HomeMy WebLinkAboutWQ0040115_Application_20180627Fast Track Application
Recd June 20, 2018
Woodlane Street Apartments
Caldwell WQ0040115
JUN 2 0 2018
Cash - BB&T Woodlane St Apt. PTA Application
2005
480.00
480.00
•0�����
WQ0040115
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
TRANSMITTAL
JUN 2 0 2.099
6VatW QW01N �auilonnl
TO: NCDEQ Water Quality Section Date:06/18/18 Job #: 40620
2090 US 70 Highway Project: Woodlane Street Apartments
Swannanoa North Carolina 28778-8211 Reference:
ATTN: Tim Heim Copies Sent To:
❑ ENCLOSED PLEASE FIND:
❑ WE ARE SENDING UNDER SEPARATE COVER:
COPIES
DATE NUMBER
DESCRIPTION
1
1
Fast Track Sewer A lication
1
2
Pro'ect Narrative
1
3
USGS ma
1
4
Vicini Ma
1
5
Flow Acce tante Form
1
6
Check for $480
1
7
Develo er O erational Agreement
THESE ITEMS ARE TRANSMITTED:
If enclosures are not as noted, please notify us at once.
COMMENTS:
Feel free to contact me with any questions at 984-255-2364 or danielle.kirklaDtimmons com.
Thank you,
Danielle Kirk
Project Engineer
SIGNED:
E
0
c
0
E
E
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A
NCAC 02T, 15A NCAC 02T.0300, Division Policies and good engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NC T.0303.
Projects not eligible for review via the fast track process (must be submitted for full technical reviewU
➢ Projects that require an environmental assessment in accordance with 15A NCAC IC4zt
o,:n.'> Projects that do not et any
he
criteria
➢ Projects that nvolyaevarian eafromrt of tthe requirements urn of 15A NCA P: document,<sac`Y Pressure sewer systems utilizing septic tank -effluent pumps (STEPs) or simplex grinds; `1114/
➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ` 0 �®%➢ Vacuum sewer systems.Otrash.n
General— When submitting an application, please use the following instructions as a checklist in order to. nsuireaflee 4ttern
are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker reviwe me atj
reduce the amount of requested additional information. Failure to submit all required items will necessitate additional
processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit
one original and one copy of the application and supporting documentation.
A. One Original and One Copy of Application and Supporting Documents
® Required unless otherwise noted
B. Cover Letter (Required for All Application Packages):
® List all items included in the application package, as well as a brief description of the requested permitting action.
➢ Be specific as to the system type, number of homes served, flow allocation required, etc.
➢ If necessary for clarity, include attachments to the application form.
C. Application Fee (All New and Major Modification Application Packages):
® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal.
➢ Payable to North Carolina Department of Envirommental Quality (NCDEQ)
D. Fast Track (Form: ETA 04-16) Application (Required for All Application Packages):
N Submit the completed and appropriately executed application.
Y If necessary for clarity or due to space restrictions, attachments to the application may be made.
❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with
the North Carolina Secretary of State.
❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of
Deeds in the county of business.
❑ The Project Name in Item 11.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
❑ The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North
Carolina licensed Professional Engin
❑ The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T.0 106(b).
Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is
provided from a person who meets the criteria in 15A NCAC 02T .0106(b).
INSTRUCTIONS FOR FORM: PTA 04-16 & SUPPORTING DOCUMENTATION Page I of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable):
❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
Y Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one
year prior to the application date.
Y Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-
215.67(a)
43-
215.67 a .
Y Intergoverimental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
® Submit an 5.5 -inch x 11 -inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project
area and closest surface waters.
Y Location of the project (gravity sewer, pump stations & force main)
Y Downstream connection points and permit number (if known) for the receiving sewer
® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field.
G. Existing Permit (All Modification Packages):
❑ Submit the most recently issued existing permit.
❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit
modification (i.e., permit description, flow allocation, treatment facility, etc.).
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T 0305(h)(I), submit documentation of power reliability for pumping stations.
Y This alternative is only available for average daily flows less than 15,000 gallons per day
Y It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible
with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed
contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated
appurtenances and personnel are available for distribution and operation of this pump station."
D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump
stations' storage capacities and the rotation schedule of the portable power source or pump, including travel
timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification)
1. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
❑ Per 15A NCAC 02T 0115(a)(I) provide the Certificate of Public Convenience and Necessity from the North Carolina
Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by
the sewer extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an
application for a franchise has been received and that the service area is contiguous to an existing franchised area or that
franchise approval is expected.
Operational Agreements (Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T 0115(c) submit the properly executed Operational Agreement (FORM: HOA).
❑ Per ISA NCAC 02T.01 15(c), submit a copy of the Articles of Incorporation, Declarations and By-laws.
