HomeMy WebLinkAboutNC0039586_LV-2018-0105 Response_20180626 �/ Tanya M.Hamilton
efoiNk DUKE Vice President
Harris Nuclear Plant
ENERGY. 5413
aron Harris Road
New l,Hill,NC 27562-9300
JUN 2 1 2019
Serial: RA-18-0053
Mr. Danny Smith, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office RECBBVED/DENRIDWR
Division of Water Resources, NCDEQ
3800 Barrett Drive JUN 2018
Raleigh, NC 27609
Water Resources
Permitting Section
Subject: Duke Energy Progress, LLC—Shearon Harris Nuclear Power Plant (HNP)
NPDES Permit No. NC0039586
Notice of Violation &Assessment of Civil Penalty
Case Number: LV-2018-0105
Wake County
Dear Mr. Smith'
On June 4, 2018, Duke Energy Progress, LLC, received the subject Notice of Violation &
Assessment of Civil Penalty letter dated May 24, 2018. In accordance with the letter, please
accept this response for payment of the penalty regarding the Outfall 002 fecal coliform results
for January 30, 2018
As provided in our previous response, dated April 12, 2018 (see enclosure), Duke Energy
Progress, LLC, and the Shearon Harris Nuclear Power Plant have responded expediently and
appropriately to this effluent limit exceedance. No additional fecal coliform exceedances at the
subject-sanitary wastewater treatment system have occurred since this date. Payment in the
amount of$139.27, made payable to the North Carolina Department of Environmental Quality,
is being forwarded under separate cover to the Wastewater Branch in accordance with the
Instructions provided in the May 24, 2018, letter.
If you have any questions regarding this matter or wish to discuss in further detail, please do not
hesitate to contact Mr. Bob Wilson, HNP Site Environmental Professional, at (919) 362-2444.
1 certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Water Quality Regional Operations Section Page 2 of 2
Serial RA-18-0053
Sincerely,
d))ai,y,. A.Q (e,,•--a•ta.-...v
Tanya M. Hamilton
Vice President, Harris Nuclear Plant
Duke Energy Progress, LLC
Enclosures: Payment for Civil Penalty Assessment
HNP-18-043 Response Letter dated April 12, 2018
cc: NC DEQ DWR Wastewater Branch (with original check)
Mr. Bob Wilson, HNP Site Environmental Professional
Mr. Don Safrit, P.E., Carolinas Permitting & Compliance
Water Quality Regional Operations Section
Serial RA-18-0053
Enclosures
Harris Nuclear Plant
Payment for Civil Penalty Assessment
(1 page plus cover)
Water Quality Regional Operations Section
Serial RA-18-0053
Enclosures
Harris Nuclear Plant
HNP-18-043 Response Letter dated April 12, 2018
(21 pages plus cover)
'fobs DUKEPaul V.Fisk
Plant ENERGY, ant Managet
Harris Nuclear Plant
5413 Shearon Harris Road
New Hill,NC 27562-9300
APR 122018
Serial: HNP-18-043
Mr. Danny Smith, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
3800 Barrett Drive
Raleigh, NC 27609
Subject: Duke Energy Progress, LLC—Shearon Harris Nuclear Power Plant (HNP)
NPDES Permit No. NC0039586
Notice of Violation & Intent to Assess Civil Penalty No. NOV-2018-LV-0189
Wake County
Dear Mr. Smith:
On March 29, 2018, Duke Energy Progress, LLC (Duke Energy), received the subject Notice of
Violation & Intent to Assess Civil Penalty letter dated March 28, 2018. In accordance with the letter,
please accept this response for further consideration regarding fecal coliform monitoring and the
results for January 2018.
