HomeMy WebLinkAboutIMP 3rd Quarter 2018 FINAL_20180629s� ti
Water Resources
Environmental Quality
June 29, 2018
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
Subject: Revised Interim Monitoring Plans for 14 Duke Energy Facilities
Yd Quarter 2018
Dear Mr. Draovitch:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised
Interim Monitoring Plans (IMPS) for the respective coal ash facilities. Per our agreement, DEQ
will be providing Duke Energy with updated IMPs quarterly until the individual facility Corrective
Action Plans are approved, and Duke Energy will include and begin sampling any newly installed
groundwater assessment wells as part of the facility IMP which DEQ will formally include in the
subsequent IMPs.
The attached IMPS only contain references to groundwater monitoring locations. DEQ may elect
to require establishment of surface water monitoring program in the future related to the ongoing
IMPs or corrective action performance monitoring. The requirement for an annual monitoring
report for each respective coal facility as set forth in the May 1, 2017 letter submitted will be due
April 30, 2019.
The attached revised facility IMPS shall be conducted on a quarterly basis pursuant to 15A NCAC
02L .0110, until Corrective Action Plans are approved for the individual facilities or as directed
otherwise by DEQ. The quarterly sampling events will be conducted in conjunction with planned
compliance monitoring sampling events for three quarters during the calendar year, supplemented
with an additional sampling event conducted at each facility in order to provide four rounds of
monitoring data to evaluate seasonal fluctuations during a year-long timeframe. If sampling an
individual groundwater location is problematic, please contact the appropriate Regional Office.
In order to optimize the groundwater monitoring at each facility, DEQ will be removing the
groundwater monitoring condition from the NPDES permits as they are reissued. Duke Energy
shall continue to monitor the compliance wells separately under the individual NPDES permits
until the NPDES permits are reissued with no groundwater monitoring condition. At that time,
the compliance wells shall continue to be monitored per the attached revised IMPs under the
authority of 15A NCAC 02L .0110.
-r—'--Nothing Compares
State of North Carolina I Environmental Quality I Division of Water Resources
Water Quality Regional Operations Section
1636 Mail Service Center I Raleigh, North Carolina 27699-1636
919-707-9129
DEQ is open to consider further optimization of the IMPs following a qualitative and quantitative
review of site-specific data. A thorough analysis of spatial and temporal trends related to
contaminant distribution that include determination of background conditions and identification of
areas impacted by coal ash residuals must be provided as a decision framework to support
improvements to long-term monitoring programs.
If you have any questions, please feel free to contact the appropriate Regional Office or Steve
Lanter (Central Office) at (919) 807-6444.
Sincerely,
Jon Rikaard, Section Chief
Animal Feeding Operations and Groundwater
Attachments: Revised Interim Monitoring Plans for the 14 coal ash facilities
cc: WQROS Regional Offices
WQROS Central File Copy
Revised Allen Steam Station Interim Monitoring Plan — Groundwater Onh
Wells to be Sampled
_
AB -10D
Sample for
Radionuclides
(X)
Regional Office Notes
AB -10S
AB -11D
X
AB -12D
AB -12S
AB -13D
X
AB -13S
X
AB-14BR
Monitor pH.
AB -14D
AB -1R
AB -2
AB -20D
Monitor pH.
AB -20S
AB-21BRL
X
Monitor pH.
AB -21D
Sample to be analyzed for total boron and sulfate
on!y.
AB -21S
X
AB -21 SL
X
AB-22BRL
Need to discuss possible additional assessment
needed at this location... please contact MRO.
AB-22BR
AB -221)
AB -22S
AB-23BRU
Sample to be analyzed for total boron and sulfate
only.
AB -23S
AB-24BR
AB -24D
Sample to be analyzed for total boron and sulfate
on!y.
AB -24S
AB-24SL
AB-25BR
Sample to be analyzed for total boron and sulfate
only.
A13-25BRU
Sample to be analyzed for total boron and sulfate
only.
X
X Monitor pH.
AB -25S
AB-25SL
AB -26D
AB -26S
AB-27BR
Monitor boron concentrations due to increasing
trend observed.
Allen Steam Station Pagel of 5 June 29, 2018
Wells to be Sampled
Sample for
Radionuclides
(X) —
Regional Office Notes
AB -27D
- —
AB -27S
AB -28D
Monitor pH. Additional development may be
necessary.
AB -28S
AB -29D
Monitor boron concentrations due to increasing
trend observed.
AB -29S
AB-29SL
Elevated pH.
AB -2D
AB -30D
AB -30S
AB -31 S
AB -32D
Sample was not collected 3/2/2018. Sample must
be collected as indicated in this IMP. If a sample is
not collected justification must be provided with
data submittal.
AB -32S
AB -33D
X
Continues to exhibit water quality issues (elevated
H). Please contact MRO to discuss further.
AB -33S
X
AB -34D
AB -34S
AB-35BR
X
Monitor chromium concentration.
AB -35D
Sample to be analyzed for total boron and sulfate
only.
AB -35S
X
AB -36D
AB -36S
AB -37D
AB -37S
AB-38BR
AB -38D
AB -38S
AB -39D
AB -39S
AB-4BR
X
AB -4D
X
AB -4S
X
AB -5
AB -6A
X
AB -6R
X
Allen Steam Station Page 2 of 5 June 29, 2018
Sample for
Wells to be Sampled Radionuclides Regional Office Notes
R�1
AB -9D X
AB -9S X
Note: BG -1D has been abandoned thus removed
BG -IDA X from the IMP. BG -IDA was installed as
replacement well.
BG -1S
X
Note: BG-2BR has been abandoned thus removed
from the IMP. BG-2BRA-2 was installed as
BG-213RA-2
X
replacement well.