❑ Developers of lots to be sold
❑ Per 15A NCAC 02T.01 15(b), submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's
JUN 2 0 2018.
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATIONLVVmgr QualMf p�lorw ^_ Pa
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Regional Office
2090 US Highway 70
Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section
Swannanoa, North Carolina 28778
Clay, Graham, Haywood, Henderson, Jackson,
(828) 2964500
Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax
Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office
225 Green Street Suite 714
Anson, Bladen, Cumberland, Harnett, Hake,
Water Quality Section
Fayetteville, North Carolina 28301-5094
Montgomery, Moore, Robeson, Richmond,
(910)433-3300
Sampson, Scotland
(910)486-0707 Fax
Mooresville Realonal Office
610 E. Center Avenue
Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section
Mooresville, North Carolina 28115
Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704)663-1699
Slanly, Union
(704)663-6040 Fax
Raleigh Regional Office
1628 Mail Service Center
Chatham, Durham, Edgecombe, Franklin,
Water Quality Section
Raleigh, North Carolina 27699-1628
Granville, Halifax, Johnston, Lee, Nash,
(919) 791-4200
Northampton, Orange, Person, Vance, Wake,
(919) 788-7159 Fax
Warren, Wilson
Washington Regional Office
943 Washington Square Mall
Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section
Washington, North Carolina 27889
Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481
Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax
Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office
127 Cardinal Drive Extension
Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section
Wilmington, North Carolina 28405
Hanover, Onslow, Pander
(910) 796-7215
(910) 350-2004 Fax
Winston-Salem Regional Off ee
450 W. Hanes Mill Road
Suite 300
Alamance, Alleghany, Ashe, Caswell, Davidson,
Dave, Forsyth, Guilford, Rockingham, Randolph,
Water Quality Section
Winston-Salem, North Carolina 27105
Stokes, Burry, Watauga, Wilkes, Yadkin
(336)776-9800
JUN ? 2018
INSTRUCTIONS FOR FORM: FTA 0416 & SUPPORTING DOCUMENTATION Page 3 of 3
1.
W00040115 State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources ETA 04-16 & SUPPORTING DOCUMENTATION
Application Number: (to be completed by DWR)
All items must be completed or the o 1' tiwill be returned
APPLICANT INFORMATION:
1. Applicant's name: Woodlane Street LLC (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual
N Corporation
❑ General Partnership
❑ Federal
❑ State/County
❑ Municipal
3. Signature authority's name: Fred G. Mills Jr per 15A NCAC 02T 0106(bl
Title: Member
4. Applicant's mailing address: PO
Box 6171
City: Raleigh State: NC
Zip: 27628._
5. Applicant's contact information:
Phone number: (919) 755-9155.
Email Address: farillsirAndlisconstruCtiODCOM
II. PROJECT INFORMATION:
1. Project name: Woodlane Street Apartment
2. Application/Project status: N Proposed (New Permit). ❑ Existing Permit/Project
If a modification, provide the existing permit number: WO00_ and issued date: _
If new construction but part of a master plan, provide the existing permit number: WQ00_
3. County where project is located: Caldwell
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.797°Longitude: -80.418°
5. Parcel ID(ifapplicable): 2785-23-9626
(or Pamel ID to closest downstream sewer)
❑ Privately -Owned Public Utility
111. CONSULTANT INFORMATION:
1. Professional Engineer: Jim Chandler License Number: 026466
Firm: Timmons Group
Mailing address: 5410 Trinity Road Suite 102
City: Raleigh State: NC Zip: 27607 -
Phone number: 9!9)866-4951 Email Address: iim.chandler(altimmonsc
IV. WASTEWATER TREATMENT FACILITY(WWTE) INFORMATION:
I. Facility Name: Granite Falls WWTP Permit Number: NC 0021890
Owner Name: Town of Granite Falls
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQUnknown Downstream (Receiving) Sewer Size: 8 inch
System Wide Collection S,,tem Permit Xb rO (if applicable): WQCS00145
Owner Name(s): Town of Granite Falls
FORM: FTA 04-16 Page I of 5
V1. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes []No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Aereement (FORM: DEVI been attached?
® Yes []No ❑N/A
3. If the Applicant is a Home/Property Owners'AssociAtion, has Operational Agreement (FORM BOA) been attached?
❑ Yes []No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls)
❑ Residential Leased ❑ Retail with food preparation/service
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities
❑ Food and drink facilities ❑ Church
❑ Businesses I offices /factories ❑Nursing Home
5. Nature of wastewater: 100 % Domestic/Commercial %Commercial
❑ Car Wash
❑ Hotel and/or Motels
❑ Swimming Pool /Clubhouse
❑ Swimming Pool/Filter Backwash
❑ Other (Explain in Attachment)
% Industrial (See 15A NCAC 02T.0 103(20))
"Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T 0114(f) []Yes ® No
➢ Ifies, Provide of flow d ct'on approval ltt
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114lD)
Daily Design Flow "•b
No. of Units
Flo
Residential - 12 Units @ 1 Bedroom
240 gal/day
t2
2,880w ]?U.