As stated in the letter, on January 30, 2018, the Daily Maximum Limit value was exceeded for
fecal coliform at the Harris Sanitary Waste Treatment Plant (Outfall 002). Outfall 002 is an
internal outfall tributary to Outfall 006, the combined outfall for HNP that discharges into Harris
Reservoir. The combined flow for Outfall 006 is on the magnitude of one thousand times that of
Outfall 002.As described in the January 2018 Discharge Monitoring Report (DMR) submitted to
the North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources
(Enclosure), the principle causes for the exceedance were related to the following aspects:
(1) Prior to sampling the effluent from Outfall 002, the ultraviolet(UV) lamps were
manually cleaned. It is suspected that this activity resulted in contaminates
accumulated on the UV lamps and/or respective Quartz sleeve to be displaced into
the sample container.
(2) Reduced light wave intensity due to age of UV lamps, thus reduced disinfection
treatment effectiveness related to the lamps. The manufacturer's recommendation
for replacement of UV lamps is one year. The entire bank of UV lamps in Control
Building No. 1 was replaced on May 4, 2017 (three lamps) and one UV lamp was
replaced on November 13, 2017. Although within the manufacturer's
recommended maintenance window, majority of the lamps were approaching 80%
of their recommended replacement interval.
(3) Extended cold weather inhibits nitrification in treatment system. Influent flow goes
directly into the AxMax Treatment Unit RST-1, an open tank, and temperature of
influent water is weather dependent. Cold water from RST-1 is distributed
throughout the system and could have contributed to reduced treatment efficiency
of the system.
The HNP Chemistry lab takes multiple internal operational samples a week to assure good quality
effluent. During January 2018, sampling indicated no abnormal conditions. There were no apparent
Water Quality Regional Operations Section Page 2 of 2
Serial HNP-18-043
equipment malfunctions. Follow-up operational checks on the system noted no corollary system
challenges to corroborate an elevated result and all other NPDES values were within expected
trends.
In response to the daily maximum fecal coliform excursion, the following actions have been
implemented:
(1) The Chemistry Operator Rounds guide has been updated to instruct maintenance
staff to clean UV lamps after sampling so the system can settle prior to next day's
sampling activities.
(2) All Outfall 002 AxMax treatment system UV lamps and Quartz sleeves were
replaced on February 2, 2018. The UV lamp replacement schedule has been
modified to replace the UV lamps in six(6) month intervals instead of the
manufacturer's recommended frequency of twelve (12) months.
Compliance with fecal coliform daily maximum and monthly geometric means for Outfall 002 since
the January 30, 2018 excursion has been excellent.
Relative to 24-hour notification of the excursion, Duke Energy staff assessed this exceedance and
determined that it did not have the potential to threaten public health or the environment as
described in Section E Reporting Requirements, item (6)(a). The fecal coliform daily maximum
exceedance was reported in the electronic DMR and subsequent DMR submission dated February
28, 2018 (Enclosure), as required by Section E Reporting Requirements, item (7).
Duke Energy respectfully requests the Division of Water Resources take into consideration
these aspects related to the subject Notice of Violation prior to a decision to proceed forward
with a civil penalty assessment for the fecal coliform exceedance.
If you have any questions regarding this matter or wish to discuss in further detail, please do not
hesitate to contact Mr. Bob Wilson, HNP Site Environmental Professional, at (919) 362-2444.
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. 1 am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
v
Pau V. Fisk
Plant Manager, Harris Nuclear Plant
Duke Energy Progress, LLC
Enclosure: Submittal of the January 2018 Discharge Monitoring Report(DMR) dated February
28, 2018
cc: Mr. Bob Wilson, HNP Site Environmental Professional
Mr. Don Safrit, P.E., Carolinas Permitting &Compliance
Water Quality Regional Operations Section
HNP-18-043
Enclosure
Harris Nuclear Plant
Submittal of the January 2018 Discharge Monitoring Report(DMR) dated February 28, 2017
(18 pages)
Paul V.Flsk
foDUKE Plant Manager
ENERGY Harris Nuclear Plant
a 5413 Shearon Harris Rd
New Hill,NC 27562-9300
FEB 2 a 2018
Serial: HNP-18-028
NC Department of Environment and Natural Resources
Division of Water Resources
Water Quality Permitting Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Subject: Duke Energy Progress, LLC
Harris Nuclear Plant and Harris Energy and Environmental Center
National Pollutant Discharge Elimination System (NPDES)
Permit Number NC0039586
Electronic Discharge Monitoring Reports (eDMRs)
Ladies and Gentlemen:
In accordance with NPDES Permit Number NC0039586, enclosed are the January 2018
eDMRs for the Harris Nuclear Plant and Harris Energy and Environmental Center.