Continues to exhibit water quality issues (elevated
H). Please contact MRO to discuss further.
BG -2D
X
BG -2S
X
BG -3D
X
BG -3S
X
BG-4BR
X
BG -4D
X
BG -4S
X
Note: GWA-14D has been abandoned thus removed
from the IMP. GWA-14DA was installed as
GWA-14DA
replacement well.
Monitor pH. Additional well development may be
necessa .
GWA-14S
GWA-15D
GWA-15S
GWA-16D
GWA-16S
GWA-17D
X
GWA-17S
X
GWA-18D
GWA-18S
GWA-19D
Sample to be analyzed for total boron and sulfate
only.
GWA-19S
GWA-1BR
X
GWA-1D
X
GWA-1 S
X
GWA-21BR
X
Monitor pH. Additional development may be
necessary.
Allen Steam Station Page 3 of 5 June 29, 2018
Allen Steam Station Page 4 of 5 June 29, 2018
Sample for
Wells to be Sampled
Radionuclides
Regional Office Notes
Note: GWA-21D has been abandoned thus removed
GWA-21DA
X
from the IMP. GWA-21DA was installed as
X
replacement well.
GWA-21 S
GWA-22D
GWA-22S
GWA-23D
Sample to be analyzed for total boron and sulfate
only.
GWA-23S
X
GWA-24BR
Monitor pH. Additional development may be
necessary.
GWA-24D
Note: GWA-24S has been abandoned thus removed
from the IMP. GWA-24SA was installed as
GWA-24SA
replacement well.
Monitor chromium concentration.
GWA-26D
GWA-26S
GWA-2D
X
GWA-2S
X
Note: GWA-3BR has been abandoned thus removed
from the IMP. GWA-3BRA was installed as
GWA-3BRA
X
replacement well.
Well should be replaced ASAP ... please contact
MRO to discuss.
GWA-3D
X
GWA-3S
X
GWA-4BR
X
Monitor boron concentrations due to increasing
trend observed.
GWA-4D
X
GWA-4S
X
Note: GWA-5BR has been abandoned thus removed
from the IMP. GWA-5BRA was installed as
GWA-5BRA
X
replacement well.
Need to discuss possible additional assessment in
this location sulfate/TDS ... please contact MRO.
GWA-5D
X
GWA-5S
X
Note: GWA-6BR has been abandoned thus removed
GWA-6BRA
X
from the IMP. GWA-6BRA was installed as
replacement well.
Allen Steam Station Page 4 of 5 June 29, 2018
Wells to be Sampled
GWA-6DA
Sample for
Radionuclides
X
Regional Office Notes
Note: GWA-61) has been abandoned thus removed
from the IMP. GWA-6DA was installed as
replacement well.
GWA-6S
X
Alkalinity
GWA-7D
X
Molybdenum
GWA-7S
X
GWA-8D
Chromium
GWA-8S
Carbon
Monitor chromium concentrations.
GWA-9BR
X
GWA-9D
X
Antimony
GWA-9S
X
Nickel
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
f
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Allen Steam Station Page 5 of 5 June 29, 2018
Revised Asheville Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
M
Regional Office Notes
ABMW-11BR
AMW-03B
X
AMW-1B
X
AMW-2A
AMW-2B
water level only
APZ-30
water level only
B-1
water level only
B -1-A
water level only
B-2
water level only
CB -1
X
CB-lBR
water level only
CB-IBRL
water level only
CB-lD
X
CB-8BR
X
CB -8D
water level only
CB-9BR
X
CB-9SL
X
GW -IBR
GW -1D
GW -2
X
GW -3
X
GW -4
X
GW -5
X
MW -3D
X
MW-5BR
MW -5D
MW -8S
X
MW -10
X
MW -11
MW -11D
MW-13BR
MW -13D
MW-14BR
MW -15A
X
MW-15BR
water level only
MW -15D
X
X
MW -16A
Asheville Steam Electric Plant Page 1 of 3 June 29, 2018
MW-16BR
X
MW -17A
X
MW-18BR
X
MW-18BRL
X
MW -18D
X
MW-19BR
water level only
MW -20A
MW -21D
X
MW-22BR
X
MW -22D
X
MW-23BR
MW-23DL
MW-23DU
MW -24S
X
MW-6BR
X
MW -6D
X
MW -6S
X
MW-7BR
water level only
MW-8BR
water level only
MW-9BR X
MW -9D X
MW -9S
X
P-102
water level only
P-103
PZ -17D
X
PZ -17S
X
PZ -19
X
PZ -22
X
CB -2
CB -3R
X
CB -4
X
CB -4B
X
CB -5
CB -6
CB -7
CB -8
X
CB -9
X
GW -1
X
CCR-101BR
X
CCR -102D
X
CCR -102S
X
Asheville Steam Electric Plant Page 2 of 3 June 29, 2018
CCR-103BR
Boron
Copper
CCR -103D
Selenium
Thallium
CCR -104D
X
Hexavalent
CCR-105BR
Sodium
Total Organic
CCR -105D
X
Chromium
EXT -01
X
Carbon
EXT -02
AS-5BR
Potential pH issues; recommend redevelopment
AS-5BRL
Calcium
Potential pH issues; recommend redevelopment
MW-15BRL
X
Combined
MW-16BRL
X
MW -16D
Uranium
MW-17BRL X
MW-20BR
X
MW-25BR
X
Arsenic
MW-25BRL
X
Potassium
MW -25S
Suspended
MW-26BRL
X
MW -26S
Solids
Barium
PZ-17BRL
X
Radium 226
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Asheville Steam Electric Plant Page 3 of 3 June 29, 2018
Belews Creek Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
Regional Office Notes
AB -IBR
AB -1D
_
AB -1 S
AB -2D
AB -2S
AB -3D
AB -3S
AB -413R
