HomeMy WebLinkAbout19940907 Ver 2_401 Application_20180621Action History (UTC -05:00) Eastern Time (US & Canada)
Submit by Anonymous User 6/21/2018 2:42:27 PM (Start Event)
Accept by Montalvo, Sheri A 6/28/2018 8:43:41 AM (Non DOT Initial Review)
• The task was assigned to Montalvo, Sheri A. The due date is: June 26, 2018 5:00 PM
6/21/2018 2:43 PM
DWR
Dfutslon of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf
A. Processing Information
County (or Counties) where the project is located:*
Harnett
Is this project a public transportation project?*
r Yes G No
This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project.
1a. Type(s) of approval sought from the Corps:*
PF Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
r% Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits.
All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form.
Nationwide Permit (NWP) Number: 18 - Minor Discharges
NWP Number Other:
List all WV nun-bers you are applying for not on the drop dow n list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
401 Water Quality Certification - Regular r 401 Water Quality Certification - Express
r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual Permit
*
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
b Yes b No
O Yes a No
1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
V so, attach the acceptance letter from mitigation bank or in -lieu fee program
r Yes r No
1f. Is the project located in anyof NC's twenty coastal counties?*
r Yes r No
1h. Is the project located in a designated trout watershed?*
r Yes r No
Link to trout information: http://wuwv.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
B. Applicant Information
1a. Who is the Primary Contact?*
Jon Swaim
1b. Primary Contact Email:*
jon.swaim@mcgillengineers.com
1c. Primary Contact Phone:*
(xxx)xxx-xxxx
(828)386-1920
1d. Who is applying for the permit?
W Owner r- Applicant (other than owner) r Agent/Consultant
(Check all that apply)
2. Owner Information
2a. Name(s) on recorded deed:
Harnett County
2b. Deed book and page no.:
Db:1160, Pg:0889; Db:2147, Pg:0433
2c. Responsible party:
(for Corporations)
Carl Davis, Director of Parks and Recreation, Harnett County
2d. Address
Street Address
PO Box 816
Address Line 2
City
Lillington
Postal / Zip Code
27546
2e. Telephone Number:
(xxx)xxx-xxxx
2f. Fax Number:
(910)814-8275
(xxx)xxx-xxxx
State / Rovince / Pagion
NC
Country
USA
2g. Email Address:*
cdavis@harnett.org
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Harnett County Government Complex Park Project
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
*
Town of Lillington
1d. Driving directions*
If it is a new project and can not easily be found in a GPS crapping system Rease provide directions.
North Main Street in Lillington, turn on W Cornelius Harnett Blvd, turn on McKinney Parkway, turn on Alexander Dr.
2. Project Identification
2a. Property Identification Number:
(tax RN or parcel ID)
0650-56-4463,0650-64-1818
2b. Property size:
(in acres)
34.3
2c. Project Address
Street Address
Alexander Drive
Address Line 2
City
State/ Province/ Fbgion
Lillington
NC
Fbstal/Zip Code
Country
27546
USA
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as
appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
35.411346 -78.816161
ex: 34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Cape Fear River
3b. Water Resources Classification of nearest receiving water:*
WS -IV
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Cape Fear
River Basin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The Project Site consists of open agricultural land in the western portion. Several forested wetlands, open water
wetlands, and upland forested areas exist throughout the Project Site. The Cape Fear River borders the southern
edge of the Project Area and North Main Street borders to the east. A portion of the proposed project is within the
100 year floodplain of the Cape Fear River.
The surrounding area of the Project Site is forested, agricultural, and commercial land.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Click the upload button or drag and drop files here to attach docurrent
USGS Map.pdf
File type rrust be pd'
1.51 MB
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
Click the upload button or drag and drop files here to attach docurrent
Soil_Map.pdf 726.58KB
File type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
4.34
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
1,520
4f. Explain the purpose of the proposed project:*
The purpose of the Harnett County Government Complex Park project is to develop an approx. 12.8 -acre park
consisting of an access road, parking area, two baseball fields with appurtenances, two soccer fields with
appurtenances, and an asphalt walking trail.
