Loading...
HomeMy WebLinkAboutWQCS00383_Recommendations_20180628 People WorkingTOWN OF NAVASSA Town Council 334 MAIN STREET Eulis A.Willis,Mayor NAVASSA,NC 28451 Milton Burns Phone: (910)371-2432 Athelston Bethel Fax:(910) 371-0041 Minnie Brown For People www.townofnavassa.org Antonio Burgess Jerry Merrick ATTN: Deborah Gore, PERCS Supervisor Charlena Alston,Town Clerk North Carolina Division of Water Quality Pretreatment, Emergency Response and Collection Systems Unit 1617 Mail Service Center Raleigh, NC 27699-1617 RECEIVED/DENR/DWR Re: Permit No. WQS00383 JUNater 2esou8 2018 WRrces Dear Sir/Madam: Permitting Section Thank you for your correspondence dated May 31, 2018. The Town of Navassa has been primarily engaged in selecting a new collection system operator prior to the expiration of our Contract with Brunswick County. Envirolink will work with us to help us through the permitting process. With respect to the permit directive issued by your department, we respectfully reject the amount of flow the permit required.The Town of Navassa does not use 200,000 gallons per day in our collection system. That number is above and beyond our current permitting needs and is factually incorrect number. We respectfully request a delay in filing our Permit until that number can be tested and quantified. This number has been part of an issue on how the Town has been overlooked by Brunswick County. Our collection system includes portions collection lines that serve the H2go Sanitary district and that Sanitary district flow has been attributed to the Town's daily totals. In addition, there was a one-time spill that was 95% H2go flow that was being collected in Navassa's system and was attributed to Navassa and drove upward our yearly flow numbers as well as our future projected capacity usage. We reported both issues to Brunswick County, our former collection system maintenance partner,to no avail. This is why the Town decided to obtain our own Collection System Operator instead of retaining our agreement with Brunswick County. We ask for an extension of time until the North Brunswick waste water treatment partners (NBWWTPP) complete the construction of a "bypass system" (currently WIP)that will remove the H2go flow from Navassa's collection system and we can accurately gauge, and in fact count, our true daily flow. We acknowledge that the current Permit is less than desirable, and we are committed to obtaining our own permit as soon as possible. Please respond to us immediately, so that we can engage our contractor to pursue the permit application.Thank you in advance for your considerations ui 74 ;it; Mayor Eulis A Willis