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
AB-4BRD
AB -4D
AB -4S
AB-4SL
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
AB-4SAP
AB -5D
AB -5S
_
AB-5SL
AB -6D
AB -6S
AB-6SL
AB -7D
AB -7S
AB -8D
AB -8S
AB-8SL
AB-9BR
AB-913RD
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
AB -9D
AB -9S
BG -1D
BG -IS
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
BG-2BRA
BG -2D
X
BG -2S
X
Belews Creek Steam Station Page 1 of 4 June 29, 2018
BG -3D
BG -3S
GWA-1 ODA
GWA-lOS
GWA-11D
GWA-11 S
GWA-12BR
GWA-12D
GWA-12S
GWA-16BR
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
GWA-16DA
GWA-16S
GWA-17D
GWA-17S
GWA-18D
GWA-18SA
GWA-19BR
GWA-19D
GWA-19SA
GWA-lBR
X
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
GWA-1D
X
GWA-1 S
X
GWA-20BR
GWA-20D
GWA-20SA
GWA-21 D
GWA-21 S
GWA-22D
GWA-22S
GWA-23D
GWA-23S
GWA-24BR
GWA-24D
X
GWA-24S
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
GWA-25BR
X
GWA-26BR
X
GWA-26D
X
GWA-26S
X
Belews Creek Steam Station Page 2 of 4 June 29, 2018
GWA-27BR
GWA-27D
GWA-27S
GWA-2D
GWA-2S
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
GWA-30D
X
GWA-30S
X
GWA-31D
GWA-31 S
GWA-32D
GWA-32S
GWA-3D
GWA-3S
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
GWA-6D
X
GWA-6S
X
GWA-7D
X
GWA-7SA
X
GWA-8D
X
GWA-8S
X
GWA-9BR
GWA-9D
GWA-9S
MW-104BR
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
MW -104D
MW -104S
MW-200BR
MW -200D
x
MW -200S
MW -201 BR
MW -201D
MW-202BR
MW -202D
MW -202S
MW-203BR
MW -203D
MW -203S
MW -204D
MW -204S
Belews Creek Steam Station Page 3 of 4 June 29, 2018
MW -3 X
EX -OB -1
EX -OB -2
Minimum Parameters to be Analvzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Belews Creek Steam Station Page 4 of 4 June 29, 2018
Revised Buck Combined Cycle Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
Regional Office Notes
AB -1D
AB-10BR
AB-10BRL
Water quality continues to be an issue (elevated pH
indicative of grout contamination). Well should be
replaced ASAP... lease contact MRO to discuss.
AB -10D
AB -10S
AB-2BR
X
Sample to be analyzed for total boron and sulfate
only.
AB -2D
X
AB -2S
X
AB-2SL
X
AB -3D
AB -3S
AB-4BRL
Water quality continues to be an issue (elevated pH).
Well should be replaced ASAP ... please contact MRO
to discuss.
AB-4BRU
AB -4S
AB-4SL
AB-5BRU
X
Volume has been insufficient to collect sample since
2015. Continue to monitor water level during each
sampling event and if volume is sufficient for
sampling then collect the sample accordingly.
AB -5S
X
AB -5 SL
X
AB-6BRU
AB-7BRU
AB -7S
AB-8BRU
AB -8S
AB-9BRA
X
Note: AB-9BR has been abandoned thus removed
from the IMP. AB-9BRA was installed as
replacement well.
AB-9BRUA
X
Note: AB-9BRU has been abandoned thus removed
from the IMP. AB-9BRUA was installed as
replacement well.
AB -9S
X
AS -1D
AS -1 S
Buck Combined Cycle Station Page 1 of 4 June 29, 2018
Wells to be
Sampled
Sample for
Radionuclides
R11
Regional Office Notes
_
AS-2D
AS-3D
AS-3S
BG-1BRA
X
Note: BG- 1BR has been abandoned thus removed
from the IMP. BG-1BRA was installed as
replacement well.
Monitor chromium concentration observed.
BG-1 S
X
BG-IDA
X
Note: BG-1D has been abandoned thus removed from
the IMP. BG-IDA was installed as replacement well.
Water quality still an issue (appears to be grout
contaminated). Well should be replaced
ASAP... please contact MRO to discuss.
BG-2D
X
BG-2S
X
BG-3BRU
X
BG-3S
X
GWA-101)
GWA-10S
GWA-11D
GWA-11 S
GWA-12BRU
X
GWA-12S
X
GWA-13D
Monitor TDS concentration observed 2/19/18.
GWA-13SR
GWA-14BR
X
1
Sample to be analyzed for total boron and sulfate j
only.
GWA-14D
X
GWA-14S
X
GWA-15BR
X
GWA-15D
X
GWA-15S
X
GWA-16BR
X
GWA-16D
X
GWA-16S
X
GWA-17S
GWA-18DA
X
Note: GWA-18D has been abandoned thus removed
from the IMP. GWA-18DA was installed as
replacement well.
Need to discuss possible additional assessment in this
location (sulfate/TDS) ... please contact MRO.
Buck Combined Cycle Station Page 2 of 4 June 29, 2018
Wells to be
Sampled
GWA-18S
Sample for
Radionuclides
h
Regional Office Notes
Monitor pH.
X
GWA-19D
X
GWA-19S
X
GWA-1D
X
GWA-1 S
X
GWA-20D
X
GWA-20S
X
GWA-22D
X
GWA-2BRA
X
Note: GWA-2BR has been abandoned thus removed
from the IMP. GWA-2BRA was installed as
replacement well.