4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The proposed project plans to develop approximately 12.75 acres of mostly open historic farmland into an athletic
park for Harnett County and the Town of Lillington. Access for the park will be achieved with the construction of an
approx 2,180 LF gravel road. The proposed road will be built along existing grass and gravel farm roads. The
proposed road will cross three unnamed tributaries to the Cape Fear River along existing culverts. No impacts are
anticipated to these streams as a result of building the new access road (see Location Map, Photo Sheets, and
Plan Sheets).
Two regulation sized baseball fields with appurtenances such as fencing, and concrete pads for dugouts are
planned to be built in the open field section in the northwest corner of the project area. No impacts to jurisdictional
waters are anticipated as a result of baseball field grading and construction. Two regulation sized soccer fields are
proposed to be built in the open field area in the southeast corner of the project area. Grading for the soccer
fields will result in approx 0.08 -acres of wetland impacts to Wetland C as fill (Impact W1). Approx. 8.00Y of fill
material will be placed below ordinary high water mark in Wetland C. See Impact Map.
A 39 space gravel parking lot (Approx. 11,000 sq. ft.) is proposed in the center of the project area situated
between the baseball and soccer fields. A concrete pad is proposed to allow for handicapped parking and a
sidewalk. No impacts to jurisdictional waters are anticipated as a result of the parking lot.
Lastly, an approx 2,900 LF 5 -foot wide asphalt walking trail is proposed to provide access from the parking lot to
the athletic fields, and will circulate around the soccer fields. Construction of the proposed walking trail will result in
permanent and temporary impacts to Wetland CB, approx. 0.003 -acres of permanent impacts are proposed with
the installation of a 15" HDPE culvert crossing, and approx 0.002 -acres of temporary impacts are proposed during
construction for access and culvert installation (Impact W2). Approx. 1.00Y of fill material will be placed below
ordinary high water mark in Wetland CB. See Impact Map. Temporary disturbed wetland areas will be returned to
original elevations and contours and stabilized using a native wetland seed mix. The proposed trail will cross
Stream D-1 over an existing culvert to allow for permanent access from the parking lot to the baseball fields. No
impacts to D-1 are anticipated from construction access or trail construction (See Plan Sheets and Details).
Typical construction equipment will be used during development including, bulldozers, excavators, and dump
trucks.
4h. Please upload project drawings for the proposed project.
Click the upload button or drag and drop files here to attach docurrent
Harnett _Co. Park_6.15.18.pdf
File type rrust be pdf
5. Jurisdictional Determinations
5.35MB
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
r Yes f No f Unknown
Comments:
Wetland and Stream delineations completed 11/8 and 11/9/2018
5b. If the Corps made a jurisdictional determination, what type of determination was made?
r Preliminary r Approved r Unknown r N/A
Corps AID Number:
Bcarrple: SAW -2017-99999
PJD package has been submitted to the Corps.
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other
John Vilas, Jon Swaim
McGill Associates, P.A.
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5dl. Jurisdictional determination upload
Click the upload button or drag and drop files here to attach docurrent
File type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
7. Future Project Plans
7a. Is this a phased project?*
r Yes r No
7b. If yes, explain.
Phase 2 of the project proposes to extend asphalt walking/biking trails through eastern section of the property. No
impacts to jurisdictional waters are anticipated.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre -construction notification.
No
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
V Wetlands r Streams -tributaries r Buffers
r- Open Waters r- Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. Site # - Reason for impact*
2b. Impact type *
2c. Type of wetland *
2d. Wetland name
*2e.
2f. Type of
2g. Impact
Forested*
Jurisdicition*
area*
Impact W1 -Fill
P
Small -Basin Wetland
Wetland C
No
Both
0.080
Ivbp label (e.g. Road Crossing 1 - Culvert,
Permanent (P) or
(404, 10) or DJVR(401,
(acres)
dewatering, etc)
Temporary (T)
other)
Impact W2 -Culvert
P
Small -Basin Wetland
Wetland CB
No
Both
0.003
Ivbp label (e.g. Fbad Grossing 1 - Culvert,
Fbrmanent (P) or
(404, 10) or DWR(401,
(acres)
dewatering, etc)
Terrl-ary (T)
other)
Impact W2 -Grading
T
Small -Basin Wetland
Wetland CB
No
Both
0.002
Ivbp label (e.g. Fbad Grossing 1 - Culvert,
Fbrrranent (F) or
(404, 10) or D/UR(401,
(acres)
dewatering, etc)
Temporary (T)
other)
2g. Total Temporary Wetland Impact
0.002
2g. Total Permanent Wetland Impact
0.083
2g. Total Wetland Impact
0.085
2h. Comments:
Wetland C - Small (0.08 -acre) basin wetland located in cleared former agricultural field within 100 -year floodplain
of Cape Fear River. Permanent impact (0.08 -acre) as fill for construction of soccer fields (Approx. 8.0 CY).