If you have any questions or require additional information, please contact Mr. Bob Wilson at
(919) 362-2444 or Mr. Don Safrit at (919) 546-6146.
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering
the information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations.
Sincerely,
Paul V. Fisk
Enclosure: Electronic Discharge Monitoring Reports (signed original and one copy)
Division of Water Resources
Serial: HNP-18-028
Enclosure
Harris Nuclear Plant and Harris Energy and Environmental Center
NPDES Permit Number NC0039586
Electronic Discharge Monitoring Reports
Submitted Electronically on February 20, 2018
(16 pages plus cover)
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1 0 STATUS:Processed
COMPLIANCE STATUS:Compliant CONTACT PHONE#:9193622966 SUBMISSION DATE:02/20/2018
Y)CU a... CLc, V 'U (r a)— f 0 02/19/2018
ORC/Certifier Signature: Dellla Allen E-Mail:della.allen@duke-energy.com Phone #:919-362-2966 Date
By this signature,I certify that this report is accurate and complete to the best of my knowledge.
The permittee shall report to the Director or the appropriate Regional Office any noncompliance that potentially threatens public health or the environment.
Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances.A written submission shall also be
provided within 5 days of the time the permittee becomes aware of the circumstances.
If the facility is noncompliant,please attach a list of corrective actions being taken and a time-table for improvements to be made as required by part II.E.6 of
the NPDES permit.
/
./j iill 02/20/2018
Permittee/Submitter Signatur Paul Vincent Fisk E-Mail:paul.fiskrcduke-energy.com Phone #:919-362-2000 Date
Permittee Address:5413 Shearon Harris Rd New Hill NC 27562 Permit Expiration Date:08/31/2021
I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons who managed the
system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,
accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for
knowing violations.
CERTIFIED LABORATORIES
LAB NAME:Duke Energy Progress, Environmental Testing Solutions,Inc,ENCO Laboratories-Cary,PACE Analytical,Gel Laboratories,DEC-Huntersville, Duke Energy
Carolinas-HEEC Outfall 007
CERTIFIED LAB#:398,037,591,67,233,248,5145
PERSON(s)COLLECTING SAMPLES:Daniel Johnson,Della Allen,Amanda Grenier,Jerry Boley,Jordan Karp,Linda Birk,Penet Melton,Barry Butler,Dale Tysinger,and
Robert Vickers
PARAMETER CODES
Parameter Code assistance may be obtained by calling the NPDES Unit(919)807-6300 or by visiting http://portal.ncdenr.orglweb/wq/swp/ps/npdes/fortns.
FOOTNOTES
Use only units of measurement designated in the reporting facility's NPDES permit for reporting data.
*No Flow/Discharge From Site:Check this box if no discharge occurs and,as a result,there are no data to be entered for all of the parameters on the DMR
for entire monitoring period.
**ORC on Site?:ORC must visit facility and document visitation of facility as required per 15A NCAC 8G.0204.
***Signature of Permittee:If signed by other than the permittee,then delegation of the signatory authority must be on file with the state per 15A NCAC 2B
.0506(b)(2)(D).