GWA-2BRU
X
GWA-2S
X
GWA-3BR
X
GWA-3BRU
X
GWA-3S
X
GWA-4D
X
GWA-4S
X
GWA-5BRU
X.
GWA-5S
X
GWA-6BR
X
GWA-6BRL
X
Need to discuss possible additional assessment in this
location sulfate/TDS ... please contact MRO.
GWA-6BRU
X
GWA-6S
X
Volume has been insufficient to collect sample since
2016. Continue to monitor water level during each
sampling event and if volume is sufficient for
sampling then collect the sample accordin 1 .
GWA-7D
X
GWA-7S
X
GWA-8D
GWA-9BRA
X
Note: GWA-9BR has been abandoned thus removed
from the IMP. GWA-9BRA was installed as
replacement well.
Need to discuss water quality issues and potential well
replacement ASAP... please contact MRO.
GWA-9D
X
GWA-9S
X
MW -10D
MW -1 lBR
X
MW-11BRL
X
Buck Combined Cycle Station Page 3 of 4 June 29, 2018
Wells to be
Sampled
Sample for
Radionuclides
X
X
Regional Office Notes
MW -11D
MW -11s
MW -12D
Alkalinity
MW -12S
Hexavalent
MW -13D
Sodium
MW -1D
MW -1S
Chromium
MW -3D
X
MW -3S
X
Calcium
MW -4D
Nickel
Strontium
MW -4S
MW -5D
MW -5S
Arsenic
Chloride
MW-6BR
X
Sulfate
MW -6D
X
MW -6S
X
MW -7D
Barium
Chromium
MW -7S
Radium 226
Sulfide
MW-8BRA
X
Note: MW-8BR has been abandoned thus removed
from the IMP. MW-8BRA was installed as
replacement well.
Monitor sulfate and TDS due to increasing
concentrations.
MW -8D
X
Total Dissolved Solids
MW -8S
X
MW -9D
X
MW -9S
X
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Antimony
Calcium
Iron
Nickel
Strontium
Total CombinedUranium
Arsenic
Chloride
Lead
Potassium
Sulfate
Total SuspendedSolids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Beryllium
Cobalt
Manganese
Radium 228
Total Dissolved Solids
Zinc
Buck Combined Cycle Station Page 4 of 4 June 29, 2018
Revised Cape Fear Steam Electric Plant Interim Monitorins Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
M
Regional Office Notes
ABMW-1
X
ABMW-1BR
X
ABMW-1 S
X
ABMW-2SL
ABMW-2SU
ABMW-3
X
X
ABMW-3BR
ABMW-3 SR
ABMW-4
X
ABMW-4S
X
ABMW-5BR
ABMW-5S
BGMW-4
X
BGTMW-4
X
CMW-01
X
CMW-02
CMW-03
X
CMW-5R
CMW-06
X
CMW-07
X
CMW-08
X
CTMW-01
X
CTMW-02
CTMW-07
CTMW-08
X
MW -10
X
MW-10BR
X
MW-l0BRL
MW -10D
MW -11
X
MW -12
X
MW-12BR
MW -13
MW-15BR
X
MW-15SL
X
MW-15SU
X
MW-16BR
X
Cape Fear Steam Electric Plant Page 1 of 3 June 29, 2018
MW -16S
X
MW-17BR
MW-17SL
X
MW-17SU
X
MW -18S
X
MW -19S
MW-20BR
MW -20S
MW-21BR
MW -21 SL
X
MW -21 SU
X
MW-22BR
MW -22S
MW-23BR
MW -23D
X
MW -23S
X
MW-24BR
X
MW -24S
X
MW-5BRR
MW-6BR
X
MW -9
X
MW-9BR
X
PZ -1
PZ -10
PZ -2
PZ -3D
PZ -3S
PZ -4
PZ -5
X
PZ -6
PZ -7
PZ -8
Cape Fear Steam Electric Plant Page 2 of 3 June 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese Radium 228
Dissolved
Zinc
Solids
Cape Fear Steam Electric Plant Page 3 of 3 June 29, 2018
Revised James E. Rovers Enerp__v Complex Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides Regional Office Notes
M
AB -IBRO
AB -1D
AB -IS
AB-2BRO
AB -2D
AB -2S
AB-3BRUA
AB -3I
AB -3S
X
AB -3 SLA
X
AB-4BR
AB -4D
AB -4S
X
AB-4SL
X
AB -513R
AB-5BRU
AB -5S
X
AB -613R
AB -6D
AB -6S
X
AS -1D
AS -1 SB
AS-2BR
AS -2D
X
AS -2S
X
AS-3BRU
AS -4D
AS -4S
AS-5BR
AS-5BRU
AS -5S
AS-6BRA
AS -6D
AS -6S
AS-7BRA
AS -7D
AS -7S
X
James E. Rogers Energy Complex Page 1 of 6 June 29, 2018
AS-8D
AS-8S
BG1-BRA
BG-1D
X
BG-IS
X
BG-21)
Water level only
CCPMW-1D
X
CCPMW-1 S
X
CCPMW-2D
Water level only
CCPMW-2S
Water level only
CCPMW-3D
Water level only
CCPMW-3S
Water level only
CCPMW-4
Water level only
CCPMW-5
Water level only
CCPMW-6D
Water level only
CCPMW-6S
Water level only
CCPTW-1D
Water level only
CCPTW-1 S
Water level only
CCPTW-2
Water level only
CLMW-1
X
