Loading...
HomeMy WebLinkAboutNC0020354_Compliance Report_20050921wArFRQ r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality Mr. John Poteat Director of Public Utilities Town of Pittsboro PO Box 759 Pittsboro, NC 27312 September 21, 2005 Subject: Pretreatment Compliance Inspection Report Program: Town of Pittsboro Chatham County NPDES Number NC0020354 Dear Mr. Poteat: On September 20, 2005 Mr. Christopher Wu of the Raleigh Regional Office performed a pretreatment compliance inspection with Mr. Perry Dunn at the Town of Pittsboro's Wastewater Treatment Facility. The inspection report is attached. Mr. Dunn's assistance was greatly appreciated as it facilitated the inspection process. The significant findings were as follows: 1. HydroTube South is currently the only Significant Industrial User (SIU) discharging to the POTW, and it is a Categorical Industrial User (CIU). The only other SIU of recent years, Townsends, Inc., shut down operations in July 2002. HydroTube South is currently in the process of negotiating with a developer interested in purchasing its property. HydroTube is considering moving its operations to Sanford within the next year or two. This would leave the Town of Pittsboro without a pretreatment program. 2. The POTW has no compliance issues with HydroTube. The SIU currently discharges no greater than 1,000 gpd but is permitted for 3,000 gpd. HydroTube was not issued any NOVs throughout the last year. 3. HydroTube does not have a Total Toxic Organic Management Plan. They do, however, send monthly statements to the POTW certifying that they are not discharging any toxic organics to the wastewater facility. 4. Mr. Tim Althaus, Vice President of Sales for HydroTube, gave a brief tour of the facility. The annual inspection conducted by the POTW is scheduled for October, so the site visit was simply an informational tour for the benefit of the inspector. 5. Mr. Dunn is keeping all of the files and data in a well organized fashioned. Such order eased the file review process. You are doing an excellent job of meeting the pretreatment program goals for the Town of Pittsboro. None Carol!tit vatura! NC DWQ/PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 791-4200 Customer Service Intemet: h2o.enrstate.no.us/Pretreat/tndex.html 3800 Barret Drive Raleigh, NC 27609 FAX (919) 571-4718 1-877-623-6748 An Fnual (lnnnrinnN/Affirmative AM. inn Fmnlnvar— 5n% RPnvcledlln% Pnst Cnnsumer Paner Mr. John Poteat Page 2 of 2 09/21/05 Thank you for your continued support of the Pretreatment Program. If you have any questions or comments, please contact Christopher Wu at (919) 791-4200 [or email: Chris. Wugncmail.net]. Cc: Deborah Gore, DWQ — PERCS Unit Chris Wu — RRO Perry Dunn, Town of Pittsboro Central Piles Sincerely, Chris opher Wu Environmental Specialist so R des E! NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION [Complete Prior To PCI• Review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: Town of Pittsboro 2. Control Authority Representative(s): Mr. Perry Dunn 3. Title(s): Pretreatment Coordinator, Wastewater Superintendent 4. Last Inspection Date: 09/08/2004 Inspection Type (Circle One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? ® Yes ❑ No ❑ N/A 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ Yes ® No Order Type and Number: NAAre Milestone Dates Being Met? ❑ Yes ❑ No ® N/A PCS CODING Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector IxTI IT.rlrIA In II In II IS 141 1091201051 hJ LsJ Fac. Type (DTIA) (TYPI) 7. Current Number Of Significant Industrial Users (SIUs)? (INS 1 P) (FACC) SNS 8. Current Number Of Categorical Industrial Users (CIUs ? 1 CNS 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Enter the Higher Number of 9 or 10 0 NOIN 12. Number of SIUs With No IUP, or With an Expired IUP 0 NOCM 13. Number of SIUs in SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods Total Number of SIUs in SNC)0 PSNC 14. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 MSNC 15. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 0 SNPS 16. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 Semi-annual Periods 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any POTW Permit Limits Violations? [K Yes E]No If Yes, What are the Parameters and How are these Problems Being Addressed? Phosphorous violation in June. It was an isolated incident. 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial ElYes ® No Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC during either of the Last 2 Semi- SNC for Limits: None Annual Periods? Have any Industries in SNC (During Either of the Last SNC for Reporting: None 2 Semi -Annual Periods) Not Been Published for Public Notice? Not Published: None (May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? [N;77 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which El ® No Ones? Filename: Pittsboro PCI Page l PRETREATMENT PROGRAM ELEMENTS RFVTF.W- Plence review PC)TW fib -c and rnm"1PtP *1,A 1F-11-;- - Program Element Date of Last Approval Date Next Due, If Applicable Headworks Analysis (HWA) 12/12/2003 08/01/2008 Industrial Waste Survey (IWS) 06/17/2004 09/30/2008 Sewer Use Ordinance (SUO) 05/12/2005 28. 