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDIMIR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4 0 PERMIT STATUS:Active
FACILITY NAME:Shearon Hams Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO
'
4V1 00410 50060
511 79739 50064 01034 01n92 NCO
Ei P e F H •
F a 8
N e < rit I Continuous weekly Weekly Weekly Weekly Weekly Weekly Annually
& $ au% C ci Recorder Grab Grab Calculated Grab Grab Grab Grab
a V F O O z' FLOW FH CHLORINE CLDURTN CLFLFREE Cr-TOTAL ZINC ANN FOLSCAN
MO cock lin 2400 rink On Y/fM mgd nO mpj/1 minutes mg/1 mga m8/l yes=I no-0
I 600 105 B 1069 0011
2 500 11 5 Y 7 9 7 6
3 510 125 Y 817
4 600 105 B 1039 <D l 0 <0 1
5 600 12 B . 54
6 600 105 N -1019
7 600 105 N 97
a 500 115 Y 941 759 029 35 <0,1 0015
9 500 12 Y 8 83
10 500 11 5 Y 10 44
II 500 115 Y 103
12 600 12 B 10 55
13 530 1 I 5 N 1135
14 600 12 5 B 1 153
15 500 125 Y 86 002
id 500 12 5 Y 7 14
17 500 19 Y 8 75 7 12
IR 0000 14 V 687 <01 0 <01
19 530 12 5 N 8 59
20 1115 3 Y 84
21 600 II B 1109 <01 0 <01
22 500 125 Y 836 0034
3] 500 11 5 V 1104 7 54
24 500 11 V 9 22
25 300 10 5 Y 11 14
26 600 10 5 B 12 08
27 600 105 N 749
29 600 105 N 942
29 510 II Y 1116
w 500 115 Y 1149 745 <01 0 01 0045
31 500 13 Y 8 51
Month!)Au rape Limk: 02 0,2 i
M4001772 Ater5201 9 656129 0 058 7 0 0025
Dn1I Maximum: 1208 76 029 35 0 0045
Dally Minimum, 6 87 7 12 0 0 D
0 011
•'••No Repotting Reason ENFRUSE>No Flow-Reuse/Recycle; ENVWTHR=No Visitation Adverse Weather. NOFLOW=No Flow; HOLIDAY=No Visitation—Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4 0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION:1.0 STATUS:Processed
Outfall 001-Effluent Comments:
Chromium is not being added to the system.Maximum Free Chlorine numbers are instantaneous readings There was 35 minutes of total chlorine discharged and no free available
discharged. Chlorine Duration of 35 minutes
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Alien ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 002 NO DISCHARGE*: NO
50050 50060 COJIO C0610 COSA 31616 C0699 00030 00625
"e i.. g a i
Y 1- F a i
a o`
eF2 Continuous Weekly Weekly Monthly Weekly Weekly
g 'tea iY A.
Recorder Grab Composite Composite Composite Grab Calculated Calculated Calculated
E t., p5. p O g. FLOW CHLORINE BOO-Cone 0113-14-Cone TSS•Com FCOLI BR TOTALN- 1402&NO3 TOT KJEL
2400 c100k On 2700 clock tin YWN mgd mg/I mg/1 mg/I mg/1 9f100m1 mg/I me/1 mg/1
1 600 105 B 0004
2 24 500 1 1 5 Y 0 0002 <2 22 •2 5 <1 89 68 21
J 510 125 Y 0007
4 600 105 0 0007
5 600 12 B 0 012
6 600 105 N 0007
7 600 10 5 N 0 007
a 500 11 5 Y 0 009
9 24 500 12 Y 0016 ,2 29 <I
10 500 11 5 Y 0 016
II 500 115 Y 0019
12 600 12 B 0 014
IJ 530 115 N 0 012
14 600 12 5 B 0 009
15 500 125 Y 0006
16 24 500 125 Y 0013 32 35 50
I7 500 19 Y 0 015
-
18 0000 14 Y 0 013
19 530 125 N 00(1
29 1115 3 Y 0008
21 600 l I B 0 01
22 500 12 5 Y 0 005
U 24 500 11 3 Y 0 005 3 4 t 2 5 32
24 500 11 Y 0 018
2s 500 105 Y 0015
26 s 600 10 5 8 0 015
22 600 105 N 0005
29 600 10 5 N 0 007
29 510 11 5 Y 0 009
3d 24 500 11 5 Y 0 013 2 9 <2 5 1600
31 500 13 Y 0 016
MomhlJ Al erne LlmIi 0060 36 311 200
Moalhl3 Menus. 0 010126 1 9 22 1 28 19770807 89 68 21
OdIJ Mulmum: 0 019 3 4 22 3 5 1600 89 68 21
040 e1lnlmam. 00002 0 22 0 0 _89 68 21
"s"No Reporting Reason ENFRUSE•-No Flaw-Reuse/Recycle; ENVWTHR r No Visitation Adverse Weather, NOFLOW No Flow,HOLIDAY No Visitation Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
Outfall 002-Effluent Comments.
