Loading...
HomeMy WebLinkAbout20180795 Ver 1_Meeting Notes_20180627Date * 6/27/2018 Site Type DMS Stream and Wetland Prepared By* Mac Haupt Sponsor/Provider DMS -RE Project Name* Slingshopt Creek NCDM S ID # DWR 20180796 ID#* HUC 02 County* Rockingham Coordinates Degrees North 36.3322 Attendees COE- Kim RS- Alex B. Axiom- Grant DMS- Jeff S., Periann EPA -Todd Degrees West -79.7130 USACE ID # Version* 2 Basin Cape Fear Notes and Sketch, etc UT1- started walking this reach first. From bottom to top R to E1 to E2. Approach is acceptable. Some discussion of a portion of the R area and E1 area, as really possible E2, however, given the work proposed, removal of old dam and changing out culvert will be ok to utilize existing proposal. Main channel- walked to the top and above fence was agreed that it should be preservation (proposed as E2). Below fence starts as R then an area of E1. Ok Rest of main channel proposed as R, ok, very end of channel is proposed as E2. No terracell! ! Wetland polygons were said to be delineated from prior work. Site started as part of the Octobank initially, now is a FD site. Will have to watch the wetlands closely at this site, most plugs did not pick up low chroma until 10-12 inches. Action Items