTDALE, NORTH CAROLINA 27545
SURVEYED ARE SHOWN AS BROKEN LINES
TEL (919) 188-871 1 FAX (919) 286-9732
PLOTTED FROM INFORMATION FOUND IN BOOKS
hA
REFERENCED. THAT THIS MAP WAS PREPARED IN
ACCORDANCE WITH G.S. 47-30 AS AMENDED,
WITNESS MY HAND AND SEAL THIS 2BRH DAY
1 Q` 9 IGP �•-.
qb
Of JULY 2004.
O
- g p
1.809 ACRES O3
Z
PROFESSIONAL LAND SURVEYOR L-3691
-
L-3691 AF
tg �
TD a
N, gym.
8 77 92'01.6
3B3.Bq'
�pq
O,
G NIP
11 WALLACE 0. CLARK. JR. CERTIFY
ca�nMN
P
THAT THIS MAP IS OFA SURVEY THAT CREATES A
SUBDIVISION OF LAND WITHIN THE AREA OF
A COUNTY
OR MIN IC IPALITY THAT HAS AN ORDINANCE THAT
REGUTATfi�A=L -_ ,�ND.
2
PROFESSIONAL LAND SURVEYOR L-3691
3,227 ACRES TOTAL
RECORDED IN BOOK OF MAPS 2004 PG. c2(A
EMILIE ROSE PRIVETTE
PIN# 2708- I8-1576
coxma
cauaR
A-1
EDGAR MITCHELL
- --
N 55°43'51'W
PRF 43 SLIDE 36-0
30.00'
KNIGHTDALE, NORTH CAROLINA 27545
A-2
TEL (919) 188-871 1 FAX (919) 286-9732
ALL DISTANCES ARE HOR12. GROUND.
hA
v •
AlI•
�
"q bIT^
LT'
3
O ?
1.809 ACRES O3
Z
1,933 ACRES
A-3 y! r
TD a
N, gym.
8 77 92'01.6
3B3.Bq'
�pq
O,
G NIP
iT
20)14 AP
ca�nMN
P
O
2
'
3,227 ACRES TOTAL
y
a N
-1.040 AC. RiW
-0.348 AC. EASEMENT
1,839 ACRES NET
I
n�...
N T7°E4'92'W
EMILIE ROSE PRIVETTE
PIN# 2708- I8-1576
coxma
cauaR
________ P 883°49'21• E
8X8,
188.98'
'(1
EW
N 55°43'51'W
78de'
30.00'
KNIGHTDALE, NORTH CAROLINA 27545
NP
TEL (919) 188-871 1 FAX (919) 286-9732
ALL DISTANCES ARE HOR12. GROUND.
v •
AlI•
�
"q bIT^
LT'
3
O ?
1.809 ACRES O3
g
)y
1,933 ACRES
OF 2
73'S0'3g.B,tpO
N
iT
20)14 AP
2ELDA P. MITCHELL
Er
P'pp D.B. 677 PG. 382
RP
iV $9 0.833 ACRE
q OR, REMAINING y ,�
i PILOT—RILEY "B2°9s'3zw EP RP D97z' G
RD. —1/03 xR G3.2q, pNu
M
-------- 60' Riw W 79°gp,91
N
'C. N,
TED UPCHURCH
D.B. 770 PG. 280
I HEREBY CERTNY THAT THE WBDMSION PLAT SHOWN HEREON
HCS BEEN FOUND TO COMPLY WITH THE SUBDMSION REGULATIONS
of FRNNAM COUNTY, WITH ALL VARIANCES NOTED IN THE MINUTES
OF THE FRANUN COUNTY PIANNINO BOARD. THAT ALL EASEMENT&
SHOWN HEREON, ARE ACCEPTED BY FRAN" COUNTY, SLE.ECT TO THE
APPROVAL BY THE DEPARTMENT OF TRANSPORTATION WHICH "SUMS NO
RESPONSIBILITY 70 OPEN OR MAINTAIN THE BANE, AND THAT THIS MAP HAS
BEEN P F IECOROBN IN TIE OFFICE OF THE REGISTER OF DE�o&
&-b Aad 2DD`f
MO19 ATOR OR ASSIST T A
APPROVAL EMPIRES IF NOT RECORDED ON OR BEFORE
It, SR_10 S DOHAND MIST BE SUBMITTED FOR REAPPROVAL
DATE
STATE OF NORTH CAROLINA
COUNTY OF FRANKLIN
Ad"!bb WE OFFICER OF FRANKLIN CWNTY,
CERTIFY THAT THE MAP OR PIAT TO WHICH THAI CERTIFICATION IB AFFIXED
OLL 9TATUT Y REOUIREMENTB FOR RECORON0.
� REVIEW OFFICER DATE
1 HETHE BY CERTIFY THAT I AM THE OWNER OF E PROPERTY SHOWN AND DESCRIBED
HEREON YMICH WAS CONVEYED TO ME BY DEED RECORDED IN D.B. P0.
AND THAT I HE
ADOPT THIS PLAN OF SUBDIVISION WITH MY FREE CONSENT,
ESTABLISH THE MINIMIM BUILDING LINES, AND DEDICATE ALL DRAINAGEWAYS
AND OTHER OPEN SPACE TO PUBLIC OR PRIVATE USE AS NOTED. FUTHER
I CEATIFY THAT THE LAND SHOWN HEREON IS WITHIN THE SUBDIVISION
REGU ATION JURIBDICTIGN OF FRAMNLIN CO„ N.C.