Residential - 36 Units @ 2 Bedrooms
240 gal/day
36
8,640 PD
Residential - 18 Units @ 3 Bedrooms
360 gal/day
18
6,48016' -
Community Building
25 gal/employee/ shift
2
50 4D
gal/
GPD
gal/
GP
Total
18,050 PD
a See I5A NCAC 02T 0114(b)(d)(e)(1) and (c)(2) for caveats to wastewater design flow rates (i.e, minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T.01 I4(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 141 shall be
determined using available flow data,/w?car using fixtures, occupancy or operation patterns, and other measured data.
S. Wastewater generated by project: 18�050+GPD (per 15A NCAC 02T.0 114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number: _
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mans (latest version) and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval ofth t is required prior to submittal ofth Fast Tk Application and suppordne documents,
2. Professional Engineer's Certification:
1. Jim Chandler, PE attest that this application for
(Professional Engineer's name from Application Item Ill. 1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes t43 -215.6A and 143-2t5.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalfies up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
SEAL
026466
3. Applicant's Certification per t5ANCAC 02T.0106(b):
Fred G, Mills, Jr. , Member attest th dis application for
(Signature Authority's name & title from Application Item 1.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system in surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. �5 ryry
Signamre: z Date: ) O
FORM: FTA 04-16 Page 5 of 5
W 00040115
a State of North Carolina
l ` Department of Environmental Quality -
" -- Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Woodlane Street Apartments
Project Name for which flow is being requested: Woodlane Street Apartments
More than one FTSE nuty be requiredfor a single project ifthe owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Granite. Falls Wastewater Treatment Plant
b. W WTP Facility Permit #: NC 0021890
All flows and in-Hop
c. W WTP facility's permitted flow 0.900 i
d. Estimated obligated flow not yet tributory to the W WTP 0.200�t+tiv„d;, e - -
e. W WTP facility's actual avg. flow 0.353
f Total flow for this specific request 0.018 ✓ J(/
g. Total actual and obligated flows to the facility 0.571 2018
It. Percent of permitted flow used 63.5 a O+ron
P,rv'v nn/w
'sa PeraPlor�
II. Complete this section for each pump station you are responsible for along the route of�-' ra�
proposed wastewater flow.
List pump stations located between the project connection point and the W WTP:
*The Firm Capacity of any pump station is defined as the maximum pumped Dow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pl) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the W WTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Town of Granite Falls
Downstream Permit Number: Unknown
Page 1 of 6
nrec nn 1s
(A)
(B)
(C)
(D)'(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Average Daily
Approx.
Not Yet
Total Current
Station
Firm
Flow**
Current Avg.
Tributary
Flow Plus
(Name or
Capacity,*
(Firm /pfl,
Daily Flow,
Daily Flow,
Obligated
Available
Number)
MOD
MOD
MOD
MGD
Flow
Capacity***
Shuford
**;,,�
0.864
0.3456
0.099
0.199
0.298
0.048
*The Firm Capacity of any pump station is defined as the maximum pumped Dow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pl) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the W WTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Town of Granite Falls
Downstream Permit Number: Unknown
Page 1 of 6
nrec nn 1s
III. Certification Statement:
I Chris Cnaybeal, War. Resources Dir certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus all attached planning assessment addendums for which I am the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Signing
Page 2 of 6
eTCR od_Ir
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section 11 where Available
Capacity is <0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MOD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or ,
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification
to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in
the system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S.
143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the
waste disposal system.
Signing Official Signature Date
Page 3 of 6
cmen nn i�
Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA)
Section):
a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facility's Permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not vet tributary to the WWTP MGD: This includes flows allocated to
other construction projects not yet contributing flow to the collection system. Flows allocated through
interlocal agreements or other contracts not yet contributing flow to the collection system are also
included. For POTWs that implement a pretreatment program, include flows allocated to industrial
users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator
for information on industrial flow tributary to your WWTP. _
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two
years and reconciled their flow records, to the best of their ability, so it is known how much flow has
been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and
In ocedures employed by the reporting entity.
C. WWTP facility's actual ave flow, MGD: Previous 12 month average.
f. Total flow for this specific request. MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility, MGD Equals [d+e+f]
h. Percent of permitted flow used: Equals [(g / c)* 100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there
is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7
MGD. There is a proposed flow expansion of 0.015 MGD.