STP discharge is secured for maintenance.No chlorine is being used for disinfection.AxMax is in service,UV lamps are being used for disinfection, Exceeded Daily Maximum
on Fecal Coliform on 01-30-18. Description of events included on attachment with paper transmittal Follow-up samples on 02-06-18 and 02-13-18 were non-detect for Fecal
Coliform. There is no known impact to the environment.
Outfall 002 Fecal Coliform Daily Maximum Exceeded
On.01/31/2018, HNP received preliminary notification from PACE Analytical lab that the Fecal
Coliform for Outfall 002 was 1600 CFU/100m1 and the duplicate was 1500 CFU/100m1, which
exceeds the Daily Maximum of 400 CFU/100m1. The results were validated by the PACE lab
manager and a final report was issued 02/07/2018. NOTE: These are diluted results and were
based upon colony counts outside acceptable range. Analytical lab QA standards have been
verified by Duke corporate as a valid elevated result. The monthly DMR will be annotated to
reflect the variance in QA standards from the vendor lab.
The previous week Fecal was 32 CFU/100m1. The January calculated geometric mean is 19.8
CFU/100m1, which is within Monthly Compliance of 200 CFU/100m1. These results will be
reported on the January 2018 eDMR. This exceedance does not require immediate notification
to the state and is characterized as a level 3 REE per enterprise environmental guidance and
Environmental Management concurred. This has been screened by Corporate Environmental ,
and determined not to be reportable other than in the Monthly eDMR.
HNP Chemistry lab takes multiple samples a week for inter-operational to assure good quality
effluent. The sampling to date indicated no abnormal conditions. There were no apparent
equipment malfunctions. Follow-up operational checks on the system noted no corollary system
challenges to corroborate an elevated result and all other NPDES values were within expected
trends.
Possible Causes:
1 - Prior to sampling the UV lamps were cleaned which possibly caused any contaminates that
had accumulated on the UV lamps or the Quartz sleeve to be displaced into the sample
container.
2—Reduced light wave intensity on UV lamps due to age of lamps. Manufacturer
recommendation for replacement of lamps is one year. The entire bank of UV lamps in Control
building #1 was replaced on May 4, 2017 and one UV lamp was replaced on November 13,
2017.
3 - Extended cold weather slows nitrification in system. Influent flow goes directly into RST-1,
which is an open tank, and temperature of influent water is weather dependent. Cold water
from RST-1 is distributed throughout the system.
Corrective Actions:
1 —Chemistry Operator Rounds guide updated to state clean UV lamps after sampling for
system to settle prior to next day sampling.
2—All UV lamps and Quartz sleeves were replaced by Vendor on February 2, 2018. Schedule
UV lamp replacement every 6 months.
NOTE:The February 06 and February 13, 2018 fecal coliform sample results were <1 and<1
CPU/ 100 mL.
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1 0 STATUS:Processed
SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 003 NO DISCHARGE: YES
• 50050 00409 01042 01015
� 2
F
4h C ms Ser Permit See Permit See PerSet Perm(
g u ' o Calculated Grab Grab Grab
Es V F O z FLOW pH COPPER IRON
3400 Nadi Hn 240i/clack Ha MN mgd su mg/l mg/l
2
3
1
5
6
9
10
11
12
13
II
15
16
17
Is
19
10
11
12
23
24
25
16
27
25
19
30
31
Monthly Aunpe Utah. 005 _.».... ... ,,...,..
Moolhly Mem..