ON -0
OWNER DATE
g- icy-oq
5
MAURICE S. PRIVETTE ET AL
D.B. 1005 PG. 795
98.32,
MBE To SO -
LINDA H. STONE, REGISTER OF DEEDS
FRANKLIN COUNTY, N.C.
FILED: FOR REGISTRATION
DATE:_f� 'A
ac�
TIME: G:4si a. AA*.
BOOK: �.C(�4
PAGE: ; I
�
SURVEY FOR
ZELDA P. MITCHELL
DUNN TOWNSHIP FRANKLIN COUNTY. N.C.
DATE: 07-28-2004 SCALE: 1" -IOD'
PINI 2708-08-8170 ZONED: R-40
BUILDING BETBACK9:
FRONT SO'
BIDE EO'
REAR 50'
GIL CLARK SURVEYING
P.O. BOX 1243 2329 HODGE RD.
KNIGHTDALE, NORTH CAROLINA 27545
NOTE: AREA COMPUTED BY COORDINATE
METHOD.
NO "C"MONS. WITHIN 2000',
TEL (919) 188-871 1 FAX (919) 286-9732
ALL DISTANCES ARE HOR12. GROUND.
LEGEND: 100 O 100 200 300
EIP EXISTING IRON PIPE
NIP NEW IRON PIPE
NPI NO POINT INSTALLED
GRAPHIC SCALE -FEET
PROJECTR 24070
125 Ft x 5ff.7- 6260 sq.ft of aroa
In this r � spore will k►e re movod from shoreline
16W,,ft.-9,25ff =A000 sq.ff.
In ffii ��,rea will only be an access road
525ft away is where spore will be dumped
A
35' 5952'N
35° 5447N
741500 741S30 741560 741290 741627 741650 741680
Map Sole: 1:1,530 T printed on A landscape (11" x 0.51 sheet.
Meters
N
0 20 40 80 120
A Feet
0
0 50 100 20D S00
lam: Wes Mercator Comermordhaoes: WGSS4 Edge tla: UTMZone 17N WGS84
USDA Natural Resources Web Soil Survey
Conservation Service National Cooperative Soil Survey
Soil Map—Franklin Courty, North Carolira
(Eddie Mitchell)
i
a
35° W 52r,
741710 741740 741770 7418M
1
35° 54'45"N
A_
6/19/2018
Page 1 of 3
MAP LEGEND
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Sod Map Unit Polygons
.,,.
Sod Map Unit Lines
®
Sod Map Unit Points
Special
Point Features
tJ
Blowout
'
Borrow Pt
Clay Spot
Closed Depression
Y
Gravel Pi:
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Cuarry
71
Miscellaneous Water
Perennial Water
Rock Outcrop
Sal re Spot
Sandy Spot
_.
Severely Eroded Spot
Sinihole
Slide or Slip
Sodic Spot
Soil Map—Franklin County, North Carolina
(Eddie Mitchell)
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
+-ori Rails
.v Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Sol Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
lire placement. The maps do not show the small areas of j
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Franklin County, North Carolina
Survey Area Data: Version 20, Oct 2, 2017
Soil map units are labeled (as space allows) for map scales
1:50.00D or larger.
Date(s) aerial images were photographed: Oct 29, 2014—Dec 9,
2017
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
USDA Natural Resources Web Soil Survey 6/19/2018
+� Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map—Franklin County, North Carolina
Map Unit Legend
Eddie Mitchell
Map Unit Symbol Map Unit Name
Acres In AOI
Percent of AOI
0.2°%
ChA
Chewada and Wehadkee
soils, 0 to 3 percent slopes,
frequently flooded
0.0
HeB
Helena sandy loam, 2 to 6
percent slopes
0.1
1.7%
W
Water
0.3
3.9°%
WaB
Wake -Saw -Wedowee complex,
2 to 8 percent slopes, rocky
1.3
17.8°%
WbD
Wake-Wateree-Wedowee
complex, 8 to 15 percent
slopes, rocky
5.6
76.3%
Totals for Area of Interest
7.4
100.0°%
USD.N Natural Resources Web Soil Survey
Conservation Service National Cooperative Soil Survey
611 912 0 1 8
Page 3 of 3
*NkIn,, ,
Irl
i
Y
a
�.
j
� w
b ,
-055
a. 1 a �
T
lex
160 ft X 25ft 4000 sq.ft.
"ky In this,areawwill only. be an access road
Ilk,
6
-525ft away is where spore will be dumped
* r
i
r
e
1
USDA-NRCS-NGCE & USDA=rFSA-APFO, Copyrighk0 2013 National•
+.
Geographic Society, i -cubed' 1
DIFFUSE FLOW
The project will not have any ditches or any water concentrated to any area. All
water will be allowed to sheet flow across the landscape. A temporary vegetation
(Pearl Millet) will be established to the finished project covered by straw. A silt
fence will also be installed on the streamline for erosion control. Fescue will be
planted this fall for a permanent vegetation when seeding dates arrive.