29. 30. Enforcement Response Plan (ERP) 10/13/1998 ElYes❑ No IF Long Term Monitoring Plan (LTMP) 03/04/2002 LTMP FILE REVIEW: 22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® Yes ❑ No 23. Should any Pollutants of Concern be Eliminated from or Added to the LTMP? ❑ Yes ® No If yes, which ones? Eliminated: Added: 24. Are Correct Detection Levels being used for all LTMP Monitoring? ® Yes ❑ No 25. Is the LTMP Data Maintained in a Table or Equivalent? ® Yes ❑ No Is the Table Adequate? ® Yes ❑ No INDUSTRIAL USER PERMIT (TITP) FUN RF.VTF.W(; TTTP FTT.R RR.VTF.WR 01? 1 PTT P RPVTVIAT AArn 1 TTT TATQDTI!"T'TnXT\ 26. User Name 1. HydroTube South 2. 3. 27. IUP Number 0001 IF - 28. 29. 30. Does File Contain Current Permit? Permit Expiration Date Categorical Standard Applied I.E. 40 CFR, Etc. Or N/A ® Yes ❑ No ElYes❑ No IF ❑ Yes ❑ No 07/31/20 / / 433.17 31. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? ® Yes ❑ No ❑Yes ❑ No 1[❑ Yes ❑ No 32. 33. Does File Contain an Inspection Completed Within Last Calendar Year? a. Does the File Contain a Slug Control Plan? b. If No, is One Needed? See Inspection Form from POTW ® Yes ❑ No ❑ Yes ❑ No [:]Yes ❑ No a. ®Yes ❑No b. oyes ❑No a. ❑Yes ❑No b. ❑Yes ❑No Ib. a. ❑Yes ❑No ❑Yes []No 34. For 40 CFR 413 and 433 TTO Certifiers, Does File Contain a Toxic Organic Management Plan (TOMP)? ❑Yes®No❑N/A 1[75Yes❑No❑N/A7esE]NoE]N/A 35. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. ®Yes ❑No b.❑Yes❑No®N/A a. ❑Yes ❑No a. ❑Yes ❑No b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 36. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required b IUP? ® Yes ElNo 11 Yes ❑ No ❑ Yes E] No 37. 38. Does File Contain POTW Sampling Chain -Of -Custodies? During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP? ® Yes ❑ No ❑ Yes ❑ No1 ❑ Yes ❑ No ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 11 39. 40. Does Sampling Indicate Flow or Production? During the Most Recent Semi -Annual Period, Did the POTW Identify All Non -Compliance from Both POTW and SILT Sampling? ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A ®Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resam le Within 30 Days? a.❑Yes❑No®N/A a.❑Yes❑NoON/A a.❑Yes❑No❑N/A b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 42. Was the SILT Promptly Notified of Any Violations (Per ERP)? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 43. During the Most Recent Semi -Annual Period, Was the SIU in SNC? I ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No 44. During the Most Recent Semi -Annual Period, Was Enforcement Taken❑Yes❑No®N/A as Specified in the POTWs ERP? ❑Yes❑No❑N/A ❑Yes❑No❑N/A 45. 46. 47. Does the File Contain Penalty Assessment Notices? Does The File Contain Proof Of Penalty Collection? a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A a.❑Yes❑No®N/A a.❑Yes❑MON/A a.❑Yes❑No❑N/A b.pYespNo®N/A b.❑Yes❑No❑N/A b ❑Yes❑No❑N/A 48. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes ® No❑ Yes ❑ No ❑Yes ❑ No 11 Filename- Pittsboro PCI Page 2 0-4-A. 4/12A 1Q S FILE REVIEW COMMENTS: The files were well organized and easily accessible. PCI SUMMARY AND COMMENTS: PCI Comments: HydroTube South, the only SIU to Pittsboro, is potentially moving operations within the next year or two. This would leave the Town of Pittsboro without any SIUs. Townsends, Inc. left as a temporary contributor in July 2002. The industry does not have a TTO; rather, it sends monthly statements to the POTW certifying that no Total Toxic Organics are being dumped. Requirements: Recommendations: NOD: ❑ Yes ® No NOV: ❑ Yes ® No QNCR: ❑ Yes ® No POTW Ratina• Satisfactory ® Marginal ❑ UnSatisfactory ❑ PCI COMPLETED BY: Christopher Wu DATE: 09/20/2005 INDUSTRY INSPECTION PCS CODING: Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac. Type I N I C 10 I 0 1 2 10 I I s 1 4 I 109 120 I OSI LPA L_s_I L -1 (DTIA) (TYPI) (INSP) FACC) 1. Industry Inspected: HydroTube South 2. Industry Address: 3. Type of Industry/Product: Metal Tubing, powder covering 4. Industry Contact: Tim Althaus Title: Vice PResident of Sales Phone: (919) 542-5300 ext. 204 Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ Yes ® No 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ Yes ❑ No B. Plant Tour ❑ Yes ❑ No C. Pretreatment Tour ❑ Yes ❑ No D. Sampling Review ❑ Yes ❑ No E. Exit Interview ❑ Yes ❑ No Industrial Inspection Comments: The official inspection occurs annually in October. The=visit to�'HydroTube South was merely a cursory tour of the facility. Filename: Pittsboro PCI Page 3 SEP 28 ®5