Doily Mo.lmam:
Oa)Mlalmum:
•••O No Reporting Reason ENFRUSE=No Flow-Reuse/Recycle; ENVWTHR No Visitation Adverse Weather, NOFLOW=No Flow, HOLIDAY=No Visitation—Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4,0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1 0 STATUS:Processed
SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 004 NO DISCHARGE*: NO
50050 C0530 06556
1 F P g
a
I < y 8 Weekly 2 X month Weekly
i
s 8 2 t 8 Estimate Grab Grab
x a y
o U F O 3 O 2 FLOW TOO-Cont 01L-GRSE
2400clock lin 2300 clock lin 0/0/N mgd mg/1 mg/1
I 600 105 B NOFLOW
2 500 11 5 Y 0 246 15 2 <5
3 510 12 5 Y NOFLOW
4 600 105 8 NOFLOW
5 600 12 0 0 239
6 600 105 N NOFLOW
7 600 105 N NOFLOW
a 500 II5 Y 016E 44 <5
9 500 12 V 0 172
t0 500 115 Y 0177
I I 500 11 5 Y 0 132
12 600 12 B NOFLOW
13 530 115 N NOFLOW
14 600 125 B 0256 <5
15 500 12 5 Y 0 184
16 500 12 5 Y 0 185
17 500 19 Y 0213
II 0000 14 Y 0 383
19 530 12 5 N 0 162
20 1115 3 Y NOFLOW
21 600 11 B 0 149 <5
22 500 125 Y NOFLOW
23 500 115 Y 0216
2.1 500 Ii Y 023
23 500 10 5 Y 0 163
26 600 105 8 NOFLOW
17 600 10 5 N NOFLOW
2e 600 10 5 N 0 236
29 510 115 Y NOFLOW
30 500 115 Y 0233 <5
31 500 13 Y NOFLOW
Mn16I5 Menge Ural; 73 30 15
Madill Mengel 0 207444 9 8 0
Dilly Masimum: 0 383 15 2 0
Dilly 013olmum. 0 132 4 4 0
"e No Reporting Reason ENFRUSE=No Flow-Reuse/Recycle, ENVWTHR No Visitation-Adverse Weather,NOFLOW=No Flow, HOLIDAY=No Visitation-Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4 0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: l 0 STATUS:Processed
Outfall 004-Effluent Comments:
All discharge flows and analysis results are reported on the day the discharge is complete
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMIR PERIOD:01-2018(January 2018) 1'ERSION:I 0 STATUS:Processed
SAMPLING LSI CATION: EFFLUENT DISCHARGE NO.: 005 NO 1)1SG RGE*: NO
59050 COLM (15056
•
F 21
E B
F LI
< F Monthly Monthly Monthly
sy o`
I Esumale Grab Grab
�` u
v u° ra. o i FLOW 15S-Cox O11.GRSE
240 dock 1ln 1430 dock Or, WWI mgd mull
1311
I 600 105 B NOFLOW
2 300 11 5 Y NOFLOW
l 510 125 Y NOFLOW
4 600 105 B NOFLOW _
5 600 12 B NOFLOW
6 600 105 N NOFLOW j
7 600 105 N NOFLOW
8 500 1115 Y NOFLOW
y
9 500 12 Y NOFLOW
In 500 115 Y NOFLOW
II 500 115 Y NOFLOW
12 600 12 B NOFLOW
13 530 115 N NOFLOW
14 600 12 5 B NOFLOW
15 500 12 5 Y NOFLOW
I6 500 125 Y NOFLOW _
17 500 19 Y 0016 X25 5116
1e 0000 14 Y NOFLOW
19 530 122 5 N NOFLOW
20 1115 3 Y NOFLOW
21 600 11 B 0 023
22 500 12 5 Y NOFLOW
v 500 115 Y 0023
112 500 11 Y NOFLOW
IS 500 _105 V 002
26 600 10 5 B NOFLOW
17 600 105 N 0019.