CLMW-2
CLMW-3D
X
CLMW-3S
X
CLMW-5D
CLMW-5S
CLMW-6
CLP-1
Water level only
CLP-2
Water level only
CLP-3
Water level only
CLP-4
Water level only
GWA-1 OD
GWA-lOS
GWA-11BRU
X
GWA-11 S
X
GWA-12BRU
GWA-12S
GWA-13BR
GWA-14BR
GWA-14D
GWA-14S
GWA-1BRU
James E. Rogers Energy Complex Page 2 of 6 June 29, 2018
GWA-20BR
X
GWA-20D
X
GWA-20S
X
GWA-21 BR
X
GWA-21 BRU
X
GWA-21 S
X
GWA-22BRU
GWA-22S
X
GWA-23D
GWA-24BR
GWA-24D
GWA-24S
GWA-25 S
GWA-25D
Water level only
GWA-26S
GWA-26D
Water level only
GWA-27BR
X
GWA-27D-A
X
GWA-28BR
GWA-28BRU
GWA-28S
GWA-29BRA
GWA-29D
X
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-30BR
GWA-30BRU
Water level only
GWA-30S
GWA-31 BR-A
GWA-31D
GWA-32D
GWA-32BR
Water level only
GWA-33BR
GWA-33D
GWA-33S
GWA-34S
GWA-35D
GWA-35S
GWA-36D
X
GWA-36S
X
James E. Rogers Energy Complex Page 3 of 6 June 29, 2018
GWA-37D
GWA-37S
GWA-38D
GWA-38S
GWA-39S
Water level only
GWA-3D
X
GWA-40S
Water level only
GWA-42S
Water level only
GWA-43D
GWA-43S
GWA-44BR
GWA-44D
GWA-44S
GWA-45D
Water level only
GWA-45S
GWA-46D
GWA-47D
GWA-48BR
GWA-4BR
Water level only
GWA-4D
X
GWA-4S
X
GWA-51D
GWA-54D
GWA-54BRO
GWA-54S
GWA-56D
GWA-56S
GWA-5BRU
GWA-5 S
GWA-6S
GWA-6D
Water level only
MW-IOD
MW-10S
MW-11 BRO
Redevelop. Sample for boron only.
MW-11DA
MW-lis
X
MW-20D
MW-20DR
MW-21 BR
MW-21D
MW-22BR
James E. Rogers Energy Complex Page 4 of 6 June 29, 2018
MW-22DR
MW -23D
MW-23DR
MW -23S
MW -24D
X
MW-24DR
X
MW-25DR
MW -2D -A
MW -30D
X
MW-30DA
X
MW -30S
X
MW-32BR
X
MW -32D
X
MW -32S
X
MW -34S
MW-34BRU
MW-36BRU
MW -36S
MW-38BR
X
MW -38D
X
MW -38S
X
MW-40BRU
MW -40S
MW-42DA
MW -42S
MW -8D
MW -8S
X
U5 -1D
U5-1 S
U5-2BR
U5 -2D
X
U5 -2S -SL -A
X
U5-4BRA
U5 -4D
U5 -4S
U5-5BR
U5 -5D
X
U5 -6D
U5 -6S
U5-8BR
U5 -8D
James E. Rogers Energy Complex Page 5 of 6 June 29, 2018
U5 -8S
Boron
Co er
CCR12-S
Selenium
Thallium
CCR -12D
Cadmium
Hexavalent
CCR -13D
Sodium
Total Organic
CCR -15D
Chromium
CCR -IB -1 S
Carbon
CCR -IB -1D
CCR -E13 -3S
Total
CCR -IB -3D
Calcium
Iron
CCR -U5 -4S
Strontium
Sample 1St Quarter 2018 only
CCR -U5 -4D
Sample 1St Quarter 2018 only
CCR -7S
Uranium
Total
CCR -7D
AB-3-MA15
Arsenic
Pump test well.
AB-3-LA15
Potassium Sulfate
Pump test well.
AB-4-UA15
Pump test well.
AB-4-LA15
Solids
Pump test well.
CCR -7S
Magnesium
Radium 226 Sulfide
CCR -7D
CCR -8D
Total
CCR -U5 -3D
Cobalt
Manganese
CCR -U5 -3S
Zinc
Minimum Parameters to be Analyzed
Aluminum
Boron
Co er
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226 Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228 Dissolved
Zinc
Solids
James E. Rogers Energy Complex Page 6 of 6 June 29, 2018
Dan River Combined Cycle Station Interim Monitoring Plan — Groundwater Onl%
Wells to be Sampled
Sample for
Radionuclides Regional Office Notes
AB-30BR
AB -30D
_
X
AB -30S
BG -1 DA
Measure water level if not dry; collect all filed
parameters if possible; if there is some water but
not enough water for all samples, please collect
samples for boron, sulfate, chloride, TDS only.
BG -10D
X
BG -10S
X
BG-10BR
X
BG -5D
BG -5S
GWA-10D
GWA-12D
GWA-12S
GWA-14D
GWA-14S
GWA-15D
GWA-16D
GWA-16S
GWA-17D
GWA-20D
GWA-20S
GWA-4D
GWA-4S
GWA-5BR
GWA-SBRD
GWA-6D
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8BR
GWA-8D
GWA-8S
GWA-9D
X
GWA-9S
X
X
MW -11
Measure water level if not dry; collect all filed
arameters ifpossible; if there is some water but
Dan River Combined Cycle Station Page 1 of 2 June 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
not enough water for all samples, please collect
samples for boron, sulfate, chloride, TDS only.