Wetland CB - Small (0.15 -acre) basin wetland located in cleared former agricultural field within 100 -year floodplain
of Cape Fear River. Permanent impact (0.003 -acre) as culverts for construction of walking trail (Approx. 1.0 CY),
and Temporary impact (0.002 -acre) due to culvert installation.
E. Impact Justification and Mitigation
......... ......... ......... ......... ......... ..... ......... ...................
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
Proposed project was designed to avoid impacts wetlands and streams to the maximum extent practicable.
Proposed roadways are planned on existing farm roads. All stream crossings are planned on existing culverts. The
athletic fields, appurtenances, walking trails, and parking area were designed to avoid streams and wetlands.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
All surface waters on the proposed project site will be protected with silt fence prior to construction. Work within
wetland impact areas will be performed in the dry. All sediment and erosion control best management practices will
be followed during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Permanent Impacts are limited to 0.083 -acres of wetland fill. All wetland impacts are in managed open field area, there are no impacts
planned to forested wetlands.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
*** Recent changes to the stormwater rules have required updates to this section .***
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
r Yes r No
For a list of options to meet the diffuse flow requirements, click here.
If no, explain why:
The Cape Fear River has no NC Riparian Buffer Protection Rules.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes G No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?*
r Yes
r No
To lookup low density requirement click here 15A NCAC 02H .1003(2)
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the
requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?*
r Yes F No
Comments:*
Local funds will be used for the proposed project.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
2b. Is this an after -the -fact permit application?*
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
The proposed project is limited to the construction of an athletic facility and walking/biking trails. No additional
development is anticipated as a result of the proposed project.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
r Yes r Nor NiA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
f Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?*
r Yes r No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers,
mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
https:Hwww.fws.gov/raleigh/species/cntylist/harnett.html, https://ecos.fws.gov/ipac/
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes
r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
http://ccma.nos.noaa.gov/products/biogeography/sa-efh/
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?*
r Yes
r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
http://gis.ncdcr.gov/hpoweb/
7c. Historic or Prehistoric Information Upload
Click the upload button or drag and drop files here to attach docurrent
NCHPO Map.pdf 263KB
File rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes
r No
8b. If yes, explain how project meets FEMA requirements:
Consultation with the Town of Lillington's Floodplain Coordinator and the Town's consulting engineering firm,
resulted in a response indicating that the proposed work in the mapped floodplain is in compliance with the Town's
Floodplain Ordinance. The proposed work will not require a CLOMR/LOMR process and it will be approved
because it is an allowable use in the floodplain and meets all other elements of the Floodplain Ordinance.
8c. What source(s) did you use to make the floodplain determination?*
http://fris.nc.gov/fris/Index.aspx?FIPS=021 &ST=NC&user=General%20Public
Miscellaneous
Miscellaneous attachments not previously requested.
Click the upload button or drag and drop files here to attach docurrent
Authorized Agent Form, Location Map.pdf 723.16KB
IMPACT MAP 6-19-18.pdf 221.46KB
Photo Sheetl.pdf 800.07KB
Photo Sheet2.pdf 1.02MB
File crust be FDF or 10&
Signature
W By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Jon Swaim
Signature
Date Submitted:
6/21/2018
Initial Review
Is this project a public transportation project?* P
C Yes t: No
Change only ff needed.
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
BIMS # Assigned *
19940907
Version#*
2
Reviewing Office
Fayetteville Regional Office - (910) 433-3300
Select Project Reviewer*
Chad Turlington:eads\ccturlington
Is a payment required for this project?*
C No payment required
f Fee received
r Fee needed - send electronic notification