28 600 105 N NOFLOW
19 510 115 Y 0022
30 500 115 Y NOFLOW
iI 500 13 Y NOFLOW
Mon1412 Ai env Umh;
]0 IS
Moothq Aver om. 0 0205 0
0
Dally MatImum: 0 027 0
0
MI)110,150.50: 0 016 0
0
""No Repot-nag Reason ENFRUSE•No Flow-Reuse/Recycle; ENVWTHR No Visitation Adverse Weather,NOFLOW--No Flow, HOLIDAY--No Visitation—Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
Outfall 005-Effluent Comments:
All discharge flows and analysis results are reported on the day the discharge is complete,
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION:1.0 STATUS:Processed
SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 006 NO DISCHARGE*: NO
50651 noson C0610 C0526 Cosso C0665 01611 91313 01591
8
GI 3
e .4 _� Weekly Weekly Monthly Monthly Monthly Monthly Monthly Weekly Monthly
s s $ d
gg
Estimate Grab Composite Composite Composite Composite Composite Grab Composite
4 St= O O A FLOW p11 9113-N-Cam TSS-Cnoe TOTAL N• TOTAL P-Can COPPER BVORAZIN ZINC
2410 dodo /In 7409 dark sin MOBN mgd au mg/1 mil(1 mg/I mgi ugil ngil ug/1
t 600 . 10 5 B 15 184
1 500 I15 Y 12669 73 0267 128 21 I 90 778 <10 135
2 510 12 5 Y 12 669
4 600 10 5 B 14 895
5 600 12 B 15 275
6 600 10 5 N 14 727
7 600 10 5 N 14 243
8 500 11 5 Y 14 107 7 19 <10
500 12 Y 13 434 9 46 15 7
to 500 11 5 Y 15 068
I I 500 11 5 Y 14 904
12 600 12 B 14 931
13 530 I 1 5 N 15 751
14 600 12 5 B 16 491
-
15 500 12 5 Y 13 544
16 500 12 5 Y 12 083
17 500 19 Y 13716 718 c10
18 0000 14 Y 11 926
19 530 125 N 13278
20 1115 3 Y 12 843
11 600 11 B 15 659
22 500 12 5 Y 12 717
13 500 1 1 5 Y 15 637 7 63 13 6 <10 99 9
14 500 II V 13 789
15 500 105 Y 15671
26 600 10 5 B 16 476
27 600 10 5 N 11 91
213 600 10 5 N 14 306
29 510 115 Y 15858
311 500 115 Y 16445 773 <ID
31 500 I3 Y 13 232
Moab!)As erne Limb:
171110161)A4e560 14 304452 0267 12 8 2 1 1 96 1028 0 43 033333
Dail)Mubnum: 16 491 7 73 0 267 12 8 2 1 1 96 13 6 0 99 9
O.81 Mlohnum 11 91 7 18 0 267 128 2 1 1 96 7 78 0 13 5
....No Reporting Reason ENFRUSE No Flow-Reuse/Recycle, ENVWTHR—No Visitation Adverse Weather; NOFLOW=No Flow, HOLIDAY=No Visitation Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4 0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01.2018(January 2018) VERSION: 1,0 STATUS:Processed
SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 006 NO DISCHARGE*: NO (Continue)
00010 191916 0.7900 01917 09630 011625
III
s ti l'
C
, a
•
' 3
e 6 Calculated Calculated Calculated Calculated Calculated Calculated
u s g u e
$
o U t= 8 1O 2 TEMP{ CALCIUM TOT HARD MCIISIU,M h1025003 TOT KJEL
2400 clock Hos 2400 dock IIra 1/BOO deg c mg/1 mg/l mg/I mg/1 mg/I
I 600 105 B
2 500 11 5 Y 12 2 0 23 1 8
3 510 125 Y
4 600 10 S B
5 600 12 B
6 600 10 5 N
7 600 10 5 N
a 500 11 5 Y 11 1
9 500 12 Y 974 426 443
In 500 11 5 Y
11 500 1I5 Y
12 600 12 B
13 530 11 5 N
14 600 12 5 B
IS 500 12 5 Y
16 500 12 5 Y
17 500 19 Y 106
18 0000 14 Y
19 530 125 N
25 1115 3 Y
21 600 II B
32 500 12 5 Y
23 500 115 Y 123 103 434 432
24 500 it Y
25 500 10 5 Y
26 600 10 5 B
27 600 10 5 N
2a 600 10 5 N
29 510 11 5 Y
30 500 115 Y II I
21 500 13 Y
91501013 Menge Limh.
Monthly Memo.