MW -11D
X
Thallium
MW -12
X
Hexavalent
MW -12D
X
Total Organic
MW -21D
Chromium
MW -21S
Carbon
MW-22BR
X
MW -22D
X
Antimony Calcium
MW -22S
X
Strontium
MW-23BR
_
MW -23D
Uranium
MW-317BR
MW-317BRL
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony Calcium
Iron
Nickel
Strontium
Combined
_
Uranium
Total
Arsenic Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Dan River Combined Cycle Station Page 2 of 2 June 29, 2018
Revised H. F. Lee Energy Complex Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
ABMW-1
Sample for
Radionuclides
(X)
Regional Office Notes
ABMW-1 S
X
AMW-11BC
_
AMW-11S
X
AMW-12BC
AMW-12S
_
AMW-13BC
AMW-13S
AMW-14BC
AMW-14S
AMW-15BC
AMW-15S
AMW-16BC
AMW-17BC
AMW-17S
AMW-18S
X
AMW-6RBC
AMW-9BC
AMW-19S
AMW-19BC
AMW-20S
AMW-20BC
AMW-21 S
AMW-21BC
AMW-22S
AMW-22BC
AMW-23 S
AMW-23BC
BGMW-10
BGMW-9
BW -1
CCR -100S
X
CMW-10
CMW-5
CMW-6R
CMW-7
CMW-8
H. F. Lee Energy Complex Page 1 of 3 June 29, 2018
CTMW-1
CW-1
CW-2
CW-3
CW-4
DMW-1
DMW-2
DMW-3
IABMW-1
IABMW-1 S
X
IABMW-2S
IABMW-3
IA 3MW-3 S
X
IMW-04BC
IMW-05BC
IMW-1BC
IMW-1S
X
IMW-2BC
IMW-3BC
IMW-3S
X
IMW-4S
X
IMW-5S
X
LLMW-1
LLMW-1 S
LLMW-2
LLMW-2S
MW-1
MW-2
MW-3
X
SMW-3
SMW-4
SMW-5
H. F. Lee Energy Complex Page 2 of 3 June 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Cop2er
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Ma esium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
H. F. Lee Energy Complex Page 3 of 3 June 29, 2018
Revised Marshall Steam Station Interim Monitorin Plan — Groundwater Onl
Sample for
Wells to be Sampled Radionuclides
(X-)
AB-10BR
AB -10D
AB -10S
Regional Office Notes
_
AB-10SL
AB -11D
AB -11S
AB-12BR
X
AB -12D
X
AB -12S
X
AB-12SL
X
AB -13D
AB -13S
AB -14D
Increasing trend in boron concentrations observed.
AB -14S
AB-15BR
AB -15D
AB -15S
AB-15SL
Increasing trend in boron and TDS concentrations
observed.
AB -16D
AB -16S
AB -17D
AB -17S
Need to discuss possible additional assessment in
this location (increasing boron
concentrations) ... please contact MRO.
AB -18D
AB -18S
AB-1BRL
X
AB-lBR
X
Increasing trend in boron concentrations observed.
AB -1D
X
Increasing trend in boron concentrations observed.
AB -IS
X
AB -20D
AB -20S
AB -21D
AB -21S
Increasing trend in boron, chloride and arsenic
concentrations observed.
AB -21)
X
Monitor boron concentrations.
AB -2S
X
Marshall Steam Station Page 1 of 5 June 29, 2018
Sample for
Wells to be Sampled Radionuclides
Regional Office Notes
{X}
AB -3D
AB -3S
Increasing trend in observed COI concentrations.
AB -4D
AB -4S
AB-4SL
AB-5BR
X
Monitor TDS concentrations due to observed
increasing trend.
AB -5D
X
Increasing trend in boron and thallium
AB -5S
X
concentrations observed. Are there other site
activities that are contributing or has historically
contributed to the COIs observed at this location?
AB-6BRL
Monitor sulfate concentrations.
Note: AB-6BR has been abandoned and thus
removed from the IMP. AB-6BRA was installed
as replacement well.
AB-6BRA
Water quality remains an issue (elevated pH).
Boron has doubled since last sampling event.
Recommend additional well development prior to
next sampling event and we will reevaluate the
next round of sampling results.
AB -6D
AB -6S
AB -7D
AB -7S
AB -8D
AB -8S
AB-9BR
AB -9D
AB -9S
AL-lBR
X
Monitor closely, boron concentrations are trending
upward near 2L standard.
AL -11)
X
Increasing trend in boron concentrations observed.
AL -1S
X
Increasing trend in boron concentrations observed.
AL-2BR
Increasing trend in boron concentrations observed.
AL-2BRL
Increasing trend in boron concentrations observed.
Need to discuss possible additional assessment in
AL-2BRLL
this location (increasing boron
concentrations) ... please contact MRO.
Marshall Steam Station Page 2 of 5 June 29, 2018
Marshall Steam Station Page 3 of 5 June 29, 2018
Sample for
Wells to be Sampled
Radionuclides
Regional Office Notes
h
Increasing trend in boron, TDS and selenium
AL -21)
concentrations observed.
Increasing trend in boron, TDS and chromium
AL -2S
concentrations observed.
Water quality issues remain (elevated pH). Please
AL-3BR
contact MRO to discuss possible well replacement.
AL -31)
Increasing trend in boron concentrations observed.
AL -3S
Monitor pH. Recommend additional well
AL-4BRL
development prior to next sampling event and we
will reevaluate the next round of sampling results.
Increasing trend in boron and TDS concentrations
AL-4BR
observed.
Increasing trend in boron and TDS concentrations
AL -41)
observed.
Note: BG-lBR has been abandoned and thus
BG-1BRA
X
removed from the IMP. BG-1BRA was installed
as replacement well.
BG -1D
X
BG -IS
X
BG-2BR
X
BG -2S
X
BG-3BR
X
BG -3D
X
BG -3S
X
GWA-lBR
X
GWA-1D
X
Note: GWA-21) has been abandoned and thus
GWA-1 S
X
removed from the IMP. GWA-2DA was installed
as replacement well.
GWA-2DA
Well continues to exhibit elevated pH (likely grout
contamination). Well should be replaced ASAP.
