Loading...
HomeMy WebLinkAbout20180788 Ver 1_Site Viability Request Form_20180530Water R esources ENVIRONMENTAL QUALITY ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director BUFFER MITIGATION &/OR NUTRIENT OFFSET SITE VIABILTV ASSESSMENT REQUEST (Form must be complete and all attachments included to process request) ❑D BUFFER MITIGATION ❑ NUTRIENT OFFSET ❑ BOTH Name Jake Byers, PE Company Michael Baker Engineering, Inc. Address 797 Haywood Road, Suite 201, Asheville, NC 28806 Phone 828-412-6101 Email jbyers@mbakerintl.com Do you have the right to access the property? 0 VES ❑ NO PARCEL/SITE DETAILS Proposed Site Name Hardin Farm Mitigation Project (RFP 16-007330) Address 8201 Millrun Rd City Stokesdale County: Guilford River Basin Cape Fear 8 -Digit HUC: 03030002 Sub -watershed (if in Jordan Lake or Falls) Jordan Lake (03030002010020) Will this be part of a stream or wetland project/bank? 0 VES ❑ NO Has anyone from DWR or the USACE visited the site in the past 12 months? ❑ VES 0 NO Has a riparian buffer or stream call been performed by Division of Water Resources staff on the subject site? ❑ VES 0 NO Is the project receiving any state or federal grant money? ❑ VES 0 NO Are there any State, Local or Federal Permits associated with the subject site? 0 YES ❑ NO PARCEL/SITE ATTACHMENTS (provide items 1-4 as a separate attachment, not to exceed 10 pages) 1. Detailed description of the site including existing site conditions and Aerial Site Map; 2. Include a timeline of landuses and landuse changes from 1990 -Present; 3. Most recent 1:24,000 scale USGS Topo Map showing the site; AND 4. Most recent published NRCS county soil survey showing site; SEND COMPLETE REQUESTS TO: NCDWR - 401 & Buffer Permitting Branch Attn: Katie Merritt 1617 Mail Service Center Raleigh, NC 27699-1617 or by email to Katie.Merritt(&ncdenr.gov Michael Baker Engineering, Inc. 797 Haywood Road, Ste. 201 1 Asheville, North Carolina 28806 INTERNATIONAL May 30, 2018 Subject: Hardin Farm Mitigaiton Project — Buffer Viability Request Form Documentation Guilford County Cape Fear River Cataloging Unit 03050101 DEQ Contract # 7824 Dear Ms. Merritt, Office: 828.412.6101 Below are the requested attachments to the Buffer Mitigation Site Viability Assessment Request Form. Detailed Site Description The project is located in Guilford County in the community of Stokesdale near Hardin's Feed & Farm Supply. The project site is located in the TLW 03030002-010020 of the Cape Fear River Basin. The project is in the Haw River headwaters and includes two UTs and a reach of the Haw River. The section of the Haw River on the project site is classified as a 303d Category 4t water according to the 2014 Integrated Report. (4t indicates a parameter exceeds criteria and there is an approved TMDL in place, prior to TMDL development these were Category 5 assessments). Upstream (source to Everfield Road, 2.1 miles away) and downstream (Cunningham Mill Road (SR 2426) to Troublesome Creek, 10 miles away) of this section are classified as Category 5 (303d listed). The site also holds Water Supply — V (WS -V) and NSW classifications. Michael Baker first visited the site in November 2016 and has been monitoring the site since. Continued degradation mainly in the form of bank erosion and increased livestock pressure is evident throughout the majority of the site. The land owner continues to clear drainage ditches in the wetlands and remove trees from the floodplain. Livestock have been grazing throughout the site during each visit. Each of the project reaches have been heavily impacted from historic land use practices, predominantly livestock grazing, and other agricultural uses. There is some mature buffer across the project site. The understory is absent due to grazing pressure. The buffer is sparse through the farm as compared to the south side of the Haw River where there has been less grazing pressure. Livestock hoof shear, lack of understory vegetation and storm flow shear stresses have severely impacted the stream banks along the project stream reaches. The lack of adequate and quality buffer vegetation throughout the site, past land use disturbances, and current livestock activities present a significant opportunity for water quality and ecosystem functional uplift through the implementation of this project. A site map with aerial imagery is shown below. INTERNATIONAL Michael Baker Engineering, Inc. 797 Haywood Road, Ste. 201 1 Asheville, North Carolina 28806 Office: 828.412.6101 Land Use This site has been in agriculture since at least 1950 according to historic aerials and discussions with the landowner. No significant land use changes directly on-site have occurred since 1990. However, development within the Haw River watershed has increased since 1990. The table below shows the land use changes since 1992 sourced from the National Land Cover Database (NLCD) within the Haw River watershed delineated from the downstream extent of the project reach. Also included below is a historic aerial map (1995), USGS topographic map, and an NRCS Soil Survey Map. Please do not hesitate to contact me should you have any questions. Sincerely, Jake Byers, PE NC Ecosystem Services Manager Enclosures: Maps Wetland Water Cultivated Developed Barren Forest Grassland Impervious Shrubland NLCD 1992 4.94% 0.70% 31.91% 3.69% 0.00% 58.76% - - - NLCD 2001 4.69% 0.65% 36.64% 9.53% 0.02% 43.65% 3.32% 1.88% 1.49% NLCD 2006 4.61% 0.78% 32.59% 15.69% 0.02% 41.61% 3.45% 2.94% 1.25% NLCD 2011 4.61% 0.78% 31.99% 16.80% 0.02% 40.67% 3.55% 3.23% 1.54% Change from 1992 to 2011 Decrease Increase Increase Increase Increase Decrease Increase Increase Increase Also included below is a historic aerial map (1995), USGS topographic map, and an NRCS Soil Survey Map. Please do not hesitate to contact me should you have any questions. Sincerely, Jake Byers, PE NC Ecosystem Services Manager Enclosures: Maps I N T E R N A T 1 0 N A L gs Figure 11E 250 500 Feet Historic Aerial 1995 Hardin Farm Mitigation Project J � 'J Conservation Easement •L OF Figure 2 Michael Baker 0 500 1,000 USGS Topographic Map INTERNATIONAL Feet (Summerfield Quad) Hardin Farm Mitigation Project Conservation Easement NRCS Soil Mapping Units CnA (Codorus loam, 0-2%) HcB (Halifax -Davie complex, 0-6%) PoB (Poplar Forest sandy loam, 2-6%) PoC (Poplar Forest sandy loam, 6-10%) PoD (Poplar Forest sandy loam, 10-15%) PoE (Poplar Forest sandy loam, 15-35%) —A PuB (Poplar Forest -Urban complex, 2-10%) SmE (Siloam sandy loam, 15-45%) Lei INTERNATIONAL 3 .Af 250 500 Figure 3 Feet Soils Map Hardin Farm Mitigation Project