Loading...
HomeMy WebLinkAboutNC0020354_Meeting Followup_19980617State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director Mr. John Poteat Superintendent Town of Pittsboro 1 • • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES .� r,—=rte June 17, 1998 1 EC' S'a T -•�D PO Box 759 i E'-Nj T L RULE Pittsboro, NC 27312 Subject: Pretreatment Unit Review of Pretreatment Program Development Town of Pittsboro (NPDES # NC0020354) Chatham County Dear Mr. Poteat: This letter is to follow up on our meeting yesterday as well as general review of the status of development of the POTW's Pretreatment Program. The following milestone dates were established for submittal of the final items required for program development. Please refer to the Comprehensive Guide for North Carolina Pretreatment Programs for assistance. 1. June - September, 1998: Conduct remaining Short Tenn Monitoring Plan (STMP) data as discussed during the meeting, plus add total nitrogen to the influent and effluent location. Maintain data summary spreadsheet. (Comprehensive Guide, Ch. 4) 2. August 1, 1998: Inspect Hydro Tube South and submit a completed Industrial User Inspection form. (Comprehensive Guide, Ch. 7) 3. August 1,1998: Submit a draft Industrial User Pretreatment Permit (IUP) for Hydro Tube South. The expiration date of the IUP must be June 30, 2002 or earlier. (Comprehensive Guide, Ch. 6) 4. September 1,1998: Issue Division approved Industrial User Pretreatment Permit (IUP) to Hydro Tube South with an expiration date of June 30, 2002 or earlier. (Comprehensive Guide, Ch. 6) 5. September 30,1998: Submit a summary of Industrial Waste Survey (IWS) (Comprehensive Guide, Ch. 3). Provide information on industries as discussed during the meeting. 6. October 14,1998: Attend meeting to conduct new Headworks Analysis (HWA) based on monitoring data to the Division (Comprehensive Guide, Ch. 5). Bring all available STMP and SIU data in spreadsheet format. 7. March 1,1999: Report on compliance status of all Significant Industrial Users (SIUs) due to the Division for the reporting period of July 1, 1998 through December 31, 1998. Response to this letter is required by the schedule outlined above. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper i Thank you for your cooperation with the Pretreatment Program. If you have any questions or concerns, please feel free to call me at (919) 733-5083 (ext. 523). DRF/pittsborodev.002 Cc: Central Files Pretreatment Group Danny Smith, Raleigh Regional Office Sincerely, -x C-0, wtol-o Dana Rees Folley Pretreatment Unit RILH r�=I��lr d