GWA-2S
GWA-3D
GWA-3 S
GWA-4D
GWA-4S
GWA-5D
GWA-5S
X
X
GWA-6D
GWA-6S
Marshall Steam Station Page 3 of 5 June 29, 2018
Sample for
Wells to be Sampled Radionuclides
A
GWA-7D
GWA-7S
GWA-8D
Regional Office Notes
GWA-8S
GWA-9BR
GWA-10D
GWA-10S
GWA-11BR
X
GWA-11D
X
Increasing trend in boron concentrations observed.
GWA-11 S
X
GWA-12BR
X
GWA-12D
Sample to be analyzed for total boron and sulfate
only.
GWA-12S
X
GWA-13DA
Sample to be analyzed for total boron and sulfate
only.
GWA-13S
GWA-14D
GWA-14S
GWA-15S
X
MS -8
MS -10
X
MS -11
MS -13
MW -1
MW -10D
X
MW -10S
X
MW -11D
Mw -11S
MW -12D
MW -12S
MW -13D
MW -13S
MW-14BR
X
MW -14D
X
MW -14S
X
MW -2
MW -3
MW -4
X
Marshall Steam Station Page 4 of 5 June 29, 2018
Wells to be Sampled
MW -4D
Sample for
Radionuclides
(X)
X
Regional Office Notes
MW -5
Selenium
Sodium
Thallium
Total Organic
MW -6D
X
Increasing trend in boron concentrations observed.
MW -6S
X
Chromium
MW -7
Water level only
MW -7D
X
MW -7S
X
Total
MW -8D
X
Iron
MW -8S
X
Combined
MW -9D
X
MW -9S
X
Uranium
Total
OB -1 (Dry Ash Basin)
OB -1 (Dry Ash Landfill)
Water level only
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Molybdenum
Selenium
Sodium
Thallium
Total Organic
Alkalinity
Cadmium
Hexavalent
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Vanadium
Barium
Chromium
Magnesium
Radium 226
Sulfide
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Marshall Steam Station Page 5 of 5 June 29, 2018
Revised Mayo Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
(X)
Regional Office Notes
ABMW-1
X
ABMW-2
ABMW-2BR
ABMW-2BRL
ABMW-3
ABMW-3S
ABMW-4
X
ABMW-4BR
ABMW-4D
BG -1
X
BG -2
X
CW -1
CW -1D
CW -2
X
CW -2D
X
CW -3
CW -4
CW -5
CW -6
X
MW-10BR
X
MW-11BR
water level only
MW -12D
X
MW -12S
X
MW-13BR
MW-14BR
MW-15BR
water level only
MW-16BR
X
MW -16D
X
MW -16S
MW -18D
MW-18BR
MW -19D
MW-19BR
MW -2
MW -3
X
MW-3BR
MW -4
Mayo Steam Electric Plant Page 1 of 2 June 29, 2018
MW-5BR
MW-8BR
MW-9BR water level only
MW-9BRL
Minimum Parameters to be Analvzed
Aluminum
Boron
CTper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Mayo Steam Electric Plant Page 2 of 2 June 29, 2018
Riverbend Steam Station Interim Monitorin Plan — Groundwater Onl►-
Wells to be
Sampled
Sample for
Radionuclides
(X)
Regional Office Notes
AB -11)
Measure all field parameters plus water level, if pH still
high, not sample for lab analyses.
AB -1S
Not sample. Please evaluate whether the well needs to be
redeveloped or re laced..
AB -2D
AB -2S
AB -8D
AB -8S
BG -IDA
BG -IS
BG-2BR
BG -2D
BG -2S
BG -3D
BG -3S
BG-4BR
X
Not Sample. Please evaluate whether this well should be
replaced because the well has not been sampled since 5/23/2017
due to high pH
BG -4D
X
BG -4S
BG-5BR
X
BG -5D
GWA-10BRU
Field parameters plus water level, if pH still high, not sample for
lab analyses.
GWA-10S
GWA-11D
GWA-11 S
GWA-12D
X
GWA-12S
X
GWA-13D
GWA-13S
GWA-14D
GWA-14S
GWA-15D
GWA-15S
X
GWA-1BRU
GWA-1 S
GWA-20BR
GWA-20DA
Riverbend Steam Station Pagel of 3 June 29, 2018
GWA-20S
GWA-21BR
GWA-21 D
GWA-21 S
GWA-22BR-A
X
GWA-22D
X
GWA-22S
X
GWA-23BR
Not Sample if pH is still high, but. please evaluate whether this
well should be replaced.