11 46 10 02 43 4 375 0 23 I 8
Dell)MGelmum: 123 IS3 434 443 023 18
Dally Mlnimume 10 6 9.74 42 6 4 32 0 23 1 8
***4 No Reporting Reason ENFRUSE=No Flow-Reuse/Recycle, ENVWTHR=No Visitation-Adverse Weather,NOFLOW=No Flow, HOLIDAY=No Visitation-Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANGED:No
eDMR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
SAMPLING LOCATION:EFFLUENT DISCHARGE NO.: 007 NO DISCHARGE*: NO
sy 500700 1)0010 00.010 516100 C0310 COS111 C0530 31616 00300
F a 8 r2
a aF i; a
1Weekly Weekly Weekly 2 X usek Weekly Weekly Weekly Weekly Weekly
3,2z
Instanlancous Grab 0m b Grab Grab Grab Grab Grab Grab
a 9 o to
o u° F° & & O 2 FLOW TEMP-C pH CHLORINE 900-Cann N1134N-Cont TSS•Conc FCOLIDR DO
2400 dock Hn 24011603a Hn %MD N mel deg c su ugil me me m8rl B'IOOml me
1 0600 105 13 NOFLOW
2 0500 I15 Y NOFLOW
3 0510 125 Y NOFLOW
4 0600 103 8 NOFLOW
5 0600 12 13 NOFLOW
6 0600 105 N NOFLOW
7 0600 105 N NOFLOW
a 0500 115 Y NOFLOW
9 0500 12 Y NOFLOW
t9 0500 I15 Y NOFLOW
it 0500 115 Y NOFLOW
12 0600 12 B NOFLOW
13 0530 115 N NOFLOW
13 0600 125 13 NOFLOW
13 0500 125 Y NOFLOW
16 0500 12 5 Y 0 025 2 1 7,79 <25 6 1 0 665 5 I 14 61
17 0500 19 Y 0 023 <25
IS 0000 14 Y 0 017
19 0530 12 5 N 0 009
20 1115 3 t' 0 002
21 0600 11 B NOFLOW
22 0500 125 Y NOFLOW
23 0500 115 Y 0025 5 782 •,25 64 31 6 e 1 1272
22 0500 11 Y 0 019 '25
25 0500 10 5 Y 0 01
26 0600 105 B NOFLOW
27 0600 105 N NOFLOW _
29 0600 105 N NOFLOW
29 0510 115 Y NOFLOW
39 0500 115 Y NOFLOW
31 0500 13 V NOFLOW
6166164 McrageLlmlt 0A2 3a a 30 209
Month!)Menem• 0 01625 3 55 0 6 25 1 8825 5 5 1 U 665
Da)61•21meco 0025 5 782 0 64 3I 6 0 1461
Day Mlnimam: 0002 21 _7,79 _0 6I _0665 5 0 1272
••••No Reporting Reason ENFRUSE-No Flow-Reuse/Recycle; ENVWTHR No Visitation Adverse Weather,NOFLOW--No Flow; HOLIDAY No Visitation-Holiday
NPDES PERMIT NO.:NC0039586 PERMIT VERSION:4.0 PERMIT STATUS:Active
FACILITY NAME:Shearon Harris Nuclear Power Plant CLASS:PC-2 COUNTY:Wake
OWNER NAME:Duke Energy Progress LLC ORC:Della R Allen ORC CERT NUMBER:27903
GRADE:PC-2 ORC HAS CHANCED:No
eDMYMR PERIOD:01-2018(January 2018) VERSION: 1.0 STATUS:Processed
Outfall 007-Effluent Comments:
No Discharge from Outfall 007 for Week 41,#2,or#5