The first Form FTSE submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6%
The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD:
c. = 6.0 MGD
d. = 0.515 MGD
e. = 2.73 MGD
f. = 0.102 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 4 of 6
crec nn i
Section 11
List the pump station name or number and approximate pump station firm capacity, approximate design
average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary
flow through the pump station (C) for each pump station that will be impacted by the proposed sewer
extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available
capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been
approved for the pump station but are not yet tributary (C).
Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as
per the Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of
not less than 25.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump
station if the system has future specific plans related to capacity that should be considered in the
permitting process.
Page 5 of 6
GTQF nn-iA
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Obligated,
Design
Approx.
Not Yet
Total Current
Firm
Average
Current Avg.
Tributary
Flow Plus
Pump Station
Capacity
Daily Flow
Daily Flow,
Daily Flow,
Obligated
Available
(Name or Number)
MGD
(Firm / pf)
MGD
MGD
Flow
Capacity*
Kew Creek PS
0.800
0.320
0.252
0.080
0.332
-0.012
Valley Road PS
1.895
0.758
0.472
0.135
0.607
0.151
Page 5 of 6
GTQF nn-iA
Planning Assessment Addendum Instructions
Submit a planning assessment addendum far each pump station listed in Section II where available
capacity is < 0.
A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate
whether there is significant likelihood that needed improvements or reductions in obligated flows will be
in place prior to activating the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum, it is responsible to
manage the flow without capacity related sanitary overflows and must take all steps necessary to
complete the project or control the rate of flow to prevent sanitary sewer overflows.
The planning assessment may identify a funded project currently in design or construction, or a planned
project in the future not yet funded but in a formal plan adopted by the system. The system should
carefully weigh the certainty of successful timely project completion for any expansion, flow
management diversion or infiltration and inflow elimination projects that are the foundation of a planned
solution to capacity tracking and acceptance compliance.
For example:
Given that:
a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080
MGD of the committed flow in Pump Station Kew Creek; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01
MGD per year; and that
c. A funded capital project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
Page 6 of 6
VTQU nn 14
STATE OF NORTH CAROLINA
COUNTYOF Caldwell
W 00040115
Permit N
JUN 2 0 2098
This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into t " t'e.*
, by and between the North Carolina Environmental
Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and
Woodlane Street, LLC , a corporation/general partnership registered/licemed to do
business in the State of North Carolina, hereinafter known as the DEVELOPER.
WITNESSETH:
1. The DEVELOPER is the owner of the certain lands lying in Caldwell County, upon
which it is erecting and will erect dwelling units and other improvements, said development to beknown
as Woodlane Street Apartments
(hereinafter the Development).
2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment
works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve
the Development on said lands.
3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143-
215.1 to construct, maintain, and operate the Disposal System,
4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements
and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter
47C or 47F of the North Carolina General Statutes.
5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the
Declaration, the (Unit Owners' Association) Woodlane Street LLC (hereinafter
Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State
of North Carolina, for the purpose, among others, of handling the property, affairs and business of the
Development; of operating, maintaining, re -constructing and repairing the common elements of the lands
and improvements subject to unit ownership, including the Disposal System; and of collecting dues and
assessments to provide funds for such operation, maintenance, re -construction andrepair.
6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed,
maintained and operated in accordance with law and permit provisions in order to protect the quality of the
waters of the State and the public interest therein.
NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties
hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows:
1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and
specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate
and maintain such systems and facilities in accordance with applicable permit provisions andlaw.
2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association
until construction has been completed in accordance with the permit and approved plans, and the staff of
the Division of Water Resources has inspected and approved of the facilities. In order to change the name
of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The
request must include a copy of the Association Bylaws and Declaration.
3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for
the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's
successor.
FORM: DEV 11-17 Page 1 of
4. s The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and
appurtenances thereto are part of the common elements and shall thereafter be property maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes andinsurance..
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses,
the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses.
Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part
of the yearlybudget.
6. In the event the common expense allocation and separate fund are not adequate for the construction, repair,
and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special
assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and
the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any
time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to some the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit mayrequire as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the continued
proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the
Association Bylaws that the Association shall not enter into voluntary dissolution without first having
transferred its said system and facilities to some person, corporation or other entity acceptable to and
approved by the COMMISSION by the issuance of apermit.
9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated by each of the parties named below:
FOR THE ENVIRONMENTAL
MANAGEMENT COMMISSION
Linda Culpepper
Interim Director, Division of Water Resources
Nameo6
�,Jn�x��..� VEire.
LOPE
By: ></') —
(Signature)
fko L I kw -s li, as
Print Name and Title
(Date)
FORM: DEV 11-17 Page 2 of
USGS Map
Granit Falls Quadrangle
North Carolina
7.5 -Minute Series
VICINITY MAP
NTS