GWA-23DA
GWA-23 S
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-3BR
GWA-3D
GWA-3 SA
GWA-4BR
GWA-4D
X
GWA-4S
X
GWA-5D
GWA-5S
GWA-6D
X
GWA-6S
X
GWA-7BR
GWA-7D
GWA-7S
GWA-8D
X
GWA-8S
X
GWA-9BR
N
GWA-9D
X
GWA-9S
X
MW-10
X
MW-11DR
MW-11 SR
MW-13
MW-14
X
MW-15
MW-15BR
MW-15DA
MW-1D
MW-1S
Riverbend Steam Station Page 2 of 3 June 29, 2018
MW -2D
Boron
CoMer
MW-2SA
Selenium
Thallium
MW -3D
Cadmium
Hexavalent
MW -3S
Sodium
Total Organic
MW -4D
Chromium
MW -4S
Carbon
MW -5D
MW -5S
Total
MW -6D
Calcium
Iron
MW -6S
Strontium
Combined
MW-7BRA
X
MW -7D
X
Uranium
Total
MW-7SR
X
MW -8D
Arsenic
MW -8I
Lead
Potassium
MW -8S
Suspended
MW -9
X
MW-9BRA
X
Barium
MW-9DA
X
Radium 226
OB -1
Vanadium
Water level only
OB -2
Water level only
Beryllium
Cobalt Manganese
Radium 228
Dissolved
Zinc
Minimum Parameters to be Analyzed
Aluminum
Boron
CoMer
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt Manganese
Radium 228
Dissolved
Zinc
Solids
Riverbend Steam Station Page 3 of 3 June 29, 2018
Revised Roxboro Steam Electric Plant Interim Monitorin, Plan — Groundwater Onlj
Wells to be
Sampled
Sample for
Radionuclides
M
Regional Office Notes
ABMW-1
X
water level only
ABMW-IBR
X
ABMW-2
X
water level only
ABMW-2BR
X
ABMW-3
ABMW-3BR
ABMW-3BRL
ABMW-4
X
ABMW-4BR
X
ABMW-5
X
ABMW-5D
X
ABMW-6
ABMW-6BR
ABMW-7
water level only
ABMW-7BR
ABMW-7BRL
BG -1
X
BG-lBR
X
BG-1BRL
water level only
BG -1 BRLR
X
BG-2BR
X
CW -1
CW -2
X
CW -2D
X
CW -3
CW -3D
CW -4
CW -5
X
GMW-10
GMW-11
GMW-6
X
GMW-7
GMW-8
GMW-9
MW-1BR
MW-2BR
MW-3BR
X
Roxboro Steam Electric Plant Page 1 of 3 June 29, 2018
MW-4BR
MW-4BRL
water level only
MW-5BR
X
MW-5D
X
MW-6BR
X
MW-6D
X
MW-7BR
MW-8BR
MW-9BR
X
MW-IOBR
X
MW-11BR
X
MW-11D
X
MW-12BR
MW-13BR
X
MW-14BR
X
MW-15BR
X
MW-15D
X
MW-16BR
X
MW-17BR
X
MW-18BR
X
MW-18D
X
MW-19BRL
X
MW-2
X
MW-20BRL
MW-21BRL
water level only
MW-22BR
MW-22D
MW-23BR
water level only
MW-23BRR
MW-24BR
MW-25BR
MW-26BR
MW-27BR
MW-28BR
MW-29BR
MW-30BR
MW-31 BR
MW-32BR
MW-33BR
GPMW-1 S
GPMW-ID
Roxboro Steam Electric Plant Page 2 of 3 June 29, 2018
GPMW-IBR
GPMW-2D
GPMW-2BR
GPMW-3D
GPMW-3BR
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper MercuEy
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
May
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Roxboro Steam Electric Plant Page 3 of 3 June 29, 2018
Revised L.V. Sutton Enerzy Complex Interim Monitorin Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides Regional Office Notes
M
X
X
AW -1C
AW -2C
AW -2D
AW -3C
AW -4C
AW -5C
AW -5D
AW -6R -D
AW -6R -E
AW -7R -D
AW -08C
AW -09C
AW -09D
MW -05C
X
MW-05CD
X
MW -05D
X
MW -05R -E
MW -7C
MW -8
X
MW -8B
X
MW -8D
X
MW -8E
X
MW -11
MW -12R
MW -16D
MW -19
MW -20
MW -20D
MW -21C
MW -22B
MW -22C
MW -23B
MW -23C
MW -23D
X
MW -23E
X
MW -24R -B
MW -24R -C
MW -27B
X
MW -27C
L.V. Sutton Energy Complex Page 1 of 2 June 29, 2018
MW -28B
Boron
MW -28C
Mercury
MW -31 R -C
X
MW -32C
X
MW -33C
X
MW -36C
X
MW -37B
X
MW -37C
X
MW-37CD
X
MW -37D
X
MW -37E
X
MW -38B
Total CombinedUranium
MW -38C
X
MW -38D
X
MW -39B
MW -39C
X
MW -39D
X
MW -40B
Total Suspended
MW -40C
MW -40D
MW -41B
X
MW -41C
X
MW -41D
X
MW -41E
Vanadium
SMW-01 C
Cobalt
SMW-02C
Radium 228
SMW-03C
Zinc
SMW-04C
SMW-5C
SMW-06C
SMW-06D
Minimum Parameters to be Analyzed
Aluminum —L
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Antimony
Calcium
Iron
Nickel
Strontium
Total CombinedUranium
Arsenic
Chloride
Lead
Potassium
Sulfate
Total Suspended
Solids
Barium
Chromium
Ma nesium
Radium 226
Sulfide
Vanadium
Beryllium
Cobalt
Manganese
Radium 228
Total Dissolved
Zinc
Solids
L.V. Sutton Energy Complex Page 2 of 2 June 29, 2018
Revised W. H. Weatherspoon Power Plant Interim Monitoring Plan — Groundwater OnIY
Wells to be
Sampled
Sample for Radionuclides
Regional Office Notes
(X)
AW -01D
AW -01I
AW -01S
AW -02D
AW -02S
AW -03D
AW -03I
AW -03S
BW -01
BW -02S
X
BW -03D
X
BW -03I
X
BW -03S
X
BW -4D
X
BW -4I
X
BW4S
X
CCR -101 -BG
CAMA
X
CW -01
CW -02
CW -03
X
MW -01
X
MW -02
X
MW -03
X
MW -04
X
MW -05
X
MW -06
X
MW -07
X
MW -33D
MW -33I
MW -33S
MW -41D
MW -41I
MW -52
X
MW -53D
MW -53I
X
MW -54D
MW -55D
W. H. Weatherspoon Power Plant Page 1 of 2 June 29, 2018
MW -55I X
PW -1 (DEP 2)
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
W. H. Weatherspoon Power Plant Page 2 of 2 June 29, 2018